Screener / SEC EDGAR /CIK 0001675149 /10-K filed Feb 26, 2026, compared with Feb 20, 2025 /Numbers from the XBRL of the 10-Ks
NYSE Materials · Primary Production of Aluminum

Alcoa Corp AA

Compare with peers Embed
New in the 10-K 4 paragraphs with nothing like them in the 10-K filed Feb 20, 2025 New in the 10-Q 33 paragraphs not in the 10-Q filed Jul 30, 2026 10-Q against the 10-K 16 risk factor paragraphs and sentences added or reworded

New risk paragraphs, branching off last year

Each branch is a paragraph in Risk Factors with nothing like it in the 10-K filed Feb 20, 2025. A box jumps to the paragraph as filed, below.

4 new

Paragraphs with nothing like them in last year's 10-K

Quoted exactly

4 paragraphs in Risk Factors of the 10-K filed Feb 26, 2026 with nothing like them in the 10-K filed Feb 20, 2025. Quoted exactly. Paragraphs that were only edited are under 10-K change.

caustic, energy, and bauxite and decreasing alumina output. The Company is committed to continuing to work collaboratively with stakeholders to achieve Ministerial decisions by the end of 2026, and anticipates mining in new major mine regions will commence no earlier than 2029. Until then, the Company expects bauxite quality will remain similar to recent grades.

Read in the 10-K

Significant declines in the market value of our marketable securities may have a material adverse effect on our results of operations should they occur.

Marketable securities consist of shares of Ma’aden acquired by Alcoa during the third quarter of 2025. Marketable securities are measured at fair value using quoted prices in active markets. Accordingly, gains and losses in fair value are recognized within earnings. The Company recorded mark-to-market gains of $197 related to marketable securities in 2025, and at December 31, 2025, the shares of Ma’aden were valued at SAR 60.95 per share, or $1,397. See Part II Item 8 of this Form 10-K in Note C to the Consolidated Financial Statements for more information on the Company’s marketable securities.

Significant declines in the market value of our noncurrent marketable securities could have a material adverse effect on our results of operations should they occur.

Read in the 10-K

Paragraphs in the 10-Q filed Oct 29, 2026 that were not in the one before

New in the latest 10-Q

33 paragraphs in the 10-Q filed Oct 29, 2026 with nothing like them in the 10-Q filed Jul 30, 2026 (at least half the words must differ; new numbers alone do not count). Quoted exactly, grouped by the item heading above them. This is text that changed, not a judgement of how serious it is.

Financial statements and notes

During the third quarter of 2026, Alcoa continued to advance the acquisition of South32 Limited’s (South32) equity interests in certain bauxite, alumina, and aluminum assets (referred to as AliGroup) (the Transaction). The Company filed the registration statement on Form S-4 with respect to Alcoa shares to be issued as Transaction consideration, which was subsequently declared effective, and progressed regulatory approvals. In September 2026, Alcoa, through wholly-owned subsidiaries, completed debt offerings of $2,600 (see Note J) to fund a portion of the cash consideration. On October 15, 2026, South32 shareholders approved the Transaction.

Read in the 10-Q

The conversion of the note and acquisition of the remaining ownership interest resulted in a reduction to Noncontrolling interest ($58) and corresponding increase to Additional capital; certain amounts related to foreign currency translation adjustments previously included within Noncontrolling interest ($8) were reclassified to Accumulated other comprehensive loss.

Read in the 10-Q

Activity and reserve balances for Restructuring and other charges, net related to Severance and employee termination costs and Other costs were as follows:

Read in the 10-Q

On September 23, 2026, Alumina Pty Ltd and Alcoa Nederland Holding B.V. (ANHBV), wholly-owned subsidiaries of Alcoa Corporation, completed debt issuances pursuant to Rule 144A and Regulation S (each under U.S. Securities Act of 1933, as amended) of $1,500 aggregate principal amount of 6.625% Senior Notes due 2034 (the 2034 Notes) and $1,100 aggregate principal amount of 6.875% Senior Notes due 2036 (the 2036 Notes), respectively. The net proceeds of these issuances were $2,592, reflecting certain issuance costs. The Company intends to use the proceeds, together with cash on hand, to fund the approximately $3,100 cash portion of the consideration for the AliGroup acquisition (see Note C) as well as related fees and expenses.

Read in the 10-Q

The initial costs incurred to complete the financing were deferred and are being amortized to interest expense over the terms of the 2034 Notes and 2036 Notes (collectively, the Notes). The commissions to the initial purchasers on each series of notes, totaling $26, are contingent and payable upon the closing of the Transaction. Interest on the Notes is paid semi-annually in March and September, and interest payments will commence on March 31, 2027. The indentures contain customary affirmative and negative covenants that are similar to those included in the indenture that governs Alumina Pty Ltd’s 6.125% Senior Notes due 2030 and 6.375% Senior Notes due 2032 issued in March 2025, such as limitations on liens and limitations on sale and leaseback transactions.

Read in the 10-Q
Show the other 28

Alumina Pty Ltd and ANHBV have the option to redeem the 2034 Notes and the 2036 Notes, respectively, under multiple scenarios, including, in whole or in part, at any time or from time to time on and after September 30, 2029 with respect to the 2034 Notes and on and after September 30, 2031 with respect to the 2036 Notes, at the applicable redemption price specified in the corresponding indenture (up to 103.313 percent and 103.438 percent of the principal amounts plus any accrued and unpaid interest in each case for the 2034 Notes and 2036 Notes, respectively). Also, each of the Notes are subject to repurchase upon the occurrence of a change of control repurchase event (as defined in the indentures) at a repurchase price in cash equal to 101 percent of the aggregate principal amount remaining on the date of repurchase, plus any accrued and unpaid interest.

Read in the 10-Q

Each of the Notes are subject to a special mandatory redemption if the Transaction is not completed by the applicable date specified in the indentures, if the Deed is terminated prior to such date, or if the Company determines that the Transaction will not be completed by such date. Upon the occurrence of any such event, Alumina Pty Ltd and ANHBV would be required to redeem all outstanding Notes, as applicable, at a redemption price equal to 100 percent of the initial issue price thereof, plus accrued and unpaid interest to, but excluding, the redemption date. Upon completion of the Transaction, the special mandatory redemption provisions will cease to apply.

Read in the 10-Q

The Notes are guaranteed on a senior unsecured basis by the Company and its subsidiaries that are party to the indentures. The Notes and the related guarantees rank equally in right of payment with all existing and future senior unsecured indebtedness of ANHBV, Alumina Pty Ltd, the Company, and such subsidiaries; rank senior in right of payment to any future subordinated obligations of ANHBV, Alumina Pty Ltd, the Company, and such subsidiaries; and are effectively subordinated to the existing and future secured indebtedness of ANHBV, Alumina Pty Ltd, the Company, and such subsidiaries, including under the credit agreement governing the Company’s Revolving Credit Facility (defined below), to the extent of the value of property and assets securing such indebtedness.

Read in the 10-Q

September 30, September 30, Other postretirement benefits 2026 2025 2026 2025 Service cost $ - $ - $ 1 $ 1 ───────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────── Interest cost(1) 5 6 15 17 Recognized net actuarial loss(1) 1 1 3 3 Amortization of prior service benefit(1) (2) (4) (7) (10) Net periodic benefit cost $ 4 $ 3 $ 12 $ 11 (1) These amounts were reported in Other (income) expenses, net on the accompanying Statement of Consolidated Operations (see Note O ). (2) These amounts were reported in Restructuring and other charges, net on the accompanying Statement of Consolidated Operations and Cash Flows. Plan Actions. In 2026, management initiated the following action to a certain pension plan: In the third quarter of 2026, settlement accounting and a related plan remeasurement was triggered within Alcoa’s Australian pension plan as a result of lump sum payments to participants. Alcoa recorded a $3 increase to Other noncurrent assets and recognized a settlement gain of $1 ($1 after-tax) in Restructuring and other charges, net on the accompanying Statement of Consolidated Operations. Number of Weighted average Plan Weighted average Increase to Settlement gain(1)

Read in the 10-Q

affected discount rate as remeasurement discount rate as of other noncurrent assets

Read in the 10-Q

This amount represents the net actuarial gain and was reclassified from Accumulated other comprehensive loss to Restructuring and other charges, net on the accompanying Statement of Consolidated Operations.

Read in the 10-Q

Under ERISA regulations, a plan sponsor that establishes a pre-funding balance by making discretionary contributions to a U.S. defined benefit pension plan may elect to apply all or a portion of this balance toward its minimum required contribution obligations to the related plan in future years.

Read in the 10-Q

In the first, second, and third quarters of 2026, management made such elections related to the Company’s U.S. plans and intends to do so for the remainder of 2026. As a result, Alcoa’s minimum required contribution to defined benefit pension plans in 2026 is estimated to be approximately $15, of which $3 was contributed to non-U.S. plans during the third quarter of 2026. In the nine-month period of 2026, $9 was contributed to non-U.S. plans.

Read in the 10-Q

In the third quarter and nine-month period of 2025, $2 and $16, respectively, were contributed to non-U.S. plans.

Read in the 10-Q

The estimated timing of cash outflows from the environmental remediation reserve at September 30, 2026 was as follows:

Read in the 10-Q

Mark-to-market (gain) loss on noncurrent marketable securities (28) (267) 7 (267)

Read in the 10-Q

In the third quarter and nine-month period of 2026, Other, net primarily related to an insurance settlement reached during the first quarter of 2026 for property damage incurred in 2024 (nine-month period only) and interest income on interest bearing accounts (both periods). Proceeds from the insurance settlement were received in the second quarter of 2026 and included in investing activities on the Statement of Consolidated Cash Flows.

Read in the 10-Q

Since announcing the AliGroup acquisition (described below) in June 2026, Alcoa continued to advance the steps required for closing. The Company filed the registration statement on Form S-4, which was subsequently declared effective, and progressed regulatory approvals. In September 2026, Alcoa, through wholly-owned subsidiaries, completed debt offerings of $2,600 to fund a portion of the cash consideration. On October 15, 2026, South32 shareholders approved the Transaction.

Read in the 10-Q

In September 2026, Alumina Pty Ltd and Alcoa Nederland Holding B.V. (ANHBV), wholly-owned subsidiaries of Alcoa Corporation, completed debt issuances pursuant to Rule 144A and Regulation S (each under U.S. Securities Act of 1933, as amended) of $1,500 aggregate principal amount of 6.625% Senior Notes due 2034 (the 2034 Notes) and $1,100 aggregate principal amount of 6.875% Senior Notes due 2036 (the 2036 Notes), respectively. The Company intends to use the net proceeds of $2,592, together with cash on hand, to fund the cash portion of the consideration for the acquisition as well as related fees and expenses. The commissions to the initial purchasers on each series of notes, totaling $26, are contingent and payable upon closing of the Transaction.

Read in the 10-Q

Upon completion of the debt offerings, the Company terminated the remaining outstanding commitments for bridge financing of up to $3,100 that it had obtained on June 30, 2026 in connection with the Transaction, and incurred $6 in structuring fees. Bridge commitment fees of $16 are contingent and payable upon closing of the Transaction.

Read in the 10-Q

In October 2026, the WA government introduced a new section 6 exemption (under the Environmental Protection Act 1986) and announced its decision to approve the 2025-2029 mine plan imminently, subject to enhanced conditions. The new section 6 exemption, which expires on December 31, 2027, replaces the exemption granted in 2023 and allows Alcoa’s mining operations to continue while the WA EPA assessment is undertaken. The enhanced mine plan conditions, together with the new section 6 exemption, provide additional environmental protections and are not expected to have a material impact on the Company’s financial position or results of operations.

Read in the 10-Q

The conversion of the note and acquisition of the remaining ownership interest resulted in a reduction to Noncontrolling interest ($58) and corresponding increase to Additional capital; certain amounts related to foreign currency translation adjustments previously included within Noncontrolling interest ($8) were reclassified to Accumulated other comprehensive loss.

Read in the 10-Q

In the third quarter of 2026, Alcoa entered into definitive agreements to sell portions of its Massena East site. The transaction creates the potential for cash proceeds up to $315 as approved data center capacity is developed by the buyer. Closing is expected within the next six months. At closing, Alcoa expects to receive approximately $50 to $65, depending on the amount of approved data center capacity. Alcoa may receive an additional approximately $60 to $250 for approved capacity expansions and capacity-based installment payments as approved capacity is commissioned during the seven-year period following closing, with most of the proceeds expected to be received during the first five years. Closing is subject to permitting and regulatory approvals, satisfaction of the conditions required to begin construction, and other customary closing conditions.

Read in the 10-Q

Cost of goods sold Sequential period comparison Cost of goods sold as a percentage of sales increased 1 percent primarily as a result of: • Lower aluminum prices • Lower shipments of aluminum Partially offset by: • Improved production costs across both segments • Higher alumina prices Year-to-date comparison Cost of goods sold as a percentage of sales decreased 7 percent primarily as a result of: • Higher aluminum prices Partially offset by: • Tariffs on U.S. imports of aluminum from Canada • Lower alumina prices • Unfavorable currency impacts • Unfavorable impacts from certain energy contracts linked to metal pricing • Lower volumes and price from bauxite offtake and supply agreements • Higher costs associated with the restart of the San Ciprián smelter • Higher energy prices in the Alumina segment Selling, general administrative, and other expenses Sequential period comparison Selling, general administrative, and other expenses decreased $4 primarily as a result of: • Lower labor costs Partially offset by: • Increased information technology services Year-to-date comparison Selling, general administrative, and other expenses increased $50 primarily as a result of: • Increased fees for professional services • Unfavorable currency impacts • Higher labor costs • Increased information technology services Provision for depreciation, depletion, and amortization Sequential period comparison The Provision for depreciation, depletion, and amortization increased $3 primarily as a result of: • Higher amortization in Australia and Brazil for mine development costs • Write off of assets for projects no longer being pursued Partially offset by: • Favorable currency impacts Year-to-date comparison The Provision for depreciation, depletion, and amortization increased $50 primarily as a result of: • Unfavorable currency impacts • Higher depreciation in Brazil for mine reclamation and bauxite residue storage asset retirement obligations • Higher depreciation in Australia for asset retirement obligations • Higher amortization in Australia and Brazil for mine development costs Partially offset by: • Lower depreciation expense related to the Kwinana (Australia) refinery closure

Read in the 10-Q

Interest expense Sequential period comparison Interest expense increased $6 primarily as a result of: • Structuring fees on the $3,100 bridge financing facility entered into in June 2026 and terminated in September 2026 • Interest on the 2034 Notes and the 2036 Notes issued in September 2026 Partially offset by: • Absence of interest and debt settlement expenses for the remaining 2028 Notes extinguished in May 2026 Year-to-date comparison Interest expense decreased $29 primarily as a result of: • Absence of interest and debt settlement expenses for 5.500% Senior Notes due 2027 (the 2027 Notes) extinguished in March 2025 • Decreased interest and debt settlement expenses for the 2028 Notes extinguished in March 2025 and May 2026 • Increased capitalized interest • Absence of interest for the 2027 Notes extinguished in December 2025 • Decreased interest on value added tax assessments in Brazil Partially offset by: • Increased interest on $500 6.125% Senior Notes due 2030 (the 2030 Notes) and $500 6.375% Senior Notes due 2032 (the 2032 Notes) issued in March 2025 • Structuring fees on the $3,100 bridge financing facility entered into in June 2026 and terminated in September 2026 • Interest on the 2034 Notes and the 2036 Notes issued in September 2026 Other (income) expenses, net Sequential period comparison Other (income) expenses, net was ($32) in the third quarter of 2026 compared with $200 in the second quarter of 2026. The favorable change of $232 was primarily a result of: • Favorable mark-to-market results on the Ma’aden shares • Favorable mark-to-market results on derivative instruments primarily due to higher power prices in the current quarter, favorable power price changes under a firming contract, and changes in the euro foreign exchange rate • Favorable currency revaluation impacts primarily due to absence of losses recognized in the second quarter of 2026 due to the U.S. dollar strengthening against the Australian dollar Year-to-date comparison Other (income) expenses, net was $42 in the nine-month period of 2026 compared with ($1,172) in the nine-month period of 2025. The unfavorable change of $1,214 was primarily a result of: • Absence of gain on sale of the Saudi Arabia joint venture, comprised of the Ma’aden Bauxite and Alumina Company and the Ma’aden Aluminium Company • Unfavorable mark-to-market results on the Ma’aden shares in the nine-month period of 2026 compared to favorable mark-to-market results in the nine-month period of 2025 subsequent to July 1, 2025 • Unfavorable mark-to-market results on derivative instruments primarily due to changes in the euro foreign exchange rate and lower power prices in the current year, partially offset by favorable power price changes under a firming contract executed in June 2025 Partially offset by: • Insurance claim settlement recognized in the first quarter of 2026

Read in the 10-Q

Restructuring and other charges, net Sequential period comparison In the third quarter of 2026, Restructuring and other charges, net of $18 primarily related to: • $25 to record net additional asset retirement obligations and environmental remediation at previously closed sites Partially offset by: • $4 benefit for take-or-pay contract costs at previously closed sites • $3 reversal resulting from changes in employee termination costs related to the closure of the Kwinana alumina refinery In the second quarter of 2026, Restructuring and other charges, net of ($4) primarily related to: • $13 benefit for take-or-pay power contract costs at previously closed sites Partially offset by: • $9 to record net additional asset retirement obligations and environmental remediation at previously closed sites Year-to-date comparison In the nine-month period of 2026, Restructuring and other charges, net of $32 primarily related to: • $34 to record net additional asset retirement obligations and environmental remediation at previously closed sites • $1 net charge for take-or-pay contract costs at previously closed sites Partially offset by: • $3 reversal resulting from changes in employee termination costs related to the closure of the Kwinana alumina refinery In the nine-month period of 2025, Restructuring and other charges, net of $904 primarily related to: • $856 for the permanent closure of the previously curtailed Kwinana alumina refinery • $37 to record net additional asset retirement obligations and environmental remediation at previously closed sites • $11 for certain employee obligations related to the February 2023 updated viability agreement for the San Ciprián aluminum smelter Partially offset by: • $3 net benefit for take-or-pay contract costs at previously closed sites Provision for income taxes Sequential period comparison The Provision for income taxes in the third quarter of 2026 was $91 on income before taxes of $573 or 15.9 percent. In comparison, the second quarter of 2026 Provision for income taxes was $73 on income before taxes of $482 or 15.1 percent. The increase to tax expense of $18 is primarily attributable to an overall increase in income in jurisdictions where taxes are paid and the impact of the annualized effective tax rate when applied to current period earnings. Year-to-date comparison The Provision for income taxes in the nine-month period of 2026 was $246 on income before taxes of $1,554 or 15.8 percent. In comparison, the nine-month period of 2025 Provision for income taxes was $79 on income before taxes of $996 or 7.9 percent. The increase in tax expense of $167 is primarily attributable to an overall increase in income in jurisdictions where taxes are paid, including the absence of the restructuring charge associated with the Kwinana closure recorded during the third quarter of 2025, and a valuation allowance of $22 recorded against certain deferred tax assets of a wholly-owned subsidiary in Canada during the first quarter of 2026, partially offset by the absence of tax expense on the gain on sale of interest in the Saudi Arabia joint venture. Noncontrolling interest On March 31, 2025, Alcoa and Trento EQT entered into a joint venture agreement for the San Ciprián operations, with Alcoa holding a 75% ownership interest, and Trento EQT holding the remaining 25% interest. As a result, Alcoa began recognizing earnings attributable to noncontrolling interest in the second quarter of 2025. On July 1, 2026, Alcoa increased its ownership interest to 90.78%, reducing Trento EQT’s ownership interest to 9.22%. On August 1, 2026, Alcoa acquired Trento EQT’s remaining ownership interest, resulting in 100% ownership interest of the San Ciprián operations. Net (loss) income attributable to noncontrolling interest was $(1) in the third quarter of 2026 compared with $2 in the second quarter of 2026. The change primarily reflects increased energy prices in July 2026. Net (loss) income attributable to noncontrolling interest was $(7) in the nine-month period of 2026 compared with $(27) in the nine-month period of 2025. The change is primarily a result of higher average realized price of aluminum, partially offset by higher costs associated with the smelter restart and lower average realized price of alumina.

Read in the 10-Q

Production Sequential period comparison Alumina production increased 11 percent primarily as a result of: • Higher production at the Pinjarra refinery due to improved stability in the third quarter of 2026 Year-to-date comparison Alumina production decreased 2 percent primarily as a result of: • Lower production at the Pinjarra refinery due to operational instability from late March 2026 through July 2026 Third-party sales Sequential period comparison Third-party sales increased $43 primarily as a result of: • Higher average realized price of $19 per metric ton principally driven by a higher average API • Higher shipments of alumina primarily due to higher production Year-to-date comparison Third-party sales decreased $1,494 primarily as a result of: • Lower shipments of alumina primarily due to lower sales of externally sourced alumina to satisfy certain customer commitments, lower production, and decreased trading • Lower average realized price of $105 per metric ton principally driven by a lower average API • Lower volumes and price from bauxite offtake and supply agreements Intersegment alumina sales Sequential period comparison Intersegment alumina sales increased $89 primarily as a result of: • Higher alumina shipments primarily due to smelter capacity restarts • Higher average API on sales to the Aluminum segment Year-to-date comparison Intersegment alumina sales decreased $213 primarily as a result of: • Lower average API on sales to the Aluminum segment Partially offset by: • Higher alumina shipments primarily due to smelter capacity restarts Segment Adjusted EBITDA Sequential period comparison Segment Adjusted EBITDA increased $95 primarily as a result of: • Higher average realized price • Improved production costs, primarily related to the recovery of stability at the Pinjarra refinery Year-to-date comparison Segment Adjusted EBITDA decreased $1,007 primarily as a result of: • Lower average realized price • Lower volumes and price from bauxite offtake and supply agreements • Unfavorable currency impacts • Higher energy prices, primarily fuel oil and diesel, associated with the Middle East conflict Partially offset by: • Absence of a charge recorded in September 2025 to increase asset retirement obligations at the Poços de Caldas (Brazil) refinery Forward Look. For the fourth quarter of 2026 in comparison to the third quarter of 2026, the Alumina segment expects to maintain the strong operational performance delivered in the third quarter of 2026, with higher shipments offsetting planned maintenance. Alcoa expects total 2026 Alumina segment production and shipments to remain unchanged from its prior projection, ranging between 9.5 and 9.6 million metric tons and between 11.5 and 11.6 million metric tons, respectively. The difference between production and shipments reflects trading volumes and externally sourced alumina to fulfill customer contracts.

Read in the 10-Q

Production Sequential period comparison Production increased 2 percent primarily as a result of: • Completion of capacity restarts at the Portland (Australia) and Lista (Norway) smelters in the second quarter of 2026 and completion of the Alumar smelter restart in the third quarter of 2026 Year-to-date comparison Production increased 10 percent primarily as a result of: • Completion of the San Ciprián smelter restart and completion of capacity restarts at the Lista and Portland smelters Third-party sales Sequential period comparison Third-party sales decreased $309 primarily as a result of: • Lower shipments primarily due to absence of second quarter 2026 shipments of inventory associated with first quarter inventory repositioning • Lower average realized price of $225 per metric ton, primarily driven by a lower average LME (on a 15-day lag) Year-to-date comparison Third-party sales increased $2,990 primarily as a result of: • Higher average realized price of $1,270 per metric ton driven by a higher average LME (on a 15-day lag) and higher regional premiums, particularly the Midwest premium (United States and Canada) which rose by an average of 118 percent and the Rotterdam premium (Europe) which rose by an average of 113 percent • Higher shipments primarily due to increased production related to capacity restarts • Higher third-party energy sales Partially offset by: • Unfavorable impacts from certain energy contracts linked to metal pricing Segment Adjusted EBITDA Sequential period comparison Segment Adjusted EBITDA decreased $211 primarily as a result of: • Lower average realized price • Unfavorable raw material costs primarily on higher market prices for carbon materials and higher average alumina input costs • Lower shipments Partially offset by: • Improved production costs primarily due to efficiencies at higher production rates • Lower tariffs on U.S. imports of aluminum from Canada under Section 232 of the Trade Expansion Act of 1962 Year-to-date comparison Segment Adjusted EBITDA increased $2,091 primarily as a result of: • Higher average realized price • Favorable raw material costs primarily on lower average alumina input costs • Higher third-party energy sales Partially offset by: • Tariffs on U.S. imports of aluminum from Canada, which were subject to a 25 percent tariff beginning March 12, 2025 until increasing to 50 percent on June 4, 2025 under Section 232 of the Trade Expansion Act of 1962 • Unfavorable impacts from certain energy contracts linked to metal pricing • Higher costs associated with the restart of the San Ciprián smelter • Unfavorable currency impacts

Read in the 10-Q

The following table provides consolidated capacity and curtailed capacity (each in kmt) for each smelter owned by Alcoa Corporation: September 30, 2026 June 30, 2026 September 30, 2025 Facility Country Capacity(1) Curtailed Capacity(1) Curtailed Capacity(1) Curtailed ─────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────── Portland(2) Australia 197 12 197 13 197 32 São Luís (Alumar)(3) Brazil 268 - 268 20 268 25 Baie-Comeau Canada 324 - 324 - 324 - Bécancour Canada 350 - 350 - 350 - Deschambault Canada 287 - 287 - 287 - Fjarðaál Iceland 351 - 351 - 351 - Lista(4) Norway 95 - 95 - 95 10 Mosjøen Norway 200 - 200 - 200 - San Ciprián(5) Spain 228 - 228 - 228 163 Massena West U.S. 130 - 130 - 130 - Warrick U.S. 215 54 215 54 215 54 2,645 66 2,645 87 2,645 284 (1) These figures represent Alcoa Corporation’s share of the facility Nameplate Capacity based on its ownership interest in the respective smelter. (2) In the second quarter of 2026, the Company completed the restart of 15 kmt of previously curtailed capacity at the Portland smelter in Australia that began in the first quarter of 2026. (3) In the third quarter of 2026, the Company completed the restart of its 268 kmt share of capacity at the Alumar smelter in São Luís, Brazil. The restart was announced in the third quarter of 2021 and production began in the second quarter of 2022. (4) In the second quarter of 2026, the Company completed the restart of one potline (31 kmt) at the Lista smelter in Norway that began in the first quarter of 2026. The line was curtailed in August 2022. (5) In the third quarter of 2025, the Company resumed the restart at the San Ciprián smelter in Spain that was paused in April 2025 following a widespread power outage across Spain. The restart was completed on April 7, 2026. Forward Look. For the fourth quarter of 2026 in comparison to the third quarter of 2026, the Aluminum segment expects higher production costs, primarily on planned maintenance, and higher raw material costs, primarily on higher market prices for carbon materials. Alcoa expects 2026 total Aluminum segment production and shipments to remain unchanged from its prior projection, ranging between 2.4 and 2.6 million metric tons, and between 2.6 and 2.8 million metric tons, respectively.

Read in the 10-Q

Reconciliations of Certain Segment Information Reconciliation of Total Segment Third-Party Sales to Consolidated Sales Quarter ended Nine months ended September 30, June 30, September 30, September 30,

Read in the 10-Q

On September 23, 2026, Alumina Pty Ltd and ANHBV completed debt issuances pursuant to Rule 144A and Regulation S of $1,500 aggregate principal amount of 6.625% Senior Notes due 2034 and $1,100 aggregate principal amount of 6.875% Senior Notes due 2036, respectively. The net proceeds of these issuances were $2,592, reflecting certain issuance costs.

Read in the 10-Q

The Company intends to use the proceeds, together with cash on hand, to fund the approximately $3,100 cash portion of the consideration for the AliGroup acquisition as well as related fees and expenses. The commissions to the initial purchasers on each series of notes, totaling $26, are contingent and payable upon closing of the Transaction (see AliGroup Acquisition above).

Read in the 10-Q

Share sales and buybacks

Period Total Number of Shares Purchased Weighted Average Price Paid Per Share Total Number of Shares Purchased as Part of Publicly Announced Program Approximate Dollar Value of Shares that May Yet be Purchased Under the Program(1)

Read in the 10-Q

The 10-Q's risk factors against the 10-K

Item 1A of the 10-Q filed Oct 29, 2026 against Item 1A of the 10-K filed Feb 26, 2026. A 10-Q repeats only the risks that changed, so a 10-K paragraph that is missing from it is not counted as removed. Added is a paragraph with nothing like it in the 10-K, Reworded a sentence that is in both with several words changed, Quiet changes a sentence in both where one to four words changed and one is a hedge or a modal (cut words struck through, new words highlighted). Text on the page, not a score; each links to the filing at sec.gov.

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
We face a number of risks that could materially and adversely affect our business, results of operations, cash flow, liquidity, or financial condition. A full discussion of our risk factors can be found in Part I Item 1A. Risk Factors of Alcoa Corporation’s Annual Report on Form 10-K for the fiscal year ended December 31, 2025. The information below includes additional risks relating to Alcoa’s proposed transaction to acquire South32 Limited’s (South32) equity interests in certain bauxite, alumina, and aluminum assets (the Transaction), pursuant to the Umbrella Implementation Deed (the Deed), dated as of June 30, 2026.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
The Transaction may be delayed or may not be completed, each of which could adversely affect Alcoa’s business, financial condition, results of operations, or stock price.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
Completion of the Transaction is subject to various conditions precedent, including regulatory and governmental approvals, approvals for listing of the Alcoa common stock and quotation of CHESS Depositary Interests (CDIs) to be issued in the Transaction, and other customary conditions specified in the Deed.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
The regulatory and governmental approval process may take longer than expected, approvals may not be obtained, or approvals may be obtained only subject to terms that are not acceptable to Alcoa or South32 or consistent with the terms of the Deed. Alcoa and South32 may waive certain of these conditions precedent and also have termination rights under the Deed, in certain circumstances. If the Deed is terminated or any condition precedent is not satisfied or, where waivable, waived, the Transaction will not be completed.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
Alcoa expects to incur significant costs associated with the Transaction. Alcoa’s fees and expenses related to the Transaction include financial advisor fees, filing fees, legal and accounting fees, and regulatory fees.

Read it in the 10-Q at sec.gov

Show the other 7
Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
If the Transaction is delayed or not completed, Alcoa may not realize the expected benefits of the Transaction and may be adversely affected by negative reactions from financial markets, customers, suppliers, employees, or other business partners; the incurrence of significant transaction-related costs, including costs that are payable regardless of whether the Transaction is completed; potential termination fee obligations; and litigation relating to the Transaction.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
The issuance of shares of Alcoa common stock dilutes the ownership position of Alcoa’s existing stockholders and the price of Alcoa common stock may be affected.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
The consideration payable in the Transaction includes shares of Alcoa common stock (which may, in whole or in part, be delivered in the form of Alcoa CDIs) representing approximately 6 percent of Alcoa’s outstanding shares post issuance. Consequently, the Company’s existing stockholders will own a smaller proportion of Alcoa common stock following the completion of the Transaction.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
The issuance of new shares of Alcoa common stock (which may, in whole or in part, be delivered in the form of Alcoa CDIs) could adversely affect the market price of Alcoa common stock. In addition, South32 shareholders, who will receive Alcoa common stock, or Alcoa CDIs (as the case may be), may decide to sell some or all of their shares or CDIs following completion of the Transaction, and South32 may ultimately effect a sale or distribution of the Alcoa common stock or CDIs it receives, each of which could have the effect of depressing the market price for Alcoa common stock. The price of Alcoa common stock and CDIs may fluctuate significantly in the days following the completion of the Transaction, including as a result of factors over which the Company has no control.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
The market price of Alcoa common stock and Alcoa CDIs following completion of the Transaction may also be affected by a variety of factors, including whether expected benefits of the Transaction are realized; transaction-related costs are greater than expected; or Alcoa’s financial position, results of operations, or cash flows meet the expectations of investors and financial analysts. Consequently, the market price of Alcoa common stock or CDIs may decline following completion of the Transaction.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
Alcoa may not realize the intended benefits of the Transaction, and integration may disrupt Alcoa’s current plans or operations.

Read it in the 10-Q at sec.gov

Added10-Q Oct 29, 2026 vs 10-K Feb 26, 2026
Alcoa may not successfully integrate the acquired operations or otherwise realize the expected benefits of the Transaction. Integration may result in operational disruptions, increased costs, delays in realizing expected synergies, or financial and operating performance that differs from expectations. As a result, the Transaction may not be accretive to earnings per share, improve Alcoa’s balance sheet position, or enhance Alcoa’s ability to generate additional free cash flow.

Read it in the 10-Q at sec.gov

The first 12 of 16 are shown (at most 12 of each type).

Phrases used for the first time

Two-word phrases in Risk Factors of the 10-K filed Feb 26, 2026 that are in none of the 1 earlier 10-Ks stored, back to Feb 20, 2025

marketable securities ×6trento eqt ×4cipri smelter ×4venture agreement ×3alumina pty ×3derivative contracts ×2risk associated ×2major mine ×2mine regions ×2march alcoa ×2eqt entered ×2agreement whereby ×2whereby alcoa ×2alcoa owns ×2eqt owns ×2production process ×2
Where each one is used
  • marketable securities: Significant declines in the market value of our marketable securities may have a material adverse effect on our results of operations should they occur.
  • trento eqt: Our refineries and smelters consume substantial amounts of natural gas and electricity in the production of alumina and aluminum. The prices for and availability of energy have in the past and could in the future be impacted by volatile market conditions resulting from factors beyond our control such as weather,...
  • cipri smelter: Our refineries and smelters consume substantial amounts of natural gas and electricity in the production of alumina and aluminum. The prices for and availability of energy have in the past and could in the future be impacted by volatile market conditions resulting from factors beyond our control such as weather,...
  • venture agreement: Our refineries and smelters consume substantial amounts of natural gas and electricity in the production of alumina and aluminum. The prices for and availability of energy have in the past and could in the future be impacted by volatile market conditions resulting from factors beyond our control such as weather,...
  • alumina pty: Alcoa and Alcoa Nederland Holding B.V. (ANHBV), a wholly-owned subsidiary of Alcoa, are party to a revolving credit agreement with a syndicate of lenders and issuers named therein (as subsequently amended, the Amended Revolving Credit Facility). Alcoa and ANHBV are also party to a revolving credit agreement...
  • derivative contracts: While global inventories remained at historically low levels in 2025, high inventories could lead to a reduction in the price of aluminum and declines in the LME price have in the past and could in the future have a negative impact on our business, financial condition, and results of operations. Regional premiums...
  • risk associated: While global inventories remained at historically low levels in 2025, high inventories could lead to a reduction in the price of aluminum and declines in the LME price have in the past and could in the future have a negative impact on our business, financial condition, and results of operations. Regional premiums...
  • major mine: In addition, the permitting processes, restrictions, and requirements imposed by conditional permits or approvals, and associated costs and liabilities, have in the past and may in the future be extensive, which can delay or prevent commencing or continuing exploration or production operations. This has in the past...

The 10-K at sec.gov

Used at least twice, small words left out. Counted, not picked: a phrase can be new because the company renamed something.

What was taken out

5 paragraphs of last year's Risk Factors with nothing like them now. The longest are quoted.

Across all companies
These valuations reflect assumptions about financial market and other economic conditions, which may change based on changes in key economic indicators. The most significant year-end assumptions used by the Company to estimate pension or other postretirement benefit income or expense for the following year are the discount rate applied to plan liabilities and the expected long-term rate of return on plan assets. In addition, the Company is required to make an annual measurement of plan assets and liabilities, which may result in a significant charge to stockholders’ equity. See Part II...
In the 10-K filed Feb 20, 2025
In October 2024, we completed our five-year strategic portfolio review to improve cost positioning, or curtail, close, or divest 1.5 million and 4 million metric tons of smelting and refining capacity, respectively. We reached approximately 93 percent of our target for smelting capacity with the decision to restart capacity at the Warrick smelter completed in the first quarter 2024, and exceeded our target for refining capacity with the decision to curtail the Kwinana refinery in January 2024. We continue to evaluate assets for opportunities for improvement to remain profitable throughout...
In the 10-K filed Feb 20, 2025
Potential pension contributions include both mandatory amounts required under federal law and discretionary contributions to improve the plans’ funded status. While the Company took several actions in recent years to improve the funded status of its pension plans and adjust its asset allocation to reduce variance risk, declines in the discount rate or lower-than-expected investment returns on plan assets could have a material negative effect on our cash flows. Adverse capital market conditions could result in reductions in the fair value of plan assets and increase our liabilities related...
In the 10-K filed Feb 20, 2025
Our results of operations may be negatively affected by the amount of expense we record for our pension and other postretirement benefit plans, reductions in the fair value of plan assets, and other factors. We calculate income or expense for our plans using actuarial valuations in accordance with accounting principles generally accepted in the United States of America (GAAP).
In the 10-K filed Feb 20, 2025

Sources

Item 1A of each 10-K and 10-Q on EDGAR, quoted exactly. Each paragraph links to the filing at sec.gov.

Also

10-K change: what was reworded or cut, section by section.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/AA/export.csv") into a cell.

Next:10-K change
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.