RemovedRisk Factors
carbon capture technology for new natural gas-fired power plants. Affected power plants are required to comply with the rule through a phased-in approach or retire. Compliance with the new rule could be required as early as 2030 for certain existing coal-fired power plants and 2032 for certain new natural gas-fired power plants. In December 2024, the United States Court of Appeals for the District of Columbia Circuit heard arguments from various stakeholders including the EPA, environmental organizations, state attorney generals, and industry groups regarding the legal merits of the final rule. In February 2025, the EPA requested that the appellate court suspend the case for 60 days and not issue an opinion so the EPA can decide how to proceed. Ameren and Ameren Missouri estimate capital expenditures of approximately $580 million may be necessary to comply with the final rule assuming it is not revised or overturned. Ameren and Ameren Missouri are monitoring the legal challenges and assessing the impacts of the final rule and, at this time, cannot predict the final impacts on their results of operations, financial position, and liquidity.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedRisk Factors
Our aging infrastructure may pose risks to system reliability and expose us to expedited or unplanned significant capital expenditures and operating costs. Both of Ameren Missouri’s coal-fired energy centers were constructed prior to 1978, and the Callaway Energy Center began operating in 1984. The age of these energy centers increases the risks of unplanned outages, reduced generation output, and higher
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RewordedRisk Factors
With respect to the transition of Ameren Missouri’s generation fleet that will be included in its 2025 Change to the 2023 PRP and carbon emission reduction targets, factors also include Ameren Missouri’s ability to obtain CCNs from the MoPSC, and any other required state or federal approvals for the addition of renewable resources, battery storage, or nuclear or natural gas-fired generation, retirement of energy centers, and new or continued customer energy-efficiency programs; the ability to enter into agreements for renewable, natural gas-fired, or nuclear generation or battery storage and acquire or construct that generation those resources at a reasonable cost; the ability to enter into natural gas supply agreements at reasonable prices and adequate quantities to power Ameren Missouri’s natural gas-fired energy centers; the ability to obtain NRC approval for an extension of the operating license for the Callaway Energy Center beyond its current 2044 expiration date; the continued existence and ability to qualify for, and use or transfer, federal production or investment tax credits; the cost of wind, solar, and other renewable generation and battery storage technologies; the cost of natural gas or hydrogen CT technologies; the cost of nuclear generation; the ability to maintain system reliability during and after the transition to clean energy generation; reliability; new and/or changes in environmental regulations, including those related to CO2 and other greenhouse gas emissions; energy prices; and demand.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
Based on its assumptions at December 31, 2024, 2025, its investment performance in 2024, 2025, and its pension funding policy, Ameren does not expect to make material contributions in 2025 and expects to make aggregate annual contributions of $170 approximately $45 million to $50 million in 2026 through 2029. each of the next five years, with aggregate estimated contributions of $240 million.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
Further, federal, state, and local authorities, including the United States Congress, authorities have considered initiatives to further restrict greenhouse gases to address global climate change, and the EPA previously announced plans to implement new climate change programs, including regulation of greenhouse gas emissions from the utility industry. climate-related risks.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
Regulations implementing To the extent our operations impact surface water bodies, including wetlands, the Clean Water Act govern potential impacts from our operations on water bodies including wetlands subject to the Act, requires permitting as well as evaluation of the ecological and biological impact of those operations.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
Achievement of these targets is dependent on many factors, including the pace and extent of development and deployment of low- to zero-carbon energy technologies and carbon capture technologies, the cost of those technologies, and support of such technologies by regulators; natural gas and energy prices; operational performance of low- to zero-carbon resources; new transmission infrastructure; the ability to maintain system reliability during and after the transition to clean reliability; customer demand for energy generation; including carbon-free energy; and constructive energy and economic policies, including those that address investment in energy infrastructure, global climate change, climate-related risks, incentives for clean energy technologies, and environmental regulations.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
Cyber attacks could include viruses, malicious or destructive code, phishing or quishing social engineering attacks, denial of service attacks, supply chain attacks, ransomware and other extortion-based attacks, improper access by third parties, attacks on email systems, and attacks leading to data loss, including data stored using cloud technologies, operational control, or exploitation of vulnerabilities specific to internally developed systems or to those provided and/or maintained by our suppliers, including those attacks arising from or generated by artificial intelligence, among various other security breaches. suppliers.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
The current federal administration is expected to review, EPA has revised, and has already revised, proposed revisions to, compliance requirements under a number of federal environmental regulatory programs; programs related to greenhouse gases; however, differences in energy policy priorities adopted by future federal presidential administrations could result in additional greenhouse gas reduction requirements in the United States.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
The Ameren Companies may or may not experience the energy demand growth currently being forecasted depending on the decisions of potential new customers about whether to locate their operations within our service territories. territories or whether customers that have signed electric service agreements begin operations within the expected timeframes.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
The resulting increase to the revenue requirement needed to recover such costs and earn a return on investments This could result in more frequent regulatory rate reviews and requests for cost recovery mechanisms.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
As of December 31, 2024, 2025, coal inventory was near targeted levels at the Labadie Energy Center and Sioux energy centers were at targeted levels. levels at the Sioux Energy Center.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
The payments related to the minimum tax by Ameren Missouri, Ameren Illinois, and ATXI are expected to be recovered, subject to approval by their respective regulators.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
Pursuant to a Missouri law, the PPRA, Ameren Missouri’s PISA election was extended through December 2028 2035 and an additional extension through December 2033 2040 is allowed if requested by Ameren Missouri and approved by the MoPSC, among other things. MoPSC.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
Quiet changesRisk Factors
Further reductions to emissions limits will become effective between 2030 and 2040, resulting in the possible closure of the Venice Energy Center by the end of 2029.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
Quiet changesRisk Factors
About 97% Approximately 96% of Ameren Missouri’s coal is purchased from the Powder River Basin in Wyoming, which has a limited number of suppliers.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
Quiet changesRisk Factors
Our ability to successfully execute our strategic plan, including the transition of Ameren Missouri’s generation fleet that will be included in its 2025 Change to the 2023 PRP, may affect customers’, investors’, legislators’, regulators’, creditors’, and rating agencies’ opinions and actions.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
The PPRA became effective in August 2025. The law includes certain provisions that affect the regulation of Ameren Missouri’s electric and natural gas businesses. These provisions create modifications to the PISA and integrated resource planning, require electric utilities to submit service tariff schedules for certain large load customers, allow the MoPSC to authorize inclusion of construction work in progress in rate base for new natural gas-fired generation facilities and new generation facilities approved through integrated resource planning, and allow natural gas utilities to file regulatory rate reviews using a future test year, among other things.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
In April 2025, the MoPSC issued an order in Ameren Missouri’s 2024 electric service regulatory rate review, approving nonunanimous stipulations and agreements. The order authorized an increase of $355 million to Ameren Missouri’s annual revenue requirement for electric retail service, effective June 1, 2025. The approved revenue requirement was based on infrastructure investments as of December 31, 2024. The order did not explicitly specify an ROE, capital structure, rate base, or any rate base disallowances. The order provides for the continued use of all existing riders and trackers. The order also changed annualized depreciation, regulatory asset and liability amortization amounts, and the base level of expenses for trackers. On an annualized basis, these changes reflect an increase in “Depreciation and amortization” of approximately $70 million, among other expense changes, on Ameren’s and Ameren Missouri’s consolidated statements of income.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
In July 2025, the MoPSC issued an order in Ameren Missouri’s 2024 natural gas delivery service regulatory rate review, approving a unanimous stipulation and agreement. The order authorized an increase of $32 million to Ameren Missouri’s annual revenue requirement for natural gas delivery service, effective September 1, 2025. The order did not explicitly specify an ROE, capital structure, rate base, or any rate base disallowances. The order provides for the continued use of all of Ameren Missouri’s existing riders and trackers.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
In November 2025, the MoPSC approved Ameren Missouri’s request to modify its existing large primary service tariff to require customers requesting 75 MWs or more of demand and who are served at transmission level voltage to comply with additional tariff terms. The additional terms include a service term of 12 years plus a ramp period of up to five years to reach peak demand, minimum demand charges of 80% of contracted capacity, customer exit terms and fees, and customer credit and collateral requirements, among other terms. In addition, new customer programs would be available under this tariff, which allow customers to support renewable generation, battery storage, and/or nuclear generation through incremental payments. The MoPSC order also includes an earnings sharing mechanism that would apply if Ameren Missouri’s earned ROE for a calendar year exceeds 9.74%, which can be adjusted by the MoPSC in future electric rate orders. If this were to occur, Ameren Missouri would defer 65% of the return in excess of the 9.74% ROE to a regulatory liability, which would be returned to retail electric customers in a future rate review. In addition, if large load customer revenues were reduced in a calendar year due to certain events, as determined by the MoPSC, Ameren Missouri may defer a portion of the reduced revenues to a regulatory asset to be included in its revenue requirement in the next electric rate review. In February 2026, Ameren Missouri executed electric service agreements with large load customers consistent with the tariff terms discussed above, representing 2.2 gigawatts of demand. Ameren and Ameren Missouri do not expect a material impact to their results of operations, financial position, or liquidity in 2026 related to these agreements.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
In August 2025, Ameren Missouri filed for a CCN to construct the Reform Solar Project (250-MW facility). Ameren Missouri expects a decision by the MoPSC in the first half of 2026. In February 2026, the MoPSC issued an order approving a nonunanimous stipulation and agreement related to a requested CCN for the Big Hollow Natural Gas (800-MW facility) and the Big Hollow Battery Energy Storage (400-MW facility) projects. Also in February 2026, Ameren Missouri acquired the Split Rail Solar Project, which includes solar panels, project design, land rights, and engineering, procurement, and construction agreements, for approximately $600 million, and took over construction management of the project, which is expected to be placed in-service in the second quarter of 2026.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
In January 2026, the CRGA was enacted and will become effective in June 2026. The law includes certain provisions that affect Ameren Illinois’ electric distribution and transmission businesses. These provisions increase the annual spending cap on energy-efficiency investments beginning in 2027 and modify the ROE component of the return on those investments.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
Earnings per diluted share in 2025, compared with 2024, were favorably affected by:
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
•decreased income tax expense at Ameren Transmission, Ameren Illinois Electric Distribution and Ameren Illinois Natural Gas resulting from the revaluation of excess deferred income tax regulatory liabilities, resulting from TCJA for FERC-regulated and ICC-regulated jurisdictions, related to ratemaking treatment of net operating loss carryforwards by affiliates under a tax allocation agreement, see Note 12 – Income Taxes under Part II, Item 8, of this report for additional information (32 cents per share);
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
•a higher allowance for equity funds used during construction at Ameren Transmission (4 cents per share).
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
Earnings per diluted share in 2025, compared with 2024, were unfavorably affected by:
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
•increased losses related to equity method investments at Ameren Transmission and Ameren (parent) (4 cents per share).
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
Revenues; Fuel and Purchased Power Expenses; Other Operations and Maintenance Expenses; Depreciation and Amortization Expenses; Taxes Other Than Income Taxes; Other Income, Net; Interest Charges; and Income Taxes, see the major headings below.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RemovedMD&A
In September 2023, the United States District Court for the Eastern District of Missouri granted Ameren Missouri’s request to modify a September 2019 remedy order issued by the district court in order to allow the retirement of the Rush Island Energy Center in advance of its previously expected retirement date of 2039, in lieu of installing a flue gas desulfurization system. Ameren Missouri retired the Rush Island Energy Center on October 15, 2024. In December 2024, the United States District Court for the Eastern District of Missouri issued an order resolving all outstanding claims in this case. The order requires Ameren Missouri to fund a program to provide electric buses and charging stations to schools in the metro St. Louis area and a program to provide air purifiers to eligible Ameren Missouri electric residential customers. These programs are estimated to cost approximately $64 million. As of December 31, 2024, Ameren and Ameren Missouri recorded liabilities of $64 million and charges of $59 million in 2024 related to the cost of these programs.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
In June 2024, Ameren Missouri filed a request with the MoPSC seeking approval to increase its annual revenues for electric service. In February 2025, Ameren Missouri filed an updated electric rate increase request seeking approval to increase its annual revenues for electric service by $446 million. The electric rate increase request is based on a 10.25% ROE, a capital structure composed of 52% common equity, a rate base of $13.9 billion, and a test year ended March 31, 2024, with certain pro-forma adjustments through the true-up date of December 31, 2024. In February 2025, the MoPSC staff recommended an increase to Ameren Missouri's annual electric service revenues of $384 million based on a 9.74% ROE, a capital structure composed of 52% common equity, and a rate base of $13.9 billion. The MoPSC proceeding relating to the proposed electric service rate changes will take place over a period of up to 11 months, with a decision by the MoPSC expected by May 2025 and new rates effective by June 2025.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
In June 2024, the MoPSC issued a financing order authorizing the issuance of securitized utility tariff bonds by AMF to finance $476 million of costs related to the accelerated retirement of the Rush Island Energy Center, which included the remaining unrecovered net plant balance associated with the facility, among other costs. Ameren Missouri will collect the amounts necessary to repay the bonds over approximately 15 years from the date of bond issuance. The securitized tariff bonds were issued in December 2024. The financing order also included a determination that the decision to retire the Rush Island Energy Center was reasonable and prudent. The MoPSC did not make a determination regarding the prudency of Ameren Missouri's prior actions that resulted in the adverse ruling in the NSR and Clean Air Act litigation discussed in Note 14 – Commitments and Contingencies under Part II, Item 8, of this report, however, claims regarding such actions could be considered in future regulatory proceedings. If future regulatory proceedings result in revenue reductions based on Ameren Missouri’s prior actions that resulted in the adverse ruling in the NSR and Clean Air Act litigation, it could have a material adverse effect on the results of operations, financial position, and liquidity of Ameren and Ameren Missouri.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
In 2024, the MoPSC issued orders approving requested CCNs for the Split Rail, Vandalia, Bowling Green, and Cass County solar projects. Ameren Missouri acquired the Cass County, Boomtown, and Huck Finn solar projects in June 2024, September 2024, and October 2024, respectively, and placed the assets of the projects, totaling $1 billion, in service in December 2024. In October 2024, the MoPSC issued an order approving a nonunanimous stipulation and agreement filed by Ameren Missouri, the MoPSC staff, and other intervenors requesting a CCN for the Castle Bluff Natural Gas Project. The order also includes the use of a post-construction cost deferral related to the project, which allows Ameren Missouri to defer and recover depreciation expense, financing costs, and applicable income taxes incurred from the date the project is placed in service to the date when project costs are reflected in updated base rates as a result of a regulatory rate review. The period of deferral would be limited to the earlier of the time the project costs are reflected in base rates or six months.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
In September 2024, Ameren Missouri filed a request with the MoPSC seeking approval to increase its annual revenues for natural gas delivery service by $40 million. The natural gas rate increase request is based on a 10.25% ROE, a capital structure composed of 52% common equity, a rate base of $531 million, and a test year ended March 31, 2024, with certain pro-forma adjustments expected through the true-up date of December 31, 2024. The MoPSC proceeding relating to the proposed natural gas delivery service rate changes will take place over a period of up to 11 months, with a decision by the MoPSC expected by August 2025 and new rates effective by September 2025.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
In November 2024, the MoPSC issued an order approving a nonunanimous stipulation and agreement for Ameren Missouri’s MEEIA 2025 plan, which includes a portfolio of customer energy-efficiency and demand response programs, along with the continued use of the MEEIA rider, which allows Ameren Missouri to collect from customers its actual MEEIA program costs, related lost electric revenues, and performance incentives. Ameren Missouri intends to invest $51 million annually in 2025 and 2026 and $22 million in 2027 for customer energy-efficiency and demand response programs. In addition, the order approved performance incentives applicable to each plan year to earn revenues by achieving certain spending and demand response goals. If 100% of the goals are achieved in 2025, 2026, and 2027, Ameren Missouri would earn performance incentive revenues of $5 million, $5 million, and $2 million, respectively.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
transmission capital investments included in the order, among other things. In January 2024, the ICC denied Ameren Illinois’ rehearing request, and Ameren Illinois filed an appeal with the Illinois Appellate Court for the Fifth Judicial District. In January 2025, the appellate court ruled on the appeal filed by Ameren Illinois. In that ruling, the court reversed a reduction of planned transmission capital investments of $48 million, but affirmed the ICC-approved 9.44% ROE and the remaining reduction of planned distribution capital investments. Ameren Illinois took prudent steps to align its operations with the ICC order, while continuing to ensure safe and adequate service is maintained.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
billion. Ameren Illinois used a 2026 future test year in this proceeding. A decision by the ICC in this proceeding is required by early December 2025, with new rates expected to be effective in December 2025.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
In October 2024, the FERC issued an order, which decreased the allowed base ROE for FERC-regulated transmission rate base under the MISO tariff from 10.02% to 9.98% and required refunds, with interest, for the periods from November 2013 to February 2015 and from late September 2016 forward. In November 2024, the MISO transmission owners, including Ameren Missouri, Ameren Illinois, and ATXI, filed a request for rehearing with the FERC, arguing, among other things, the FERC should not have ordered refunds back to September 2016 or imposed interest on those refunds. Also in November 2024, another intervenor filed a request for rehearing with the FERC, requesting the FERC correct aspects of the ROE methodology used in the October 2024 order and reconsider its decision in a February 2015 complaint case to deny refunds for the period from February 2015 to May 2016. In December 2024, the FERC issued a notice indicating a future order related to the rehearing requests will be issued but did not specify a timeline. In January 2025, the MISO transmission owners, including Ameren Missouri, Ameren Illinois, and ATXI, filed an appeal of the October 2024 order to the United States Court of Appeals for the District of Columbia Circuit. As a result of the October 2024 order, Ameren and Ameren Illinois recognized reductions to electric revenues of $10 million and $7 million, respectively, and recognized interest expense of $2 million and $1 million, respectively, on their statements of income in 2024.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
•increased base rate revenues at Ameren Illinois Natural Gas effective November 28, 2023, pursuant to the November 2023 ICC natural gas rate order, partially offset by increased depreciation and amortization expenses included in base rates (4 cents per share); and
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
•increased taxes other than income taxes at Ameren Missouri, largely resulting from the absence in 2024 of employee retention tax credits received under the Coronavirus Aid, Relief, and Economic Security Act (2 cents per share).
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RemovedMD&A
(d)The electric deferred income tax adjustment relates to certain excess deferred income taxes that will be amortized through 2025. Offsetting expense increases or decreases are reflected within "Income Taxes" on the statement of income. This item has no overall impact on earnings.
Read it in 10-K Feb 18, 2025 at sec.govopen_in_new
RewordedMD&A
Base rates (estimate)(b) $ 62 249 $ 14 96 $ — $ 89 81 $ — $ 165 426 Effect of weather (estimate)(c) 3 66 — — — — 3 66 Retail sales volumes and changes in customer usage patterns (excluding the estimated effects of weather and MEEIA) 27 20 — — — — 27 Customer charges 2 20 RESRAM(d) (23) — — — — 2 (23) Rush Island Energy Center base rate revenue deferral (13) — — — — (13) MEEIA 2019 performance incentives 1 Securitized utility tariff bond surcharges 46 — — — — 1 46 Off-system sales, capacity, transmission, and FAC revenues, net 96 452 — — — — 96 Recovery of power restoration efforts provided to other utilities 1 3 — — — 4 452 Ameren Illinois energy-efficiency program investment revenues — 21 12 — — — 21 Electric deferred income tax adjustment(d) — (23) 12 Other 4 18 — — — (23) Other 6 4 — 15 (15) 10 (6) 16 Cost recovery mechanisms – offset in fuel and purchased power(e) (54) (193) (12) 201 — — (12) (259) (41) 148 Other cost recovery mechanisms(f) 22 45 (5) (17) — — — 67 (22) Total electric revenue change $ 153 784 $ (129) 310 $ — $ 104 81 $ (27) (47) $ 101 1,128 Natural gas revenue change:
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Ameren Missouri’s ability to obtain CCNs from the MoPSC, and any other required state or federal approvals for the addition of renewable resources, battery storage, or nuclear or natural gas-fired generation, retirement of energy centers, and new or continued customer energy-efficiency programs; the ability to enter into agreements for renewable, natural gas-fired, or nuclear generation or battery storage and acquire or construct that generation those resources at a reasonable cost; the ability of suppliers, contractors, and developers to meet contractual commitments and timely complete projects, projects timely, which is dependent upon the availability of necessary labor, materials, and equipment, geopolitical conflict, or government actions, among other things; changes in the scope and timing of projects; the ability to enter into natural gas supply agreements at reasonable prices and adequate quantities to power Ameren Missouri’s natural gas-fired energy centers; the continued existence and ability to qualify for, and use or transfer, federal production or investment tax credits; the ability to maintain system reliability; new and/or changes in environmental regulations, including those related to CO2 and other greenhouse gas emissions; energy prices; and demand;
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
DRPlus and 401(k)(b)(c) Various $ 44 $ 40 $ 47 ATM program(d) Various 530 233 299 Total Ameren common stock issuances(e) $ 574 $ 273 $ 346 Maturities of Long-term Debt Ameren: 2.50% Senior unsecured notes due 2024 September $ — $ 450 $ Ameren Missouri: 3.50% Senior secured notes due 2024 April — 350 4.85% Securitized utility tariff bonds due 2039(a) October 17 — Ameren Missouri: Illinois: 3.25% First mortgage bonds due 2025 June 300 — ATXI: 3.43% Senior unsecured notes due 2050 August — 49 Total Ameren long-term debt maturities $ 317 (f) $ 849 (f)
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Month Issued, Redeemed, Repurchased, or Matured 2025 2024 2023 Issuances of Long-term Debt Ameren: 5.70% 5.375% Senior unsecured notes due 2026 November 2035 March $ 749 $ — $ 599 5.00% Senior unsecured notes due 2029 December — 699 Ameren Missouri: 5.25% First mortgage bonds due 2054 January — 347 — 5.45% 5.25% First mortgage bonds due 2053 March 2035 April 500 — 499 5.20% First mortgage bonds due 2034 April — 499 — 5.125% First mortgage bonds due 2055 October — 449 — 4.85% Securitized utility tariff bonds due 2039(a) December — 476 — Ameren Illinois: 4.95% 5.625% First mortgage bonds due 2033 May 2055 March 350 — 498 5.55% First mortgage bonds due 2054 June — 624 5.625% First mortgage bonds due 2055 September 361 — ATXI: 5.17% Senior unsecured notes due 2039 August — 70 — 5.42% Senior unsecured notes due 2053 August — 70 — Total Ameren long-term debt issuances $ 1,960 $ 2,535 $ 2,295 Issuances of Common Stock Ameren:
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Energy costs (excluding the estimated effect of weather) $ 95 459 $ — $ $ $ — $ 95 459 Effect of higher net energy costs included in base rates 22 weather (estimate)(a) 11 — — — — 22 Retail sales volumes 6 11 Transmission service charges 10 — — — — 6 Transmission service charges 8 10 Other (1) — — — — 8 Other (3) — — — — (2) (3) Cost recovery mechanisms – offset in electric revenue(a) (54) (193) revenue(b) (12) 201 — — (12) (259) (41) 148 Total fuel and purchased power change $ 74 467 $ (193) 201 $ $ $ (12) (43) $ (131) 625
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Base rates (estimate) $ 9 $ — $ 4 $ — $ — $ 47 $ — $ — $ 47 Sales volume (excluding the estimated effects 13 Effect of weather) 2 weather (estimate)(c) 12 — — — — 2 Effect of weather (estimate)(c) 12 Other 1 — — — — 1 Other — — 3 — — 3 Cost recovery mechanisms – offset in natural gas purchased for resale(e) (20) (4) — (16) 23 — — (36) 19 Other cost recovery mechanisms(f) (2) — 7 — — 5 3 — — 3 Total natural gas revenue change $ (19) 18 $ — $ 41 30 $ — $ — $ 22 48
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
In addition to changes by segment as segments discussed below, other operations and maintenance expenses decreased $34 $18 million in 2024 for activity not reported as part of a segment, as reflected in “Other/Intersegment Eliminations” above, primarily because of a $14 million increase in the elimination of intercompany rent related to ATXI’s operations control center discussed below; a $10 million increase in the elimination of the non-service cost component of net periodic benefit income at Ameren Services; and a $8 million gain on the sale of land. above.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Other income, net, decreased $2 $16 million in 2024, 2025, compared with 2023 2024, primarily due to a decrease of $5 million in lower allowance for equity funds used during construction, primarily related to lower average construction work in progress balances and a decrease of $2 $13 million in the reduction in non-service cost component of net periodic benefit income. income and an increase of $5 million in charitable donations.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Ameren Illinois’ cash used in investing activities decreased $267 increased $18 million during 2024, 2025, compared with 2023, 2024, due to a decrease an increase in capital expenditures, largely resulting from increased expenditures for natural gas and electric distribution infrastructure upgrades as well as increased expenditures related to major storms, partially offset by decreased expenditures for electric transmission infrastructure upgrades. infrastructure.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Depreciation and amortization expenses increased $203 million, $134 million, decreased $22 million and $63 $57 million at Ameren, Ameren and Ameren Missouri, respectively, and increased $33 million at Ameren Illinois, respectively, primarily because of additional property, plant, and equipment investments across their respective segments. Illinois.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Base rate Additionally, revenues were unfavorably favorably affected by a decrease in the allowed base ROE under the MISO tariff resulting from absence of the October 2024 FERC order, which included customer refunds order that decreased base ROE for certain historical periods (-$7 (+$10 million).
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Base rate Additionally, revenues were unfavorably favorably affected by a decrease in the allowed base ROE under the MISO tariff resulting from absence of the October 2024 FERC order, which included customer refunds order that decreased base ROE for certain historical periods (-$7 (+$7 million).
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
Quiet changesMD&A
Related to these projects, Ameren began substation upgrades in May 2024 in advance of transmission line construction, which is expected to begin in spring 2026, with forecasted completion dates near the end of this decade.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
Quiet changesMD&A
Related to these projects, Ameren began substation upgrades in May 2024 in advance of transmission line construction, which is expected to begin in spring 2026, with forecasted completion dates near the end of this decade.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
Quiet changesMD&A
Ameren Illinois will reconcile reconciles its actual revenue requirement, as adjusted for certain cost variations, to ICC-approved electric distribution service rates on an annual basis, subject to a reconciliation cap.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new