Screener / SEC EDGAR /CIK 0001780312 /10-K filed Mar 2, 2026, compared with Mar 3, 2025 /Numbers from the XBRL of the 10-Ks
Nasdaq Communication · Communications Services

AST SpaceMobile, Inc. ASTS

Compare with peers Embed
New in the 10-K 23 paragraphs with nothing like them in the 10-K filed Mar 3, 2025 New in the 10-Q 55 paragraphs not in the 10-Q filed Aug 10, 2026 10-Q against the 10-K 13 risk factor paragraphs and sentences added or reworded

New risk paragraphs, branching off last year

Each branch is a paragraph in Risk Factors with nothing like it in the 10-K filed Mar 3, 2025. A box jumps to the paragraph as filed, below.

23 new

Paragraphs with nothing like them in last year's 10-K

Quoted exactly

23 paragraphs in Risk Factors of the 10-K filed Mar 2, 2026 with nothing like them in the 10-K filed Mar 3, 2025. Quoted exactly. Paragraphs that were only edited are under 10-K change.

•We face risks related to our international operations, including global economic conditions and exchange rate fluctuations.

Read in the 10-K

•The Ligado Transaction may not be consummated, and may be impacted by ongoing litigation.

Read in the 10-K

•increases in the costs of materials or services, including due to tariffs and inflation;

Read in the 10-K

In March 2025, our subsidiaries AST & Science, LLC (“AST LLC”) and Spectrum USA I, LLC (“SpectrumCo”) entered into agreements with Ligado Networks LLC under which we will receive long-term access to up to 45 MHz of lower mid-band spectrum in the United States for direct-to-device satellite applications (the “Ligado Transaction”). The agreements were entered into as part of the restructuring of Ligado LLC, which together with certain of its direct and indirect subsidiaries (together with Ligado Networks LLC, “Ligado”) filed voluntary petitions for relief under Chapter 11 of the United States Bankruptcy Code in the United States Bankruptcy Court for the District of Delaware (the “Bankruptcy Court”) on January 5, 2025. The Bankruptcy Court approved the Ligado Transaction on June 23, 2025 and confirmed Ligado’s Chapter 11 plan of reorganization (the “Ligado Chapter 11 Plan”) on or about September 29, 2025.

Pursuant to the Ligado Transaction, we agreed to pay Ligado consideration totaling $550.0 million in cash and, provided that the Ligado Chapter 11 Plan has been confirmed and the financial sponsors of Ligado provide a backstop to Ligado that is acceptable to the Company in support of a full refund of payments by Ligado in the event applicable regulatory approvals are not obtained and the closing does not occur (the “Backstop Commitment”), of such amount $535.0 million will be paid to Ligado for the benefit of Inmarsat as follows: $420.0 million on October 31, 2025, $100.0 million on March 31, 2026 and $15.0 million upon receipt of specified regulatory approvals and the closing of the Ligado Transaction. The remaining $15.0 million will be paid directly to Ligado upon closing of the Ligado Transaction. We have made the first $420.0 million payment to Ligado for the benefit of Inmarsat, which was required to be made by October 31, 2025. The $520 million Backstop Commitment has been memorialized in an amendment to Ligado’s debtor-in-possession financing arrangements and has been approved by the Bankruptcy Court. The funds under the $520 million Backstop Commitment will be available to be drawn by Ligado in the event the applicable regulatory approvals are not obtained in accordance with the definitive documents between us and Ligado, and is subject to the satisfaction of certain other conditions. The proceeds of the Backstop Commitment can only be used to refund us for the amounts that we paid to Ligado for the benefit of Inmarsat prior to receipt of the applicable regulatory approvals.

In connection with the Ligado Transaction, BackstopCo, LLC, a subsidiary of AST LLC (“BackstopCo”), entered into a loan agreement with UBS AG, Stamford Branch, as lender (the “UBS Loan Agreement”) on October 31, 2025, under which we undertook a cash collateralized term loan in an aggregate principal amount of $420.0 million, to finance the first $420.0 million payment to Ligado for the benefit of Inmarsat. Additionally, in connection with the Ligado Transaction, SpectrumCo entered into the $550 million Sound Point Credit Facility. The availability of the delayed-draw term loan under the Sound Point Credit Facility to SpectrumCo is subject to satisfaction of certain conditions, including, among others, receipt of regulatory approvals and the closing of the Ligado Transaction.

Read in the 10-K

Before we begin providing full commercial service in the United States, we will need a grant of the remaining aspects of our Modification Application. We expect that, if approved, the FCC will apply routine conditions that will govern our operations. However, we cannot be sure that additional regulatory approvals will be forthcoming or, if received, that they will be issued in a timely manner and on terms and conditions that will allow us to meet our business plan. We are also required to meet certain launch and operational milestones for our satellite constellation. If we do not meet those milestones, we risk losing access to some of our spectrum. To commence commercial service outside the United States, we will need to obtain additional approvals from the relevant non-U.S. regulatory authorities. If we are unable to obtain such regulatory approvals, we would not be able to operate in those jurisdictions. Additionally, government regulators, including the FCC, may adopt expansive views of the scope of their regulatory authority and impose additional regulatory requirements on us. Government regulators may also decide to reallocate spectrum for other uses, making our access to the spectrum more difficult.

Read in the 10-K
Show the other 7

•securing necessary components on acceptable terms, in a timely manner and that meet our quality expectations;

Read in the 10-K

In addition, over the last several years, the U.S. government has shut down at times, including the extended government shutdown that began on October 1, 2025 and ended on November 13, 2025. If a prolonged government shutdown occurs in the future, including as a result of reaching the debt ceiling, it could significantly impact the ability of federal agencies to perform normal business functions on which the operation of our business may rely, including the ability of the FCC, the U.S. Department of Commerce and others to timely review and process our regulatory submissions, any of which could have a material adverse effect on our business.

Read in the 10-K

Our ability to obtain regulatory approval for the Ligado Transaction may also be impacted by pending litigation with Inmarsat Global Limited (“Inmarsat”). In June 2025 we entered into a settlement agreement with Ligado and Inmarsat (the “Mediated Agreement”), which was subsequently approved by the Bankruptcy Court and is binding on the parties to the Mediated Agreement. The Mediated Agreement provides, among other things, that Inmarsat will provide certain regulatory support for the Ligado Transaction. However, rather than perform its regulatory support obligations, Inmarsat filed an action in New York State Supreme Court (such action the “New York State Action”) in December 2025. In January 2026, we and Ligado filed motions before the Bankruptcy Court seeking to compel Inmarsat to perform its regulatory support obligations in accordance with the Mediated Agreement. In January 2026, the Bankruptcy Court granted our motion and Ligado’s motion and ordered Inmarsat to dismiss the New York State Action and to comply with its obligations under the Mediated Agreement, including by providing regulatory support before the Federal Communications Commission. Inmarsat has appealed the matter to the United States District Court for the District of Delaware. If the Bankruptcy Court’s ruling requiring Inmarsat to provide regulatory support is overturned on appeal, this could materially impair our ability to obtain regulatory approval for the Ligado Transaction.

Read in the 10-K

In addition, we may elect to pay certain sublease spectrum amounts payable under the sublease with Crown Castle MM Holding LLC in either cash or shares of Class A Common Stock, and we may elect to pay the annual spectrum usage fee owed to Ligado in cash or shares of Class A Common Stock. The total of the Crown Castle annual payment and the annual spectrum usage fee payment owed to Ligado payable by us that we have the option to pay in shares of our Class A Common Stock is approximately $96.0 million as of December 31, 2025.

These equity issuances, including the issuance of shares of Class A Common Stock upon the exercise of Ligado’s penny warrants and our election to pay sublease spectrum amounts and annual spectrum usage fees in the form of Class A Common Stock, would cause our shareholders to experience significant dilution and may have an adverse impact on the trading price of our Class A Common Stock.

Read in the 10-K

In order to finance a portion of the consideration owed in connection with the Ligado Transaction, on July 15, 2025, SpectrumCo entered into a credit agreement with Sound Point Agency LLC, as administrative agent and collateral agent, and the lenders from time to time party thereto which provides for a senior secured delayed-draw term loan facility in an aggregate principal amount of $550.0 million (the “Sound Point Credit Agreement”). SpectrumCo’s ability to draw the full amount of the loan under the Sound Point Credit Agreement is subject to the satisfaction of a number of conditions precedent, including receipt of regulatory applications currently pending before the Federal Communications Commission, which, for various reasons, may not occur.

Read in the 10-K

Additionally, in order to finance the first $420.0 million payment to Ligado for the benefit of Inmarsat, on October 31, 2025, BackstopCo entered into a loan agreement with UBS AG, Stamford Branch, as lender (the “UBS Loan Agreement”). The UBS Loan Agreement provides for a cash collateralized term loan facility (the “UBS Loan Facility”) in an aggregate principal amount of $420.0 million. BackstopCo is required to maintain cash or cash equivalents on deposit or credited to its collateral account in

an amount equal to (or in excess of) 102.0% of the outstanding principal amount of the loan under the UBS Loan Facility. The UBS Loan Facility is further secured by substantially all of BackstopCo’s assets (which includes the right to receive the refund amount from Ligado in the event the applicable regulatory approvals are not obtained). Such assets are not available for other potential senior secured financings by AST.

Read in the 10-K

Changes in U.S. trade policy, including changes to existing trade agreements and any resulting changes in international trade relations, may have a material adverse effect on our business, prospects, financial condition or operating results.

The recent change in the U.S.’s approach to international trade has impacted and may continue to impact existing bilateral or multi-lateral trade agreements and treaties with foreign countries. The U.S. has imposed tariffs on certain foreign goods and may increase tariffs or impose new ones, and certain foreign governments have retaliated and may continue to do so. While certain tariffs have been paused or invalidated, ultimately trade policy decisions are outside of our control and may have consequences for our business, prospects, financial condition and operating results. Changes in trade policies, such as new tariffs or increases in tariffs, or reactionary measures, including retaliatory tariffs, restrictions or barriers on imports and exports, legal challenges, or currency manipulation, could adversely impact us. The implementation of these or other actions has begun to and may continue to lead to increased costs for our product components or reduce availability in our supply chain, which could impact the cost to design, develop and manufacture our satellites. Changes in U.S. trade policy and legal interpretations thereof have created ongoing turmoil in international trade relations, and it is unclear what future actions the U.S. government or foreign governments will or will not take with respect to tariffs or other international trade agreements and policies. Current trade negotiations may fail, which may exacerbate these risks. Ongoing or new trade wars or other governmental action related to tariffs or international trade agreements or policies could increase our costs, adversely impact our supply chain or otherwise have a material adverse effect on our business, prospects, financial condition or operating results. While we intend to take steps to mitigate any impacts of tariffs or other impacts resulting from changes in trade policy, our ability to do so may be limited by operational, supply chain and other constraints.

Acquisitions, investments, partnerships, joint ventures and other strategic transactions involve a number of inherent risks, any of which could result in the benefits anticipated not being realized.

We regularly evaluate and consider strategic transactions such as acquisitions, investments, partnerships, joint ventures and other growth strategies, some of which could be material to our business. However, there is no assurance that we will be able to consummate any such transactions, that any of these strategic transactions will be able to achieve results that meet our expectations or that business judgments concerning the value, strengths and weaknesses of businesses and assets acquired will prove to be correct. Also, we cannot be certain that we will be able to successfully identify suitable acquisition candidates, investments or joint ventures partners, negotiate acquisitions of identified candidates, investments, partnerships, strategic transactions or joint ventures on terms acceptable to us, obtain any regulatory approvals or consents necessary to consummate any such acquisitions, investments, partnerships, joint ventures or strategic transactions, or integrate acquisitions that we complete.

Our ability to deliver the expected benefits from any acquisitions, investments, joint ventures or other strategic transactions that we complete is subject to numerous uncertainties and risks, including our ability to integrate personnel, financial, supply chain, IT and other systems successfully; disruption of our business and distraction of management and other critical personnel; the need to hire additional management and other critical personnel; and increasing the scope and complexity of our operations. If an acquired business fails to operate as anticipated or cannot be successfully integrated with our existing business, or if an investment

or joint venture fails to succeed as anticipated or any potential partner fails to perform as anticipated, it could have a material adverse effect on our business or financial condition. Moreover, the integration of businesses, investments, partnerships and joint venture arrangements may create complexity in our financial systems and internal controls and make them more difficult to manage. Such integration into our internal control system could cause us to fail to meet our financial reporting obligations. We will continue to analyze and evaluate the acquisition of strategic businesses, investments, partnerships, joint ventures and other strategic transactions with the potential to strengthen our position or enhance our business.

In connection with any strategic transaction or acquisition, we may acquire or inherit liabilities or defects such as legal claims, including those not identified during due diligence, such as third-party liability and other tort claims; claims for breach of contract; employment-related claims; environmental, health and safety liabilities, conditions or damage; permitting, regulatory or other compliance with law issues; liability for hazardous materials; or trade liabilities. If we acquire any of these liabilities, and they are not adequately covered by insurance or an enforceable indemnity or similar agreement from a creditworthy counterparty or are otherwise mitigated, we may be responsible for significant out-of-pocket expenditures.

Any future strategic transaction or acquisition may be financed by, among other alternatives, incurring additional indebtedness, issuing debt securities in the public or private capital markets, or issuing additional equity securities or convertible debt securities. Incurring additional debt would increase our leverage and potentially subject us to restrictive covenants contained in the instruments governing the debt, while issuing additional equity could result in dilution to our existing shareholders. Incurring debt or issuing equity would also impact our ability to access capital in the future. There is also no assurance that we would be able to raise the capital necessary to consummate any strategic transaction or acquisition.

Read in the 10-K

Paragraphs in the 10-Q filed Nov 9, 2026 that were not in the one before

New in the latest 10-Q

55 paragraphs in the 10-Q filed Nov 9, 2026 with nothing like them in the 10-Q filed Aug 10, 2026 (at least half the words must differ; new numbers alone do not count). Quoted exactly, grouped by the item heading above them. This is text that changed, not a judgement of how serious it is.

Financial statements and notes

operations. In the opinion of management, these unaudited condensed consolidated financial statements contain all adjustments (consisting only of normal and recurring adjustments) necessary to fairly state the unaudited condensed consolidated financial statements.

Read in the 10-Q

On June 27, 2025, the AST Companies entered into a Master Equipment Financing Agreement (the “MEFA”) with Trinity Capital, Inc. (“Trinity”), as agent (the “Agent”) and lender, and the other lenders party thereto (the “Lenders”) providing for a conditional commitment to provide financing of up to $100.0 million (“Trinity Capital Equipment Loan”).

Read in the 10-Q

On September 1, 2026, the Company entered into an amendment to the Schedules (the “Amendment”) with the Lenders. Under the Amendment, the Company made scheduled payments totaling $11.5 million, applied in inverse order of maturity, and received releases of the Lenders’ security interests in certain real property fixtures and equipment. The payments did not result in prepayment premiums, and no non-utilization fee is payable under the MEFA or any Schedule. The Company continues to make an aggregate monthly payment of approximately $1.1 million and an end of term payment of 9% of the drawn amounts. The Company evaluated the terms of the Amendment under ASC 470-50, Debt - Modifications and Extinguishments, and accounted for it as a debt modification. Fees of $2.4 million paid to the Lenders were capitalized and will be recognized as an adjustment to interest expense over the remaining term of the debt using the effective interest method. Fees paid to third parties are expensed as incurred.

Read in the 10-Q

The Company and certain of its current executive officers have been named as defendants in a putative stockholder class action lawsuit pending in the United States District Court for the Western District of Texas. The action is styled Hunter v. AST SpaceMobile, Inc. et al., No. 7:26-cv-00378 (W.D. Tex.) (the “Securities Class Action”). The complaint in the Securities Class Action, which was filed on September 14, 2026, alleges that defendants violated the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and SEC Rule 10b-5 promulgated thereunder by making false and misleading statements and omissions, and that the current executive officers named as defendants are control persons under Section 20(a) of the Exchange Act. The complaint was filed on behalf of stockholders who purchased shares of the Company’s common stock between March 4, 2025 and July 16, 2026, and seeks monetary damages on behalf of the purported class.

Read in the 10-Q

Legal proceedings

The Company has been named as a nominal defendant and certain of its current and former executive officers and directors have been named as defendants in two derivative lawsuits filed in the United States District Court for the Western District of Texas on October 21, 2026 and November 5, 2026, respectively. The actions are styled Papa et al. v. Avellan et al., No. 7:26-cv-00430 (W.D. Tex.) and Paul et al. v. Avellan et al., No. 7:26-cv-00446 (W.D. Tex.) (the “Derivative Actions”). The complaints assert claims under the Exchange Act and for breach of fiduciary duty, unjust enrichment, abuse of control, gross mismanagement, and waste of corporate assets against all defendants, and claims for contribution under the Exchange Act against certain of the defendants. The Derivative Actions seek compensatory damages, disgorgement of compensation and profits, revisions to the Company’s governance and internal procedures, and attorneys’ fees and costs.

Read in the 10-Q
Show the other 50

The Securities Class Action and the Derivative Actions are at an early stage. The Company intends to defend itself and its current and former directors and officers vigorously against the claims alleged in the Securities Class Action and Derivative Actions.

Read in the 10-Q

Financial statements and notes

In addition, the Company is subject to various legal proceedings and claims that have arisen in the ordinary course of business and that have not been fully adjudicated.

Read in the 10-Q

15. Subsequent Events Firefly Agreements On November 6, 2026, the Company entered into a license agreement (the “License Agreement”) and a Supply and Services Agreement (the “Supply and Services Agreement”) with Firefly Aerospace, Inc. (“Firefly”) to build its own 20-ton rocket (“Blacklift”) to deploy BB satellites in LEO using Miranda and Vira engines from Firefly. Pursuant to the License Agreement, Firefly will grant the Company a perpetual license to manufacture the Miranda and vacuum-variant Vira engines. In consideration for the license, the Company will pay Firefly $400.0 million in cash and an estimated 10 to 14 million in shares of the Company’s Class A Common Stock, a portion of which is subject to lock-up, as determined by a forward VWAP calculation. The shares will be issued pursuant to an effective registration statement of the Company filed with the Securities and Exchange

Read in the 10-Q

Commission; however, 2.4 million shares will be freely tradable at closing, with the remaining shares subject to a lock-up that permits additional shares to be sold at six months, one year and three years post-closing.

Read in the 10-Q

Pursuant to the Supply and Services Agreement, Firefly will supply the Company engines for the first three Blacklift rockets and provide engineering and other support services over a three-year period. As consideration for the Supply and Services Agreement, the Company will pay Firefly (1) a services fee of $250.0 million over a three-year period and (2) a hardware fee of $250.0 million for the delivery of the engines for its first three rockets.

Read in the 10-Q

Closing of the License Agreement and the Supply and Services Agreement is expected to occur in the fourth quarter of 2026, subject to customary closing conditions.

Read in the 10-Q

On November 6, 2026, the Company and Rakuten Group, Inc. (“Rakuten”) agreed to establish a joint venture (“Rakuten AST, Inc.” or “RAST”) in Japan to own and operate a constellation of mid-band LEO satellites (“J-LEO Constellation”). The J-LEO Constellation is expected to be capable of providing direct-to-device (“D2D”) communications network in Japan to commercially available devices including in the event of disasters and other emergencies, and D2D communications network globally subject to regulatory approvals.

Read in the 10-Q

Rakuten and the Company own 51% and 49%, respectively, of the voting common shares in RAST. Common share contributions were de minimis. The Japanese Ministry of Internal Affairs and Communications (the “Japanese MIC”) selected the joint proposal from Rakuten’s preparatory company and Rakuten Mobile, Inc. for the publicly solicited "J-LEO: Japan Low Earth Orbit Satellite Communications Project". RAST is expected to receive a grant of up to JPY 148.0 billion (approximately $938.0 million based on a dollar/yen exchange rate of 157.75) over approximately three years to deploy and manage the J-LEO Constellation. RAST is expected to be funded by the grant award and the Company’s investments in RAST through preferred shares subscriptions, as discussed below. Such funds will be used to buy satellites, launch support services, and software licenses from the Company, and establish the infrastructure to deploy and manage the J-LEO Constellation.

Read in the 10-Q

The Company will subscribe for no-coupon preferred shares to fund the remaining cost (above the grant award) for the deployment of the J-LEO Constellation. The preferred shares will have a liquidation preference over common shares in case of dissolution or termination of RAST. The J-LEO Constellation will be used by RAST and Rakuten to provide services in Japan and three exclusive markets. RAST will receive 100% of the revenue generated in the three exclusive markets. The remaining capacity of the J-LEO Constellation will be used solely by the Company to provide services to its customers worldwide subject to regulatory approvals, with the Company sharing a pre-determined low single digit percentage of qualifying revenue with RAST. The revenue earned by RAST is expected to be used, subject to shareholders deciding otherwise, to reinvest in expanding the constellation and buying additional satellites from the Company.

Read in the 10-Q

The joint venture agreement (“Joint Venture Agreement”) contemplates a series of commercial agreements to be entered into by RAST, Rakuten and the Company, including a satellite supply agreement (the “Satellite Supply Agreement”) and a Mission Control and Monitoring System Software License Agreement (the “Rakuten License Agreement”) that were signed as part of the closing of the joint venture. Under the Satellite Supply Agreement, the Company will supply satellites to RAST. Under the Rakuten License Agreement, the Company will provide a non-exclusive, non-transferable and non-sublicensable license to RAST of the Company’s mission control and monitoring software to establish the Japan satellite operations center and the Japan payload operations center. In consideration for the license, RAST will pay the Company a one-time license fee of $75.0 million.

Read in the 10-Q

The term of the joint venture ends on the later of (i) the 8th anniversary of the Joint Venture Agreement closing or (ii) the permanent retirement of the last satellite, unless extended or terminated earlier pursuant to the terms of the Joint Venture Agreement.

Read in the 10-Q

• our ability to successfully develop and build our own rockets on time, or at all, using the engine architecture and intellectual property licensed from Firefly;

Read in the 10-Q

• our ability to develop, manufacture, and deliver the mid-band satellites to RAST on time, or at all, and to ensure the proper functioning of the satellites to meet the service standards and timeline required of the grant received by RAST to fund the J-LEO Constellation;

Read in the 10-Q

On November 6, 2026, we entered into a license agreement (the “License Agreement”) and a Supply and Services Agreement (the “Supply and Services Agreement”) with Firefly Aerospace, Inc. (“Firefly”) in an effort to build our own 20-ton rocket (“Blacklift”) to deploy BB satellites in LEO using Miranda and Vira engines from Firefly. Refer to the “Liquidity and Capital Resources” section below for further details.

Read in the 10-Q

On November 6, 2026, we and Rakuten Group, Inc. (“Rakuten”) agreed to establish a joint venture (“Rakuten AST, Inc.” or “RAST”) in Japan to own and operate a constellation of mid-band LEO satellites (“J-LEO Constellation”). The J-LEO Constellation is expected to be capable of providing direct-to-device (“D2D”) communications network in Japan to commercially available devices including in the event of disasters and other emergencies, and D2D communications network globally subject to regulatory approvals. Refer to the “Liquidity and Capital Resources” section below for further details.

Read in the 10-Q

On November 6, 2026, we entered into a License Agreement and a Supply and Services Agreement with Firefly to build our own 20-ton rocket (“Blacklift”) to deploy BB satellites in LEO using Miranda and Vira engines from Firefly.

Read in the 10-Q

Pursuant to the License Agreement, Firefly will grant us a perpetual license to manufacture the Miranda and vacuum-variant Vira engines. In consideration for the license, we will pay Firefly $400.0 million in cash and an estimated 10 to 14 million in shares of our Class A Common Stock, a portion of which is subject to lock-up, as determined by a forward VWAP calculation. The shares will be issued pursuant to an effective registration statement of the Company filed with the Securities and Exchange Commission; however, 2.4 million shares will be freely tradable at closing, with the remaining shares subject to a lock-up that permits additional shares to be sold at six months, one year and three years post-closing.

Read in the 10-Q

Pursuant to the Supply and Services Agreement, Firefly will supply us engines for the first three Blacklift rockets and provide engineering and other support services over a three-year period. As consideration for the Supply and Services Agreement, we will pay Firefly (1) a services fee of $250.0 million over a three-year period and (2) a hardware fee of $250.0 million for delivery of the engines for our first three rockets. The Supply and Services Agreement has a 36-month term, extendable by mutual agreement, unless early terminated pursuant terms of the Supply and Services Agreement.

Read in the 10-Q

Closing of the License Agreement and the Supply and Services Agreement is expected to occur in the fourth quarter of 2026, subject to customary closing conditions.

Read in the 10-Q

On November 6, 2026, we and Rakuten agreed to establish RAST, a joint venture, in Japan to own and operate a constellation of mid-band LEO satellites (“J-LEO Constellation”). The J-LEO Constellation is expected to be capable of providing direct-to-device (“D2D”) communications network in Japan to commercially available devices including in the event of disasters and other emergencies, and D2D communications network globally subject to regulatory approvals.

Read in the 10-Q

Rakuten and we own 51% and 49%, respectively, of the voting common shares in RAST. Common share contributions were de minimis. The Japanese Ministry of Internal Affairs and Communications (the “Japanese MIC”) selected the joint proposal from Rakuten’s preparatory company and Rakuten Mobile, Inc. for the publicly solicited "J-LEO: Japan Low Earth Orbit Satellite Communications Project". Rakuten AST is expected to receive a grant of up to JPY 148.0 billion (approximately $938.0 million based on a dollar/yen exchange rate of 157.75) to be paid over approximately three years to deploy and manage the J-LEO Constellation. RAST is expected to be funded by the grant award and our investments in RAST through preferred shares subscriptions, as discussed below. Such funds will be used to buy satellites, launch support services, and software licenses from us, and establish the infrastructure to deploy and manage the J-LEO Constellation.

Read in the 10-Q

We will subscribe for no coupon preferred shares to fund the remaining cost (above the grant award) for the deployment of the J-LEO Constellation. The preferred shares will have a liquidation preference over common shares in case of dissolution or termination of RAST. The amount of our subscription is subject to numerous factors such as satellite materials and launch costs and our preliminary estimate is that the subscription will be approximately $1.4 billion over an approximately three year period. The J-LEO Constellation will be used by RAST and Rakuten to provide services in Japan and three exclusive markets. RAST will receive 100% of the revenue generated in the three exclusive markets. The remaining capacity of the J-LEO Constellation will be used solely by us to provide services to our customers worldwide subject to regulatory approvals, with us sharing a pre-determined low single digit percentage of qualifying revenue with RAST. The revenue earned by RAST is expected to be used, subject to shareholders deciding otherwise, to reinvest in expanding the constellation and buying additional satellites from us.

Read in the 10-Q

The joint venture agreement (“Joint Venture Agreement”) contemplates a series of commercial agreements to be entered into by RAST, Rakuten and us, including a satellite supply agreement (the “Satellite Supply Agreement”) and a Mission Control and Monitoring System Software License Agreement (the “Rakuten License Agreement”) that were signed as part of the closing of the joint venture. Under the Satellite Supply Agreement, we will supply satellites to RAST. Under the Rakuten License Agreement, we will provide a non-exclusive, non-transferable and non-sublicensable license to RAST of our mission control and monitoring software to establish the Japan satellite operations center and the Japan payload operations center. In consideration for the license, RAST will pay the Company a one-time license fee of $75.0 million.

Read in the 10-Q

The term of the joint venture ends on the later of (i) the 8th anniversary of the Joint Venture Agreement closing or (ii) the permanent retirement of the last satellite, unless extended or terminated earlier pursuant to the terms of the Joint Venture Agreement.

Read in the 10-Q

On September 1, 2026, we entered into an amendment to the Schedules (the “Amendment”) with the Lenders. Under the Amendment, we made scheduled payments totaling $11.5 million, applied in inverse order of maturity, and received releases of the Lenders’ security interests in certain real property fixtures and equipment. The payments did not result in prepayment premiums, and no non-utilization fee is payable under the MEFA or any Schedule. We continue to make an aggregate monthly payment of approximately $1.1 million and an end of term payment of 9% of the drawn amounts.

Read in the 10-Q

• Ability to develop, manufacture, and deliver the mid-band satellites to RAST on time and to ensure the proper functioning of the satellites to meet the persistency requirement and timeline required of the grant received by RAST to fund the J-LEO Constellation;

Read in the 10-Q

• Ability to accurately estimate and meet the costs necessary to fund the build-out of the J-LEO Constellation,

Read in the 10-Q

• Ability to accurately estimate and meet the costs necessary to fund the development and build-out of Blacklift rockets, and;

Read in the 10-Q

Legal proceedings

The Company and certain of its current executive officers have been named as defendants in a putative stockholder class action lawsuit pending in the United States District Court for the Western District of Texas. The action is styled Hunter v. AST SpaceMobile, Inc. et al., No. 7:26-cv-00378 (W.D. Tex.) (the “Securities Class Action”). The complaint in the Securities Class Action, which was filed on September 14, 2026, alleges that defendants violated the Exchange Act, and SEC Rule 10b-5 promulgated thereunder by making false and misleading statements and omissions, and that the current executive officers named as defendants are control persons under Section 20(a) of the Exchange Act. The Complaint was filed on behalf of stockholders who purchased shares of the Company’s common stock between March 4, 2025 and July 16, 2026, and seeks monetary damages on behalf of the purported class.

Read in the 10-Q

The Company has been named as a nominal defendant and certain of its current and former executive officers and directors have been named as defendants in two derivative lawsuits filed in the United States District Court for the Western District of Texas on October 21, 2026 and November 5, 2026, respectively. The actions are styled Papa et al. v. Avellan et al., No. 7:26-cv-00430 (W.D. Tex.) and Paul et al. v. Avellan et al., No. 7:26-cv-00446 (W.D. Tex.) (the “Derivative Actions”). The complaints assert claims under the Exchange Act and for breach of fiduciary duty, unjust enrichment, abuse of control, gross mismanagement, and waste of corporate assets against all defendants, and claims for contribution under the Exchange Act against certain of the defendants. The Derivative Actions seek compensatory damages, disgorgement of compensation and profits, revisions to the Company’s governance and internal procedures, and attorneys’ fees and costs.

Read in the 10-Q

The Securities Class Action and the Derivative Actions are at an early stage. The Company intends to defend itself and its current and former directors and officers vigorously against the claims alleged in the Securities Class Action and Derivative Actions.

Read in the 10-Q

Additionally, the Company is subject to various legal proceedings and claims that have arisen in the ordinary course of business and that have not been fully adjudicated.

Read in the 10-Q

Risk Factors

We may not be able to launch our satellites, or operate our satellites after launch, successfully.

Read in the 10-Q

We rely on third parties to launch our satellites. If we fail to find third parties to launch our satellites or if the third parties fail to perform or delay their performance, the SpaceMobile Service may not be made operational in the anticipated timeframe or at all. There are a limited number of third parties with the capabilities to launch our satellites, some of which have launched services that could compete with the SpaceMobile Service and some of which only have a limited track record of being capable of launching our satellites. We have entered into launch agreements with multiple launch service providers that we believe will enable us to launch over 100 BB satellites by the end of 2028. Additionally, we have access to certain priority launches for U.S. Government missions alongside the DPAS rated program. Although we have secured contracts with various launch providers and have access to priority launches for U.S. Government missions alongside the DPAS rated program, our launch partners may encounter launch, deployment, or in-orbit delays or failures. Such delays or failures could slow the anticipated timeline of the SpaceMobile Service, our planned launch campaign or even lead to the damage or complete loss of our satellites, which would materially adversely affect our business, financial condition and results of operations.

Read in the 10-Q

We do not presently have long-term contracts with third parties to launch all of the satellites which we intend to launch.

Read in the 10-Q

Also, we may not be able to operate our satellites successfully due to mechanical deployment failures after launch or problems occurring during the deployment once in space. In addition, we may not achieve the desired altitudes to operate our satellites which could result in a failure of our satellites to operate as planned.

Read in the 10-Q

We may experience delays or other complications in the design and manufacture of Blacklift or could experience delayed launches or launch failures.

Read in the 10-Q

On November 6, 2026, we entered into a License Agreement and a Supply and Services Agreement with Firefly to build Blacklift, our own 20-ton rocket to deploy BB satellites in LEO using Miranda and Vira engines from Firefly. The successful development of our Blacklift rockets and related technology involves many uncertainties, some of which are beyond our control, including:

Read in the 10-Q

• whether we will receive and the timing of receipt of licenses and government approvals;

Read in the 10-Q

• meeting stated technological objectives and goals for the design on time, on budget and within target cost objectives;

Read in the 10-Q

• our ability to obtain additional required approvals, licenses or certifications from regulatory agencies and maintain current approvals, licenses or certifications;

Read in the 10-Q

• performance of our manufacturing facility despite the risks of events or occurrences that could disrupt productions, such as natural disasters;

Read in the 10-Q

• performance of a limited number of suppliers for certain raw materials and supplied components and their willingness to do business with us;

Read in the 10-Q

• performance of our third-party contractors that support our research and development activities; and

Read in the 10-Q

• our ability to continue funding and maintaining our research and development activities.

Read in the 10-Q

Additionally, even if we are able to successfully develop and manufacture our Blacklift rockets, we may experience delayed launches or launch failures. Delays in launching launch vehicles are common and can result from manufacturing delays, supply chain delays, natural or man-made disasters, adverse weather conditions or issues at the facilities used for testing, training, and operating space-related activities, including launch sites, delays in obtaining required regulatory approvals, regulatory standards preventing us from launching at certain times, unexpected national priority events, launch failures, and unexpected events or disruptions that occur during transportation of launch vehicles or other equipment to the launch payload processing facility. If launch vehicle schedules are not met, a launch opportunity may not be available at the time the satellites are ready to be launched. In addition, launch vehicles or satellite deployment mechanisms may fail, which could result in the destruction of any satellites we have in that launch vehicle or an inability for the satellites to perform their intended mission.

Read in the 10-Q

Any delays or other complications in the design and manufacture of Blacklift or delayed launches or launch failures in the future could materially adversely affect our business, financial condition and results of operations.

Read in the 10-Q

Other information

On November 6, 2026, we entered into the License Agreement and the Supply and Services Agreement with Firefly to build our own 20-ton rocket to deploy BB satellites in LEO using Miranda and Vira engines from Firefly.

Read in the 10-Q

On November 6, 2026, we and Rakuten agreed to establish a joint venture in Japan to own and operate a constellation of mid-band LEO satellites. The J-LEO Constellation is expected to be capable of providing direct-to-device communications network in Japan to commercially available devices including in the event of disasters and other emergencies, and D2D communications network globally subject to regulatory approvals.

Read in the 10-Q

For information regarding the above transactions and agreements, see Note 15 Subsequent Events of our notes to the unaudited condensed consolidated financial statements included in Part I, Item 1 of this Quarterly Report, which section is incorporated by reference into this Part II, Item 5.

Read in the 10-Q

The 10-Q's risk factors against the 10-K

Item 1A of the 10-Q filed Nov 9, 2026 against Item 1A of the 10-K filed Mar 2, 2026. A 10-Q repeats only the risks that changed, so a 10-K paragraph that is missing from it is not counted as removed. Added is a paragraph with nothing like it in the 10-K, Reworded a sentence that is in both with several words changed, Quiet changes a sentence in both where one to four words changed and one is a hedge or a modal (cut words struck through, new words highlighted). Text on the page, not a score; each links to the filing at sec.gov.

What the 10-Q itself says about its risk factors:For a detailed discussion of the risks and uncertainties related to our business, please refer to the section titled “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2025 filed with the SEC on March 2, 2026. There have been no material changes from the risk factors set forth in our Annual Report on Form 10-K for the year ended December 31, 2025, except as specified below.

Read in the 10-Q
Added10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
We do not presently have long-term contracts with third parties to launch all of the satellites which we intend to launch.

Read it in the 10-Q at sec.gov

Added10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
We may experience delays or other complications in the design and manufacture of Blacklift or could experience delayed launches or launch failures.

Read it in the 10-Q at sec.gov

Added10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
On November 6, 2026, we entered into a License Agreement and a Supply and Services Agreement with Firefly to build Blacklift, our own 20-ton rocket to deploy BB satellites in LEO using Miranda and Vira engines from Firefly. The successful development of our Blacklift rockets and related technology involves many uncertainties, some of which are beyond our control, including:

Read it in the 10-Q at sec.gov

Added10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
• meeting stated technological objectives and goals for the design on time, on budget and within target cost objectives;

Read it in the 10-Q at sec.gov

Show the other 8
Added10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
• our ability to obtain additional required approvals, licenses or certifications from regulatory agencies and maintain current approvals, licenses or certifications;

Read it in the 10-Q at sec.gov

Added10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
• performance of our manufacturing facility despite the risks of events or occurrences that could disrupt productions, such as natural disasters;

Read it in the 10-Q at sec.gov

Added10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
• performance of a limited number of suppliers for certain raw materials and supplied components and their willingness to do business with us;

Read it in the 10-Q at sec.gov

Added10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
Additionally, even if we are able to successfully develop and manufacture our Blacklift rockets, we may experience delayed launches or launch failures. Delays in launching launch vehicles are common and can result from manufacturing delays, supply chain delays, natural or man-made disasters, adverse weather conditions or issues at the facilities used for testing, training, and operating space-related activities, including launch sites, delays in obtaining required regulatory approvals, regulatory standards preventing us from launching at certain times, unexpected national priority events, launch failures, and unexpected events or disruptions that occur during transportation of launch vehicles or other equipment to the launch payload processing facility. If launch vehicle schedules are not met, a launch opportunity may not be available at the time the satellites are ready to be launched. In addition, launch vehicles or satellite deployment mechanisms may fail, which could result in the destruction of any satellites we have in that launch vehicle or an inability for the satellites to perform their intended mission.

Read it in the 10-Q at sec.gov

Added10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
Any delays or other complications in the design and manufacture of Blacklift or delayed launches or launch failures in the future could materially adversely affect our business, financial condition and results of operations.

Read it in the 10-Q at sec.gov

Reworded10-Q Nov 9, 2026 vs 10-K Mar 2, 2026
We have entered into launch agreements with multiple launch service providers which that we believe will enable us to continue our planned launch campaign to launch over 60 Block 2 100 BB satellites. satellites by the end of 2028.

Read it in the 10-Q at sec.govThe 10-K sentence

Phrases used for the first time

Two-word phrases in Risk Factors of the 10-K filed Mar 2, 2026 that are in none of the 1 earlier 10-Ks stored, back to Mar 3, 2025

sound point ×10point credit ×9ubs loan ×8investments partnerships ×6currently funded ×5funded constellation ×5constellation size ×5mediated agreement ×5regulatory support ×5chapter plan ×4backstop commitment ×4trade policy ×4trade agreements ×4supply chain ×4acquisitions investments ×4partnerships joint ×4
Where each one is used
  • sound point: In connection with the Ligado Transaction, BackstopCo, LLC, a subsidiary of AST LLC (“BackstopCo”), entered into a loan agreement with UBS AG, Stamford Branch, as lender (the “UBS Loan Agreement”) on October 31, 2025, under which we undertook a cash collateralized term loan in an aggregate principal amount of...
  • point credit: In connection with the Ligado Transaction, BackstopCo, LLC, a subsidiary of AST LLC (“BackstopCo”), entered into a loan agreement with UBS AG, Stamford Branch, as lender (the “UBS Loan Agreement”) on October 31, 2025, under which we undertook a cash collateralized term loan in an aggregate principal amount of...
  • ubs loan: In connection with the Ligado Transaction, BackstopCo, LLC, a subsidiary of AST LLC (“BackstopCo”), entered into a loan agreement with UBS AG, Stamford Branch, as lender (the “UBS Loan Agreement”) on October 31, 2025, under which we undertook a cash collateralized term loan in an aggregate principal amount of...
  • investments partnerships: Acquisitions, investments, partnerships, joint ventures and other strategic transactions involve a number of inherent risks, any of which could result in the benefits anticipated not being realized.
  • currently funded: •our inability to obtain capital in the public and private markets to finance the SpaceMobile Service and related infrastructure, products and services beyond the currently funded constellation size on acceptable terms or at all;
  • funded constellation: •our inability to obtain capital in the public and private markets to finance the SpaceMobile Service and related infrastructure, products and services beyond the currently funded constellation size on acceptable terms or at all;
  • constellation size: •our inability to obtain capital in the public and private markets to finance the SpaceMobile Service and related infrastructure, products and services beyond the currently funded constellation size on acceptable terms or at all;
  • mediated agreement: Our ability to obtain regulatory approval for the Ligado Transaction may also be impacted by pending litigation with Inmarsat Global Limited (“Inmarsat”). In June 2025 we entered into a settlement agreement with Ligado and Inmarsat (the “Mediated Agreement”), which was subsequently approved by the Bankruptcy Court...

The 10-K at sec.gov

Used at least twice, small words left out. Counted, not picked: a phrase can be new because the company renamed something.

What was taken out

18 paragraphs of last year's Risk Factors with nothing like them now. The longest are quoted.

Across all companies
If we identify future deficiencies in our internal control over financial reporting or if we are unable to comply with the demands that are placed upon us as a public company, including the requirements of Section 404 of the Sarbanes-Oxley Act, in a timely manner, we may be unable to accurately report our financial results, or report them within the timeframes required by the SEC. We also could become subject to sanctions or investigations by the SEC or other regulatory authorities. In addition, if we are unable to assert that our internal control over financial reporting is effective, or...
In the 10-K filed Mar 3, 2025
On April 12, 2021, the Acting Chief Accountant and Acting Director of the Division of Corporation Finance of the SEC issued a Staff Statement on Accounting and Reporting Considerations for Warrants Issued by Special Purpose Acquisition Companies (“SPACs”) (the “SEC Staff Statement”). The SEC Staff Statement sets forth the conclusion of the SEC’s Office of the Chief Accountant that certain provisions included in the warrant agreements entered into by many special purpose acquisition companies require such warrants to be accounted for as liabilities measured at fair value, rather than as...
In the 10-K filed Mar 3, 2025
The trading market for our securities is influenced to some extent by the research and reports that industry or financial analysts publish about us and our business. We do not control these analysts, and the analysts who publish information about our company may have relatively little experience with us or our industry, which could affect their ability to accurately forecast our results and could make it more likely that we fail to meet their estimates. In the event we obtain securities or industry analyst coverage, if any of the analysts who cover us provide inaccurate research or issue...
In the 10-K filed Mar 3, 2025
We are required, pursuant to Section 404 of the Sarbanes-Oxley Act, to furnish a report on the effectiveness of our internal control over financial reporting as of the end of each fiscal year, which requires us to document and test our internal control over financial reporting. In support of such certification, we were required to document and make significant changes and enhancements, including hiring personnel and establishing our internal audit functions. Likewise, our independent registered public accounting firm was required to provide an attestation report on the effectiveness of our...
In the 10-K filed Mar 3, 2025

Sources

Item 1A of each 10-K and 10-Q on EDGAR, quoted exactly. Each paragraph links to the filing at sec.gov.

Also

10-K change: what was reworded or cut, section by section.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/ASTS/export.csv") into a cell.

Next:10-K change
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.