Screener / SEC EDGAR /CIK 0001691303 /10-K filed Feb 12, 2026, compared with Feb 13, 2025 /Numbers from the XBRL of the 10-Ks
NYSE Energy · Silver Ores

Warrior MET Coal, Inc. HCC

Compare with peers Embed
The 10-K against last year's

166 changes: 27 added, 26 removed, 111 reworded, 2 quiet changes

10-K Feb 12, 2026 vs Feb 13, 2025

10-K 0001193125-26-048914 (Feb 12, 2026) vs 10-K 0001691303-25-000010 (Feb 13, 2025)

Every paragraph, and how much of it changed

One bar per paragraph, in the order of the 10-K. Height and colour show the share of its words not in the closest paragraph a year earlier; the tallest bars are new paragraphs.

Risk Factors

331 paragraphs · 9 new · 92 reworded · 5 gone · 10-K Feb 12, 2026 against Feb 13, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 59 · 50% changed Every version of it
•difficulties •delays or delays challenges in securing integrating newly acquired federally owned mineral leases within into the mine plan; plan and obtaining associated approvals;
Paragraph 55 · 47% changed Every version of it
The We commenced longwall operations at Blue Creek in October 2025, eight months ahead of schedule. Although this represents a significant milestone in the development of Blue Creek will Creek, the completion of the remaining construction activities and the successful ramp‑up and operation of the longwall involve substantial risks. Our continued development and ongoing ramp‑up require substantial additional capital expenditures that we may not recover. In addition, during our development of Blue Creek the remaining construction, commissioning and early operating phases, we will face may encounter numerous financial, regulatory, operational, geological, environmental, political and legal uncertainties that are beyond our control and that may cause unforeseen delays in, or unexpectedly increase unexpected increases in costs. If the costs associated with, the completion of Blue Creek. Accordingly, remaining development and ramp‑up activities do not proceed as planned, we may not be able unable to complete achieve expected production levels, costs, margins or returns within the development of Blue Creek on schedule, anticipated timeframe—or at the budgeted cost or at all, and any such delays or increased costs all—which could have a material adverse effect on our financial condition, results of operations operations, liquidity or cash flows. We spent approximately $350.5 million on the development of Blue Creek in 2024, $716.5 million on the project to date and expect to invest approximately $225.0 to $250.0 million in 2025. Our planned development of Blue Creek involves numerous risks, including, but not limited to, the following:
Paragraph 64 · 45% changed Every version of it
•delays from associated with unexpected adverse geological and/or weather conditions, accidents, geotechnical variability, methane conditions, roof control challenges, or weather-related impacts, as well as accidents and other factors beyond our control;
Paragraph 196 · 40% changed Every version of it
In addition, federal, state or local regulatory agencies have the authority under certain circumstances following significant health and safety incidents, such as fatalities, to order a mine to be temporarily or permanently closed. If this occurred, we may be required to incur capital expenditures to re-open the mine. In the event that these agencies order the closing of our mines, our steelmaking coal sales contracts generally permit us to issue force majeure notices, which suspend our obligations to deliver steelmaking coal under these contracts; however, our customers may challenge our issuances of force majeure notices. If these challenges are successful, we may have to purchase steelmaking coal from third-party sources, if available, to fulfill these obligations or incur capital expenditures to re-open the mines and/or negotiate settlements with the customers, which may include price reductions, the reduction of commitments, and the extension of time for delivery or the termination of customers’ contracts. Any of these actions could have a material adverse effect on our business and results of operations.
Paragraph 86 · 39% changed Every version of it
Maintaining and expanding mines and related infrastructure is capital intensive. Specifically, the exploration, permitting and development of steelmaking coal reserves, mining costs, the maintenance of machinery, facilities and equipment and compliance with applicable laws and regulations require ongoing capital expenditures. While a significant amount of the capital expenditures required at our mines has been spent, we must continue to invest capital to maintain our production. In addition, any decisions to increase production at our existing mines or the development of the high-quality met coal recoverable reserves at Blue Creek could also affect our capital needs or cause future capital expenditures to be higher than in the past and/or higher than our estimates. We cannot assure you that we will be able to maintain our production levels or generate sufficient cash flow, or that we will have access to sufficient financing to continue our production, exploration, permitting and development activities at or above our present levels and on our current or projected timelines, and we may be required to defer all or a portion of our capital expenditures. Our results of operations, business and financial condition may be materially adversely affected if we cannot make such capital expenditures.
Paragraph 30 · 38% changed Every version of it
Additionally, we face risks related to ongoing wars, including the Russia-Ukraine war that began in February 2022 and the Israel-Hamas war that began in October 2023, as well as trade disruptions related to the conflict conflicts in the Persian Gulf Gulf, the Red Sea and Red Sea. Venezuela. The extent and duration of the military conflicts, resulting sanctions and other trade measures, and future market or supply disruptions in these and other regions, are impossible to predict, but could be significant and may have a severe adverse effect on the region. Globally, various governments, such as the European Union, have banned imports from Russia including commodities such as natural gas and coal. These events significantly impacted coking coal markets by disrupting previously existing trading patterns. The resulting volatility, including market expectations of potential changes in coal prices and inflationary pressures on steel products, may significantly affect prices for our coal or the cost of supplies and equipment.
Paragraph 159 · 36% changed Every version of it
Moreover, while we may publish voluntary disclosures regarding ESG matters from time to time, many of the statements in those voluntary disclosures are based on hypothetical expectations and assumptions that may or may not be representative of current or actual risks or events, or forecasts of expected risks or events, including the costs associated therewith. Such expectations and assumptions are necessarily uncertain and may be prone to error or subject to misinterpretation given the long timelines involved in measuring and reporting on many ESG matters. In addition, we may commit to certain ESG initiatives over time, such as investing capital in project and technologies to reduce our greenhouse gas emissions; however, we may not ultimately be able to achieve our goals or reach our commitments, either on the timeframes or costs initially anticipated or at all due to factors within or outside of our control. If we do not, or are perceived to not, adapt or comply with investor or stakeholder expectations and standards on ESG matters, we may suffer from reputational damage and increased risk of litigation or activism, which could materially and adversely affect our business, results of operations, financial position and cash flow.
Paragraph 189 · 36% changed Every version of it
In addition, the coal industry in the U.S. is affected by significant legislation mandating certain benefits for current and retired coal miners. Compliance with these requirements imposes significant costs on us and can result in reduced productivity. Moreover, the possibility exists that new health and safety legislation and/or regulations may be adopted and/or orders may be entered that may materially and adversely affect our mining operations. We must compensate employees for work-related injuries. If we do not make adequate provisions for our workers’ compensation liabilities, it could harm our future operating results. In addition, the erosion through tort liability of the protections we are currently provided by workers’ compensation laws could increase our liability for work-related injuries and materially and adversely affect our operating results.

MD&A

144 paragraphs · 18 new · 78 reworded · 21 gone · 10-K Feb 12, 2026 against Feb 13, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 9 · 49% changed
We have invested approximately $350.5 million in 2024 and $716.5 million project-to-date. We expect to spend $225 to $250 $240.3 million in 2025 and $956.8 million in the Blue Creek, project-to-date. While the longwall operations have recently commenced, there remains a significant amount of surface infrastructure to be completed to finish the overall project. Warrior remains on the continued development of budget and expects total Blue Creek and the remaining project capital expenditures of $54 $995 million to $109 million in $1.075 billion. The remaining amounts are expected to be primarily spent by the end of the first quarter of 2026.
Paragraph 100 · 49% changed
On December 6, 2021, we August 28, 2025, Warrior Met Coal, Inc. (the “Company”) entered into the that certain First Amendment to Second Amended and Restated Asset-Based Revolving Credit Agreement (the “Second Amended and Restated Credit Agreement”), “Amendment”), by and among us the Company and certain of our its subsidiaries, as borrowers, the guarantors party thereto, the lenders from time to time party thereto and Citibank, N.A. as administrative agent (in such capacity, the "Agent"), agent, which amends and restates in its entirety the Company's existing Second Amended and Restated Asset-Based Revolving Credit Agreement (as amended, (the “credit facility”, and the “ABL credit facility as amended by the Amendment, the “Amended ABL Facility”). The Second Amended and Restated Credit Agreement, Amendment, among other things, (i) extended increases the aggregate commitments available to be borrowed under the Amended ABL Facility by $27.0 million to $143.0 million; (ii) extends the maturity date of the credit facility to the earlier of (x) August 28, 2030 and (y) 91 days prior to the maturity date of the Company's 7.875% Senior Notes due 2028 (if such notes are still outstanding as of such date); and (iii) amends certain borrowing base calculations and other terms and provisions of the credit facility. As of December 31, 2025, no loans were outstanding under the Amended ABL Facility to December 6, 2026; (ii) changed the calculation and there were $2.5 million of the interest rate payable on borrowings from being based on a London Inter-Bank Offered Rate to be based on a Secured Overnight Financing Rate, with corresponding changes to the applicable interest rate margins with respect to such borrowings, (iii) amended certain definitions related to the calculation of the borrowing base; (iv) increased the commitments that may be used to issue letters of credit to $65.0 million; issued and (v) amended certain baskets contained in outstanding under the covenants to conform to the baskets contained in the indenture governing the Notes (the "Indenture"). The Second Amended and Restated Credit Agreement also allows us to borrow up to $116.0 ABL Facility. At December 31, 2025, we had $140.5 million through November 2026, subject to of availability under the borrowing base and other conditions. Amended ABL Facility.
Paragraph 28 · 48% changed
Our average net selling price per metric ton represents our coal net sales revenue divided by total metric tons of coal sold. In addition, our average net selling price per metric ton is net of the previously mentioned demurrage and quality specification adjustments. We normally compete on a delivered basis when negotiating contract and spot transactions with our global customers. However, depending on market dynamics and other circumstances, the burden of ocean freight may be borne entirely by the supplier, shared between both partners, or assumed entirely by the customer. In the instance when we are responsible for the freight, the freight costs will reduce our net sales revenues and impact our net selling price realizations.
Paragraph 102 · 47% changed
Borrowings under the Amended ABL Facility bear interest at a rate equal to either (i) SOFR, plus a credit adjustment spread, ranging currently from approximately 11 bps to 43 bps depending on the interest period selected by us, Secured Overnight Financing Rate ("SOFR"), or (ii) an alternate base rate plus, in each case of the foregoing (i) and (ii), an applicable margin, which is
Paragraph 21 · 46% changed
Our primary business, the mining We have one reportable segment identified as Mining which consists of Mine No. 4, Mine No. 7 and exporting of steelmaking coal for the steel industry, is conducted in one business segment: Mining. All other operations and results are reported under the “All Other” category as a reconciling item to consolidated amounts, which includes the business results from our sale of natural gas extracted as a byproduct from our underground coal mines, royalties from our leased properties and the business results related to the Blue Creek mine development. Our mine. We determined that our natural gas and royalty businesses do business did not meet the criteria in ASC 280, Segment Reporting, to be considered as operating or a reportable segments. segment. Therefore, we have included their results in an "all other" category as a reconciling item to consolidated amounts.
Paragraph 120 · 39% changed
As of December 31, 2024, we had $9.5 million of collateral recognized as short term investments. These investments were posted as collateral for the self-insured black lung related claims asserted by or on behalf of former employees of Walter Energy and its subsidiaries, which were assumed in the acquisition of certain assets of Walter Energy and relate to periods prior to March 31, 2016. We also had $43.4 million and $5.1 million in fixed income securities as of December 31, 2024 2025 and December 31, 2024, respectively, with maturities less than twelve months and the Company had no such investments as of December 31, 2023. months.
Paragraph 127 · 37% changed
Pursuant to the Amended Rights Agreement, one preferred stock purchase right (a “Right” or the “Rights”) was distributed to stockholders of the Company for each share of common stock of the Company outstanding as of the close of business on February 28, 2020. Initially, these Rights will not be exercisable and will trade with the shares of common stock. If the Rights become exercisable, each Right will initially entitle stockholders to buy one one-thousandth of a share of a newly created series of preferred stock designated as “Series A Junior Participating Preferred Stock” at an exercise price of $159.00 per Right. While the Amended Rights Agreement is in effect, any person or group that acquires beneficial ownership of 4.99% or more of the common stock or any existing stockholder who currently owns 5.00% or more of the common stock that acquires any additional shares of common stock (such person, group or existing stockholder, an "Acquiring Person") without approval from the Board would be subject to significant dilution in their ownership interest in the Company. In such an event, each Right will entitle its holder to buy, at the exercise price, common stock having a market value of two times the then current exercise price of the Right and the Rights held by such Acquiring Person will become void. The Amended Rights Agreement also gives discretion to the Board to determine that someone is an Acquiring Person even if they do not own 4.99% or more of the Common Stock but do own 4.99% or more in value of the outstanding stock, as determined pursuant to Section 382 of the Code and the regulations promulgated thereunder. In addition, the Board has established procedures to consider and approve requests to exempt certain acquisitions of the Company’s securities from the Amended Rights Agreement if the Board determines that doing so would not limit or impair the availability of the federal and state NOLs or is otherwise in the best interests of the Company and conditioned upon and subject to the satisfaction of certain continuing factual representations and covenants. The Board may redeem the Rights for $0.01 per Right at any time before any person or group triggers the Amended Rights Agreement. The distribution of the Rights is not a taxable event for stockholders of the Company and will not affect the Company’s financial condition or results of operations (including earnings per share).
Paragraph 77 · 37% changed
In addition, in connection with the acquisition of certain assets of Walter Energy, we assumed all black lung liabilities of Walter Energy and its U.S. subsidiaries incurred prior to March 31, 2016, for which we are self-insured. We have posted $18.6 million in surety bonds and $9.5 million of collateral recognized as short term investments in addition to maintaining a black lung trust of $1.4 million that was acquired from Walter Energy. We received a letter from the U.S. Department of Labor ("DOL") on February 21, 2020 under its new process for self-insurance renewals that would require us to increase the amount of collateral posted to $39.8 million, but we appealed such increase. We received another letter from the DOL on December 8, 2021 requesting additional information to support our appeal of the collateral requested by the DOL. On February 9, 2022, the DOL held a conference call with representatives from the Company related to our appeal. On July 12, 2022, we received a decision on our appeal from the DOL lowering the amount of collateral required to be posted from $39.8 million to $28 million. We appealed this decision. In addition, on January 19, 2023, the DOL proposed revisions to regulations under the Black Lung Benefits Act governing authorization of self-insurers, which was then subsequently revised as part of the final rules published on December 12, 2024, which became effective on January 13, 2025. 2025 (the "2025 Final Regulations"). The final rules require, 2025 Final Regulations required, among other requirements, all self-insured operators to post security of at least 100 percent of their projected black lung liabilities. On January 14, 2025, we received a letter from the DCMWC outlining the new procedures and application process for authorizing operators to self-insure under the new regulations. The changes letter outlined authorization form requirements and provided a 60-day period for the submission of the required documents. Subsequently, on February 20, 2025, we received another letter from the DCMWC stating that the 60-day deadline to provide information was no longer applicable and no information was required to be submitted at this time. DCWMC further stated that additional guidance would be provided in due course after consultation with the final rules required by the new DOL may leadership. We have posted $18.6 million in surety bonds and $9.9 million of collateral recognized as short term investments in addition to maintaining a greater impact on our profitability and cash flows in the future. black lung trust of $0.9 million that was acquired from Walter Energy.

A paragraph is matched with the one last year that shares the most of its words; under half in common makes it new. The paragraphs shown are the 8 reworded the most in each section.

The paragraph that changed most in each section

The redline

Marked against last year's 10-K: cut words struck through, new words highlighted.

Accounting Policies466 words changed in this paragraph; it is 47% similar to last year's version.
Property, Plant and Equipment Property, Plant and Equipment Property, plant and equipment are recorded at cost. Depreciation is recorded principally on the straight-line method over the estimated useful lives of the assets. Leasehold improvements are amortized on the straight-line method over the lesser of the useful life of the improvement or the remaining lease term. Estimated useful lives used in computing depreciation expense range from three to ten years for machinery and equipment, and from fifteen to thirty years for land improvements and buildings. Well life is used to estimate the useful life for gas properties and related development, and mine life is used for amortizing mine development costs. Gains and losses upon disposition are reflected in the Consolidated Statements of Operations in the period of disposition. Maintenance and repair expenditures are charged to cost of sales as incurred. Deferred Mine Development Costs of developing new underground mines and certain underground expansion projects are capitalized. Underground development costs, which are costs incurred to make the coal physically accessible, may include construction permits and licenses, mine design, construction of access roads, main entries, airshafts, roof protection and other facilities. Mine development costs are amortized primarily on a units-of-production basis over the estimated reserve tons directly benefiting from the capital expenditures. Costs amortized during the production phase of a mine are capitalized into inventory and expensed to cost of sales as the coal is sold. Coal sales revenue related to incidental production during the development phase are recorded as sales with an offset to cost of sales based on the estimated cost per ton sold for the mine when the asset is in place for its intended use. Amortization expense for mine development was $7.8 million, $5.5 million and $2.3 million for the years ended December 31, 2025, December 31, 2024 and December 31, 2023, respectively, and is included in depreciation and depletion in the accompanying Consolidated Statements of Operations. Owned and Leased Mineral Interests Costs to obtain coal reserves and lease mineral rights are capitalized based on cost or the fair value at acquisition and depleted using the units-of-production method over the life of proven and probable reserves. Lease agreements are generally long-term in nature (original terms range from 10 to 50 years) and substantially all of the leases contain provisions that allow for automatic extension of the lease term provided certain requirements are met. Depletion expense for mineral interests was $6.9 million, $8.4 million, and $7.3 million for the years ended December 31, 2025, December 31, 2024, and December 31, 2023, respectively, and is included in depreciation and depletion in the accompanying Consolidated Statements of Operations. Asset Retirement Obligations The Company has certain asset retirement obligations primarily related to mine closing reclamation costs, perpetual water care costs and other costs associated with dismantling and removing facilities. Asset retirement obligations are determined for each mine using various estimates and assumptions, including estimates of disturbed acreage as determined from engineering data, estimates of future costs to reclaim the disturbed acreage and the timing of related cash flows, discounted using a credit-adjusted, risk-free rate. The Company's asset retirement obligations also include estimates to reclaim gas wells in accordance with the Oil and Gas Board of Alabama. On at least an annual basis, the Company reviews the entire asset retirement obligation liability and makes necessary adjustments for permit changes, the anticipated timing of mine closures, and revisions to cost estimates and productivity assumptions to reflect current experience. As changes in estimates occur, the carrying amount of the obligation and asset are revised to reflect the new estimate after applying the appropriate credit-adjusted, risk-free discount rate. The future costs of these obligations are accrued at the estimated fair value in the period in which they are incurred if a reasonable estimate of fair value can be made. The present value of the estimated asset retirement cost is capitalized as part of the carrying amount of the long-lived asset. For sites where there is no asset, expense or income is recognized for changes in estimates.

Source: 10-K text, Note 2 – Summary of Significant Accounting Policies, 10-K 0001193125-26-048914 vs 10-K text, Note 2 – Summary of Significant Accounting Policies, 10-K 0001691303-25-000010

Legal Proceedings354 words changed in this paragraph; it is 36% similar to last year's version.
Note 14 - Commitments and Contingencies Environmental Matters The Company is subject to a wide variety of laws and regulations concerning the protection of the environment, both with respect to the construction and operation of its plants, mines and other facilities and with respect to remediating environmental conditions that may exist at its own and other properties. The Company believes that it is in substantial compliance with federal, state and local environmental laws and regulations. The Company accrues for environmental expenses resulting from existing conditions that relate to past operations when the costs are probable and can be reasonably estimated. As of December 31, 2025 and December 31, 2024, there were no accruals for environmental matters other than asset retirement obligations for mine reclamation. Miscellaneous Litigation From time to time, the Company is party to a number of lawsuits arising in the ordinary course of their businesses. The Company records costs relating to these matters when a loss is probable and the amount can be reasonably estimated. The effect of the outcome of these matters on the Company’s future results of operations cannot be predicted with certainty as any such effect depends on future results of operations and the amount and timing of the resolution of such matters. As of December 31, 2024 2025 and December 31, 2023, 2024, there were no items accrued for miscellaneous litigation. Commitments and Contingencies - Other The Company is party to various transportation and throughput agreements with rail and barge transportation providers and the Alabama State Port Authority. These agreements contain annual minimum tonnage guarantees with respect to coal transported from the mine sites to the Port of Mobile in Alabama, unloading of rail cars or barges, and the loading of vessels. If the Company does not meet its minimum throughput obligations, which are based on annual minimum amounts, it is required to pay the transportation providers or the Alabama State Port Authority a contractually specified amount per metric ton for the difference between the actual throughput and the minimum throughput requirement. At December 31, 2025 and December 31, 2024, the Company had no liability recorded for minimum throughput requirements. Royalty Obligations A substantial amount of the coal that the Company mines is produced from mineral reserves leased from third-party landowners. These leases convey mining rights to the Company in exchange for royalties to be paid to the landowner as either a fixed amount per ton or as a percentage of the sales price. Although coal leases have varying renewal terms and conditions, they generally last for the economic life of the reserves. Coal royalty expense was $81.5 million, $123.0 million, and $120.5 million, for the years ended December 31, 2025, December 31, 2024, and December 31, 2023, respectively.

Source: Item 3, via Note 14 – Commitments and Contingencies, 10-K 0001193125-26-048914 vs Item 3, via Note 15 – Commitments and Contingencies, 10-K 0001691303-25-000010

MD&A258 words changed in this paragraph; it is 52% similar to last year's version.
Pursuant to the Amended Rights Agreement, one preferred stock purchase right (a “Right” or the “Rights”) was distributed to stockholders of the Company for each share of common stock of the Company outstanding as of the close of business on February 28, 2020. Initially, these Rights will not be exercisable and will trade with the shares of common stock. If the Rights become exercisable, each Right will initially entitle stockholders to buy one one-thousandth of a share of a newly created series of preferred stock designated as “Series A Junior Participating Preferred Stock” at an exercise price of $159.00 per Right. While the Amended Rights Agreement is in effect, any person or group that acquires beneficial ownership of 4.99% or more of the common stock or any existing stockholder who currently owns 5.00% or more of the common stock that acquires any additional shares of common stock (such person, group or existing stockholder, an "Acquiring Person") without approval from the Board would be subject to significant dilution in their ownership interest in the Company. In such an event, each Right will entitle its holder to buy, at the exercise price, common stock having a market value of two times the then current exercise price of the Right and the Rights held by such Acquiring Person will become void. The Amended Rights Agreement also gives discretion to the Board to determine that someone is an Acquiring Person even if they do not own 4.99% or more of the Common Stock but do own 4.99% or more in value of the outstanding stock, as determined pursuant to Section 382 of the Code and the regulations promulgated thereunder. In addition, the Board has established procedures to consider and approve requests to exempt certain acquisitions of the Company’s securities from the Amended Rights Agreement if the Board determines that doing so would not limit or impair the availability of the federal and state NOLs or is otherwise in the best interests of the Company and conditioned upon and subject to the satisfaction of certain continuing factual representations and covenants. The Board may redeem the Rights for $0.01 per Right at any time before any person or group triggers the Amended Rights Agreement. The distribution of the Rights is not a taxable event for stockholders of the Company and will not affect the Company’s financial condition or results of operations (including earnings per share).

Source: Item 7, 10-K 0001193125-26-048914 vs Item 7, 10-K 0001691303-25-000010

Risk Factors183 words changed in this paragraph; it is 39% similar to last year's version.
The We commenced longwall operations at Blue Creek in October 2025, eight months ahead of schedule. Although this represents a significant milestone in the development of Blue Creek will Creek, the completion of the remaining construction activities and the successful ramp‑up and operation of the longwall involve substantial risks. Our continued development and ongoing ramp‑up require substantial additional capital expenditures that we may not recover. In addition, during our development of Blue Creek the remaining construction, commissioning and early operating phases, we will face may encounter numerous financial, regulatory, operational, geological, environmental, political and legal uncertainties that are beyond our control and that may cause unforeseen delays in, or unexpectedly increase unexpected increases in costs. If the costs associated with, the completion of Blue Creek. Accordingly, remaining development and ramp‑up activities do not proceed as planned, we may not be able unable to complete achieve expected production levels, costs, margins or returns within the development of Blue Creek on schedule, anticipated timeframe—or at the budgeted cost or at all, and any such delays or increased costs all—which could have a material adverse effect on our financial condition, results of operations operations, liquidity or cash flows. We spent approximately $350.5 million on the development of Blue Creek in 2024, $716.5 million on the project to date and expect to invest approximately $225.0 to $250.0 million in 2025. Our planned development of Blue Creek involves numerous risks, including, but not limited to, the following:

Source: Item 1A, 10-K 0001193125-26-048914 vs Item 1A, 10-K 0001691303-25-000010

Sentences and paragraphs added, removed or reworded

Every change, by type

Sentences and paragraphs of HCC's Risk Factors and MD&A, 10-K Feb 12, 2026 against 10-K Feb 13, 2025. Each links to the text at sec.gov.

Quiet changes are sentences kept from last year with one to four words changed, at least one of them a hedge, a modal or a qualifier (may, could, will, not, significant, material…). A year or date rolling forward is not counted.

The full word list

adverse, adversely, all, although, anticipate, anticipates, any, approximately, believe, believes, can, cannot, certain, could, expect, expects, generally, however, if, intend, intends, largely, likely, many, material, materially, may, might, most, must, never, no, not, possible, primarily, probable, should, significant, significantly, some, substantial, substantially, unlikely, will, would

AddedRisk Factors
We spent approximately $240.3 million on the development of Blue Creek in 2025, $956.8 million on the project to date and expect to invest approximately $50.0 to $75.0 million in 2026 for the final construction of the Blue Creek mine. The continued development, commissioning, ramp-up and integration of Blue Creek involves numerous risks, including, but not limited to, the following:
Read it in 10-K Feb 12, 2026 at sec.gov
AddedRisk Factors
Because Blue Creek is in the early stages of ramp‑up, we are subject to additional risks specific to achieving stable, full‑capacity longwall operations, including lower‑than‑expected early production rates, lower recovery, higher unit costs during the ramp period, operational disruptions, ventilation or methane‑related constraints, equipment performance issues, and the timing and execution of planned longwall moves. Any of these factors could result in extended downtime, lower throughput, diminished yields, unplanned capital expenditures, reduced sales volumes, higher transportation or demurrage costs, or lower realized pricing, which could adversely affect our profitability and cash flows during the ramp‑up period.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedRisk Factors
increase transportation and port costs significantly. Further, delays of ocean vessels could affect our revenues, costs and relative competitiveness compared to the supply of steelmaking coal and other products from our competitors.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedRisk Factors
On January 19, 2023, the DOL proposed revisions to regulations under the Black Lung Benefits Act governing authorization of self-insurers, which was then subsequently revised as part of the final rules published on December 12, 2024, which became effective on January 13, 2025. The final rules require, among other requirements, all self-insured operators to post security of at least 100 percent of their projected black lung liabilities. On January 14, 2025, we received a letter from the DCMWC outlining the new procedures and application process for authorizing operators to self-insure under the new
Read it in 10-K Feb 12, 2026 at sec.gov
AddedRisk Factors
regulations. The letter outlined authorization form requirements and provided a 60-day period for the submission of the required documents. Subsequently, on February 20, 2025, we received another letter from the DCMWC stating that the 60-day deadline to provide information was no longer applicable and no information was required to be submitted at this time. DCWMC further stated that additional guidance would be provided in due course after consultation with the new DOL leadership. For additional information see “Part I, Item 1. Business-Environmental and Regulatory Matters-Workers’ Compensation and Black Lung.” Our estimated total black lung liabilities as of December 31, 2025 were $36.1 million (net of the black lung trust). In future years, the DOL could require us to increase the amount of the collateral which could negatively impact our cash flows.
Read it in 10-K Feb 12, 2026 at sec.gov
Show the other 56
AddedRisk Factors
We are responsible for assessing the operating effectiveness of internal controls over financial reporting and we may conclude that our internal controls over financial reporting are ineffective. During the course of the preparation of our consolidated financial statements, we evaluate our internal controls to identify and correct deficiencies in our internal controls
Read it in 10-K Feb 12, 2026 at sec.gov
RemovedRisk Factors
sustained failure to be able to market our coal during such periods would have a material adverse effect on our business, results of operations, cash flows and ability to pay dividends to our stockholders.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedRisk Factors
In addition, we have become increasingly dependent upon digital technologies, including information systems, infrastructure and cloud applications and services, to operate our businesses, process and record financial and operating data, communicate with our employees and business partners, analyze seismic and drilling information, estimate quantities of
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedRisk Factors
Accordingly, required permits may not be issued or renewed in a timely fashion or at all, or permits issued or renewed may be conditioned in a manner that may restrict our ability to efficiently and economically conduct our mining activities, any of which would materially reduce our production, cash flow and profitability.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedRisk Factors
Certain transactions, including public offerings by us or our stockholders and redemptions may cause us to undergo an “owner shift” which by itself or when aggregated with other owner shifts that we have undergone or will undergo could cause
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedRisk Factors
to do business. Furthermore, detecting, investigating, and resolving actual or alleged violations is expensive and can consume significant time and attention of our senior management.
Read it in 10-K Feb 13, 2025 at sec.gov
RewordedRisk Factors
In addition, if its development is successful, the operation of once in full operation, Blue Creek would exacerbate will increase our existing exposure to the mining and operation operational risks discussed elsewhere in this Report, including, but not limited to, including risks related to increasing the concentration of associated with having our mining operations production concentrated in Alabama, mining hazards and operating risks, transportation risks, liability risks and regulatory risks.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
In addition, during our development of Blue Creek the remaining construction, commissioning and early operating phases, we will face may encounter numerous financial, regulatory, operational, geological, environmental, political and legal uncertainties that are beyond our control and that may cause unforeseen delays in, or unexpectedly increase the costs associated with, the completion of Blue Creek. unexpected increases in costs.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
Disruption or delays of any of these transportation services due to weather-related problems, which are variable and unpredictable, strikes or lock-outs, accidents, infrastructure damage, governmental regulation, third-party actions, lack of capacity or other events beyond our control could impair our ability to supply our products to our customers and result in lost sales and reduced profitability.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
If either our preparation plant or river barge load-out facilities, or those of a third party processing or loading our steelmaking coal, suffer extended downtime, including major damage, or are destroyed, our ability to process and deliver steelmaking coal to prospective customers would be materially impacted, which would materially adversely affect our business, results of operations, financial condition and cash flows.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
These regulations were tightened in 2024, during the Biden Administration Administration, to further limit the discharge of PM 2.5. 2.5, though current EPA leadership views the 2024 rule as unlawful and the Agency has requested the U.S.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
These laws and regulations include those relating to import and export controls, tariffs, economic sanctions laws, customs laws, tax laws sanctions, national security, customs, tax, money laundering and anti-corruption laws, such (such as the U.S.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
In addition, any decisions Any decision to increase production at our existing mines or the continued development and ramp‑up of the high-quality met coal recoverable reserves at Blue Creek could also affect increase our capital needs or cause future capital expenditures to be higher than in the past and/or higher than our estimates.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
In addition, perspectives on ESG considerations continue to evolve, and we cannot currently predict how regulators’, investors’ and other stakeholders’ views on ESG matters may affect the regulatory and investment landscape and affect our business, financial condition, and results of operations.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
These events significantly impacted coking coal markets by disrupting previously existing trading patterns. patterns and may lead to further volatility in the price of certain commodities, including steelmaking coal.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
Currently, there are no universal standards for such scores or ratings, but the importance of sustainability evaluations is becoming more broadly accepted by some investors and stockholders. stockholders value sustainability evaluations.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedRisk Factors
The Amended Rights Agreement also gives discretion to the Board to determine that someone is an Acquiring Person even if they do not own 4.99% or more of the outstanding common stock but do own 4.99% or more in value of the Company’s outstanding stock, as determined pursuant to Section 382 of the Code and the regulations promulgated thereunder.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
We commenced longwall operations at the Blue Creek mine in October 2025, eight months ahead of schedule and on budget. The ahead-of-schedule start of Blue Creek's longwall is already having an impact on our production profile, cost structure, and earnings potential heading into 2026. Due to the accelerated startup of the longwall, we produced approximately 1.8 million metric tons in 2025 and expect to produce at a minimum approximately 4.1 to 4.4 million metric tons in 2026.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
On February 21, 2025, we provided an update on the Blue Creek project. Due to the implementation of innovative technologies and best practices, we increased nameplate production capacity of the Blue Creek mine by 25%, from the original production plan of 4.4 million metric tons to 5.4 million metric tons. With better-than-expected recovery and the anticipated addition of a fourth continuous miner unit, our overall nameplate production capacity increases up to approximately 6.4 million metric tons. The additional capacity increases our overall nameplate production capacity by 88%, from 7.3 million metrics tons per year to 13.7 million metrics tons per year. While our nameplate production capacity has significantly increased, actual annual sales and production volumes will be dependent upon steelmaking coal market conditions. Even in these early stages of production and sales, Blue Creek has already contributed to lower cash costs, further improving our position in the first-quartile of the global cost curve. In addition, Blue Creek's low-cost structure has reduced our all-in cash cost breakeven point and enhanced our profitability and cash flow generation.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
On November 25, 2025, Warrior Met Coal BC, LLC (“Warrior BC”), a wholly-owned subsidiary of the Company, entered into Federal Coal Lease ALES-056519 at Mine No. 1 (the “Mine No. 1 Lease”) and Warrior Met Coal Mining, LLC (“Warrior Mining”, and together with Warrior BC, the “Companies”), a wholly-owned subsidiary of the Company, entered into Federal Coal Lease ALES-055797 at Mine No. 4 (the “Mine No. 4 Lease”, and, together with the Mine No. 1 Lease, the “Leases”), each with the United States of America through the Bureau of Land Management (the “BLM”) of the United States Department of the Interior.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
The Mine No. 1 Lease covers approximately 8,346 acres and the Mine No. 4 Lease covers approximately 5,704 acres. The BLM estimates the Mine No. 1 Lease tract contains approximately 32.9 million metric tons of recoverable coal reserves, and the Mine No. 4 Lease tract contains approximately 15.3 million metric tons of recoverable coal reserves. Subject to the terms and conditions thereof, the Leases provide the Companies with the exclusive right to drill for, mine, extract, remove or otherwise process and dispose of the coal deposits in, upon, or under the lands described therein. Each Lease has a minimum term of 20 years and for so long thereafter as coal is produced in commercial quantities from the leased lands, subject to readjustment of lease terms at the end of the twentieth lease year and each 10-year period thereafter. Pursuant to each lease, each Company is required to pay customary production royalties of 7% of the value of the coal produced and per acre annual rental payments to the BLM.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
Warrior BC bid approximately $32 million for the Mine No. 1 Lease and has submitted a payment for approximately $6.4 million, which is the first of five equal payments. Warrior Mining bid approximately $15 million for the Mine No. 4 Lease and has submitted a payment for approximately $3.0 million, which is the first of five equal payments. Successive installments are due each year on the anniversary of the Leases for the next four years. These future installments were recorded at a discount using our credit-adjusted risk-free rate and are presented in the Consolidated Balance Sheets as short and long-term federal coal lease obligations. As of December 31, 2025, the present value of the short-term and long-term obligations were $8.8 million and $23.7 million, respectively.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
On January 13, 2026, the U.S. Department of the Interior issued mining plan approval documents for each Lease, thereby authorizing coal development and mining operations on parts of each Lease within the area of mining plan approval.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
Global steelmaking coal markets remained challenged throughout 2025, driven primarily by depressed global steel demand, record‑high Chinese steel exports, and an abundant global supply of steelmaking coal. During the fourth quarter of 2025, pricing for high‑quality steelmaking coal improved slightly, reversing the consistent weakening experienced during the first half of the year. As of February 10, 2026, the Platts Index price for premium LV coal was $251.50 per metric ton, while the Platts Low Vol HCC was $208.60 per metric ton. Seasonal restocking activity and resilient steel production continued to support demand, with India emerging as a significant near‑term driver of import requirements.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
Weather‑related supply constraints—most notably the arrival of Cyclone Koji in Australia in January 2026—contributed to a sharp increase in premium LV coal pricing. According to Wood Mackenzie, this event may result in prolonged operational disruptions due to chronic underinvestment in Queensland’s mining and logistical infrastructure. Despite these temporary supply constraints, we expect the overall pricing environment in 2026 to remain broadly consistent with 2025 levels, reflecting persistent global steel demand weakness, elevated Chinese steel exports, and continued abundance in global steelmaking coal supply.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
The United States government continues to impose a broad range of tariffs on foreign goods imported into the U.S., with certain nations and regions enacting retaliatory tariffs on U.S. exports. Ongoing trade and tariff uncertainty has contributed to lower seaborne coal prices. Any newly implemented tariffs or other trade measures—whether imposed by the U.S. or by trading partners—could reduce economic activity, increase our operating costs, diminish demand for steelmaking coal, alter customer purchasing behaviors, disrupt our supply chain, or materially impact steelmaking coal pricing. These measures could also limit trade with the U.S. or produce other adverse economic outcomes.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
It remains too early to quantify the impact of current or potential tariffs on our consolidated financial statements. We continue to monitor the evolving trade environment and evaluate actions to mitigate potential adverse effects on our business.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
On July 4, 2025, the One, Big, Beautiful Bill Act ("OBBBA") was enacted into law and includes significant provisions, such as the permanent extension of certain expiring provisions of the Tax Cuts and Jobs Act. The legislation has multiple effective dates, with certain provisions effective in 2025 and others implemented through 2027. The changes include, among other things, an update to IRC Section 250 Deduction: FDII to Foreign-Derived Deduction Eligible Income ("FDDEI"), which provides for, among other things, a permanent deduction of 33.34% of FDDEI, which reduces the statutory tax rate to 14% of such income. The OBBBA also classified metallurgical coal as a critical mineral eligible for the advanced manufacturing production tax credit under Section 45X (the "45X Credit") of the Internal Revenue Code. The 45X Credit for metallurgical coal provides for a credit of 2.5% of eligible production costs through 2029. Section 50202 of the OBBBA also temporarily decreases the royalty rate for coal leases on federal lands to not more than 7% through 2034. We are currently assessing the impact of the OBBBA on our consolidated financial statements.
Read it in 10-K Feb 12, 2026 at sec.gov
AddedMD&A
We delivered strong results for the year ended December 31, 2025 driven by record sales volumes, the commencement of longwall operations at the transformational Blue Creek mine, and continued cost improvements. The ahead-of-schedule start of Blue Creek's longwall in October 2025 is already reshaping Warrior's production profile, cost structure and earnings potential.
Read it in 10-K Feb 12, 2026 at sec.gov
RemovedMD&A
On May 3, 2022, we announced the relaunch of the development of our Blue Creek mine, a strategic growth project that we expect will deliver significant future returns to stockholders. We believe that Blue Creek represents one of the few remaining untapped reserves of premium High Vol A steelmaking coal in the United States and that it has the potential to provide us with meaningful growth. We believe that the combination of low production costs and the premium quality of the High Vol A steelmaking coal mined from Blue Creek, assuming we achieve our expected price realizations, will generate some of the highest steelmaking coal margins in the U.S., generate strong investment returns and achieve a rapid payback of our investment across a range of steelmaking coal price environments.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
Our third-party reserve report indicates that, once developed, Blue Creek will produce a premium High Vol A steelmaking coal that is characterized by low-sulfur and strong coking properties. High Vol A steelmaking coal has traditionally priced at a discount to the Australian Premium Low Vol and the U.S. Low Vol coals; however, we have observed extended periods in which High Vol A steelmaking coal achieved a premium over these indices. We expect U.S. High Vol A coals will
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
continue to become an important component of global steelmakers' coal blends due to their unique characteristics. In addition, we also expect that as the decade progresses, overall production and the supply of premium hard coking coals will be outpaced by the growth in demand coming from countries like India, Indonesia and Vietnam. This trend creates an opportunity for us to take advantage of favorable pricing dynamics driven by the projected tightness in supply and the desirable characteristics of our premium High Vol A steelmaking coal.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
We believe that the execution risk of Blue Creek is lower than most projects of this size and nature due to utilizing highly experienced engineers with strong backgrounds in building new mines around the world to manage the project. The same highly experienced and knowledgeable engineers and familiar contractors who built mine infrastructure in recent years are being leveraged to build Blue Creek.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
In 2023, we focused on the slope, return shaft, service shaft, bathhouse, warehouse, and substations. Also, in 2023, we initiated important and highly beneficial project scope changes that we expect will require incremental capital expenditures over the life of the project while lowering operating costs, increasing flexibility to manage risks, and making better use of multi-channel transportation methods. While we originally planned on a single channel to transport coal from the Blue Creek mine via an overland belt to a third-party owned and operated barge loadout facility, we are now constructing a belt conveyor system to a railroad loadout to transport the majority of the coal. We expect this change to de-risk the single channel to market, lower operating costs and move volumes faster to the port. We are also constructing and will operate a barge loadout ourselves rather than utilizing a third-party provider. We believe that the potential economic benefits associated with this scope change should provide us with an inherently robust and cost competitive outbound logistics model that will provide additional flexibility to manage alternative transportation methods.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
The inclusion of the benefits and incremental capital expenditures relating to these specific scope changes are not expected to have a material impact on the project's economic metrics of net present value and internal rate of return and did not change the project timeline. In addition, we have experienced inflationary cost increases ranging from 25% to 35%, primarily in relation to labor, construction materials, and certain equipment. Inflationary pressures are expected to continue during the remainder of the project development period. While cost inflation has impacted the cost of the project, these inflationary pressures are expected to be offset by an inflationary increase in the long-term price assumption for steelmaking coal. We continue to expect a total project capital expenditure estimate of $995 million to $1.075 billion.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
In 2024, we made significant progress on the major components for seam access, surface infrastructure and coal transportation. We installed and commissioned the service cage, slope belt, slope car and raw coal belt, which allowed us to begin development of the initial longwall panel with three continuous miner units, producing 190 thousand metric tons during the year. On the surface infrastructure components, we began construction on the dry slurry processing system and we made significant progress on the construction of the preparation plant, which is projected to be online during the middle of 2025. All major preparation plant equipment is on-site awaiting installation. We have also started to take delivery of the longwall shields, and we expect to have all shields on site in the first half of 2025. On the coal transportation components, the clean coal storage silos at the rail loadout were completed, and the construction of the clean coal belt structure and the rail and barge loadouts remain on schedule. We are also focused on increasing the headcount at Blue Creek and continue to work closely with contractors and vendors to overcome supply chain and labor shortages in the mining industry. To date, we have not encountered any significant barriers that have prevented us from achieving our goals.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
The project remains on schedule with the longwall scheduled to start up no later than the second quarter of 2026. We expect to ramp up production through the development of the project. Specifically, we expect to produce approximately 900 thousand metric tons in 2025, approximately 2.7 million metric tons in 2026 and approximately 4.4 million metric tons in 2027. We do not expect the tons produced in 2024 and 2025 of approximately 1.1 million metric tons to be sold until the second half of 2025 when the preparation plant comes online. These are estimates subject to revision and we expect to provide updated financial and operational information on Blue Creek in the near future.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
If we are able to successfully develop Blue Creek, we expect that it will be a transformational investment for us. We expect that the new single longwall mine at Blue Creek will have the capacity to produce an average of 4.4 million metric tons per annum of premium High Vol A met coal over the first ten years of production, thereby increasing our annual production capacity by approximately 60%. We expect the addition of Blue Creek to enhance our already advantageous position on the
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
U.S. inflation is currently at approximately 2.89%, driven by increased energy and food costs, supply constraints and strong consumer demand. While inflation in the overall economy has eased in the last twelve months, we have not seen it easing significantly in the coal mining industry. We expect that inflation will continue to negatively impact our profitability, as we expect inflation to remain high for steel prices, freight rates, labor and other materials and supplies. Specifically, we have experienced inflationary cost increases ranging from 25% to 35%, primarily in relation to labor, construction materials, and certain equipment. In addition, we have experienced inflation in the costs of belt structure, roof bolts, cable, magnetite, rock dust and other supplies, plus labor and parts on equipment repair and rebuilds.
Read it in 10-K Feb 13, 2025 at sec.gov
RemovedMD&A
During the fourth quarter of 2024, high-quality steelmaking coal prices reached levels not seen since 2021 due to a confluence of weaker demand, excess Chinese steel exports into our customers' markets, and ample supply of steelmaking coals. As of January 21, 2025, the Platts Index price for premium LV coal was $188.00 per metric ton. Per the Wood Mackenzie global metallurgical coal short-term outlook released in January 2025, premium LV coal is expected to be between $195.00 and $207.00 per metric ton for 2025. This expectation is in large part driven by supply tightness and increased buying from India due to modest restocking of steelmaking coals.
Read it in 10-K Feb 13, 2025 at sec.gov
RewordedMD&A
On December 6, 2021, we (the “Company”) entered into the that certain First Amendment to Second Amended and Restated Asset-Based Revolving Credit Agreement (the “Second Amended and Restated Credit Agreement”), “Amendment”), by and among us the Company and certain of our its subsidiaries, as borrowers, the guarantors party thereto, the lenders from time to time party thereto and Citibank, N.A. as administrative agent (in such capacity, the "Agent"), agent, which amends and restates in its entirety the Company's existing Second Amended and Restated Asset-Based Revolving Credit Agreement (as amended, (the “credit facility”, and the “ABL credit facility as amended by the Amendment, the “Amended ABL Facility”).
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
The $97.0 $24.9 million increase decrease in cost of sales was primarily driven by a $55.0 $231.0 million increase decrease due to a 6% or 0.4 million metric ton increase in steelmaking coal sales volumes combined with a $39.8 million increase due to a $5.50 $26.44 per metric ton increase decrease in the average cash cost of sales per metric ton. ton offset partially by a $207.2 million increase due to a 21% increase in steelmaking coal sales volumes.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
Net cash provided by operating activities was $367.4 $229.2 million for the year ended December 31, 2024, 2025, and was primarily attributed to net income of $250.6 $57.0 million adjusted for depreciation and depletion expense of $154.0 $188.6 million, stock-based compensation expense of $22.1 $20.0 million, accretion and valuation adjustment of asset retirement obligations of $5.4 million, deferred income tax benefit of $8.1 million, mark-to-market loss on gas hedges of $1.8 million, million and amortization of debt issuance costs and debt discount of $1.6 million, offset partially by deferred income tax benefit of $9.4 million, mark-to-market gain on gas hedges of $0.2 million and an increase in net working capital of $55.2 $22.6 million.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
Refer to the respective notes to the consolidated financial statements for further information about our asset retirement obligations (Note 9), black lung obligations (Note 10), financing lease payment obligations (Note 11), federal coal leases (Note 12), credit facilities and long-term debt (Note 13), commitments and contingencies (Note 15), asset retirement obligations (Note 8), black lung obligations (Note 10), lease payment obligations (Note 14), share repurchase programs (Note 16) 17) and derivative instruments (Note 17). 18).
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
For the year ended December 31, 2024, 2025, we recognized income tax expense benefit of $33.1 $2.6 million or an effective tax rate of 11.7% negative 4.7% primarily due to pre-tax federal income tax expense at the U.S. statutory tax rate of $283.7 $11.4 million offset partially by an income tax benefit of $14.4 $12.2 million of driven by percentage depletion deduction, $4.7 million due to the marginal well tax credit and $12.1 $4.3 million due to a deduction under Section 250 of the Code:
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
Cost of sales (exclusive of items shown separately below) was $982.4 million, or 75.0% of total revenues for the year ended December 31, 2025, compared to $1,007.3 million, or 66.0% of total revenues for the year ended December 31, 2024, compared to $910.3 million, or 54.3% of total revenues for the year ended December 31, 2023. 2024.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
Interest income was $18.5 million, or 1.4% of total revenues, for the year ended December 31, 2025, compared to $33.0 million, or 2.2% of total revenues, for the year ended December 31, 2024, compared to $40.7 million, or 2.4% of total revenues, for the year ended December 31, 2023. 2024.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
While the Amended Rights Agreement is in effect, any person or group that acquires beneficial ownership of 4.99% or more of the common stock or any existing stockholder who currently owns 5.00% or more of the common stock that acquires any additional shares of common stock (such person, group or existing stockholder, an "Acquiring Person") without approval from the Board would be subject to significant dilution in their ownership interest in the Company.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
The average net selling price of our steelmaking coal decreased $34.32 or 14% $61.12 from $241.64 per metric ton for the year ended December 31, 2023 to $207.32 per metric ton for the year ended December 31, 2024. 2024 to $146.20 per metric ton for the year ended December 31, 2025.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
In addition, in connection with the acquisition of certain assets of Walter Energy, we We assumed all of the black lung liabilities of Walter Energy and its U.S. subsidiaries incurred prior to March 31, 2016, for which we are self-insured. subsidiaries.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
As of December 31, 2024, Mine No. 4 and Mine No. 7, 2025, our two three operating mines, underground mines had approximately 82.4 179.3 million metric tons of recoverable reserves and our Blue Creek mine contained 69.0 54.0 million metric tons of recoverable reserves and 39.7 million metric tons of coal resources exclusive of reserves.
Read it in 10-K Feb 12, 2026 at sec.gov
RewordedMD&A
Net cash used in financing activities was $68.5 $15.4 million for the year ended December 31, 2024, 2025, primarily due to the payment of quarterly and special dividends of $43.8 million, principal repayments of financing lease obligations of $17.4 $36.9 million, payment of quarterly dividends of $17.8 million and payments of tax withholdings on vested equity awards of $11.8 $9.4 million offset partially offset by proceeds received from financing lease obligations of $4.5 $48.8 million.
Read it in 10-K Feb 12, 2026 at sec.gov
Quiet changesMD&A
Similarly, if alternative ingredients are used in substitution for steelmaking coal in the integrated steel mill process, the demand for steelmaking coal would could materially decrease, which could also materially adversely affect demand for our steelmaking coal.
Read it in 10-K Feb 12, 2026 at sec.gov

Sources

The two latest 10-Ks on EDGAR, section by section. Each change links to the text at sec.gov.

Also

New risk factors: paragraphs with nothing like them last year, quoted in full.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/HCC/export.csv") into a cell.

Next:Related parties
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.