HIVE Digital Technologies Ltd. HIVE
Paragraphs with nothing like them in last year's 10-K
Fewer than two 10-Ks to compare.
Paragraphs in the 10-Q filed Nov 9, 2026 that were not in the one before
New in the latest 10-Q
38 paragraphs in the 10-Q filed Nov 9, 2026 with nothing like them in the 10-Q filed Aug 14, 2026 (at least half the words must differ; new numbers alone do not count). Quoted exactly, grouped by the item heading above them. This is text that changed, not a judgement of how serious it is.
10-Q
As at Note September 30, 2026 March 31, 2026 ──────────────────────────────────────────────────────────────────────────────────────────────────── Assets Current assets Cash $138,990 $23,113 Amounts receivable and prepaids, net 5 18,645 15,566 Derivative asset 10 22,082 606 Investments 4 11,018 9,741 Digital currencies 6 22,622 10,822 Total current assets 213,357 59,848 Plant and equipment, net 7 390,649 480,476 Long term receivables, net 5 1,289 2,147 Deposits, net 8 148,024 53,579 Right of use assets 15 104,367 43,096 Total assets $857,686 $639,146 Liabilities Current liabilities Accounts payable and accrued liabilities 9,16 $29,409 $27,045 Provision for regulatory liabilities 16 84,473 - Current portion of lease liability 15 15,796 12,368 Current portion of loans payable 12 1,460 1,460 Current portion of term loan 13 1,202 2,038 Current portion of mortgage payable 14 162 143 Warrant liability 11, 25 555 413 Current income tax liability 4,734 10,968 Total current liabilities 137,791 54,435 Convertible loan - liability component 10 235,253 - Loans payable 12 9,229 9,497 Lease liability 15 92,632 31,212 Mortgage payable 14 18,325 14,348 Deferred tax liability - 295 Total liabilities 493,230 109,787 Equity Share capital - - Additional paid in capital 18 1,001,341 944,048 Accumulated other comprehensive income 7,033 7,621 Accumulated deficit (643,918) (422,310) Total equity 364,456 529,359 Total liabilities and equity $857,686 $639,146
Read in the 10-Q
Condensed Interim Consolidated Statements of Changes in Equity ────────────────────────────────────────────────────────────────────────────────────── (expressed in thousands of United States dollars, except share and per share data) (Unaudited)
Read in the 10-Q
Condensed Interim Consolidated Statements of Changes in Equity ────────────────────────────────────────────────────────────────────────────────────── (expressed in thousands of United States dollars, except share and per share data) (Unaudited)
Read in the 10-Q
Condensed Interim Consolidated Statements of Cash Flows (expressed in thousands of United States dollars) (Unaudited)
Read in the 10-Q
of the identifiable assets acquired, and liabilities assumed as the date of the acquisition:
Read in the 10-Q
Show the other 33
of the identifiable assets acquired, and liabilities assumed as the date of the acquisition:
Read in the 10-Q
During the period ended September 30, 2026, the Company assessed factors such as the challenging economics of Bitcoin mining, including lower mining revenue per unit of computing power, together with the reduction in market values for ASIC equipment. These factors reduce the cash flows and residual values expected to be recovered over the remaining useful lives of the mining equipment asset group, the Company determined that these factors were indicators of impairment. As a result, the Company performed a recoverability test under ASC 360 and determined that the undiscounted cash flows expected from the use and eventual disposition of the asset group were less than its carrying amount. The Company then measured the impairment as the amount by which the carrying amount exceeded the fair value of the impaired group, which was determined using Level 3 inputs under ASC 820. As a result, the Company recorded impairment totaling $31.2 million.
Read in the 10-Q
Changes of 1% in certain key assumptions, such as end of life and discount rate, would result in an increase in the non-cash impairment charge by $1,841 and $1,157, respectively.
Read in the 10-Q
Balance, March 31, 2025 $12,992 Interest 244 Repayment (3,096) Foreign exchange movement 817 Balance, March 31, 2026 10,957 Interest 290 Repayment - Foreign exchange movement (558) Balance, September 30, 2026 10,689 Less: current portion (1,460) Non-current portion $9,229
Read in the 10-Q
The Company has lease agreements for its offices, and buildings for its data centers in Sweden and Quebec, Canada, in addition to electrical equipment in Sweden.
Read in the 10-Q
Finance Leases Weighted average discount rate 9.90% 9.90% Weighted average remaining lease term (in years) 2.50 3.00
Read in the 10-Q
The Amended October 2024 Equity Distribution Agreement restates and supersedes the previous October 2024 Equity Distribution Agreement, dated October 3, 2024, among the Company and the Agents, pursuant to which the Company sold common shares of the Company for aggregate proceeds of US$180.8 million.
Read in the 10-Q
Issued 1,000,000 common shares as part of consideration for an asset acquisition (Note 3).
Read in the 10-Q
There were no transfers of financial instruments between Level 1, Level 2, and Level 3 during the period presented.
Read in the 10-Q
As of September 30, 2026, and March 31, 2026, the fair values of cash, amounts receivable and prepaid assets, accounts payable, current portion of convertible loan, lease liability, loans payable, and term loan approximated their carrying values because of the short-term nature of these instruments.
Read in the 10-Q
Subsequent to the period ended September 30, 2026, BUZZ Alpha Cloud Inc., an indirect wholly owned subsidiary of the Company, entered into a Loan and Security Agreement with an institutional lender. The agreement provides a credit facility of approximately $ 128.9 million (the "Facility"). The Company will use the Facility to buy NVIDIA GB200 GPUs and related infrastructure for a three-year fixed-term customer contract.
Read in the 10-Q
The Facility has a fixed interest rate of 9.0 % per year and a three-year term. Principal and interest are repaid over the life of the loan in equal monthly payments. At the end of the term, the Company will own the GPUs outright with no residual payment.
Read in the 10-Q
The Facility is secured by the GPUs and related assets of BUZZ Alpha Cloud Inc. BUZZ High Performance Computing Inc. (“BUZZ HPC”), the parent of BUZZ Alpha Cloud Inc., has given a limited recourse guarantee and has pledged its shares of BUZZ Alpha Cloud Inc. to the lender. BUZZ HPC is not otherwise liable under the Facility. The Facility includes customary terms and covenants, including a required debt-service coverage ratio.
Read in the 10-Q
After deducting a 1.5 % agent fee and estimated escrow interest, the lender is depositing net proceeds of approximately $ 125.4 million into a third-party escrow account. The funds will be released to the equipment supplier when the equipment is accepted, and loan repayments will start at that time.
Read in the 10-Q
Subsequent to the period ended September 30, 2026, Buzz High Performance Computing Holdings AB (formerly Bikupa Holdings AB), a wholly owned subsidiary, completed a share purchase agreement with Bodens Utveckling AB. Under the agreement, the Company purchased all shares of a newly formed Swedish Company that owns the Boden datacentre property and land. The Company has leased and operated this data centre since 2018. The Company paid SEK 99.4 million (approximately US $ 10.1 million) in consideration for the acquisition. With this acquisition, the Company now owns the Boden data centre, and the existing lease with Bodens Utvecklings AB has ended. The Company expects to account for the transaction as an asset acquisition.
Read in the 10-Q
On August 17, 2026, the Company announced that BUZZ entered into a GPU cloud services agreement with an enterprise customer (the "Customer") to which it will provide the Customer with access to a dedicated GPU which will consist of 2,016 NVIDIA Blackwell Ultra GPUs in NVIDIA GB300 NVL72 rack-scale systems and will be deployed at a facility in Merritt, British Columbia. The cluster will be designed to support large-scale AI training, AI inference and advanced enterprise workloads. Deployment is expected to occur during the first quarter of the 2027 calendar year. The estimated total contract value is approximately $350 million over the five-year term. The Company expects capital expenditures associated with the deployment (including the accelerated computing cluster and all associated hardware and service warranties) to total approximately $185 million. The Customer has agreed to furnish a deposit of approximately 10% of the total contract value.
Read in the 10-Q
On September 10, 2026, the Company announced that Mark Volk was appointed Senior Vice President, Revenue at BUZZ.
Read in the 10-Q
On September 16, 2026, the Company announced that BUZZ HPC entered into a strategic partnership with ProCogia, a Vancouver-based applied-AI and data engineering company. Under the arrangement, ProCogia will procure dedicated GPU capacity from BUZZ HPC's Canadian data centers to power ProCogia's own artificial intelligence products and client workloads and, in turn, will serve as a preferred applied-AI services partner to BUZZ HPC's customers. BUZZ and ProCogia also intend to jointly market their combined sovereign-compute and applied-AI capabilities to enterprise and small- and medium-sized business customers in the United States and Europe.
Read in the 10-Q
Non-cash impairment on equipment was $31.2 million in the current period compared $nil in the prior period. The Company determined that indicators of impairment existed for its equipment due to the depressed mining economics, specifically the volatility of Bitcoin throughout the current period. The Company noted that the carrying value exceeded the recoverable amount of its mining equipment and recorded a non-cash impairment charge.
Read in the 10-Q
Provision on sales tax receivable was $nil in both the current and prior period.
Read in the 10-Q
Non-cash impairment on equipment was $31.2 million in the current period compared $nil in the prior period. The Company determined that indicators of impairment existed for its equipment due to the depressed mining economics, specifically the volatility of Bitcoin throughout the current period. The Company noted that the carrying value exceeded the recoverable amount of its mining equipment and recorded a non-cash impairment charge.
Read in the 10-Q
September 30, March 31, (in thousands) 2026 2026 ────────────────────────────────────────────────────────────────────────────── Cash $138,990 $23,113 Amounts receivable and prepaids 18,645 15,566 Investments 11,018 9,741 Derivative asset 22,082 606 Digital currencies 22,622 10,822 Plant and equipment 390,649 480,476 Long term receivable 1,289 2,147 Deposits, net of provision 148,024 53,579 Right of use asset 104,367 43,096 TOTAL ASSETS $857,686 $639,146 Accounts payable and accrued liabilities $29,409 $27,045 Provision for regulatory liabilities 84,473 - Current portion of lease liability 15,796 12,368 Current portion of mortgage payable 162 143 Term loan 1,202 2,038 Current portion of loans payable 1,460 1,460 Warrant liability 555 413 Current income tax liability 4,734 10,968 Convertible loan - liability component 235,253 - Loans payable 9,229 9,497 Lease liability 92,632 31,212 Mortgage payable 18,325 14,348 Deferred tax liability - 295 TOTAL LIABILITIES $493,230 $109,787
Read in the 10-Q
The increase is mainly attributable to interest income on cash holdings from the April and June 2026 convertible notes.
Read in the 10-Q
Subsequent to the period ended September 30, 2026, BUZZ Alpha Cloud Inc., an indirect wholly owned subsidiary of the Company, entered into a Loan and Security Agreement with an institutional lender. The agreement provides a credit facility of approximately $128.9 million (the "Facility"). The Company will use the Facility to buy NVIDIA GB200 GPUs and related infrastructure for a three-year fixed-term customer contract.
Read in the 10-Q
The Facility has a fixed interest rate of 9.0% per year and a three-year term. Principal and interest are repaid over the life of the loan in equal monthly payments. At the end of the term, the Company will own the GPUs outright with no residual payment.
Read in the 10-Q
The Facility is secured by the GPUs and related assets of BUZZ Alpha Cloud Inc. BUZZ High Performance Computing Inc. (“BUZZ HPC”), the parent of BUZZ Alpha Cloud Inc., has given a limited recourse guarantee and has pledged its shares of BUZZ Alpha Cloud Inc. to the lender. BUZZ HPC is not otherwise liable under the Facility. The Facility includes customary terms and covenants, including a required debt-service coverage ratio.
Read in the 10-Q
After deducting a 1.5% agent fee and estimated escrow interest, the lender is depositing net proceeds of approximately $125.4 million into a third-party escrow account. The funds will be released to the equipment supplier when the equipment is accepted, and loan repayments will start at that time.
Read in the 10-Q
Subsequent to the period ended September 30, 2026, Buzz High Performance Computing Holdings AB (formerly Bikupa Holdings AB), a wholly owned subsidiary, completed a share purchase agreement with Bodens Utveckling AB. Under the agreement, the Company purchased all shares of a newly formed Swedish Company that owns the Boden datacentre property and land. The Company has leased and operated this data centre since 2018. The Company paid SEK 99.4 million (approximately US $10.1 million) in consideration for the acquisition. With this acquisition, the Company now owns the Boden data centre, and the existing lease with Bodens Utvecklings AB has ended. The Company expects to account for the transaction as an asset acquisition.
Read in the 10-Q
Risk Factors
There have been no material changes to the risk factors set forth in our Annual Report on Form 10-K for the fiscal year ended March 31, 2026 and our Quarterly Reports on Form 10-Q, except for the risk factor noted below.
Read in the 10-Q
Increasing political and regulatory scrutiny of data center development could delay, prevent, or restrict the development and operation of our data centers, increase our costs, and adversely affect our business.
Read in the 10-Q
The development and operation of data centers, including facilities supporting high-performance computing, AI, and cryptocurrency-related services, have increasingly drawn political, regulatory, and public scrutiny due to concerns regarding energy consumption, land use, carbon emissions, water usage, environmental impacts, effects on consumer utility rates, noise, and the perceived limited benefit relative to the resources consumed. In response, governmental authorities have adopted or are considering moratoria, restrictions on electrical capacity allocation, increased utility rates, enhanced permitting requirements, and other restrictive measures on data center development and operations. For example, in August 2026, the Town of Oakville, the location of our planned AI factory, imposed a one-year moratorium on new data center development while it studies the related planning and infrastructure implications, which ultimately may have implications on the timeline of our project which may, as a result, be delayed or negatively affected.
Read in the 10-Q
In Québec, the provincial government directed the Régie de l’énergie to consider economic, social, and environmental concerns when setting new electricity rates for data centers. In response, Hydro-Québec proposed a new rate for large data centers and a modified rate for cryptocurrency service related facilities, both of which, if approved, would significantly exceed current rates. We have challenged these increases in Court, arguing that they exceed the government’s statutory authority and encroach on the Régie de l’énergie’s exclusive jurisdiction to set reasonable electricity rates. Although the Court ruled in our favor in October 2026, Hydro-Québec may continue to pursue the proposed rate hikes at the Régime de l'énergie. Separately, Ontario regulators are considering a distinct rate class for new data centers intended to make such centers bear the full cost of their electricity rather than shifting the burden onto taxpayers. While these proposals remain subject to regulatory proceedings and legal challenges, they are illustrative of growing political and public opposition to the industries in which we operate.
Read in the 10-Q
Similar measures could be adopted in other jurisdictions where we currently operate or may seek to operate, and the scope and impact of any resulting regulatory framework in Ontario, Québec, and beyond remains uncertain. There can be no assurance that electricity rates, power allocations, governmental approvals, or other conditions necessary for the development and continued operation of our data centers will remain available on commercially reasonable terms, or at all. Increased energy costs, restrictions on available electricity, delays in obtaining approvals, or limitations on data center development or operation could materially increase our operating expenses, delay or prevent planned facilities, reduce the economic viability of existing or proposed operations, or otherwise adversely affect our business, financial condition, and results of operations.
Read in the 10-Q
The 10-Q's risk factors against the 10-K
Item 1A of the 10-Q filed Nov 9, 2026 against Item 1A of the 10-K filed Jun 2, 2026.
A 10-Q repeats only the risks that changed, so a 10-K paragraph that is missing from it is not counted as removed.
Added is a paragraph with nothing like it in the 10-K, Reworded a sentence that is in both with several words changed,
Quiet changes a sentence in both where one to four words changed and one is a hedge or a modal
(cut words struck through, new words highlighted).
Text on the page, not a score; each links to the filing at sec.gov.
What the 10-Q itself says about its risk factors:There have been no material changes to the risk factors set forth in our Annual Report on Form 10-K for the fiscal year ended March 31, 2026 and our Quarterly Reports on Form 10-Q, except for the risk factor noted below.
Read in the 10-Q
Sources
Item 1A of each 10-K and 10-Q on EDGAR, quoted exactly. Each paragraph links to the filing at sec.gov.
Also
10-K change: what was reworded or cut, section by section.
Work with it
Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/HIVE/export.csv") into a cell.