Screener / SEC EDGAR /CIK 0000719413 /10-K filed Feb 17, 2026, compared with Feb 13, 2025 /Numbers from the XBRL of the 10-Ks
NYSE Materials · Aggregates

Hecla Mining Co HL

Compare with peers Embed
Earnings releases

Latest results release: Nov 4, 2026

8-K item 2.02, exhibit 99

What HL's management wrote with each quarter's results: the press release and, when the company files them, its prepared remarks or the call transcript. The call itself is not filed with SEC, so most quarters have the release only.

Read and search

Every release, in full · linked to sec.gov

Press release Nov 4, 2026 · EX-99.1

Hecla Reports Third Quarter 2026 Results

Open on SEC

Cash Flow from Continuing Operations up 16% Quarter-Over-Quarter to record $203 million; Free Cash Flow1Nearly Triples Year-Over-Year to record $151 million COEUR D'ALENE, IDAHO - November 3, 2026 - Hecla Mining Company (NYSE:HL) ("Hecla", or the "Company") today announced third quarter 2026 financial and operating results."Prior quarter" refers to the second quarter of 2026. Prior period financial information has been recast to reflect Casa Berardi as a discontinued operation.

Revenue: $395 million from continuing operations, the second highest in company's history.

Profitability: Income from continuing operations of $150 million or $0.22 per share - up from $118 million or $0.18 per share in the prior quarter.

Adjusted EBITDA: $211 million from continuing operations, a 6% increase over the prior quarter (both periods on a continuing operations basis, excluding Casa Berardi). 4

Record cash flow generation: Cash flow generated from continuing operations of $203 million, and record quarterly free cash flow from continuing operations of $151 million; Greens Creek set a new site-level quarterly record of $147 million. 1

Strengthening balance sheet: The Company ended the quarter with $692 million of cash and cash equivalents, reflecting continued balance sheet strength and strategic flexibility. The Company remains debt free (excluding finance leases) and has entered into a new $500 million revolving credit agreement with an additional $100 million accordion option. The facility is undrawn, with $3.4 million of capacity currently utilized for outstanding letters of credit. This is the strongest balance sheet position in the Company's history.

New Director: Mr. Dale Andres has joined the Board of Directors. Mr. Andres is a mining executive with over 35 years of experience in base and precious metals.

Silver production from continuing operations was 4.2 million ounces, nearly unchanged from the prior quarter, with consolidated silver sales volumes stronger, reflecting the timing of shipments, mainly at Greens Creek.

Consolidated costs applicable to sales from continuing operations of $158 million, up 35% from the prior quarter due primarily to the timing of sales. Silver cash cost remained negative at ($3.20) per ounce and AISC was $14.34 per ounce (excluding Keno Hill, which has not yet achieved commercial production). Year-to-date AISC of $9.37/oz is essentially in line with $9.26/oz a year ago, and YTD cash cost improved to ($4.94)/oz from ($2.20)/oz. 2,3,5 1 Production and cost guidance: Consolidated 2026 silver production is expected to be 15.3-16.1 million ounces, with low end raised compared to prior guidance of 15.1-16.1 million ounces. Consolidated silver cash cost and AISC guidance improved to ($4.75)-($4.25)/oz and $11.50-$12.50/oz respectively, 2,3 on outperformance during the first nine months of the year, reduced sustaining capital investment guidance, and higher by-product credits. 2,3 See Guidance section for more details.

Greens Creek: Produced over 1.9 million ounces of silver and nearly 12 thousand ounces of gold. Costs applicable to sales were $76 million, with silver cash cost of ($10.11) per ounce and AISC of ($3.25) per ounce. 2,3,5

Lucky Friday: Produced nearly 1.3 million ounces of silver. Costs applicable to sales were $34 million, with silver cash cost of $7.31 per ounce and AISC of $27.68 per ounce. 2,3,5 The surface cooling project is expected to commission in the fourth quarter.

Keno Hill: Produced nearly 1.0 million ounces of silver. Milled silver grade improved more than 35% from the prior quarter and milling rates reached a new quarterly record. Milling rates will be suppressed beginning in the fourth quarter to preserve the tailings storage, waste rock and water treatment capacity available under current permits while license amendments are pursued (see "Keno Hill Update" below).

Growth pipeline: Preliminary work on the Greens Creek pyrite concentrate continues, and has led to a revision to growth capital expenditure guidance for Greens Creek. Subject to final investment approval, intermittent production using temporary equipment could begin in late 2027 with potential to reach full capacity in late 2028, when construction of the new circuit is expected to be completed. Separately, the scope of the Greens Creek dry-stack tailings reprocessing evaluation has broadened to include two additional potential paths forward, or a combination of them. In Nevada, 2026 exploration investment guidance of $16 million is more than three times the 2025 level with expanded programs at Midas and new programs at Hollister and Aurora. See "Project Pipeline Update" section below for further details.

Exploration: Exploration success continued in the third quarter, led by the discovery of a new mineralized extension at Keno Hill's Flame & Moth, 900 feet southwest of the existing resource; ongoing progress along the Bermingham trend toward the historic Hector-Calumet Mine; and massive sulfide intercepts at Greens Creek’s West Ore Offset target, with assays pending. Hecla also commenced drilling in Nevada at Aurora and Hollister and continued follow-up drilling on the new high-grade veins discovered at Midas in the second quarter.

Rob Krcmarov, President and Chief Executive Officer, said: “Our third quarter results reflect the strength of the platform we have built, and we are well positioned to achieve our 2026 guidance. We generated record free cash flow of $151 million, led by Greens Creek's record $147 million. Our free cash flow generation and debt-free balance sheet provide us with the strongest financial position in our history, with nearly $700 million in cash and total liquidity of approximately $1.2 billion. Our organic pipeline continues to advance at Greens Creek, where preliminary work on the pyrite concentrate circuit is progressing and we are now evaluating two additional potential paths forward for the dry- stack tailings. These opportunities are still early stage, but they demonstrate the potential for meaningful value creation and to further solidify Hecla’s position as North America’s premier silver producer. We are delighted to welcome Dale Andres to our Board. We look forward to his insight and contributions as we continue to grow Hecla." 2 FINANCIAL AND OPERATIONAL OVERVIEW _____________________________________________ ________________________________________________________________ In the following table and throughout this release, "costs applicable to sales" is exclusive of depreciation, depletion and amortization; "prior quarter" refers to the second quarter of 2026. All information in the table below is presented on a continuing operations basis.

THIRD QUARTER RESULTS Sales of $395 million increased 18% and payable silver sold was 23% higher compared to the prior quarter, both primarily driven by the timing of sales at Greens Creek. 3 Income from continuing operationswas $150 million, or $0.22 per share compared to the $118 million in the prior quarter (in each case from continuing operations, excluding Casa Berardi). The increase was primarily related to:

A $36 million increase in fair value adjustments, net, primarily due to realized and unrealized marketable securities gains

A $41 million increase in costs applicable to sales primarily related to higher consolidated sales volumes of concentrates 5

A $22 million increase in tax expense primarily related to higher profitability compared to the prior quarter

A $6 million increase in exploration and pre-development expense, primarily related to the seasonal increase in exploration activities across the portfolio and the start up of programs at Hollister and Aurora in Nevada

Adjusted EBITDA from continuing operationswas $211 million, up 6% from the prior quarter (in each period, excluding Casa Berardi), primarily reflecting the increase in revenue, partly offset by higher costs applicable to sales and exploration and pre-development expense.4,5

Cash and cash equivalentsat September 30, 2026, of $692 million, up over 43% from the prior quarter. The increase reflects strong cash flow generation as well as $64 million of proceeds from the sale of investments. The Company's new $500 million credit facility remains undrawn, with $3.4 million of availability utilized for outstanding letters of credit.

Record cash provided by operating activities from continuing operationswas $203 million, up 16% from the prior quarter, primarily due to favorable working capital changes, higher volumes of payable silver and gold ounces sold and higher realized gold price, partly offset by a lower realized lead and zinc price (in each period, excluding Casa Berardi).

Capital investment in continuing operationswas $52 million, up 32% from the prior quarter (in each period, excluding Casa Berardi). Capital investment is expected to increase in the fourth quarter, as projects across the portfolio advance, including the planned completion of the dry stack tailings facility expansion at Keno Hill.

Record free cash flow from continuing operationswas $151 million, surpassing the previous all-time high of $144 million set in the first quarter of 2026, primarily due to higher cash flow from operations (in each period, excluding Casa Berardi).1Greens Creek set a new quarterly site-level free cash flow record of $147 million.1 4

(a) Precious metals concentrates include intersegment sales to Greens Creek. Consolidated silver production from continuing operations was 4.2 million ounces, nearly unchanged from the prior quarter. Production decreased 6% at Greens Creek and 17% at Lucky Friday, but these declines were offset by a 54% increase at Keno Hill which set a new quarterly record of nearly 1.0 million ounces. Keno Hill’s increase was driven by record tons milled of 38,163 and a 36% higher milled silver grade compared with the prior quarter. Greens Creek production declined from the prior quarter mainly due to higher than planned maintenance during the quarter. Greens Creek plans to reduce mill availability in the fourth quarter for additional scheduled maintenance. As planned, Lucky Friday production declined as the mine moved out of a high-grade pocket of ore that drove a production record in the second quarter. 5 Gold productionfrom Greens Creek was 12 thousand ounces, down 16% from the prior quarter due primarily to 5% lower mill throughput for the reasons noted above.

Silver payable ounces soldof 4.1 million ounces, up 23% from the prior quarter, primarily due to higher payable ounces sold at Greens Creek and Keno Hill, partly offset by lower sales at Lucky Friday.

Gold payable ounces soldof 13 thousand ounces, up 25% from the prior quarter due to the timing of sales at Greens Creek.

Concentrate volumes produced and soldwere higher at Keno Hill and for zinc concentrate at Lucky Friday compared to the prior quarter. At Greens Creek, concentrate production was lower for all three concentrates produced, while concentrate sales were higher for silver concentrate, compared to the prior quarter, reflecting the catch up in shipments: zinc and precious metals concentrate sales roughly matched production. Concentrates sales at Lucky Friday and Keno Hill were broadly in line with production in the third quarter.

Consolidated silver costs applicable to sales (excludes depreciation) from continuing operationsrose 35% over the prior quarter to $158 million, primarily due to higher sales volumes of silver, gold, lead and zinc.5

Silver cash costs and AISC per silver ounce from continuing operations, excluding Keno Hill, which has not yet achieved commercial production, were ($3.20) and $14.34, respectively, higher than the prior quarter, primarily due to lower ounces produced at Greens Creek and Lucky Friday, $26 million higher costs applicable to sales (on higher sales volumes as noted above) and $14 million lower by-product credits compared to the prior quarter on lower gold production. This was partly offset by $4 million lower treatment charges ("TCs"), with TCs shifting to a net credit in the quarter due to favorable market conditions that could persist through the fourth quarter of 2026. The increase in AISC compared to the prior quarter reflects these same cash cost drivers, along with $5 million higher sustaining capital investment, mostly attributable to Lucky Friday.2,3

In the tables below the Company provides production, cost, and capital guidance on a consolidated basis and by mine, as well as projected consolidated exploration and pre-development expenditures. Silver production guidance is unchanged for Greens Creek, tightened up for Lucky Friday and for Keno Hill. There is no change to Greens Creek gold production guidance. Total silver cash costs and AISC per ounce2,3guidance is improved on better than expected results during the first nine months of 2026 and reduced sustaining capital investment guidance contributing to the improved AISC guidance. Total capital investment guidance is reduced by about 4%. 2026 Production Outlook

Consolidated silver production is expected to be 15.3-16.1 million ounces, with low end raised compared to prior guidance of 15.1-16.1 million ounces, and Greens Creek's gold production guidance of 51.0-55.0 koz is reiterated. Greens Creek's silver production is expected to be 8.0-8.3 million ounces, unchanged from prior guidance.

Lucky Friday's silver production is expected to be 5.0-5.2 million ounces, with low end raised from the prior 4.9-5.2 million ounces.

Keno Hill's silver production is expected to be 2.3-2.6 million ounces, with low end raised from the prior 2.2-2.6 million ounces. Keno Hill Update 6 In an attempt to maintain operational continuity, the Company is choosing to suppress Keno Hill mill throughput to approximately 300 tons per day in the fourth quarter of 2026 with further suppression, expected beginning in January 2027 to levels significantly below third quarter 2026 throughput. Including the Phase 2W dry-stack expansion, the Company estimates that approximately 200,000 tons of tailings storage capacity remains available under its current permits; how long that capacity lasts will depend on the rate at which ore is milled and the tailings generated per ton milled. The suppression is intended to preserve the tailings storage, waste rock and water treatment capacity available under our current permits while we pursue the license amendments needed to expand that capacity; it is not a cost-driven decision. We expect to hold the lower milling rate until those amendments are received, currently estimated by approximately mid-2029, and the related infrastructure is built. We expect silver production to decline by proportionally less than throughput because, during this period, we expect to be more selective in both mining and processing. In the mine, we will attempt to reduce dilution and prioritize higher-grade areas of the deposit. In the mill, we expect to preferentially process higher-grade material and stockpile lower-grade material for later processing. Actual production will depend on the grades, dilution, and recoveries we achieve. We expect to provide 2027 production guidance for Keno Hill in February 2027. See “Risk Factors” in the Company’s Form 10-Q for the quarter ended September 30, 2026. 2026 Cost Guidance Improved

Total silver cash cost and AISC guidance per silver ounce is improved to ($4.75)-($4.25)/oz and $11.50-$12.50/oz respectively.2,3This guidance only incorporates Greens Creek and Lucky Friday, as Keno Hill has not yet reached commercial production. At Greens Creek, guidance for costs applicable to sales (excludes depreciation) at $250 million, up $10 million from the prior guidance due mostly to actual results over the first nine months and higher expected power generation on site in the fourth quarter. Cash cost per silver ounce and AISC per silver ounce (guidance is improved to ($13.00)-($12.50) and ($5.50)-($5.00) respectively from ($12.50)-($12.00) and ($4.25)-($3.75) respectively. 2,3,5

At Lucky Friday, guidance for costs applicable to sales (excludes depreciation) of $140 million is reiterated. Cash cost guidance is improved to $8.50-$9.00 from the prior $9.00-$9.75, per silver ounce, and the higher end of AISC improved slightly to $24.50-$25.50 from $24.50-$26.00, per silver ounce to reflect better than expected results during the first nine months of 2026, with AISC guidance partly offset by the higher sustaining capital investment guidance at the mine. 2,3,5 2026 Capital and Exploration Investment

Total capital (growth and sustaining) investment guidance lowered, now at $198-$214 million from $208-$223 million to reflect lower spend in the first nine months. Greens Creek's capital investment is primarily attributable to mine development and the expansion of its tailings facility, which, when completed is expected to provide tailings storage capacity through 2045.

Lucky Friday's capital investment is heavily tied to underground development, a new tailings facility and a surface cooling project, which is now in a commissioning phase (subsequent to quarter end) with construction recently completed. The surface cooling project is designed to increase the cooling capacity at the mine to support its reserve mine-life of fifteen years.

Expected capital investment at Keno Hill comprises mine development, expansion of its tailings facility, and infrastructure projects. Exploration and pre-development expenditures, from continuing operations, remain unchanged and are expected to be $55 million, with the focus at Greens Creek and Keno Hill, Nevada and Lucky Friday.

Metal Prices and FX rate assumptions 7 Assumptions utilized in the calculation of by-products for the fourth quarter are as follows, gold $4,000/oz, zinc $1.40/lb, lead $0.85/lb and copper $4.00/lb. Numbers are rounded. Assumed exchange rate for Canadian dollar is unchanged at 1.35 CAD/USD.

PROJECT PIPELINE UPDATE ________________________________________________________ _____________________________________________________ Hecla remains focused on advancing a pipeline of organic growth opportunities that build on existing infrastructure, established permitting paths, and the Company's deep operational expertise. The projects outlined below are anticipated to be low-capital- intensity opportunities with the potential to meaningfully expand precious metal output, cash flows and net asset value over time, while reducing many of the exploration and development risks inherent in greenfield projects. Greens Creek Pyrite Concentrate Circuit Greens Creek is advancing engineering and evaluation of a pyrite concentrate circuit which has the potential to recover additional silver and gold that currently report to tailings. Preliminary metallurgical and engineering work indicates the project could, at average reserve grades, add approximately 1.0 to 1.2 million ounces of silver and 10,000 to 15,000 ounces of gold in annual production, once fully ramped up. Preliminary cost estimates are underway. Early indications point to a potential return on capital exceeding Company thresholds, while potentially also reducing the rate of tailings deposited into the tailing storage facility, which would be expected to lower future tailings-related capital investment. This work is at a scoping level of engineering, incorporating some advanced design. Given preliminary indications of favorable benefit-to-cost ratio and perceived low technical risk, the project is well suited to an accelerated engineering and execution path subject to receipt of applicable permits, and final investment approval. Under that path, the Company expects to begin intermittent production of pyrite concentrate in late 2027 using temporary equipment, ahead of completing the new circuit, expected in late 2028. These estimates are preliminary, based on early-stage engineering and metallurgical work, and remain subject to change as the project advances. Actual results may differ materially from these estimates due to further technical work, permitting timelines, market conditions, and other factors described under "Cautionary Statement Regarding Forward-Looking Statements, Including 2026 Outlook" in this news release and under "Risk Factors" in the Company's 2025 Form 10-K filed on February 17, 2026, and Form 10-Q filed on August 4, 2026 and expected to be filed on November 3, 2026, as well as in other reports filed by the Company from time to time 8 with the Securities and Exchange Commission. The reference to scoping level of engineering in this section describes the engineering and cost-estimate maturity of processing circuit design work. It does not refer to an initial assessment, pre-feasibility study, feasibility study or technical report summary under SEC Regulation S-K 1300 or a preliminary economic assessment, pre-feasibility study, feasibility study or technical report under NI 43-101 in Canada.

The Greens Creek tailings reprocessing project offers potential organic value creation, though significant groundwork is still needed before that value can be realized. Overall, the Company is evaluating three potential paths forward. The path with the greatest amount of time invested to date, is at a preliminary, conceptual stage of engineering (equivalent to an AACE Class 5 to Class 4 cost estimate) and is progressing through a multi-phase metallurgical study conducted with a third party, with Phase 3 testing completed in August 2026 (metallurgical results pending). This third phase of multi-ton metallurgical work is a key milestone that should help shape next steps, with the potential to advance to a pilot plant test in Phase 4. If the tests yield positive results, it is expected the project would advance through further engineering and economic studies before any decision to execute. Early indications point to a potentially low capital intensity path for Hecla to achieve initial cash flows, though the project remains in early-stage testing and depends on the potential third-party partner securing a suitable processing facility. As an added benefit, reprocessing all or part of the existing tailings could decrease the space needed for tailings storage and help lower the mine's long-term reclamation liability.

The Company is also at an early stage of evaluating two additional pathways associated with the dry-stack tailings. The first is based on advances in processing technology and growing market demand for material like Greens Creek tailings, which has created the potential to turn material once managed only as tailings into a marketable low-grade feedstock. This potential project pathway could recover additional silver and gold currently contained in tailings material, subject to further metallurgical testing and the identification of a suitable third-party processing arrangement. In the fourth quarter, we expect to load a test parcel from Greens Creek of approximately 5,500 dry metric tonnes of low-grade feedstock for shipment and sale to a third party smelter. The second option is a potential self-processing pathway that would require an onsite processing facility that could require new or amended permits. The Company expects to begin metallurgical evaluation of the self-processing concept in the first quarter of 2027, with results from this testing potentially available by spring 2027 to help determine potential next steps. The Company expects to be able to provide further details on these options in coming quarters as evaluation work advances. Potential for the combination of two or more of these three options is also being evaluated.

At September 30, 2026, the dry-stack tailings facility at Greens Creek held an estimated 10.7 million tons of material, containing roughly 51 million ounces of silver, nearly 600 thousand ounces of gold, and additional critical minerals, representing a combined estimated in-situ gross metal value of approximately $6.4 billion (based on September 30, 2026 metals prices and before transportation, processing or sales costs, which are expected to be significant). This material is not a mineral resource or mineral reserve. Any recovery would depend on further testing, a suitable processing arrangement and favorable economics.

Hecla continues to evaluate the potential to restart the existing Midas mill in northern Nevada, a historic high-grade gold and silver operation. Midas benefits from existing permitted infrastructure, which could help reduce the capital required for restart, and the Company is working to expand the existing high- grade gold and silver resource to the scale needed to support that restart. Midas represents a potential hub-and-spoke operating model, with ore potentially sourced from multiple regional deposits and fed into the 1,200 tpd mill. The site also includes an existing permitted tailings facility, offering approximately 15 years of storage capacity at the mill's nameplate capacity.

The Company has allocated $16 million of the 2026 exploration budget for the Nevada project portfolio, more than three times the investment made in 2025. The 2026 drill program at Midas is focused on following up on the success of the 2025 drill program with a heavy focus on SE Pediment area that includes multiple targets including Sinter, Sinter Offset, and Pogo. The nearby Hollister high- grade gold and silver project is within trucking distance of the Midas mill and drilling resumed in the third quarter after a multi-year pause. With multiple veins 9 and trends still open along strike and at depth, and programs at Aurora and Hollister beginning in the third quarter, the Company expects continued exploration momentum through the fourth quarter of 2026 and aims to provide regular exploration updates for the Nevada exploration projects throughout the coming quarters. EXPLORATION AND PRE-DEVELOPMENT ________________________________________________________________________________ _____________________________ Investment and Strategy During the third quarter, the Company invested $16.6 million in exploration and corporate development (and $0.6 million in pre-development) activities, focused on high-impact discovery drilling at Keno Hill in Yukon and Midas, Aurora and Hollister in Nevada, and resource expansion programs at the Company's producing assets. Year-to-date, the Company has invested $32.5 million in exploration and corporate development, with this strategy balancing district-scale discovery with near-mine resource definition and reserve extension. Guidance for 2026 remains at $55 million investment in exploration and pre-development. Producing Asset Resource Definition

Underground drilling at Greens Creek and Keno Hill continues to extend and upgrade mineralization near existing resource boundaries. The aim is to convert Inferred resources, the least certain category, into more certain categories and to identify reserve extensions.

Three underground rigs continued drilling around existing resources, with results received from the 200S, East and SWB zones. Notable intercepts include:

• East Zone. 6.4 oz/ton silver, 0.04 oz/ton gold, 25.4% zinc and 12.0% lead over 20.7 feet.

One underground rig continued drilling in the Arctic Zone of the Bermingham mine. Notable intercepts on the Bermingham Main Vein include:

• 54.3 oz/ton silver, 7.4% zinc and 4.7% lead over 4.6 feet, which upgrades the resource.

• 24.8 oz/ton silver, 1.6% zinc and 1.9% lead over 5.0 feet, which expands the resource on the same vein.

Exploration drilling at Keno Hill ramped up through the quarter after a period of reduced drilling capacity earlier in the year. The primary contractor returned its second and third drills to service in late July and late August, and a second contractor added one drill at Flame & Moth in late July. Four drills are now operating and are expected to continue through the remainder of 2026.

Drilling has been successful in testing the favorable Basal Quartzite on strike with the Lightning vein. The zone has currently been defined over 350 feet of dip length and sits 900 feet southwest of the existing resource. Four holes tested the area and three found significant mineralization. Assays are back for two holes (Figure 1).

The zone is open to the northeast, toward the existing resource, and to the southwest. Follow-up drilling will continue in the fourth quarter and into 2027. 10 Figure 1: Flame & Moth longitudinal section showing the new extension, holes 944 and 951, and the 900-foot gap to the existing resource

Drilling at Bermingham Deep extended the high-grade Footwall/Ruby silver trend both southwest and northeast. Key results include 25.7 oz/ton silver and 4.2% lead over 10.0 feet (K-26-0940) and 14.6 oz/ton silver over 5.2 feet (K-26-0935B) in the Footwall Vein. The Ruby Vein returned 9.3 oz/ton silver over 15.8 feet (K-26-0941). The subparallel Main Vein 2 returned 61.1 oz/ton silver and 3.8% lead over 5.3 feet and has been extended about 260 feet to the southwest. Together, the trend now spans about 1,300 feet, up 500 feet from Q2, though that length relies on visual observations from two holes (K-26-0942 and K-26-0945) with assays still pending (Figure 2). The northeast extension points toward the historic Hector-Calumet Mine, where the company believes the two mineralizing systems may converge at depth, making it a major target for late 2026 and 2027.

Figure 2: Bermingham Deep longitudinal section showing recent assay results. 11 Nevada Exploration

Midas is the only Nevada property with results this quarter: hole DMC-494 confirmed a second narrow high-grade gold vein (0.73 oz/ton gold and 2.9 oz/ton silver over 1.4 feet), and five follow-up holes all hit the expected structure, though only one has been assayed so far. Midas remains in restart evaluation with no decision made, and the key question is whether the veins have enough continuity and grade to support a resource.

At Aurora and Hollister, drilling has just begun and all assays are pending. Early holes at both found alteration and veining typical of gold-silver systems, which supports continued drilling, with remaining targets scheduled for Q4 and follow-up drilling in 2027.

Detailed exploration drill assay highlights can be found in Table A at the end of this

Pursuant to the Company's dividend policy, theBoard of Directors declared a quarterly cash dividend of $0.00375 per share of common stock payable on or about December 8, 2026, to stockholders of record on November 23, 2026.

A conference call and webcast will be held on Wednesday, November 4, at 10:00 a.m. Eastern Time to discuss these results. The Company recommends that you dial in at least 10 minutes before the call commencement. You may join the conference call by dialing toll-free 1-833-461-5787 or for international dialing 1-585-542-9983. The Conference ID is 462083930 and must be provided when dialing in. Hecla's live and archived webcast can be accessed athttps://events.q4inc.com/attendee/462083930orwww.hecla.comunder Investors.

Founded in 1891, Hecla Mining Company (NYSE: HL) is the largest silver producer in the United States and Canada. In addition to operating mines in Alaska and Idaho, the Company is advancing its Keno Hill mine in the Yukon, Canada, and owns a number of exploration and pre-development projects in world-class silver and gold mining districts throughout North America.

Non-GAAP financial measures are intended to provide additional information only and do not have any standard meaning prescribed by United States generally accepted accounting principles ("GAAP"). These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. The non-GAAP financial measures cited in this release and listed below are reconciled to their most comparable GAAP measure at the end of this release.

(1)Free cash flow is a non-GAAP measure calculated as cash provided by operating activities less capital investment. Cash provided by operating activities for the Greens Creek, Lucky Friday, and Keno Hill operations excludes exploration and pre-development investment, as it is a discretionary expenditure and not a component of the mines’ operating performance. Capital investment refers to Additions to properties, plants and equipment from the Consolidated Statements of Cash Flows. 12 (2)Cash cost per silver ounce is a non-GAAP measurement, a reconciliation of costs applicable to sales can be found at the end of the release. It is an important operating statistic that management utilizes to measure each mine's operating performance. It also allows the benchmarking of performance of each mine versus those of our competitors. As a primary silver mining company, management also uses the statistic on an aggregate basis - aggregating the Greens Creek and Lucky Friday mines to compare performance with that of other silver mining companies. Similarly, the statistic is useful in identifying acquisition and investment opportunities as it provides a common tool for measuring the financial performance of other mines with varying geologic, metallurgical and operating characteristics. In addition, the Company may use it when formulating performance goals and targets under its incentive program.

(3)All-in sustaining cost (“AISC”) is a non-GAAP measurement, a reconciliation of which to costs applicable to sales, the closest GAAP measurement, can be found in the end of the release. AISC includes costs applicable to sales and other direct production costs, expenses for reclamation at the mine sites and all site sustaining capital costs. AISC is calculated net of depreciation, depletion, and amortization and by-product credits.

Current GAAP measures used in the mining industry, such as total costs applicable to sales, do not capture all the expenditures incurred to discover, develop and sustain silver and gold production. Management believes that AISC is a non-GAAP measure that provides additional information to management, investors and analysts to help (i) in the understanding of the economics of our operations and performance compared to other producers and (ii) in the transparency by better defining the total costs associated with production. Similarly, the statistic is useful in identifying acquisition and investment opportunities as it provides a common tool for measuring the financial performance of other mines with varying geologic, metallurgical and operating characteristics. In addition, the Company may use it when formulating performance goals and targets under its incentive program.

(4)Adjusted EBITDA is a non-GAAP measurement, a reconciliation of which to income from continuing operations, the most comparable GAAP measure, can be found at the end of the release. Adjusted EBITDA is a measure used by management to evaluate the Company's operating performance but should not be considered an alternative to income from continuing operations, or cash provided by operating activities as those terms are defined by GAAP, and does not necessarily indicate whether cash flows will be sufficient to fund cash needs. In addition, the Company may use it when formulating performance goals and targets under its incentive program.

(5)Excludes depreciation, depletion and amortization. Cautionary Statement Regarding Forward Looking Statements, Including 2026 Outlook This news release contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by such sections and other applicable laws, including Canadian securities laws. Words such as "may", "will", "should", "expects", "intends", "projects", "believes", "estimates", "targets", "anticipates" and similar expressions are used to identify these forward-looking statements.

Such forward-looking statements may include, without limitation: (i) the Company’s organic project pipeline has potential for meaningful value creation, with the potential to meaningfully expand precious metal output, cash flows and net asset value over time, while reducing many of the exploration and development risks inherent in greenfield projects; (ii) at Greens Creek, (a) the expansion of its tailings facility, when completed, is expected to provide tailings storage capacity through 2045; and (b) the potential new pyrite concentrate circuit (1) could create incremental annual production of approximately 1.0 to 1.2 million ounces of silver and 10,000 to 15,000 ounces of gold from material that currently reports to tailings, once fully ramped up, (2) has a potential robust return on capital meeting Company thresholds, while potentially also reducing the rate of tailings deposited into the tailing storage facility, which would be expected to lower future tailings-related capital investment, (3) has projected favorable benefit-to-cost ratio and perceived low technical risk, and is well suited to an accelerated engineering and execution path, and (4) if approved, could begin intermittent production using temporary equipment in late 2027, with the potential to reach full capacity in late 2028, when construction of the new circuit 13 is expected to be completed; (c) the tailings reprocessing project (1) offers potential organic value creation, (2) completed Phase 3 testing in August 2026, which is a key milestone that should help shape next steps, with the potential to advance to a pilot plant test in Phase 4, (3) is expected to advance through further engineering and economic studies before any decision to execute if the tests yield positive results, (4) represents a potentially low capital intensity path for Hecla to achieve initial cash flows, and (5) could decrease the space needed for tailings storage and help lower the mine's long-term reclamation liability; (d) the potential direct sale of dry-stack tailings, including the shipment and sale of the test parcel, and the potential self-processing pathway, including the timing of metallurgical evaluation and results; (iii) the Midas restart project has the potential to reduce the capital required to restart the operation through its permitted infrastructure, with Midas representing a potential hub-and-spoke operating model where ore sources could come from multiple regional sources fed into the 1,200 tpd mill; (iv) commissioning of the Lucky Friday surface cooling project is expected to be completed in the fourth quarter of 2026; (v) capital investment is expected to increase in the fourth quarter as numerous projects are advanced across the portfolio; (vi) Company- wide and mine-specific estimated spending on capital, exploration and predevelopment for 2026; (vii) Company-wide and mine-specific estimated silver and gold production, costs applicable to sales, and cash cost and AISC per silver ounce for 2026; (viii) the expected suppression of Keno Hill mill throughput to approximately 300 tons per day in the fourth quarter of 2026 and further beginning in January 2027, the estimated remaining tailings storage capacity and how long it will last, the expected timing of license amendments and related infrastructure, the expected partial offset from more selective mining and processing, and the expected timing of 2027 guidance for Keno Hill; (ix) metals prices and foreign exchange rate assumptions; and (x) exploration plans and results, including planned drilling, the extent and continuity of mineralization, and pending assays.

The material factors or assumptions used to develop such forward-looking statements or forward-looking information include that the Company’s plans for development and production will proceed as expected and will not require revision as a result of risks or uncertainties, whether known, unknown or unanticipated, to which the Company’s operations are subject. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect, which could cause actual results to differ from forward-looking statements. Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s projects being consistent with current expectations and mine plans; (iii) political/regulatory developments in any jurisdiction in which the Company operates being consistent with its current expectations; (iv) the exchange rate for the USD/CAD being approximately consistent with current levels; (v) certain price assumptions for gold, silver, lead and zinc; (vi) prices for key supplies being approximately consistent with current levels; (vii) the accuracy of our current mineral reserve and mineral resource estimates; (viii) there being no significant changes to the availability of employees, vendors and equipment; (ix) the Company’s plans for development and production will proceed as expected and will not require revision as a result of risks or uncertainties, whether known, unknown or unanticipated; (x) counterparties performing their obligations under hedging instruments and put option contracts; (xi) sufficient workforce is available and trained to perform assigned tasks; (xii) weather patterns and rain/snowfall within normal seasonal ranges so as not to impact operations; (xiii) relations with interested parties, including First Nations and Native Americans, remain productive; (xiv) maintaining availability of water rights; (xv) factors do not arise that reduce available cash balances; and (xvi) there being no material increases in our current requirements to post or maintain reclamation and performance bonds or collateral related thereto. In addition, material risks that could cause actual results to differ from forward-looking statements include but are not limited to: (i) gold, silver and other metals price volatility; (ii) operating risks; (iii) currency fluctuations; (iv) increased production costs and variances in ore grade or recovery rates from those assumed in mining plans; (v) community relations; and (vi) litigation, political, regulatory, labor and environmental risks. For a more detailed discussion of such risks and other factors that may impact expected future results, see the Company's 2025 Form 10-K filed on February 17, 2026 and Form 10-Q expected to be filed on November 3, 2026. The Company undertakes no obligation and has no intention of updating forward-looking statements other than as may be required by law.

This news release uses the terms “mineral resources”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources.” Mineral resources that are not mineral reserves do not have 14 demonstrated economic viability. You should not assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. Further, inferred mineral resources have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically, and an inferred mineral resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a mineral reserve. The Company reports reserves and resources under the SEC’s mining disclosure rules (“S-K 1300”) and Canada’s National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) because the Company is a “reporting issuer” under Canadian securities laws. Unless otherwise indicated, all resource and reserve estimates contained in this press release have been prepared in accordance with S-K 1300 as well as NI 43-101.

Kurt D. Allen, MSc., CPG, VP-Exploration of Hecla Mining Company, Paul W. Jensen, MSc., CPG, Chief Geologist of Hecla Limited, and Matt Blattman, P.E., RM-SME, MMSA, VP-Technical Services serve as Qualified Persons under S-K 1300 and NI 43-101 for Hecla’s mineral projects. Mr. Allen supervised the preparation of the scientific and technical information concerning exploration activities while Mr. Jensen supervised the preparation of mineral resources for this news release. Mr. Blattman supervised the preparation of the mineral reserves for this news release. Technical Report Summaries for the Company’s Greens Creek, Lucky Friday and Keno Hill properties are filed as exhibits 96.1, 96.2 and 96.4, respectively, to the Company’s Annual Report on Form 10-K for the year ended December 31, 2025, and are available at www.sec.gov. Information regarding data verification, surveys and investigations, quality assurance program and quality control measures and a summary of analytical or testing procedures for (i) the Greens Creek Mine are contained in its Technical Report Summary and in its NI 43-101 technical report titled “Technical Report for the Greens Creek Mine” effective date December 31, 2018, (ii) the Lucky Friday Mine are contained in its Technical Report Summary and in its NI 43-101 technical report titled “Technical Report for the Lucky Friday Mine Shoshone County, Idaho, USA” effective date April 2, 2014, and (iii) Keno Hill is contained in its Technical Report Summary titled “S-K 1300 Technical Report Summary on the Keno Hill Mine, Yukon, Canada” and in its NI 43-101 technical report titled “Technical Report on the Keno Hill Mine, Yukon, Canada” effective date December 31, 2023. Also included in each Technical Report Summary and technical report listed above is a description of the key assumptions, parameters and methods used to estimate mineral reserves and resources and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant factors. Information regarding data verification, surveys and investigations, quality assurance program and quality control measures and a summary of sample, analytical or testing procedures are contained in NI 43-101 technical reports prepared for Klondex Mines Ltd. for (i) the Fire Creek Mine (technical report dated March 31, 2018), (ii) the Hollister Mine (technical report dated May 31, 2017, amended August 9, 2017), and (iii) the Midas Mine (technical report dated August 31, 2014, amended April 2, 2015). Information regarding data verification, surveys and investigations, quality assurance program and quality control measures and a summary of sample, analytical or testing procedures are contained in a NI 43-101 technical reports prepared for ATAC Resources Ltd. for (i) the Osiris Project (technical report dated July 28, 2022) and (ii) the Tiger Project (technical report dated February 27, 2020). Copies of these technical reports are available under the SEDAR profiles of Klondex Mines Unlimited Liability Company and ATAC Resources Ltd., respectively, at www.sedar.com (the Fire Creek technical report is also available under Hecla’s profile on SEDAR). Mr. Jensen reviewed and verified information regarding drill sampling, data verification of all digitally collected data, drill surveys and specific gravity determinations relating to all the mines. The review encompassed quality assurance programs and quality control measures including analytical or testing practice, chain-of-custody procedures, sample storage procedures and included independent sample collection and analysis. This review found the information and procedures meet industry standards and are adequate for Mineral Resource and Mineral Reserve estimation and mine planning purposes.

Website:http://www.hecla.com 16 HECLA MINING COMPANY Consolidated Statements of Operations (dollars and shares in thousands, except per share amounts - unaudited)

(1) Excludes depreciation, depletion and amortization 17 HECLA MINING COMPANY Consolidated Statements of Cash Flows (dollars in thousands - unaudited)

18 HECLA MINING COMPANY Consolidated Balance Sheets (dollars and shares in thousands - unaudited)

September 30, 2026 December 31, 2025 ────────────────────────────────────────────────────────────────────────────── ASSETS Current assets: Cash and cash $ 691,569 $ 241,558 equivalents Accounts receivable 169,199 182,249 Inventories 85,153 81,687 Other current assets 106,241 83,065 Assets of discontinued — 40,785 operations Total current assets 1,052,162 629,344 Investments 45,562 47,842 Restricted cash and 1,170 1,174 cash equivalents Properties, plants, equipment and mine 2,151,987 2,130,581 development, net Operating lease 8,039 8,859 right-of-use assets Other non-current 101,104 31,901 assets Assets of discontinued — 710,944 operations Total assets $ 3,360,024 $ 3,560,645 LIABILITIES Current liabilities: Accounts payable and other current $ 142,569 $ 126,364 accrued liabilities Finance leases 4,133 4,262 Accrued reclamation 13,402 13,795 and closure costs Accrued interest — 7,678 Other current 16,553 39,107 liabilities Liabilities of discontinued — 40,358 operations Total current 176,657 231,564 liabilities Accrued reclamation 117,118 112,491 and closure costs Long-term debt including finance 7,078 263,171 leases Deferred tax 197,648 157,585 liability Other non-current 39,864 33,912 liabilities Liabilities of discontinued — 170,276 operations Total liabilities 538,365 968,999 STOCKHOLDERS’ EQUITY Preferred stock 38 39 Common stock 170,115 169,689 Capital surplus 2,653,620 2,643,211 Retained earnings 58,354 (182,143 ) (accumulated deficit) Accumulated other comprehensive loss, (20,124 ) (3,334 ) net Treasury stock (40,344 ) (35,816 ) Total stockholders’ 2,821,659 2,591,646 equity Total liabilities and stockholders’ $ 3,360,024 $ 3,560,645 equity Common shares 681,230 679,220 outstanding

19 Reconciliation of Costs Applicable to Sales to Cash Cost, Before By-product Credits (non-GAAP) and Cash Cost (non-GAAP) and All-In Sustaining Cost, Before By-product Credits (non-GAAP) and All-In Sustaining Cost (non-GAAP)

The tables below present reconciliations between the most comparable GAAP measure of costs applicable to sales to the non-GAAP measures of (i) Cash Cost, Before By-product Credits, (ii) Cash Cost, (iii) AISC, Before By-product Credits and (iv) AISC for our operations and for the Company for the three and nine months ended September 30, 2026 and 2025, the three months ended June 30, 2026, March 31, 2026 and December 31, 2025.

Cash Cost and AISC are measures developed by precious metals companies (including the Silver Institute and the World Gold Council) in an effort to provide a uniform standard for comparison purposes. There can be no assurance, however, that these non-GAAP measures as the Company reports them are the same as those reported by other mining companies.

Cash Cost is an important operating statistic that the Company utilizes to measure each mine's operating performance. The Company uses AISC as a measure of our mines' net cash flow after costs for reclamation and sustaining capital. This is similar to the Cash Cost non-GAAP measure the Company reports, but also includes reclamation and sustaining capital costs. Current GAAP measures used in the mining industry, such as costs applicable to sales, do not capture all the expenditures incurred to discover, develop and sustain silver and gold production. Cash Cost and AISC also allow us to benchmark the performance of each of our mines versus those of our competitors. As a silver and gold mining company, we also use these statistics on an aggregate basis - aggregating the Greens Creek and Lucky Friday mines to compare our performance with that of other silver mining companies. Similarly, these statistics are useful in identifying acquisition and investment opportunities as they provide a common tool for measuring the financial performance of other mines with varying geologic, metallurgical and operating characteristics.

Cash Cost, Before By-product Credits and AISC, Before By-product Credits include all direct and indirect operating cash costs related directly to the physical activities of producing metals, including mining, processing and other plant costs, third-party refining expense, on-site general and administrative costs, royalties and mining production taxes. AISC, Before By-product Credits for each mine also includes reclamation and sustaining capital costs. AISC, Before By- product Credits for our consolidated silver properties also includes corporate costs for general and administrative expense and sustaining capital costs. By- product credits include revenues earned from all metals other than the primary metal produced at each unit. As depicted in the tables below, by-product credits comprise an essential element of our silver unit cost structure, distinguishing our silver operations due to the polymetallic nature of their orebodies.

In addition to the uses described above, Cash Cost and AISC per Ounce provide management and investors an indication of operating cash flow, after consideration of the average price received from production. The Company also uses these measurements for the comparative monitoring of performance of our mining operations period-to-period from a cash flow perspective. 20

(1) Includes all direct and indirect operating costs related to the physical activities of producing metals, including mining, processing and other plant costs, third-party refining and marketing expense, on-site general and administrative costs and royalties, before by-product revenues earned from all metals other than the primary metal produced at each operation. AISC, Before By- product Credits also includes reclamation and sustaining capital costs. (2) AISC, Before By-product Credits for our consolidated silver properties includes corporate costs for general and administrative expense and sustaining capital. 24 (3) Excludes depreciation, depletion and amortization (4) Other includes costs applicable to sales related to the Company's environmental remediation services business. (5) Keno Hill has not yet reached commercial production and is excluded from the calculation of Cash Cost Before By-product Credits, Cash Cost, AISC Before By-product Credits, and AISC. 2026 Guidance, Current Estimates: Reconciliation of Costs Applicable to Sales to Non-GAAP Measures

25 Reconciliation of Income from Continuing Operations (GAAP) to Adjusted EBITDA from Continuing Operations (non-GAAP) This release refers to the non-GAAP measures of adjusted earnings before interest, taxes, depreciation and amortization ("Adjusted EBITDA") from continuing operations, which is a measure of our operating performance. Adjusted EBITDA from continuing operations is calculated as income from continuing operations before the following items: interest expense, income and mining taxes, depreciation, depletion, and amortization expense, ramp-up and suspension costs, gains and losses on disposition of assets, foreign exchange gains and losses, write down of property, plant and equipment, fair value adjustments, net, interest and other income, provisions for closed operations and environmental matters, stock-based compensation, provisional price gains, monetization of zinc and lead hedges and inventory adjustments. Management believes that, when presented in conjunction with comparable GAAP measures, adjusted EBITDA is useful to investors in evaluating our operating performance and ability to meet our debt obligations. The following table reconciles income from continuing operations to adjusted EBITDA from continuing operations:

26 Reconciliation of Cash Provided by Operating Activities from Continuing Operations (GAAP) to Free Cash Flow from Continuing Operations (non-GAAP) This release refers to a non-GAAP measure of free cash flow from continuing operations, calculated as cash provided by operating activities from continuing operations, less capital investments. Management believes that, when presented in conjunction with comparable GAAP measures, free cash flow from continuing operations is useful to investors in evaluating our operating performance. The following table reconciles cash provided by operating activities from continuing operations to free cash flow from continuing operations:

Full text with the tables
                                                                                
                    Hecla Reports Third Quarter 2026 Results                    
                                                                                
Cash Flow from Continuing Operations up 16% Quarter-Over-Quarter to record $203 
  million; Free Cash Flow1Nearly Triples Year-Over-Year to record $151 million  
COEUR D'ALENE, IDAHO - November 3, 2026 - Hecla Mining Company (NYSE:HL)
("Hecla", or the "Company") today announced third quarter 2026 financial and
operating results."Prior quarter" refers to the second quarter of 2026. Prior
period financial information has been recast to reflect Casa Berardi as a
discontinued operation.

THIRD QUARTER 2026 HIGHLIGHTS

Financial Performance:

Revenue: $395 million from continuing operations, the second highest in
company's history.

Profitability: Income from continuing operations of $150 million or $0.22 per
share - up from $118 million or $0.18 per share in the prior quarter.

Adjusted EBITDA: $211 million from continuing operations, a 6% increase over the
prior quarter (both periods on a continuing operations basis, excluding Casa
Berardi). 4

Record cash flow generation: Cash flow generated from continuing operations of
$203 million, and record quarterly free cash flow from continuing operations of
$151 million; Greens Creek set a new site-level quarterly record of $147
million. 1

Strengthening balance sheet: The Company ended the quarter with $692 million of
cash and cash equivalents, reflecting continued balance sheet strength and
strategic flexibility. The Company remains debt free (excluding finance leases)
and has entered into a new $500 million revolving credit agreement with an
additional $100 million accordion option. The facility is undrawn, with $3.4
million of capacity currently utilized for outstanding letters of credit. This
is the strongest balance sheet position in the Company's history.

Corporate Matters:

New Director: Mr. Dale Andres has joined the Board of Directors. Mr. Andres is a
mining executive with over 35 years of experience in base and precious metals.

Operational Performance:

Operations:

Safety: Consolidated TRIFR of 1.51, down from 1.57 in the prior quarter.

Silver production from continuing operations was 4.2 million ounces, nearly
unchanged from the prior quarter, with consolidated silver sales volumes
stronger, reflecting the timing of shipments, mainly at Greens Creek.

Consolidated costs applicable to sales from continuing operations of $158
million, up 35% from the prior quarter due primarily to the timing of sales.
Silver cash cost remained negative at ($3.20) per ounce and AISC was $14.34 per
ounce (excluding Keno Hill, which has not yet achieved commercial production).
Year-to-date AISC of $9.37/oz is essentially in line with $9.26/oz a year ago,
and YTD cash cost improved to ($4.94)/oz from ($2.20)/oz. 2,3,5
                                       1                                        
Production and cost guidance: Consolidated 2026 silver production is expected to
be 15.3-16.1 million ounces, with low end raised compared to prior guidance of
15.1-16.1 million ounces. Consolidated silver cash cost and AISC guidance
improved to ($4.75)-($4.25)/oz and $11.50-$12.50/oz respectively, 2,3 on
outperformance during the first nine months of the year, reduced sustaining
capital investment guidance, and higher by-product credits. 2,3 See Guidance
section for more details.

Individual Mine Performance:

Greens Creek: Produced over 1.9 million ounces of silver and nearly 12 thousand
ounces of gold. Costs applicable to sales were $76 million, with silver cash
cost of ($10.11) per ounce and AISC of ($3.25) per ounce. 2,3,5

Lucky Friday: Produced nearly 1.3 million ounces of silver. Costs applicable to
sales were $34 million, with silver cash cost of $7.31 per ounce and AISC of
$27.68 per ounce. 2,3,5 The surface cooling project is expected to commission in
the fourth quarter.

Keno Hill: Produced nearly 1.0 million ounces of silver. Milled silver grade
improved more than 35% from the prior quarter and milling rates reached a new
quarterly record. Milling rates will be suppressed beginning in the fourth
quarter to preserve the tailings storage, waste rock and water treatment
capacity available under current permits while license amendments are pursued
(see "Keno Hill Update" below).

Growth pipeline: Preliminary work on the Greens Creek pyrite concentrate
continues, and has led to a revision to growth capital expenditure guidance for
Greens Creek. Subject to final investment approval, intermittent production
using temporary equipment could begin in late 2027 with potential to reach full
capacity in late 2028, when construction of the new circuit is expected to be
completed. Separately, the scope of the Greens Creek dry-stack tailings
reprocessing evaluation has broadened to include two additional potential paths
forward, or a combination of them. In Nevada, 2026 exploration investment
guidance of $16 million is more than three times the 2025 level with expanded
programs at Midas and new programs at Hollister and Aurora. See "Project
Pipeline Update" section below for further details.

Exploration: Exploration success continued in the third quarter, led by the
discovery of a new mineralized extension at Keno Hill's Flame & Moth, 900 feet
southwest of the existing resource; ongoing progress along the Bermingham trend
toward the historic Hector-Calumet Mine; and massive sulfide intercepts at
Greens Creek’s West Ore Offset target, with assays pending. Hecla also commenced
drilling in Nevada at Aurora and Hollister and continued follow-up drilling on
the new high-grade veins discovered at Midas in the second quarter.

Rob Krcmarov, President and Chief Executive Officer, said: “Our third quarter
results reflect the strength of the platform we have built, and we are well
positioned to achieve our 2026 guidance. We generated record free cash flow of
$151 million, led by Greens Creek's record $147 million. Our free cash flow
generation and debt-free balance sheet provide us with the strongest financial
position in our history, with nearly $700 million in cash and total liquidity of
approximately $1.2 billion. Our organic pipeline continues to advance at Greens
Creek, where preliminary work on the pyrite concentrate circuit is progressing
and we are now evaluating two additional potential paths forward for the dry-
stack tailings. These opportunities are still early stage, but they demonstrate
the potential for meaningful value creation and to further solidify Hecla’s
position as North America’s premier silver producer. We are delighted to welcome
Dale Andres to our Board. We look forward to his insight and contributions as we
continue to grow Hecla."
                                       2                                        
FINANCIAL AND OPERATIONAL OVERVIEW _____________________________________________
________________________________________________________________ In the
following table and throughout this release, "costs applicable to sales" is
exclusive of depreciation, depletion and amortization; "prior quarter" refers to
the second quarter of 2026. All information in the table below is presented on a
continuing operations basis.
                                                                                
  In                                                                            
  thousa…                                                                       
  (except   3Q-2026   2Q-2026   1Q-2026   4Q-2025   3Q-2025  YTD-20…  YTD-2025  
  per                                                                           
  ounce                                                                         
  amount…                                                                       
  Financ…                                                                       
  Highli…                                                                       
  Sales    $394,820  $333,851  $411,433  $363,578  $315,998  $1,140…  $740,324  
  Costs                                                                         
  applic…                                                                       
  to       $158,197  $117,283  $124,410  $122,150  $135,925  $399,8…  $345,162  
  sales                                                                         
  (5)                                                                           
  Deprec…                                                                       
  deplet…   $36,549   $36,772   $33,768   $27,927   $37,728  $107,0…   $98,857  
  and                                                                           
  amorti…                                                                       
  Income                                                                        
  and                                                                           
  mining    $40,548   $18,767   $50,900   $37,351   $31,030  $110,2…   $61,390  
  tax                                                                           
  provis…                                                                       
  Income                                                                        
  from     $149,600  $117,876  $164,653  $110,059   $89,363  $432,1…  $148,000  
  contin…                                                                       
  operat…                                                                       
  Basic                                                                         
  income                                                                        
  per                                                                           
  common                                                                        
  share       $0.22     $0.18     $0.24     $0.16     $0.13    $0.64     $0.23  
  (in                                                                           
  dollar…                                                                       
  from                                                                          
  contin…                                                                       
  operat…                                                                       
  Adjust…                                                                       
  EBITDA                                                                        
  from     $211,474  $199,179  $265,104  $200,955  $147,137  $675,7…  $317,398  
  contin…                                                                       
  operat…                                                                       
  (4)                                                                           
  Cash                                                                          
  provid…                                                                       
  by                                                                            
  operat…  $202,951  $174,919  $182,922  $165,852  $101,556  $560,7…  $237,587  
  activi…                                                                       
  from                                                                          
  contin…                                                                       
  operat…                                                                       
  Capital                                                                       
  invest…                                                                       
  in       $(51,71…  $(39,14…  $(39,26…  $(65,93…  $(44,42…  $(130,…  $(124,9…  
  contin…                                                                       
  operat…                                                                       
  Free                                                                          
  cash                                                                          
  flow                                                                          
  from     $151,237  $135,777  $143,657   $99,916   $57,131  $430,6…  $112,648  
  contin…                                                                       
  operat…                                                                       
  (1)                                                                           
  Free                                                                          
  cash                                                                          
  flow 1                                                                        
  by                                                                            
  operat…                                                                       
  (before                                                                       
  explor…                                                                       
  and                                                                           
  corpor…                                                                       
  costs)                                                                        
  Greens                                                                        
  Creek                                                                         
  Cash                                                                          
  flow     $155,146  $139,181  $131,368  $101,902   $83,408  $425,6…  $202,637  
  from                                                                          
  operat…                                                                       
  Explor…    $3,388    $2,588      $276      $743    $3,228   $6,252    $5,621  
  Capital  $(11,74…  $(12,07…  $(6,113)  $(23,28…  $(12,17…  $(29,9…  $(31,33…  
  invest…                                                                       
  Free                                                                          
  cash     $146,788  $129,699  $125,531   $79,363   $74,457  $402,0…  $176,923  
  flow                                                                          
  (1)                                                                           
  Lucky                                                                         
  Friday                                                                        
  Cash                                                                          
  flow      $88,331  $103,606   $64,619   $56,869   $29,279  $256,5…   $73,733  
  from                                                                          
  operat…                                                                       
  Explor…    $2,143      $638      $991      $885    $1,054   $3,772    $1,223  
  Capital  $(23,65…  $(16,68…  $(17,01…  $(24,68…  $(16,86…  $(57,3…  $(48,25…  
  invest…                                                                       
  Free                                                                          
  cash      $66,819   $87,563   $48,592   $33,074   $13,468  $202,9…   $26,703  
  flow                                                                          
  (1)                                                                           
  Keno                                                                          
  Hill                                                                          
  Cash                                                                          
  flow       $4,811   $17,932   $29,570   $33,028   $22,109  $52,313   $28,893  
  from                                                                          
  operat…                                                                       
  Explor…    $4,321    $3,854    $1,356      $365      $975   $9,531    $6,011  
  Capital  $(11,20…  $(7,236)  $(15,02…  $(15,96…  $(14,74…  $(33,4…  $(42,22…  
  invest…                                                                       
  Free                                                                          
  cash     $(2,073)   $14,550   $15,901   $17,429    $8,337  $28,378  $(7,324)  
  flow                                                                          
  (1)                                                                           
  Metals                                                                        
  Prices                                                                        
  Average                                                                       
  metal                                                                         
  prices                                                                        
  Silver                                                                        
  -                                                                             
  London     $62.73    $73.44    $84.39    $54.83    $39.38   $73.52    $34.97  
  PM Fix,                                                                       
  $/ounce                                                                       
  Gold -                                                                        
  London     $4,270    $4,517    $4,875    $4,142    $3,456   $4,554    $3,199  
  PM Fix,                                                                       
  $/ounce                                                                       
  Lead -                                                                        
  LME                                                                           
  Final       $0.84     $0.89     $0.88     $0.89     $0.89    $0.87     $0.89  
  Cash                                                                          
  Buyer,                                                                        
  $/pound                                                                       
  Zinc -                                                                        
  LME                                                                           
  Final       $1.74     $1.57     $1.47     $1.44     $1.28    $1.59     $1.25  
  Cash                                                                          
  Buyer,                                                                        
  $/pound                                                                       
  Realiz…                                                                       
  Prices                                                                        
  Silver,    $63.62    $63.06    $82.70    $69.28    $42.58   $69.81    $37.45  
  $/ounce                                                                       
  Gold,      $4,279    $4,256    $4,899    $4,210    $3,535   $4,604    $3,307  
  $/ounce                                                                       
  Lead,       $0.91     $0.97     $0.98     $0.97     $0.93    $0.95     $0.92  
  $/pound                                                                       
  Zinc,       $1.48     $1.63     $1.41     $1.45     $1.48    $1.50     $1.37  
  $/pound                                                                       
                                                                                
THIRD QUARTER RESULTS Sales of $395 million increased 18% and payable silver
sold was 23% higher compared to the prior quarter, both primarily driven by the
timing of sales at Greens Creek.
                                       3                                        
Income from continuing operationswas $150 million, or $0.22 per share compared
to the $118 million in the prior quarter (in each case from continuing
operations, excluding Casa Berardi). The increase was primarily related to:

An 18% increase in revenue from continuing operations for the items noted above

A $36 million increase in fair value adjustments, net, primarily due to realized
and unrealized marketable securities gains

Partly offset by:

A $41 million increase in costs applicable to sales primarily related to higher
consolidated sales volumes of concentrates 5

A $22 million increase in tax expense primarily related to higher profitability
compared to the prior quarter

A $6 million increase in exploration and pre-development expense, primarily
related to the seasonal increase in exploration activities across the portfolio
and the start up of programs at Hollister and Aurora in Nevada

Adjusted EBITDA from continuing operationswas $211 million, up 6% from the prior
quarter (in each period, excluding Casa Berardi), primarily reflecting the
increase in revenue, partly offset by higher costs applicable to sales and
exploration and pre-development expense.4,5

Cash and cash equivalentsat September 30, 2026, of $692 million, up over 43%
from the prior quarter. The increase reflects strong cash flow generation as
well as $64 million of proceeds from the sale of investments. The Company's new
$500 million credit facility remains undrawn, with $3.4 million of availability
utilized for outstanding letters of credit.

Record cash provided by operating activities from continuing operationswas $203
million, up 16% from the prior quarter, primarily due to favorable working
capital changes, higher volumes of payable silver and gold ounces sold and
higher realized gold price, partly offset by a lower realized lead and zinc
price (in each period, excluding Casa Berardi).

Capital investment in continuing operationswas $52 million, up 32% from the
prior quarter (in each period, excluding Casa Berardi). Capital investment is
expected to increase in the fourth quarter, as projects across the portfolio
advance, including the planned completion of the dry stack tailings facility
expansion at Keno Hill.

Record free cash flow from continuing operationswas $151 million, surpassing the
previous all-time high of $144 million set in the first quarter of 2026,
primarily due to higher cash flow from operations (in each period, excluding
Casa Berardi).1Greens Creek set a new quarterly site-level free cash flow record
of $147 million.1
                                       4                                        
                                                                                
  In                                                                            
  thousa…                                                                       
  (except   3Q-2026   2Q-2026   1Q-2026   4Q-2025   3Q-2025  YTD-20…  YTD-2025  
  per                                                                           
  ounce                                                                         
  amount…                                                                       
  Operat…                                                                       
  Highli…                                                                       
  Milled                                                                        
  tons                                                                          
  (tons)                                                                        
  Greens    207,638   217,433   208,922   200,952   227,587  633,993   670,707  
  Creek                                                                         
  Lucky     100,545   101,978   108,608    98,499   105,329  311,131   328,549  
  Friday                                                                        
  Keno       38,163    33,504    24,274    24,417    29,740   95,941    83,922  
  Hill                                                                          
  Milled                                                                        
  silver                                                                        
  grade -                                                                       
  (opt)                                                                         
  Greens       11.7      12.0      13.0      12.2      13.1     12.2      12.8  
  Creek                                                                         
  Lucky        13.2      15.6      11.9      13.4      13.4     13.6      12.9  
  Friday                                                                        
  Keno         26.2      19.3      20.8      25.4      31.8     22.4      30.0  
  Hill                                                                          
  Silver                                                                        
  produc…                                                                       
  Greens                                                                        
  Creek,   1,935,1…  2,051,0…  2,177,1…  1,951,7…  2,347,6…  6,163,…  6,773,2…  
  ounces                                                                        
  Lucky                                                                         
  Friday,  1,272,5…  1,532,5…  1,237,2…  1,250,2…  1,337,3…  4,042,…  4,010,4…  
  ounces                                                                        
  Keno                                                                          
  Hill,     963,048   625,236   488,719   597,020   898,328  2,077,…  2,421,4…  
  ounces                                                                        
  Total,   4,170,8…  4,208,8…  3,903,1…  3,799,0…  4,583,3…  12,282…  13,205,…  
  ounces                                                                        
  Gold                                                                          
  produc…                                                                       
  Greens                                                                        
  Creek,     11,996    14,199    12,886    12,256    15,584   39,081    47,093  
  ounces                                                                        
  Silver                                                                        
  payable  4,094,2…  3,318,9…  3,575,0…  3,732,0…  4,457,0…  10,988…  11,487,…  
  ounces                                                                        
  sold                                                                          
  Gold                                                                          
  payable    12,706    10,151    11,533    10,484    14,277   34,390    36,389  
  ounces                                                                        
  sold                                                                          
  Concen…                                                                       
  volumes                                                                       
  produc…                                                                       
  and                                                                           
  sold                                                                          
  Greens                                                                        
  Creek                                                                         
  Silver                                                                        
  concen…    16,116    17,630    16,321    14,896    17,180   50,067    50,706  
  produc…                                                                       
  tons                                                                          
  Silver                                                                        
  concen…    20,516    12,601    16,295    17,333    18,954   49,412    48,239  
  sold,                                                                         
  tons                                                                          
  Zinc                                                                          
  concen…    17,065    17,990    18,474    17,485    18,548   53,529    57,712  
  produc…                                                                       
  tons                                                                          
  Zinc                                                                          
  concen…    17,114    17,796    18,467    18,918    20,065   53,377    56,436  
  sold,                                                                         
  tons                                                                          
  Precio…                                                                       
  metal                                                                         
  concen…     5,775     7,633     8,063     5,571     6,379   21,471    22,210  
  produc…                                                                       
  tons                                                                          
  Precio…                                                                       
  metal                                                                         
  concen…     6,874     8,394    15,603         —     8,743   30,871    25,134  
  sold,                                                                         
  tons                                                                          
  Lucky                                                                         
  Friday                                                                        
  Silver                                                                        
  concen…    13,758    15,452    12,635    12,283    13,796   41,845    39,942  
  produc…                                                                       
  tons                                                                          
  Silver                                                                        
  concen…    14,000    15,538    12,382    12,590    13,726   41,920    39,942  
  sold,                                                                         
  tons                                                                          
  Zinc                                                                          
  concen…     7,084     6,527     6,352     6,269     6,869   19,963    20,486  
  produc…                                                                       
  tons                                                                          
  Zinc                                                                          
  concen…     7,170     6,478     6,185     7,220     6,178   19,833    20,420  
  sold,                                                                         
  tons                                                                          
  Keno                                                                          
  Hill                                                                          
  Silver                                                                        
  concen…     1,889     1,288       901     1,165     2,056    4,078     5,509  
  produc…                                                                       
  tons                                                                          
  Silver                                                                        
  concen…     1,654     1,063       806     1,544     2,380    3,523     5,211  
  sold,                                                                         
  tons                                                                          
  Precio…                                                                       
  metals                                                                        
  concen…     1,361       999       783       815     1,398    3,143     3,090  
  produc…                                                                       
  tons                                                                          
  Precio…                                                                       
  metals                                                                        
  concen…     1,236       897       798     1,023     1,258    2,931     2,806  
  sold,                                                                         
  tons                                                                          
  (a)                                                                           
  Total                                                                         
  Silver                                                                        
  Cash                                                                          
  Costs                                                                         
  and                                                                           
  AISC                                                                          
  Silver                                                                        
  cash                                                                          
  costs     $(3.20)   $(8.10)   $(3.24)   $(0.23)   $(2.03)  $(4.94)   $(2.20)  
  per                                                                           
  ounce                                                                         
  (2)                                                                           
  Silver                                                                        
  AISC                                                                          
  per        $14.34     $6.07     $8.17    $18.11    $11.01    $9.37     $9.26  
  ounce                                                                         
  (3)                                                                           
  Greens                                                                        
  Creek                                                                         
  Cash                                                                          
  Costs                                                                         
  and                                                                           
  AISC                                                                          
  Silver                                                                        
  cash                                                                          
  costs    $(10.11)  $(17.11)  $(11.94)   $(6.67)   $(8.50)  $(13.0…   $(8.41)  
  per                                                                           
  ounce                                                                         
  (2)                                                                           
  Silver                                                                        
  AISC                                                                          
  per       $(3.25)  $(10.71)   $(8.39)     $2.70   $(2.55)  $(7.55)   $(3.82)  
  ounce                                                                         
  (3)                                                                           
  Lucky                                                                         
  Friday                                                                        
  Cash                                                                          
  Costs                                                                         
  and                                                                           
  AISC                                                                          
  Silver                                                                        
  cash                                                                          
  costs       $7.31     $3.95    $12.07     $9.82     $9.33    $7.50     $8.29  
  per                                                                           
  ounce                                                                         
  (2)                                                                           
  Silver                                                                        
  AISC                                                                          
  per        $27.68    $17.08    $23.78    $25.73    $23.30   $22.47    $20.81  
  ounce                                                                         
  (3)                                                                           
                                                                                
(a) Precious metals concentrates include intersegment sales to Greens Creek.
Consolidated silver production from continuing operations was 4.2 million
ounces, nearly unchanged from the prior quarter. Production decreased 6% at
Greens Creek and 17% at Lucky Friday, but these declines were offset by a 54%
increase at Keno Hill which set a new quarterly record of nearly 1.0 million
ounces. Keno Hill’s increase was driven by record tons milled of 38,163 and a
36% higher milled silver grade compared with the prior quarter. Greens Creek
production declined from the prior quarter mainly due to higher than planned
maintenance during the quarter. Greens Creek plans to reduce mill availability
in the fourth quarter for additional scheduled maintenance. As planned, Lucky
Friday production declined as the mine moved out of a high-grade pocket of ore
that drove a production record in the second quarter.
                                       5                                        
Gold productionfrom Greens Creek was 12 thousand ounces, down 16% from the prior
quarter due primarily to 5% lower mill throughput for the reasons noted above.

Silver payable ounces soldof 4.1 million ounces, up 23% from the prior quarter,
primarily due to higher payable ounces sold at Greens Creek and Keno Hill,
partly offset by lower sales at Lucky Friday.

Gold payable ounces soldof 13 thousand ounces, up 25% from the prior quarter due
to the timing of sales at Greens Creek.

Concentrate volumes produced and soldwere higher at Keno Hill and for zinc
concentrate at Lucky Friday compared to the prior quarter. At Greens Creek,
concentrate production was lower for all three concentrates produced, while
concentrate sales were higher for silver concentrate, compared to the prior
quarter, reflecting the catch up in shipments: zinc and precious metals
concentrate sales roughly matched production. Concentrates sales at Lucky Friday
and Keno Hill were broadly in line with production in the third quarter.

Consolidated silver costs applicable to sales (excludes depreciation) from
continuing operationsrose 35% over the prior quarter to $158 million, primarily
due to higher sales volumes of silver, gold, lead and zinc.5

Silver cash costs and AISC per silver ounce from continuing operations,
excluding Keno Hill, which has not yet achieved commercial production, were
($3.20) and $14.34, respectively, higher than the prior quarter, primarily due
to lower ounces produced at Greens Creek and Lucky Friday, $26 million higher
costs applicable to sales (on higher sales volumes as noted above) and $14
million lower by-product credits compared to the prior quarter on lower gold
production. This was partly offset by $4 million lower treatment charges
("TCs"), with TCs shifting to a net credit in the quarter due to favorable
market conditions that could persist through the fourth quarter of 2026. The
increase in AISC compared to the prior quarter reflects these same cash cost
drivers, along with $5 million higher sustaining capital investment, mostly
attributable to Lucky Friday.2,3

GUIDANCE

In the tables below the Company provides production, cost, and capital guidance
on a consolidated basis and by mine, as well as projected consolidated
exploration and pre-development expenditures. Silver production guidance is
unchanged for Greens Creek, tightened up for Lucky Friday and for Keno Hill.
There is no change to Greens Creek gold production guidance. Total silver cash
costs and AISC per ounce2,3guidance is improved on better than expected results
during the first nine months of 2026 and reduced sustaining capital investment
guidance contributing to the improved AISC guidance. Total capital investment
guidance is reduced by about 4%.
2026 Production Outlook                                                         
                                                                                
Consolidated silver production is expected to be 15.3-16.1 million ounces, with 
low end raised compared to prior guidance of 15.1-16.1 million ounces, and      
Greens Creek's gold production guidance of 51.0-55.0 koz is reiterated.         
Greens Creek's silver production is expected to be 8.0-8.3 million ounces,
unchanged from prior guidance.

Lucky Friday's silver production is expected to be 5.0-5.2 million ounces, with
low end raised from the prior 4.9-5.2 million ounces.

Keno Hill's silver production is expected to be 2.3-2.6 million ounces, with low
end raised from the prior 2.2-2.6 million ounces.
Keno Hill Update                                                                
                                       6                                        
In an attempt to maintain operational continuity, the Company is choosing to
suppress Keno Hill mill throughput to approximately 300 tons per day in the
fourth quarter of 2026 with further suppression, expected beginning in January
2027 to levels significantly below third quarter 2026 throughput. Including the
Phase 2W dry-stack expansion, the Company estimates that approximately 200,000
tons of tailings storage capacity remains available under its current permits;
how long that capacity lasts will depend on the rate at which ore is milled and
the tailings generated per ton milled. The suppression is intended to preserve
the tailings storage, waste rock and water treatment capacity available under
our current permits while we pursue the license amendments needed to expand that
capacity; it is not a cost-driven decision. We expect to hold the lower milling
rate until those amendments are received, currently estimated by approximately
mid-2029, and the related infrastructure is built. We expect silver production
to decline by proportionally less than throughput because, during this period,
we expect to be more selective in both mining and processing. In the mine, we
will attempt to reduce dilution and prioritize higher-grade areas of the
deposit. In the mill, we expect to preferentially process higher-grade material
and stockpile lower-grade material for later processing. Actual production will
depend on the grades, dilution, and recoveries we achieve. We expect to provide
2027 production guidance for Keno Hill in February 2027. See “Risk Factors” in
the Company’s Form 10-Q for the quarter ended September 30, 2026.
2026 Cost Guidance Improved                                                     
                                                                                
Total silver cash cost and AISC guidance per silver ounce is improved to        
($4.75)-($4.25)/oz and $11.50-$12.50/oz respectively.2,3This guidance only      
incorporates Greens Creek and Lucky Friday, as Keno Hill has not yet reached    
commercial production.                                                          
At Greens Creek, guidance for costs applicable to sales (excludes depreciation)
at $250 million, up $10 million from the prior guidance due mostly to actual
results over the first nine months and higher expected power generation on site
in the fourth quarter. Cash cost per silver ounce and AISC per silver ounce
(guidance is improved to ($13.00)-($12.50) and ($5.50)-($5.00) respectively from
($12.50)-($12.00) and ($4.25)-($3.75) respectively. 2,3,5

At Lucky Friday, guidance for costs applicable to sales (excludes depreciation)
of $140 million is reiterated. Cash cost guidance is improved to $8.50-$9.00
from the prior $9.00-$9.75, per silver ounce, and the higher end of AISC
improved slightly to $24.50-$25.50 from $24.50-$26.00, per silver ounce to
reflect better than expected results during the first nine months of 2026, with
AISC guidance partly offset by the higher sustaining capital investment guidance
at the mine. 2,3,5
2026 Capital and Exploration Investment                                         
                                                                                
Total capital (growth and sustaining) investment guidance lowered, now at       
$198-$214 million from $208-$223 million to reflect lower spend in the first    
nine months.                                                                    
Greens Creek's capital investment is primarily attributable to mine development
and the expansion of its tailings facility, which, when completed is expected to
provide tailings storage capacity through 2045.

Lucky Friday's capital investment is heavily tied to underground development, a
new tailings facility and a surface cooling project, which is now in a
commissioning phase (subsequent to quarter end) with construction recently
completed. The surface cooling project is designed to increase the cooling
capacity at the mine to support its reserve mine-life of fifteen years.

Expected capital investment at Keno Hill comprises mine development, expansion
of its tailings facility, and infrastructure projects.
Exploration and pre-development expenditures, from continuing operations, remain
unchanged and are expected to be $55 million, with the focus at Greens Creek and
Keno Hill, Nevada and Lucky Friday.                                             
                                                                                
Metal Prices and FX rate assumptions                                            
                                       7                                        
Assumptions utilized in the calculation of by-products for the fourth quarter
are as follows, gold $4,000/oz, zinc $1.40/lb, lead $0.85/lb and copper
$4.00/lb. Numbers are rounded. Assumed exchange rate for Canadian dollar is
unchanged at 1.35 CAD/USD.
                                                                    
                  Silver Production (Moz)    Gold Production (Koz)  
  Greens Creek    8.0 - 8.3                  51.0 - 55.0            
  Lucky Friday    5.0 - 5.2                  N/A                    
  Keno Hill       2.3 - 2.6                  N/A                    
  2026 Total      15.3 - 16.1                51.0 - 55.0            
                                                                    
                                                                                
                   Costs applicable    Cash cost per         AISC per produced  
                        to sales(5)    silver ounce (2)      silver ounce (3)   
                         (millions)                                             
  Greens Creek                  250    -$13.00) - ($12.50    -$5.50) - ($5.00   
  Lucky Friday                  140    $8.50 - $9.00         $24.50 - $25.50    
  Total Silver                  390    -$4.75) - ($4.25      $11.50 - $12.50    
                                                                                
                                                                           
  (millions)                                 Total  Sustaining  Growth     
  2026 Total Capital Investment         $198 - 214  $142 - 153  $56 - $61  
  Greens Creek                             55 - 60  54 - 58     1 - 2      
  Lucky Friday                             79 - 84  79 - 84     -          
  Keno Hill                                55 - 59  -           55 - 59    
  Corporate                                 9 - 11  9 - 11      -          
  2026 Exploration & Pre-Development           $55                         
                                                                           
PROJECT PIPELINE UPDATE ________________________________________________________
_____________________________________________________ Hecla remains focused on
advancing a pipeline of organic growth opportunities that build on existing
infrastructure, established permitting paths, and the Company's deep operational
expertise. The projects outlined below are anticipated to be low-capital-
intensity opportunities with the potential to meaningfully expand precious metal
output, cash flows and net asset value over time, while reducing many of the
exploration and development risks inherent in greenfield projects. Greens Creek
Pyrite Concentrate Circuit Greens Creek is advancing engineering and evaluation
of a pyrite concentrate circuit which has the potential to recover additional
silver and gold that currently report to tailings. Preliminary metallurgical and
engineering work indicates the project could, at average reserve grades, add
approximately 1.0 to 1.2 million ounces of silver and 10,000 to 15,000 ounces of
gold in annual production, once fully ramped up. Preliminary cost estimates are
underway. Early indications point to a potential return on capital exceeding
Company thresholds, while potentially also reducing the rate of tailings
deposited into the tailing storage facility, which would be expected to lower
future tailings-related capital investment. This work is at a scoping level of
engineering, incorporating some advanced design. Given preliminary indications
of favorable benefit-to-cost ratio and perceived low technical risk, the project
is well suited to an accelerated engineering and execution path subject to
receipt of applicable permits, and final investment approval. Under that path,
the Company expects to begin intermittent production of pyrite concentrate in
late 2027 using temporary equipment, ahead of completing the new circuit,
expected in late 2028. These estimates are preliminary, based on early-stage
engineering and metallurgical work, and remain subject to change as the project
advances. Actual results may differ materially from these estimates due to
further technical work, permitting timelines, market conditions, and other
factors described under "Cautionary Statement Regarding Forward-Looking
Statements, Including 2026 Outlook" in this news release and under "Risk
Factors" in the Company's 2025 Form 10-K filed on February 17, 2026, and Form
10-Q filed on August 4, 2026 and expected to be filed on November 3, 2026, as
well as in other reports filed by the Company from time to time
                                       8                                        
with the Securities and Exchange Commission. The reference to scoping level of
engineering in this section describes the engineering and cost-estimate maturity
of processing circuit design work. It does not refer to an initial assessment,
pre-feasibility study, feasibility study or technical report summary under SEC
Regulation S-K 1300 or a preliminary economic assessment, pre-feasibility study,
feasibility study or technical report under NI 43-101 in Canada.

Greens Creek Tailings Reprocessing Project

The Greens Creek tailings reprocessing project offers potential organic value
creation, though significant groundwork is still needed before that value can be
realized. Overall, the Company is evaluating three potential paths forward. The
path with the greatest amount of time invested to date, is at a preliminary,
conceptual stage of engineering (equivalent to an AACE Class 5 to Class 4 cost
estimate) and is progressing through a multi-phase metallurgical study conducted
with a third party, with Phase 3 testing completed in August 2026 (metallurgical
results pending). This third phase of multi-ton metallurgical work is a key
milestone that should help shape next steps, with the potential to advance to a
pilot plant test in Phase 4. If the tests yield positive results, it is expected
the project would advance through further engineering and economic studies
before any decision to execute. Early indications point to a potentially low
capital intensity path for Hecla to achieve initial cash flows, though the
project remains in early-stage testing and depends on the potential third-party
partner securing a suitable processing facility. As an added benefit,
reprocessing all or part of the existing tailings could decrease the space
needed for tailings storage and help lower the mine's long-term reclamation
liability.

The Company is also at an early stage of evaluating two additional pathways
associated with the dry-stack tailings. The first is based on advances in
processing technology and growing market demand for material like Greens Creek
tailings, which has created the potential to turn material once managed only as
tailings into a marketable low-grade feedstock. This potential project pathway
could recover additional silver and gold currently contained in tailings
material, subject to further metallurgical testing and the identification of a
suitable third-party processing arrangement. In the fourth quarter, we expect to
load a test parcel from Greens Creek of approximately 5,500 dry metric tonnes of
low-grade feedstock for shipment and sale to a third party smelter. The second
option is a potential self-processing pathway that would require an onsite
processing facility that could require new or amended permits. The Company
expects to begin metallurgical evaluation of the self-processing concept in the
first quarter of 2027, with results from this testing potentially available by
spring 2027 to help determine potential next steps. The Company expects to be
able to provide further details on these options in coming quarters as
evaluation work advances. Potential for the combination of two or more of these
three options is also being evaluated.

At September 30, 2026, the dry-stack tailings facility at Greens Creek held an
estimated 10.7 million tons of material, containing roughly 51 million ounces of
silver, nearly 600 thousand ounces of gold, and additional critical minerals,
representing a combined estimated in-situ gross metal value of approximately
$6.4 billion (based on September 30, 2026 metals prices and before
transportation, processing or sales costs, which are expected to be
significant). This material is not a mineral resource or mineral reserve. Any
recovery would depend on further testing, a suitable processing arrangement and
favorable economics.

Midas Restart Project

Hecla continues to evaluate the potential to restart the existing Midas mill in
northern Nevada, a historic high-grade gold and silver operation. Midas benefits
from existing permitted infrastructure, which could help reduce the capital
required for restart, and the Company is working to expand the existing high-
grade gold and silver resource to the scale needed to support that restart.
Midas represents a potential hub-and-spoke operating model, with ore potentially
sourced from multiple regional deposits and fed into the 1,200 tpd mill. The
site also includes an existing permitted tailings facility, offering
approximately 15 years of storage capacity at the mill's nameplate capacity.

The Company has allocated $16 million of the 2026 exploration budget for the
Nevada project portfolio, more than three times the investment made in 2025. The
2026 drill program at Midas is focused on following up on the success of the
2025 drill program with a heavy focus on SE Pediment area that includes multiple
targets including Sinter, Sinter Offset, and Pogo. The nearby Hollister high-
grade gold and silver project is within trucking distance of the Midas mill and
drilling resumed in the third quarter after a multi-year pause. With multiple
veins
                                       9                                        
and trends still open along strike and at depth, and programs at Aurora and
Hollister beginning in the third quarter, the Company expects continued
exploration momentum through the fourth quarter of 2026 and aims to provide
regular exploration updates for the Nevada exploration projects throughout the
coming quarters.
EXPLORATION AND PRE-DEVELOPMENT                                                 
________________________________________________________________________________
_____________________________
Investment and Strategy                                                         
During the third quarter, the Company invested $16.6 million in exploration and
corporate development (and $0.6 million in pre-development) activities, focused
on high-impact discovery drilling at Keno Hill in Yukon and Midas, Aurora and
Hollister in Nevada, and resource expansion programs at the Company's producing
assets. Year-to-date, the Company has invested $32.5 million in exploration and
corporate development, with this strategy balancing district-scale discovery
with near-mine resource definition and reserve extension. Guidance for 2026
remains at $55 million investment in exploration and pre-development.
Producing Asset Resource Definition                                             
                                                                                
Underground drilling at Greens Creek and Keno Hill continues to extend and      
upgrade mineralization near existing resource boundaries. The aim is to convert 
Inferred resources, the least certain category, into more certain categories and
to identify reserve extensions.                                                 
                                                                                
Greens Creek                                                                    
                                                                                
Three underground rigs continued drilling around existing resources, with       
results received from the 200S, East and SWB zones. Notable intercepts include: 
                                                                                
• 200S Zone. 63.6 oz/ton silver, 0.01 oz/ton gold, 4.1% zinc and 1.9% lead over 
14.1 feet.                                                                      
                                                                                
• 200S Zone. 48.1 oz/ton silver, 0.11 oz/ton gold, 0.8% zinc and 0.4% lead over 
15.9 feet.                                                                      
                                                                                
• East Zone. 6.4 oz/ton silver, 0.04 oz/ton gold, 25.4% zinc and 12.0% lead over
20.7 feet.                                                                      
                                                                                
Keno Hill                                                                       
                                                                                
One underground rig continued drilling in the Arctic Zone of the Bermingham     
mine. Notable intercepts on the Bermingham Main Vein include:                   
                                                                                
• 54.3 oz/ton silver, 7.4% zinc and 4.7% lead over 4.6 feet, which upgrades the 
resource.                                                                       
                                                                                
• 24.8 oz/ton silver, 1.6% zinc and 1.9% lead over 5.0 feet, which expands the  
resource on the same vein.                                                      
                                                                                
EXPLORATION PROGRAMS                                                            
                                                                                
Keno Hill Exploration                                                           
                                                                                
Exploration drilling at Keno Hill ramped up through the quarter after a period  
of reduced drilling capacity earlier in the year. The primary contractor        
returned its second and third drills to service in late July and late August,   
and a second contractor added one drill at Flame & Moth in late July. Four      
drills are now operating and are expected to continue through the remainder of  
2026.                                                                           
                                                                                
Flame & Moth, a new zone of high-grade silver                                   
                                                                                
Drilling has been successful in testing the favorable Basal Quartzite on strike 
with the Lightning vein. The zone has currently been defined over 350 feet of   
dip length and sits 900 feet southwest of the existing resource. Four holes     
tested the area and three found significant mineralization. Assays are back for 
two holes (Figure 1).                                                           
                                                                                
• Hole K-26-0944. 26.1 oz/ton silver and 14.0% zinc over 8.5 feet.              
                                                                                
• Hole K-26-0951. 6.5 oz/ton silver and 3.5% zinc over 16.1 feet.               
                                                                                
The zone is open to the northeast, toward the existing resource, and to the     
southwest. Follow-up drilling will continue in the fourth quarter and into 2027.
                                       10                                       
Figure 1: Flame & Moth longitudinal section showing the new extension, holes 944
and 951, and the 900-foot gap to the existing resource                          
                                                                                
Bermingham Deep, extending a high-grade trend                                   
                                                                                
Drilling at Bermingham Deep extended the high-grade Footwall/Ruby silver trend  
both southwest and northeast. Key results include 25.7 oz/ton silver and 4.2%   
lead over 10.0 feet (K-26-0940) and 14.6 oz/ton silver over 5.2 feet            
(K-26-0935B) in the Footwall Vein. The Ruby Vein returned 9.3 oz/ton silver over
15.8 feet (K-26-0941). The subparallel Main Vein 2 returned 61.1 oz/ton silver  
and 3.8% lead over 5.3 feet and has been extended about 260 feet to the         
southwest. Together, the trend now spans about 1,300 feet, up 500 feet from Q2, 
though that length relies on visual observations from two holes (K-26-0942 and  
K-26-0945) with assays still pending (Figure 2). The northeast extension points 
toward the historic Hector-Calumet Mine, where the company believes the two     
mineralizing systems may converge at depth, making it a major target for late   
2026 and 2027.                                                                  
                                                                                
Figure 2: Bermingham Deep longitudinal section showing recent assay results.    
                                       11                                       
Nevada Exploration                                                              
                                                                                
Midas is the only Nevada property with results this quarter: hole DMC-494       
confirmed a second narrow high-grade gold vein (0.73 oz/ton gold and 2.9 oz/ton 
silver over 1.4 feet), and five follow-up holes all hit the expected structure, 
though only one has been assayed so far. Midas remains in restart evaluation    
with no decision made, and the key question is whether the veins have enough    
continuity and grade to support a resource.                                     
                                                                                
At Aurora and Hollister, drilling has just begun and all assays are pending.    
Early holes at both found alteration and veining typical of gold-silver systems,
which supports continued drilling, with remaining targets scheduled for Q4 and  
follow-up drilling in 2027.                                                     
                                                                                
Detailed exploration drill assay highlights can be found in Table A at the end  
of this                                                                         
                                                                                
release.                                                                        
DIVIDENDS

Pursuant to the Company's dividend policy, theBoard of Directors declared a
quarterly cash dividend of $0.00375 per share of common stock payable on or
about December 8, 2026, to stockholders of record on November 23, 2026.

CONFERENCE CALL AND WEBCAST

A conference call and webcast will be held on Wednesday, November 4, at 10:00
a.m. Eastern Time to discuss these results. The Company recommends that you dial
in at least 10 minutes before the call commencement. You may join the conference
call by dialing toll-free 1-833-461-5787 or for international dialing
1-585-542-9983. The Conference ID is 462083930 and must be provided when dialing
in. Hecla's live and archived webcast can be accessed
athttps://events.q4inc.com/attendee/462083930orwww.hecla.comunder Investors.

ABOUT HECLA

Founded in 1891, Hecla Mining Company (NYSE: HL) is the largest silver producer
in the United States and Canada. In addition to operating mines in Alaska and
Idaho, the Company is advancing its Keno Hill mine in the Yukon, Canada, and
owns a number of exploration and pre-development projects in world-class silver
and gold mining districts throughout North America.

NOTES

Non-GAAP Financial Measures

Non-GAAP financial measures are intended to provide additional information only
and do not have any standard meaning prescribed by United States generally
accepted accounting principles ("GAAP"). These measures should not be considered
in isolation or as a substitute for measures of performance prepared in
accordance with GAAP. The non-GAAP financial measures cited in this release and
listed below are reconciled to their most comparable GAAP measure at the end of
this release.

(1)Free cash flow is a non-GAAP measure calculated as cash provided by operating
activities less capital investment. Cash provided by operating activities for
the Greens Creek, Lucky Friday, and Keno Hill operations excludes exploration
and pre-development investment, as it is a discretionary expenditure and not a
component of the mines’ operating performance. Capital investment refers to
Additions to properties, plants and equipment from the Consolidated Statements
of Cash Flows.
                                       12                                       
(2)Cash cost per silver ounce is a non-GAAP measurement, a reconciliation of
costs applicable to sales can be found at the end of the release. It is an
important operating statistic that management utilizes to measure each mine's
operating performance. It also allows the benchmarking of performance of each
mine versus those of our competitors. As a primary silver mining company,
management also uses the statistic on an aggregate basis - aggregating the
Greens Creek and Lucky Friday mines to compare performance with that of other
silver mining companies. Similarly, the statistic is useful in identifying
acquisition and investment opportunities as it provides a common tool for
measuring the financial performance of other mines with varying geologic,
metallurgical and operating characteristics. In addition, the Company may use it
when formulating performance goals and targets under its incentive program.

(3)All-in sustaining cost (“AISC”) is a non-GAAP measurement, a reconciliation
of which to costs applicable to sales, the closest GAAP measurement, can be
found in the end of the release. AISC includes costs applicable to sales and
other direct production costs, expenses for reclamation at the mine sites and
all site sustaining capital costs. AISC is calculated net of depreciation,
depletion, and amortization and by-product credits.

Current GAAP measures used in the mining industry, such as total costs
applicable to sales, do not capture all the expenditures incurred to discover,
develop and sustain silver and gold production. Management believes that AISC is
a non-GAAP measure that provides additional information to management, investors
and analysts to help (i) in the understanding of the economics of our operations
and performance compared to other producers and (ii) in the transparency by
better defining the total costs associated with production. Similarly, the
statistic is useful in identifying acquisition and investment opportunities as
it provides a common tool for measuring the financial performance of other mines
with varying geologic, metallurgical and operating characteristics. In addition,
the Company may use it when formulating performance goals and targets under its
incentive program.

(4)Adjusted EBITDA is a non-GAAP measurement, a reconciliation of which to
income from continuing operations, the most comparable GAAP measure, can be
found at the end of the release. Adjusted EBITDA is a measure used by management
to evaluate the Company's operating performance but should not be considered an
alternative to income from continuing operations, or cash provided by operating
activities as those terms are defined by GAAP, and does not necessarily indicate
whether cash flows will be sufficient to fund cash needs. In addition, the
Company may use it when formulating performance goals and targets under its
incentive program.

(5)Excludes depreciation, depletion and amortization.
Cautionary Statement Regarding Forward Looking Statements, Including 2026       
Outlook                                                                         
This news release contains "forward-looking statements" within the meaning of
Section 27A of the Securities Act of 1933, as amended, and Section 21E of the
Securities Exchange Act of 1934, as amended, which are intended to be covered by
the safe harbor created by such sections and other applicable laws, including
Canadian securities laws. Words such as "may", "will", "should", "expects",
"intends", "projects", "believes", "estimates", "targets", "anticipates" and
similar expressions are used to identify these forward-looking statements.

Such forward-looking statements may include, without limitation: (i) the
Company’s organic project pipeline has potential for meaningful value creation,
with the potential to meaningfully expand precious metal output, cash flows and
net asset value over time, while reducing many of the exploration and
development risks inherent in greenfield projects; (ii) at Greens Creek, (a) the
expansion of its tailings facility, when completed, is expected to provide
tailings storage capacity through 2045; and (b) the potential new pyrite
concentrate circuit (1) could create incremental annual production of
approximately 1.0 to 1.2 million ounces of silver and 10,000 to 15,000 ounces of
gold from material that currently reports to tailings, once fully ramped up, (2)
has a potential robust return on capital meeting Company thresholds, while
potentially also reducing the rate of tailings deposited into the tailing
storage facility, which would be expected to lower future tailings-related
capital investment, (3) has projected favorable benefit-to-cost ratio and
perceived low technical risk, and is well suited to an accelerated engineering
and execution path, and (4) if approved, could begin intermittent production
using temporary equipment in late 2027, with the potential to reach full
capacity in late 2028, when construction of the new circuit
                                       13                                       
is expected to be completed; (c) the tailings reprocessing project (1) offers
potential organic value creation, (2) completed Phase 3 testing in August 2026,
which is a key milestone that should help shape next steps, with the potential
to advance to a pilot plant test in Phase 4, (3) is expected to advance through
further engineering and economic studies before any decision to execute if the
tests yield positive results, (4) represents a potentially low capital intensity
path for Hecla to achieve initial cash flows, and (5) could decrease the space
needed for tailings storage and help lower the mine's long-term reclamation
liability; (d) the potential direct sale of dry-stack tailings, including the
shipment and sale of the test parcel, and the potential self-processing pathway,
including the timing of metallurgical evaluation and results; (iii) the Midas
restart project has the potential to reduce the capital required to restart the
operation through its permitted infrastructure, with Midas representing a
potential hub-and-spoke operating model where ore sources could come from
multiple regional sources fed into the 1,200 tpd mill; (iv) commissioning of the
Lucky Friday surface cooling project is expected to be completed in the fourth
quarter of 2026; (v) capital investment is expected to increase in the fourth
quarter as numerous projects are advanced across the portfolio; (vi) Company-
wide and mine-specific estimated spending on capital, exploration and
predevelopment for 2026; (vii) Company-wide and mine-specific estimated silver
and gold production, costs applicable to sales, and cash cost and AISC per
silver ounce for 2026; (viii) the expected suppression of Keno Hill mill
throughput to approximately 300 tons per day in the fourth quarter of 2026 and
further beginning in January 2027, the estimated remaining tailings storage
capacity and how long it will last, the expected timing of license amendments
and related infrastructure, the expected partial offset from more selective
mining and processing, and the expected timing of 2027 guidance for Keno Hill;
(ix) metals prices and foreign exchange rate assumptions; and (x) exploration
plans and results, including planned drilling, the extent and continuity of
mineralization, and pending assays.

The material factors or assumptions used to develop such forward-looking
statements or forward-looking information include that the Company’s plans for
development and production will proceed as expected and will not require
revision as a result of risks or uncertainties, whether known, unknown or
unanticipated, to which the Company’s operations are subject. Estimates or
expectations of future events or results are based upon certain assumptions,
which may prove to be incorrect, which could cause actual results to differ from
forward-looking statements. Such assumptions, include, but are not limited to:
(i) there being no significant change to current geotechnical, metallurgical,
hydrological and other physical conditions; (ii) permitting, development,
operations and expansion of the Company’s projects being consistent with current
expectations and mine plans; (iii) political/regulatory developments in any
jurisdiction in which the Company operates being consistent with its current
expectations; (iv) the exchange rate for the USD/CAD being approximately
consistent with current levels; (v) certain price assumptions for gold, silver,
lead and zinc; (vi) prices for key supplies being approximately consistent with
current levels; (vii) the accuracy of our current mineral reserve and mineral
resource estimates; (viii) there being no significant changes to the
availability of employees, vendors and equipment; (ix) the Company’s plans for
development and production will proceed as expected and will not require
revision as a result of risks or uncertainties, whether known, unknown or
unanticipated; (x) counterparties performing their obligations under hedging
instruments and put option contracts; (xi) sufficient workforce is available and
trained to perform assigned tasks; (xii) weather patterns and rain/snowfall
within normal seasonal ranges so as not to impact operations; (xiii) relations
with interested parties, including First Nations and Native Americans, remain
productive; (xiv) maintaining availability of water rights; (xv) factors do not
arise that reduce available cash balances; and (xvi) there being no material
increases in our current requirements to post or maintain reclamation and
performance bonds or collateral related thereto. In addition, material risks
that could cause actual results to differ from forward-looking statements
include but are not limited to: (i) gold, silver and other metals price
volatility; (ii) operating risks; (iii) currency fluctuations; (iv) increased
production costs and variances in ore grade or recovery rates from those assumed
in mining plans; (v) community relations; and (vi) litigation, political,
regulatory, labor and environmental risks. For a more detailed discussion of
such risks and other factors that may impact expected future results, see the
Company's 2025 Form 10-K filed on February 17, 2026 and Form 10-Q expected to be
filed on November 3, 2026. The Company undertakes no obligation and has no
intention of updating forward-looking statements other than as may be required
by law.

Cautionary Statements to Investors on Reserves and Resources

This news release uses the terms “mineral resources”, “measured mineral
resources”, “indicated mineral resources” and “inferred mineral resources.”
Mineral resources that are not mineral reserves do not have
                                       14                                       
demonstrated economic viability. You should not assume that all or any part of
measured or indicated mineral resources will ever be converted into mineral
reserves. Further, inferred mineral resources have a great amount of uncertainty
as to their existence and as to whether they can be mined legally or
economically, and an inferred mineral resource may not be considered when
assessing the economic viability of a mining project, and may not be converted
to a mineral reserve. The Company reports reserves and resources under the SEC’s
mining disclosure rules (“S-K 1300”) and Canada’s National Instrument 43-101 –
Standards of Disclosure for Mineral Projects (“NI 43-101”) because the Company
is a “reporting issuer” under Canadian securities laws. Unless otherwise
indicated, all resource and reserve estimates contained in this press release
have been prepared in accordance with S-K 1300 as well as NI 43-101.

Qualified Person (QP)

Kurt D. Allen, MSc., CPG, VP-Exploration of Hecla Mining Company, Paul W.
Jensen, MSc., CPG, Chief Geologist of Hecla Limited, and Matt Blattman, P.E.,
RM-SME, MMSA, VP-Technical Services serve as Qualified Persons under S-K 1300
and NI 43-101 for Hecla’s mineral projects. Mr. Allen supervised the preparation
of the scientific and technical information concerning exploration activities
while Mr. Jensen supervised the preparation of mineral resources for this news
release. Mr. Blattman supervised the preparation of the mineral reserves for
this news release. Technical Report Summaries for the Company’s Greens Creek,
Lucky Friday and Keno Hill properties are filed as exhibits 96.1, 96.2 and 96.4,
respectively, to the Company’s Annual Report on Form 10-K for the year ended
December 31, 2025, and are available at www.sec.gov. Information regarding data
verification, surveys and investigations, quality assurance program and quality
control measures and a summary of analytical or testing procedures for (i) the
Greens Creek Mine are contained in its Technical Report Summary and in its NI
43-101 technical report titled “Technical Report for the Greens Creek Mine”
effective date December 31, 2018, (ii) the Lucky Friday Mine are contained in
its Technical Report Summary and in its NI 43-101 technical report titled
“Technical Report for the Lucky Friday Mine Shoshone County, Idaho, USA”
effective date April 2, 2014, and (iii) Keno Hill is contained in its Technical
Report Summary titled “S-K 1300 Technical Report Summary on the Keno Hill Mine,
Yukon, Canada” and in its NI 43-101 technical report titled “Technical Report on
the Keno Hill Mine, Yukon, Canada” effective date December 31, 2023. Also
included in each Technical Report Summary and technical report listed above is a
description of the key assumptions, parameters and methods used to estimate
mineral reserves and resources and a general discussion of the extent to which
the estimates may be affected by any known environmental, permitting, legal,
title, taxation, socio-political, marketing, or other relevant factors.
Information regarding data verification, surveys and investigations, quality
assurance program and quality control measures and a summary of sample,
analytical or testing procedures are contained in NI 43-101 technical reports
prepared for Klondex Mines Ltd. for (i) the Fire Creek Mine (technical report
dated March 31, 2018), (ii) the Hollister Mine (technical report dated May 31,
2017, amended August 9, 2017), and (iii) the Midas Mine (technical report dated
August 31, 2014, amended April 2, 2015). Information regarding data
verification, surveys and investigations, quality assurance program and quality
control measures and a summary of sample, analytical or testing procedures are
contained in a NI 43-101 technical reports prepared for ATAC Resources Ltd. for
(i) the Osiris Project (technical report dated July 28, 2022) and (ii) the Tiger
Project (technical report dated February 27, 2020). Copies of these technical
reports are available under the SEDAR profiles of Klondex Mines Unlimited
Liability Company and ATAC Resources Ltd., respectively, at www.sedar.com (the
Fire Creek technical report is also available under Hecla’s profile on SEDAR).
Mr. Jensen reviewed and verified information regarding drill sampling, data
verification of all digitally collected data, drill surveys and specific gravity
determinations relating to all the mines. The review encompassed quality
assurance programs and quality control measures including analytical or testing
practice, chain-of-custody procedures, sample storage procedures and included
independent sample collection and analysis. This review found the information
and procedures meet industry standards and are adequate for Mineral Resource and
Mineral Reserve estimation and mine planning purposes.

For further information, please contact:

Mike Parkin

Vice President - Strategy and Investor Relations

Cheryl Turner
                                       15                                       
Investor Relations Coordinator

Investor Relations

Email: [email protected]

Website:http://www.hecla.com
                                       16                                       
HECLA MINING COMPANY Consolidated Statements of Operations (dollars and shares
in thousands, except per share amounts - unaudited)
                                                                                
           Three  Septe…           June       Nine    Sept…          Septe…     
           Mont…     30,            30,       Months    30,             30,     
           Ended    2026           2026       Ended    2026            2025     
 ────────────────────────────────────────────────────────────────────────────── 
  Sales    $      394,8…       $  333,…       $       1,14…       $  740,3…     
  COSTS                                                                         
  AND                                                                           
  EXPE…                                                                         
  Costs                                                                         
  appl…                                                                         
  to              158,1…          117,…               399,…          345,1…     
  sales                                                                         
  (1)                                                                           
  Depr…                                                                         
  depl…           36,549          36,7…               107,…          98,857     
  and                                                                           
  amor…                                                                         
  Gene…                                                                         
  and             15,582          15,1…               46,5…          38,411     
  admi…                                                                         
  Expl…                                                                         
  and             17,181          11,6…               33,4…          22,544     
  pre-…                                                                         
  Care                                                                          
  and              3,353          3,062               9,661          10,728     
  main…                                                                         
  Prov…                                                                         
  for                                                                           
  clos…                                                                         
  oper…            4,017          1,329               6,643           2,902     
  and                                                                           
  envi…                                                                         
  matt…                                                                         
  Other                                                                         
  oper…            2,787          2,853               10,8…           5,365     
  expe…                                                                         
  net                                                                           
  Total                                                                         
  costs           237,6…          188,…               614,…          523,9…     
  and                                                                           
  expe…                                                                         
  Inco…                                                                         
  from            157,1…          145,…               525,…          216,3…     
  oper…                                                                         
  Other                                                                         
  inco…                                                                         
  (exp…                                                                         
  Inte…             (620  )       (2,4…  )            (8,6…  )       (35,6…  )  
  expe…                                                                         
  Fair                                                                          
  value           26,691          (9,2…  )            11,5…          27,666     
  adju…                                                                         
  net                                                                           
  Fore…                                                                         
  exch…             (652  )       (4,4…  )            (4,5…  )       (3,724  )  
  (los…                                                                         
  gain                                                                          
  Other                                                                         
  inco…            7,575          7,049               18,1…           4,697     
  net                                                                           
                  32,994          (9,0…  )            16,3…          (6,965  )  
  Inco…                                                                         
  befo…                                                                         
  inco…           190,1…          136,…               542,…          209,3…     
  and                                                                           
  mini…                                                                         
  taxes                                                                         
  Inco…                                                                         
  and                                                                           
  mini…           (40,5…  )       (18,…  )            (110…  )       (61,3…  )  
  tax                                                                           
  prov…                                                                         
  Inco…                                                                         
  from            149,6…          117,…               432,…          148,0…     
  cont…                                                                         
  oper…                                                                         
  (Los…                                                                         
  from                                                                          
  disc…                                                                         
  oper…                                                                         
  net                  —              —               (183…  )       39,303     
  of                                                                            
  inco…                                                                         
  and                                                                           
  mini…                                                                         
  taxes                                                                         
  Net             149,6…          117,…               248,…          187,3…     
  inco…                                                                         
  Pref…                                                                         
  stock             (132  )        (132  )             (396  )         (414  )  
  divi…                                                                         
  Net                                                                           
  inco…                                                                         
  appl…    $      149,4…       $  117,…       $       248,…       $  186,8…     
  to                                                                            
  comm…                                                                         
  stoc…                                                                         
  Basic                                                                         
  inco…                                                                         
  per                                                                           
  comm…                                                                         
  share                                                                         
  from     $        0.22       $   0.18       $        0.64       $    0.23     
  cont…                                                                         
  oper…                                                                         
  after                                                                         
  pref…                                                                         
  divi…                                                                         
  Basic                                                                         
  (los…                                                                         
  per                                                                           
  comm…    $           —       $      —       $       (0.27  )    $    0.06     
  share                                                                         
  from                                                                          
  disc…                                                                         
  oper…                                                                         
  Basic                                                                         
  inco…                                                                         
  per                                                                           
  comm…    $        0.22       $   0.18       $        0.37       $    0.29     
  share                                                                         
  after                                                                         
  pref…                                                                         
  divi…                                                                         
  Dilu…                                                                         
  inco…                                                                         
  per                                                                           
  comm…                                                                         
  share                                                                         
  from     $        0.22       $   0.17       $        0.64       $    0.23     
  cont…                                                                         
  oper…                                                                         
  after                                                                         
  pref…                                                                         
  divi…                                                                         
  Dilu…                                                                         
  (los…                                                                         
  inco…                                                                         
  per                                                                           
  comm…    $           —       $      —       $       (0.27  )    $    0.06     
  share                                                                         
  from                                                                          
  disc…                                                                         
  oper…                                                                         
  Dilu…                                                                         
  inco…                                                                         
  (los…                                                                         
  per                                                                           
  comm…    $        0.22       $   0.17       $        0.37       $    0.29     
  share                                                                         
  after                                                                         
  pref…                                                                         
  divi…                                                                         
  Weig…                                                                         
  aver…                                                                         
  numb…                                                                         
  of              671,6…          670,…               670,…          646,3…     
  comm…                                                                         
  shar…                                                                         
  outs…                                                                         
  basic                                                                         
  Weig…                                                                         
  aver…                                                                         
  numb…                                                                         
  of              676,8…          675,…               676,…          649,5…     
  comm…                                                                         
  shar…                                                                         
  outs…                                                                         
  dilu…                                                                         
                                                                                
(1) Excludes depreciation, depletion and amortization
                                       17                                       
HECLA MINING COMPANY Consolidated Statements of Cash Flows (dollars in thousands
- unaudited)
                                                                                
           Three  Septe…           June       Nine    Sept…          Septe…     
           Mont…     30,            30,       Months    30,             30,     
           Ended    2026           2026       Ended    2026            2025     
 ────────────────────────────────────────────────────────────────────────────── 
  OPER…                                                                         
  ACTI…                                                                         
  Net      $      149,6…       $  117,…       $       248,…       $  187,3…     
  inco…                                                                         
  Less:                                                                         
  (Los…                                                                         
  inco…                                                                         
  from                                                                          
  disc…                —              —               (183…  )       39,303     
  oper…                                                                         
  net                                                                           
  of                                                                            
  taxes                                                                         
  Inco…                                                                         
  from            149,6…          117,…               432,…          148,0…     
  cont…                                                                         
  oper…                                                                         
  Non-…                                                                         
  elem…                                                                         
  incl…                                                                         
  in                                                                            
  net                                                                           
  inco…                                                                         
  Depr…                                                                         
  depl…           39,236          36,9…               110,…          101,1…     
  and                                                                           
  amor…                                                                         
  Fair                                                                          
  value           (26,6…  )       9,246               (11,…  )       (27,6…  )  
  adju…                                                                         
  net                                                                           
  Prov…                                                                         
  for                                                                           
  recl…            1,856          1,857               5,584           4,839     
  and                                                                           
  clos…                                                                         
  costs                                                                         
  Stoc…            3,377          3,297               9,458           7,562     
  comp…                                                                         
  Defe…                                                                         
  inco…           (2,015  )       8,099               33,9…          50,648     
  taxes                                                                         
  Net                                                                           
  fore…                                                                         
  exch…              652          4,445               4,599           3,724     
  loss                                                                          
  (gai…                                                                         
  Other                                                                         
  non-…            1,753           (119  )            3,393           7,535     
  item…                                                                         
  net                                                                           
  Chan…                                                                         
  in                                                                            
  asse…                                                                         
  and                                                                           
  liab…                                                                         
  Acco…           (6,726  )       63,1…               13,4…          (72,4…  )  
  rece…                                                                         
  Inve…           11,079          (15,…  )            (3,8…  )       (7,812  )  
  Other                                                                         
  curr…                                                                         
  and              5,350          (38,…  )            (52,…  )       14,073     
  non-…                                                                         
  asse…                                                                         
  Acco…                                                                         
  paya…                                                                         
  accr…                                                                         
  and             25,724          (7,3…  )            17,6…          (3,507  )  
  other                                                                         
  curr…                                                                         
  liab…                                                                         
  Accr…                                                                         
  payr…                                                                         
  and             (12,6…  )       19,0…               (8,9…  )       10,093     
  rela…                                                                         
  bene…                                                                         
  Accr…           10,624          (27,…  )            4,651           4,779     
  taxes                                                                         
  Accr…                                                                         
  recl…                                                                         
  and                                                                           
  clos…                                                                         
  costs            1,796           (226  )            1,793          (3,372  )  
  and                                                                           
  other                                                                         
  non-…                                                                         
  liab…                                                                         
  Cash                                                                          
  prov…                                                                         
  by                                                                            
  oper…           202,9…          174,…               560,…          237,5…     
  acti…                                                                         
  of                                                                            
  cont…                                                                         
  oper…                                                                         
  Cash                                                                          
  prov…                                                                         
  by                                                                            
  oper…                —              —               11,3…          107,9…     
  acti…                                                                         
  of                                                                            
  disc…                                                                         
  oper…                                                                         
  Net                                                                           
  cash                                                                          
  prov…           202,9…          174,…               572,…          345,5…     
  by                                                                            
  oper…                                                                         
  acti…                                                                         
  INVE…                                                                         
  ACTI…                                                                         
  Addi…                                                                         
  to                                                                            
  prop…                                                                         
  plan…           (51,7…  )       (39,…  )            (130…  )       (124,…  )  
  equi…                                                                         
  and                                                                           
  mine                                                                          
  deve…                                                                         
  Proc…                                                                         
  from                                                                          
  sale                                                                          
  of                                                                            
  Hecla                —          10,1…               178,…               —     
  Queb…                                                                         
  net                                                                           
  of                                                                            
  tran…                                                                         
  costs                                                                         
  Proc…                                                                         
  from                                                                          
  sale                 —              —               5,228               —     
  of                                                                            
  Mine…                                                                         
  Hecla                                                                         
  Proc…                                                                         
  from            63,697          21,9…               181,…           3,696     
  inve…                                                                         
  sales                                                                         
  Purc…                                                                         
  of                (764  )        (735  )            (57,…  )            —     
  inve…                                                                         
  Proc…                                                                         
  from                27              4                 766             714     
  asset                                                                         
  disp…                                                                         
  Net                                                                           
  cash                                                                          
  prov…                                                                         
  by                                                                            
  (used                                                                         
  in)             11,246          (7,7…  )            177,…          (120,…  )  
  inve…                                                                         
  acti…                                                                         
  of                                                                            
  cont…                                                                         
  oper…                                                                         
  Net                                                                           
  cash                                                                          
  (used                                                                         
  in)                                                                           
  inve…                —              —               (8,7…  )       (45,1…  )  
  acti…                                                                         
  of                                                                            
  disc…                                                                         
  oper…                                                                         
  Net                                                                           
  cash                                                                          
  prov…                                                                         
  by              11,246          (7,7…  )            169,…          (165,…  )  
  (used                                                                         
  in)                                                                           
  inve…                                                                         
  acti…                                                                         
  FINA…                                                                         
  ACTI…                                                                         
  Proc…                                                                         
  from                                                                          
  issu…                —              —                  63          216,2…     
  of                                                                            
  stoc…                                                                         
  net                                                                           
  Acqu…                                                                         
  of                   —          (3,3…  )            (4,5…  )         (885  )  
  trea…                                                                         
  shar…                                                                         
  Repa…                                                                         
  of                   —          (263…  )            (263…  )       (274,…  )  
  debt,                                                                         
  net                                                                           
  Divi…                                                                         
  paid                                                                          
  to                                                                            
  comm…           (2,790  )       (2,5…  )            (8,0…  )       (7,676  )  
  and                                                                           
  pref…                                                                         
  stoc…                                                                         
  Cred…                                                                         
  faci…           (1,725  )           —               (1,7…  )            —     
  costs                                                                         
  Repa…                                                                         
  of                                                                            
  fina…           (1,562  )       (2,4…  )            (5,3…  )       (5,272  )  
  leas…                                                                         
  and                                                                           
  other                                                                         
  Net                                                                           
  cash                                                                          
  used                                                                          
  in                                                                            
  fina…           (6,077  )       (271…  )            (282…  )       (71,8…  )  
  acti…                                                                         
  of                                                                            
  cont…                                                                         
  oper…                                                                         
  Net                                                                           
  cash                                                                          
  used                                                                          
  in                                                                            
  fina…                —              —               (8,4…  )       (1,371  )  
  acti…                                                                         
  of                                                                            
  disc…                                                                         
  oper…                                                                         
  Net                                                                           
  cash                                                                          
  used            (6,077  )       (271…  )            (291…  )       (73,2…  )  
  in                                                                            
  fina…                                                                         
  acti…                                                                         
  Effe…                                                                         
  of                                                                            
  exch…              (33  )         143                (220  )          311     
  rates                                                                         
  on                                                                            
  cash                                                                          
  Net                                                                           
  incr…                                                                         
  (dec…                                                                         
  in                                                                            
  cash,                                                                         
  cash                                                                          
  equi…           208,0…          (104…  )            450,…          107,0…     
  and                                                                           
  rest…                                                                         
  cash                                                                          
  and                                                                           
  cash                                                                          
  equi…                                                                         
  Cash,                                                                         
  cash                                                                          
  equi…                                                                         
  and                                                                           
  rest…                                                                         
  cash                                                                          
  and             484,6…          588,…               242,…          28,045     
  cash                                                                          
  equi…                                                                         
  at                                                                            
  begi…                                                                         
  of                                                                            
  peri…                                                                         
  Cash,                                                                         
  cash                                                                          
  equi…                                                                         
  and                                                                           
  rest…                                                                         
  cash                                                                          
  and      $      692,7…       $  484,…       $       692,…       $  135,0…     
  cash                                                                          
  equi…                                                                         
  at                                                                            
  end                                                                           
  of                                                                            
  peri…                                                                         
                                                                                
                                       18                                       
HECLA MINING COMPANY Consolidated Balance Sheets (dollars and shares in
thousands - unaudited)
                                                                                
                              September 30, 2026          December 31, 2025     
 ────────────────────────────────────────────────────────────────────────────── 
  ASSETS                                                                        
  Current assets:                                                               
  Cash and cash            $             691,569       $            241,558     
  equivalents                                                                   
  Accounts receivable                    169,199                    182,249     
  Inventories                             85,153                     81,687     
  Other current assets                   106,241                     83,065     
  Assets of                                                                     
  discontinued                                 —                     40,785     
  operations                                                                    
  Total current assets                 1,052,162                    629,344     
  Investments                             45,562                     47,842     
  Restricted cash and                      1,170                      1,174     
  cash equivalents                                                              
  Properties, plants,                                                           
  equipment and mine                   2,151,987                  2,130,581     
  development, net                                                              
  Operating lease                          8,039                      8,859     
  right-of-use assets                                                           
  Other non-current                      101,104                     31,901     
  assets                                                                        
  Assets of                                                                     
  discontinued                                 —                    710,944     
  operations                                                                    
  Total assets             $           3,360,024       $          3,560,645     
  LIABILITIES                                                                   
  Current liabilities:                                                          
  Accounts payable and                                                          
  other current            $             142,569       $            126,364     
  accrued liabilities                                                           
  Finance leases                           4,133                      4,262     
  Accrued reclamation                     13,402                     13,795     
  and closure costs                                                             
  Accrued interest                             —                      7,678     
  Other current                           16,553                     39,107     
  liabilities                                                                   
  Liabilities of                                                                
  discontinued                                 —                     40,358     
  operations                                                                    
  Total current                          176,657                    231,564     
  liabilities                                                                   
  Accrued reclamation                    117,118                    112,491     
  and closure costs                                                             
  Long-term debt                                                                
  including finance                        7,078                    263,171     
  leases                                                                        
  Deferred tax                           197,648                    157,585     
  liability                                                                     
  Other non-current                       39,864                     33,912     
  liabilities                                                                   
  Liabilities of                                                                
  discontinued                                 —                    170,276     
  operations                                                                    
  Total liabilities                      538,365                    968,999     
  STOCKHOLDERS’ EQUITY                                                          
  Preferred stock                             38                         39     
  Common stock                           170,115                    169,689     
  Capital surplus                      2,653,620                  2,643,211     
  Retained earnings                       58,354                   (182,143  )  
  (accumulated deficit)                                                         
  Accumulated other                                                             
  comprehensive loss,                    (20,124  )                  (3,334  )  
  net                                                                           
  Treasury stock                         (40,344  )                 (35,816  )  
  Total stockholders’                  2,821,659                  2,591,646     
  equity                                                                        
  Total liabilities and                                                         
  stockholders’            $           3,360,024       $          3,560,645     
  equity                                                                        
  Common shares                          681,230                    679,220     
  outstanding                                                                   
                                                                                
                                       19                                       
Reconciliation of Costs Applicable to Sales to Cash Cost, Before By-product
Credits (non-GAAP) and Cash Cost (non-GAAP) and All-In Sustaining Cost, Before
By-product Credits (non-GAAP) and All-In Sustaining Cost (non-GAAP)

The tables below present reconciliations between the most comparable GAAP
measure of costs applicable to sales to the non-GAAP measures of (i) Cash Cost,
Before By-product Credits, (ii) Cash Cost, (iii) AISC, Before By-product Credits
and (iv) AISC for our operations and for the Company for the three and nine
months ended September 30, 2026 and 2025, the three months ended June 30, 2026,
March 31, 2026 and December 31, 2025.

Cash Cost and AISC are measures developed by precious metals companies
(including the Silver Institute and the World Gold Council) in an effort to
provide a uniform standard for comparison purposes. There can be no assurance,
however, that these non-GAAP measures as the Company reports them are the same
as those reported by other mining companies.

Cash Cost is an important operating statistic that the Company utilizes to
measure each mine's operating performance. The Company uses AISC as a measure of
our mines' net cash flow after costs for reclamation and sustaining capital.
This is similar to the Cash Cost non-GAAP measure the Company reports, but also
includes reclamation and sustaining capital costs. Current GAAP measures used in
the mining industry, such as costs applicable to sales, do not capture all the
expenditures incurred to discover, develop and sustain silver and gold
production. Cash Cost and AISC also allow us to benchmark the performance of
each of our mines versus those of our competitors. As a silver and gold mining
company, we also use these statistics on an aggregate basis - aggregating the
Greens Creek and Lucky Friday mines to compare our performance with that of
other silver mining companies. Similarly, these statistics are useful in
identifying acquisition and investment opportunities as they provide a common
tool for measuring the financial performance of other mines with varying
geologic, metallurgical and operating characteristics.

Cash Cost, Before By-product Credits and AISC, Before By-product Credits include
all direct and indirect operating cash costs related directly to the physical
activities of producing metals, including mining, processing and other plant
costs, third-party refining expense, on-site general and administrative costs,
royalties and mining production taxes. AISC, Before By-product Credits for each
mine also includes reclamation and sustaining capital costs. AISC, Before By-
product Credits for our consolidated silver properties also includes corporate
costs for general and administrative expense and sustaining capital costs. By-
product credits include revenues earned from all metals other than the primary
metal produced at each unit. As depicted in the tables below, by-product credits
comprise an essential element of our silver unit cost structure, distinguishing
our silver operations due to the polymetallic nature of their orebodies.

In addition to the uses described above, Cash Cost and AISC per Ounce provide
management and investors an indication of operating cash flow, after
consideration of the average price received from production. The Company also
uses these measurements for the comparative monitoring of performance of our
mining operations period-to-period from a cash flow perspective.
                                       20                                       
                                                                                
                                       21                                       
                                                                                
                                                                                
 ────────────────────────────────────────────────────────────────────────────── 
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                       22                                       
                                                                                
  …                                                                             
  …                                                                             
  …                                                                             
  …    $…    $…    $…    $…    $…    $…    $…    $2…    $…    $2…    $…    $2…  
  …                                                                             
  …                                                                             
  …                                                                             
  …                                                                             
  …                                                                             
  …                                                                             
  …    -…    -…    -…    -…    -…    -…    -…    -1…    -…    -3…    -…    -2…  
  …                                                                             
  …                                                                             
  …                                                                             
  …                                                                             
  …    $…    $…    $…    $…    $…    $…    $…    $7…    $…    $(…    $…    $(…  
  …                                                                             
  …                                                                             
  …                                                                             
  …                                                                             
  …                                                                             
  …    $…    $…    $…    $…    $…    $…    $…    $4…    $…    $2…    $…    $3…  
  …                                                                             
  …                                                                             
  …                                                                             
  …                                                                             
  …    -…    -…    -…    -…    -…    -…    -…    -1…    -…    -3…    -…    -2…  
  …                                                                             
  …                                                                             
  …                                                                             
  …    $…    $…    $…    $…    $…    $…    $…    $2…    $…    $(…    $…    $9…  
  …                                                                             
  …                                                                             
                                                                                
                                       23                                       
                                                                                
      …                             …                                           
      …                             …                                           
      …                             …                                           
      …                             …                                           
      …                             …                                           
      …                             …                                           
 ────────────────────────────────────────────────────────────────────────────── 
      …    …    …    …    …         …    …    …    …               …    …       
      …    …    …    …    …    …    …    …    …    …        …      …    …    …  
                …                             …                                 
      …    …    …    …    …    …    …    …    …    …        …      …    …    …  
      …    …    -    —    —    …    …    …    —    —        …      …    —    …  
      …    …    —    —    —    …    …    …    —    —        …      …    —    …  
      …    …    —    —    —    …    …    …    —    —        …      …    —    …  
      —    —    …    —         …    —    —    …    —        …      —    —    …  
      —    —    —    —    …    …                            …      —    —    …  
      …    …    —    —    —    …    …    …    —    —        …      …    —    …  
      …    …    —    —    —    …    …    …    —    —        …      …    —    …  
      …    …    —    …    —    …    …    …    —    …        …      …    …    …  
      —    —    —    …    —    …    —    —    —    …        …      —    …    …  
      …    …    —    …    —    …    …    …    —    …        …      …    …    …  
                                                                                
      …    …    —    —    —    …    …    …    —    —        …      …    —    …  
      …    —    —    —    —    …    …    —    —    —        …      —    —    …  
      …    …    —    —    —    …    …    …    —    —        …      …    —    …  
      …    —    —    —    —    …    …    —    —    —        …      —    —    …  
      …    …    —    —    —    …    …    …    —    —        …      …    —    …  
      …    …    …    …    …    …    …    …    …    …        …      …    …    …  
      …    …    …    …    …    …    …    …    …    …        …      …    …    …  
      …    …                   …    …    …                  …      …         …  
      …    …                   …    …    …                  …      …         …  
      …    …                   …    …    …                  …      …         …  
      …    …                   …    …    …                  …      …         …  
      …    …                   …    …    …                  …      …         …  
      …    …                   …    …    …                  …      …         …  
      …    …                   …    …    …                  …      …         …  
                                                                                
(1) Includes all direct and indirect operating costs related to the physical
activities of producing metals, including mining, processing and other plant
costs, third-party refining and marketing expense, on-site general and
administrative costs and royalties, before by-product revenues earned from all
metals other than the primary metal produced at each operation. AISC, Before By-
product Credits also includes reclamation and sustaining capital costs. (2)
AISC, Before By-product Credits for our consolidated silver properties includes
corporate costs for general and administrative expense and sustaining capital.
                                       24                                       
(3) Excludes depreciation, depletion and amortization (4) Other includes costs
applicable to sales related to the Company's environmental remediation services
business. (5) Keno Hill has not yet reached commercial production and is
excluded from the calculation of Cash Cost Before By-product Credits, Cash Cost,
AISC Before By-product Credits, and AISC. 2026 Guidance, Current Estimates:
Reconciliation of Costs Applicable to Sales to Non-GAAP Measures
                                                                                
  In              Estimate for                                                  
  thousands      Twelve Months                                                  
  (except per            Ended                                                  
  ounce           December 31,                                                  
  amounts)                2026                                                  
 ────────────────────────────────────────────────────────────────────────────── 
                  Greens Creek    Lucky Friday    Corporate(2)    Total Silver  
  Costs                                                                         
  applicable          $249,600        $139,600              $—        $389,200  
  to sales                                                                      
  (3)                                                                           
  Treatment              2,300           1,700               —           4,000  
  costs                                                                         
  Other costs          -18,700          -4,600               —         -23,300  
  Cash Cost,                                                                    
  Before               233,200         136,700               —         369,900  
  By-product                                                                    
  Credits (1)                                                                   
  Reclamation                                                                   
  and other              3,700             900               —           4,600  
  costs                                                                         
  Sustaining            57,000          82,000           7,000         146,000  
  capital                                                                       
  General and                —               —          65,000          65,000  
  administra…                                                                   
  AISC,                                                                         
  Before               293,900         219,600          72,000         585,500  
  By-product                                                                    
  Credits (1)                                                                   
  By-product                                                                    
  credits:                                                                      
  Zinc                -104,600         -40,900               —        -145,500  
  Gold                -205,300               —               —        -205,300  
  Lead                 -25,200         -51,000               —         -76,200  
  Copper                -1,600               —               —          -1,600  
  Total                                                                         
  By-product          -336,700         -91,900               —        -428,600  
  credits                                                                       
  Cash Cost         $(103,500)         $44,800              $—       $(58,700)  
  AISC               $(42,800)        $127,700         $72,000        $156,900  
  Divided by                                                                    
  silver                 8,150           5,100                          13,250  
  ounces                                                                        
  produced                                                                      
  Cash Cost,                                                                    
  Before                                                                        
  By-product            $28.61          $26.80                          $27.92  
  Credits,                                                                      
  per Silver                                                                    
  Ounce                                                                         
  By-product                                                                    
  credits per           -41.31          -18.02                          -32.35  
  silver                                                                        
  ounce                                                                         
  Cash Cost                                                                     
  per Silver          $(12.70)           $8.78                         $(4.43)  
  Ounce                                                                         
  AISC,                                                                         
  Before                                                                        
  By-product                                                                    
  Credits,              $36.06          $43.06                          $44.19  
  per                                                                           
  Silver                                                                        
  Ounce                                                                         
  By-product                                                                    
  credits per           -41.31          -18.02                          -32.35  
  silver                                                                        
  ounce                                                                         
  AISC per                                                                      
  Silver               $(5.25)          $25.04                          $11.84  
  Ounce                                                                         
                                                                                
                                       25                                       
Reconciliation of Income from Continuing Operations (GAAP) to Adjusted EBITDA
from Continuing Operations (non-GAAP) This release refers to the non-GAAP
measures of adjusted earnings before interest, taxes, depreciation and
amortization ("Adjusted EBITDA") from continuing operations, which is a measure
of our operating performance. Adjusted EBITDA from continuing operations is
calculated as income from continuing operations before the following items:
interest expense, income and mining taxes, depreciation, depletion, and
amortization expense, ramp-up and suspension costs, gains and losses on
disposition of assets, foreign exchange gains and losses, write down of
property, plant and equipment, fair value adjustments, net, interest and other
income, provisions for closed operations and environmental matters, stock-based
compensation, provisional price gains, monetization of zinc and lead hedges and
inventory adjustments. Management believes that, when presented in conjunction
with comparable GAAP measures, adjusted EBITDA is useful to investors in
evaluating our operating performance and ability to meet our debt obligations.
The following table reconciles income from continuing operations to adjusted
EBITDA from continuing operations:
                                                                                
                                                           …                    
                                                           …                    
                                                           …          …         
    …          …          …          …          …          …          …         
 ────────────────────────────────────────────────────────────────────────────── 
       …          …       $  …       $  …       $  …          …       $  1…     
       …          …          …          …          …          …          3…     
       …          …          …          …          …          …          6…     
       …          …          …          …          …          …          1…     
       …          …          …          …          …          …          6…     
       …  )       …          …          6          …          …          3…     
       …          …          …  )       …          …  )       …          3…     
       …  )       …          …          …          …  )       …          (…  )  
       …          …          …  )       …  )       …  )       …  )       (…  )  
       …          …          …          …          …          …          2…     
       …          …          …          …          …          …          7…     
       —          —          —          …          …          …          2…     
       …  )       …  )       …  )       …          …  )       …  )       (…  )  
    $  …       $  …       $  …       $  …       $  …       $  …       $  3…     
                                                                                
                                       26                                       
Reconciliation of Cash Provided by Operating Activities from Continuing
Operations (GAAP) to Free Cash Flow from Continuing Operations (non-GAAP) This
release refers to a non-GAAP measure of free cash flow from continuing
operations, calculated as cash provided by operating activities from continuing
operations, less capital investments. Management believes that, when presented
in conjunction with comparable GAAP measures, free cash flow from continuing
operations is useful to investors in evaluating our operating performance. The
following table reconciles cash provided by operating activities from continuing
operations to free cash flow from continuing operations:
                                                                                
                   Thr…                               Nine                      
       Dol…        Mon…                              Mont…                      
       are         End…                              Ended                      
       in          Sep…                              Sept…                      
       tho…  2026   30,       2025             2026    30,       2025           
 ────────────────────────────────────────────────────────────────────────────── 
  Ca…                                                                           
  pr…                                                                           
  by                                                                            
  op…        $     202…       $     101…       $     560,…       $     237…     
  ac…                                                                           
  fr…                                                                           
  co…                                                                           
  op…                                                                           
  Le…                                                                           
  Ca…                                                                           
  in…              (51…  )          (44…  )          (130…  )          (12…  )  
  fr…                                                                           
  co…                                                                           
  op…                                                                           
  Fr…                                                                           
  ca…                                                                           
  fl…        $     151…       $     57,…       $     430,…       $     112…     
  fr…                                                                           
  co…                                                                           
  op…                                                                           
                                                                                
                                       27                                       
Table A Assay Results – Q3/2026 Keno Hill (Yukon)
                                                                                
                            Sam…  Samp…  True                            Depth  
        Pros…  Dri…  Dril…  From     To  Wid…  Silv…  Gold   Lead  Zinc   From  
        Vein   Num…  Azm/…  (fe…  (fee…  (fe…  (oz/…  (oz…    (%)   (%)  Surf…  
                                                                         (fee…  
        Berm…                                                                   
  Sur…  Deep,                                                                   
  Exp…  Berm…  K-2…  277/…  1,9…  2,00…   5.2   14.6  0.00    0.7   0.9  1,621  
        Foot…                                                                   
        Vein                                                                    
  Ber…                                                                          
  Dee…                                                                          
  Ber…  incl…  277…  1,99…  2,0…    1.4  46.2   0.01   2.2    2.0  1,6…         
  Foo…                                                                          
  Vein                                                                          
  Ber…                                                                          
  Dee…                                                                          
  Ber…  K-26…  282…  2,12…  2,1…   10.0  25.7   0.00   4.2    0.7  1,8…         
  Foo…                                                                          
  Vein                                                                          
  Ber…                                                                          
  Dee…                                                                          
  Ber…  incl…  282…  2,12…  2,1…    0.7  302…   0.05  54.6    6.8  1,8…         
  Foo…                                                                          
  Vein                                                                          
  Ber…                                                                          
  Dee…                                                                          
  Ber…  K-26…  286…  1,85…  1,8…    1.4  20.4   0.00   2.1    1.7  1,5…         
  Foo…                                                                          
  Vein                                                                          
  Ber…                                                                          
  Dee…                                                                          
  Ber…  K-26…  277…  1,91…  1,9…    7.6   3.4   0.00   0.2    0.7  1,5…         
  Main                                                                          
  Vein                                                                          
  2                                                                             
  Ber…                                                                          
  Dee…                                                                          
  Ber…  K-26…  282…  1,76…  1,7…    5.3  61.1   0.01   3.8    0.0  1,5…         
  Main                                                                          
  Vein                                                                          
  2                                                                             
  Ber…                                                                          
  Dee…                                                                          
  Ber…  K-26…  282…  1,79…  1,7…    1.1  37.3   0.01   2.0    5.4  1,5…         
  Main                                                                          
  Vein                                                                          
  2                                                                             
  Ber…                                                                          
  Dee…  K-26…  277…  1,82…  1,8…    7.2   1.3   0.00   0.1    0.2  1,4…         
  Ruby                                                                          
  Vein                                                                          
  Ber…                                                                          
  Dee…  K-26…  286…  1,81…  1,8…   15.8   9.3   0.00   0.6    1.0  1,4…         
  Ruby                                                                          
  Vein                                                                          
  Ber…                                                                          
  Dee…  incl…  286…  1,82…  1,8…    1.7  43.6   0.01   1.9    0.1  1,4…         
  Ruby                                                                          
  Vein                                                                          
  Ber…                                                                          
  Dee…  incl…  286…  1,83…  1,8…    3.9  12.2   0.00   1.3    2.9  1,4…         
  Ruby                                                                          
  Vein                                                                          
  Ber…                                                                          
  Gap,  K-26…  337…  588.4  589…    0.8   3.2   0.01   0.0    3.1   374         
  Bear                                                                          
  Vein                                                                          
  Fla…                                                                          
  and                                                                           
  Mot…  K-26…  275…  1,24…  1,2…    4.8  11.7   0.00   1.4    3.6   926         
  Lig…                                                                          
  Vein                                                                          
  Fla…                                                                          
  and                                                                           
  Mot…  incl…  275…  1,24…  1,2…    2.0  26.5   0.01   3.3    7.0   926         
  Lig…                                                                          
  Vein                                                                          
  Fla…                                                                          
  and                                                                           
  Mot…  K-26…  254…  1,44…  1,4…    8.5  26.1   0.01   0.7   14.0  1,0…         
  Lig…                                                                          
  Vein                                                                          
  Fla…                                                                          
  and                                                                           
  Mot…  incl…  254…  1,44…  1,4…    2.4  60.8   0.01   0.7   13.8  1,0…         
  Lig…                                                                          
  Vein                                                                          
  Fla…                                                                          
  and                                                                           
  Mot…  K-26…  242…  1,58…  1,5…    5.8   4.5   0.02   0.6    0.1  1,2…         
  Lig…                                                                          
  Vein                                                                          
  Fla…                                                                          
  and                                                                           
  Mot…  K-26…  298…  953.7  975…   16.1   6.5   0.00   0.4    3.5   795         
  Lig…                                                                          
  Vein                                                                          
  Fla…                                                                          
  and                                                                           
  Mot…  incl…  298…  953.7  954…    0.7  12.1   0.00   2.9    6.3   795         
  Lig…                                                                          
  Vein                                                                          
  Fla…                                                                          
  and                                                                           
  Mot…  K-26…  242…  1,42…  1,4…    1.0   2.0   0.01   0.4    0.8  1,1…         
  Chr…                                                                          
  Vein                                                                          
                                                                                
                                                                                
        Mine,               Sam…  Samp…  True                            Depth  
        Zone,  Dri…  Dril…  From     To  Wid…  Silv…  Gold   Lead  Zinc   From  
        Vein   Num…  Azm/…  (fe…  (fee…  (fe…  (oz/…  (oz…    (%)   (%)  Surf…  
                                                                         (fee…  
        Berm…                                                                   
  Und…  Arct…                                                                   
  Def…  Berm…  BMU…  146/…  385…  386.2   0.4   81.1  0.03    4.3   0.8  1,283  
        Main                                                                    
        Vein                                                                    
  Ber…                                                                          
  Arc…                                                                          
  Ber…  BMUG…  115…  489.8  490…    0.3  11.3   0.00   0.2    0.0  1,2…         
  Main                                                                          
  Vein                                                                          
  Ber…                                                                          
  Arc…                                                                          
  Ber…  BMUG…  125…  473.6  479…    4.6  54.3   0.01   4.7    7.4  1,3…         
  Main                                                                          
  Vein                                                                          
  Ber…                                                                          
  Arc…                                                                          
  Ber…  incl…  125…  473.6  476…    2.8  81.5   0.01   7.8   12.5  1,3…         
  Main                                                                          
  Vein                                                                          
  Ber…                                                                          
  Arc…                                                                          
  Ber…  BMUG…  125…  515.3  521…    5.0  24.8   0.01   1.9    1.6  1,3…         
  Main                                                                          
  Vein                                                                          
  Ber…                                                                          
  Arc…                                                                          
  Ber…  incl…  125…  519.7  521…    1.1  79.9   0.01   4.1    1.3  1,3…         
  Main                                                                          
  Vein                                                                          
                                                                                
Midas (Nevada)
                                                                                
                                 Sample  Sample    True                  Depth  
         Zone    Drill…  Drill…    From      To   Width    Gold  Silv…    From  
                 Number  Azm/D…  (feet)  (feet)  (feet)  (oz/t…  (oz/…  Surfa…  
                                                                        (feet)  
  Surf…  Sinter                                                                 
  Expl…  Offset  DMC-4…  039/-…   841.1   842.0     0.8    0.30    3.5    -615  
         South…                                                                 
  Sint…                                                                         
  Offs…  DMC-4…  032/-…  1,108…  1,111…     2.7    0.06     0.3   -815          
  Sout…                                                                         
  Sint…  DMC-4…  192/-…   759.0   761.9     2.1    0.14     0.9   -530          
  Reso…                                                                         
  Sint…  DMC-4…  192/-…   961.4   963.8     1.8    0.03     0.4   -665          
  Reso…                                                                         
  Sint…  DMC-4…  040/-…   994.7   996.1     1.0    0.07     0.1   -975          
  Reso…                                                                         
  Pogo                                                                          
  Sint…  DMC-4…  045/-…  1,274…  1,276…     1.4    0.73     2.9   -855          
  Gap                                                                           
                                                                                
                                       28                                       
                                                                                
                                 Sample  Sample    True                  Depth  
         Zone    Drill…  Drill…    From      To   Width    Gold  Silv…    From  
                 Number  Azm/D…  (feet)  (feet)  (feet)  (oz/t…  (oz/…  Surfa…  
                                                                        (feet)  
         Pogo                                                                   
         Sinter  inclu…  045/-…  1,274…  1,276…     1.0    0.99    3.7    -855  
         Gap                                                                    
  Pogo                                                                          
  Sint…  DMC-4…  045/-…  1,681…  1,681…     0.4    0.79     0.4  -1,1…          
  Gap                                                                           
  Pogo                                                                          
  Sint…  DMC-4…  080/-…  1,236…  1,245…     6.6    0.03     0.8   -870          
  Gap                                                                           
  Pogo                                                                          
  Sint…  inclu…  080/-…  1,240…  1,240…     0.4    0.18     5.1   -870          
  Gap                                                                           
                                                                                
Greens Creek (Alaska)
                                                                                
                                                                         Depth  
               Dri…  Dril…  Sam…  Samp…  True  Silv…  Gold   Lead  Zinc   From  
        Zone   Num…  Azm/…  From     To  Wid…  (oz/…  (oz…    (%)   (%)   Mine  
                            (fe…  (fee…  (fe…                            Port…  
                                                                         (fee…  
  Und…  200s   GC6…  315.…  433…  448.0  14.1   63.6  0.01    1.9   4.1   -742  
  Def…                                                                          
  200s  GC68…  251…  129.0  158…    7.6  18.6   0.02   3.0    5.6  -1,…         
  200s  GC68…  256…  366.8  371…    4.8  14.3   0.01   0.3    0.8  -1,…         
  200s  GC68…  252…  321.2  342…   20.8  16.5   0.02   0.3    0.7  -1,…         
  200s  GC68…  244…  347.4  361…   14.0  23.3   0.04   0.3    0.6  -1,…         
  200s  GC68…  264…  384.4  405…   15.9  48.1   0.11   0.4    0.8  -1,…         
  EAST  GC68…  75.…  520.0  543…   20.7   6.4   0.04  12.0   25.4   858         
  SWB   GC68…  105…  269.1  285…   12.2  13.2   0.02   3.9   13.3  -859         
  SWB   GC68…  78.…  253.1  265…   12.2  10.7   0.02   3.4   11.5  -407         
                                                                                
                                       29                                       

Sources

The 8-K item 2.02 filings (SEC EDGAR) and their EX-99 exhibits: the results release and, when filed, prepared remarks or the call transcript.

Also

Said vs did: the targets in these releases against what was then reported. Filings: every filing.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/HL/export.csv") into a cell.

Next:Presentations
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.