Screener / SEC EDGAR /CIK 0001057877 /10-K filed Feb 19, 2026, compared with Feb 20, 2025 /Numbers from the XBRL of the 10-Ks
NYSE Utilities · Electric Utilities

Idacorp Inc IDA

Compare with peers Embed
New in the 10-K 7 paragraphs with nothing like them in the 10-K filed Feb 20, 2025 New in the 10-Q 9 paragraphs not in the 10-Q filed Jul 30, 2026 10-Q against the 10-K 0 risk factor paragraphs and sentences added or reworded

New risk paragraphs, branching off last year

Each branch is a paragraph in Risk Factors with nothing like it in the 10-K filed Feb 20, 2025. A box jumps to the paragraph as filed, below.

7 new

Paragraphs with nothing like them in last year's 10-K

Quoted exactly

7 paragraphs in Risk Factors of the 10-K filed Feb 19, 2026 with nothing like them in the 10-K filed Feb 20, 2025. Quoted exactly. Paragraphs that were only edited are under 10-K change.

on average. These projects are subject to usual permitting and construction risks that can adversely affect project costs and the completion time. These risks include, as examples:

Read in the 10-K

Factors contributing to lower hydropower generation can increase costs and negatively impact IDACORP's and Idaho Power's financial condition and results of operations. Idaho Power derives a significant portion of its power supply from its hydropower facilities. During 2025 and 2024, 52 percent and 54 percent, respectively, of Idaho Power's electric power from Idaho Power-owned generation was from hydropower facilities. Due to Idaho Power’s heavy reliance on hydropower

Read in the 10-K

life, or property damage, reputational harm, or enforcement actions or liability if a contractor violates applicable laws, rules, regulations, or orders.

Read in the 10-K

the co-owners’ willingness or ability to continue their participation or the timing of facility construction, modification, or decommissioning could lead to restrictions and disruptions to operations, adverse financial impacts to Idaho Power, and/or uncertainty related to the resulting cost recovery of such assets.

Read in the 10-K

Changes in U.S. trade policy and the impact of tariffs could have an adverse effect on Idaho Power's business and results of operations. The U.S. government has implemented and may continue to implement significant trade policy and tariff actions, including but not limited to tariffs on imported steel and aluminum products, tariffs on certain imports from China, Canada, and Mexico, and baseline tariffs on imports from many other countries. If regulators do not deem prudent the increased costs for Idaho Power's projects or maintenance of its existing facilities resulting from tariffs or other trade policy, Idaho Power may be unable to recover those increased costs through rates in full or at all or on a timely basis. Any inability of Idaho Power to recover increased costs could result in impairment or otherwise materially adversely affect IDACORP's and Idaho Power's financial condition and results of operations. Further, if as a result of increased costs due to tariffs or other trade policies, other resources become more economical, Idaho Power may terminate uneconomical projects and seek to develop those other

resources. If any projects are canceled because they are no longer economical, Idaho Power could incur significant cancellation penalties under purchase orders or construction contracts.

Read in the 10-K
Show the other 1

Volatility or disruptions in the financial markets, failure of IDACORP or Idaho Power to satisfy conditions necessary for obtaining loans or issuing debt securities, and denial of regulatory authority to issue debt or equity securities, may negatively

Read in the 10-K

Paragraphs in the 10-Q filed Oct 29, 2026 that were not in the one before

New in the latest 10-Q

9 paragraphs in the 10-Q filed Oct 29, 2026 with nothing like them in the 10-Q filed Jul 30, 2026 (at least half the words must differ; new numbers alone do not count). Quoted exactly, grouped by the item heading above them. This is text that changed, not a judgement of how serious it is.

Financial statements and notes

Amount Reclassified from AOCI Three months ended Nine months ended September 30, September 30, 2026 2025 2026 2025 Amortization of defined benefit pension items(1) Prior service cost $ 55 $ 55 $ 166 $ 166 Net loss 241 173 721 518 Total before tax 296 228 887 684 Tax benefit(2) (74) (57) (222) (173) Total reclassification for the period, net of tax $ 222 $ 171 $ 665 $ 511

Read in the 10-Q

MD&A

• In September 2026, IDACORP's board of directors approved an increase in the regular quarterly cash dividend on IDACORP's common stock from $0.88 per share to $0.90 per share, as a part of a 200 percent increase in quarterly dividends over the last 15 years.

Read in the 10-Q

Idaho Power is preparing its 2027 IRP, its 20-year forecast of load and power supply resource options. Included in the below table are Idaho Power's preliminary load forecast assumptions the company anticipates using in the 2027 IRP as of the date of this report, and for comparison purposes, growth rates Idaho Power used in its prior two IRPs.

Read in the 10-Q

5-Year Forecasted Annual Growth Rate 20-Year Forecasted Annual Growth Rate Retail Sales Annual Peak Retail Sales Annual Peak

Read in the 10-Q

Idaho Power Credit Facility: Idaho Power's incurrence of short-term indebtedness, such as its credit facility, is subject to the approval of the IPUC, OPUC, and WPSC. Idaho Power currently has authority for unsecured borrowing up to $600 million with a final maturity date no later than December 31, 2030. In October 2026, Idaho Power requested regulatory approval to maintain up to $1.0 billion of unsecured borrowings outstanding at any one time, with a final maturity date of December 31, 2033. The requests are intended to support liquidity and financial flexibility. In October 2026, the IPUC and OPUC approved Idaho Power's applications. As of the date of this report, the WPSC application remains pending.

Read in the 10-Q
Show the other 4

relevant. The ability of IDACORP to pay dividends on its common stock is generally dependent upon dividends paid to it by its subsidiaries, primarily Idaho Power.

Read in the 10-Q

Greenhouse Gas Standards for Fossil Fuel-Fired Power Plants: In September 2026, the EPA finalized a rule repealing the 2024 carbon capture and storage (CCS)-based standards under CAA Section 111 for new base load stationary combustion turbines and the emissions guidelines and standards for existing fossil fuel-fired steam electric generating units (EGUs). The final rule also retained the Phase 1 CO2 emission rate limits from the 2024 rule for new natural gas plants. Concurrently, the EPA issued a supplemental proposal to repeal all greenhouse gas (GHG) emission standards for fossil fuel-fired EGUs under CAA Section 111. Idaho Power does not expect the repeal of the 2024 CCS standards to have any near-term impact on its plans or operations, however the Phase 1 CO2 emission rate limits retained from the 2024 rule may impact emission rate limits for Idaho Power’s new natural gas-fired facilities. If the repeal of the GHG emission standards for fossil fuel-fired EGUs is finalized and becomes effective, it could simplify Idaho Power's compliance requirements with respect to both existing and new fossil fuel-fired EGUs.

Read in the 10-Q

In September 2026, the EPA and the Army Corps of Engineers released a supplemental proposal to the original plan proposed in 2025 to define the "Waters of the United States" or WOTUS. This supplemental WOTUS proposal would narrow federal CWA jurisdiction by moving toward a perennial water standard to align with the Supreme Court’s 2023 Sackett v. Environmental Protection Agency decision. The proposal defines “relatively permanent” as perennial, meaning that for water to be considered WOTUS under the CWA, it must contain standing or continuously flowing water every day of the year under ordinary conditions. The proposal also narrows when wetlands are federally regulated, requiring perennial surface water in the wetland and a continuous surface-water connection to a jurisdictional water. Idaho Power does not expect that the proposed definition of WOTUS would alter how the CWA applies to most of Idaho Power's facilities, including its hydropower plants. As a result, Idaho Power does not expect the proposed definition, if implemented, to materially impact Idaho Power's operations or financial condition.

Read in the 10-Q

Market risk

Variable Rate Debt: As of September 30, 2026, IDACORP had no variable rate debt.

Read in the 10-Q

The 10-Q's risk factors against the 10-K

Item 1A of the 10-Q filed Oct 29, 2026 against Item 1A of the 10-K filed Feb 19, 2026. A 10-Q repeats only the risks that changed, so a 10-K paragraph that is missing from it is not counted as removed. Added is a paragraph with nothing like it in the 10-K, Reworded a sentence that is in both with several words changed, Quiet changes a sentence in both where one to four words changed and one is a hedge or a modal (cut words struck through, new words highlighted). Text on the page, not a score; each links to the filing at sec.gov.

1 paragraph in the 10-Q's Item 1A, and none of them adds, rewords or quietly edits a paragraph of the 10-K's.

Phrases used for the first time

Two-word phrases in Risk Factors of the 10-K filed Feb 19, 2026 that are in none of the 1 earlier 10-Ks stored, back to Feb 20, 2025

trade policy ×3coal suppliers ×2oregon sale ×2current presidential ×2
Where each one is used
  • trade policy: Changes in U.S. trade policy and the impact of tariffs could have an adverse effect on Idaho Power's business and results of operations. The U.S. government has implemented and may continue to implement significant trade policy and tariff actions, including but not limited to tariffs on imported steel and aluminum...
  • coal suppliers: Idaho Power’s use of coal and natural gas to fuel power generation facilities exposes it to commodity availability and price risk, which can adversely affect IDACORP's and Idaho Power's results of operations and financial condition. As part of its normal business operations, Idaho Power purchases coal and natural...
  • oregon sale: IDACORP's and Idaho Power's activities are concentrated in one industry and in one region, which exposes it to risks from lack of diversification, regional economic conditions, and regional legislation and regulation. IDACORP and Idaho Power do not have diversified operations or sources of revenue. Idaho Power...
  • current presidential: Changes in legislation, regulation, and government policy may have a material adverse effect on IDACORP’s and Idaho Power’s business. Legislative and regulatory proposals and recently enacted legislation that could have a material impact on IDACORP and Idaho Power include, but are not limited to, changes in tax...

The 10-K at sec.gov

Used at least twice, small words left out. Counted, not picked: a phrase can be new because the company renamed something.

What was taken out

5 paragraphs of last year's Risk Factors with nothing like them now. The longest are quoted.

Across all companies
Statutory and regulatory factors will limit another party’s ability to acquire IDACORP and could deprive shareholders of the opportunity to gain a takeover premium for their shares of common stock. Even if IDACORP's board of directors favors a sale of the company, a sale would require approval of a number of federal and state regulatory agencies, including the FERC, the IPUC, the OPUC, and the WPSC. The approval process could be lengthy and the outcome uncertain, which may deter otherwise interested parties from proposing or attempting a business combination.
In the 10-K filed Feb 20, 2025
Obligations imposed in connection with hydropower license renewals and permitting may require large capital expenditures, increase operating costs, reduce hydropower generation, and negatively affect IDACORP's or Idaho Power's results of
In the 10-K filed Feb 20, 2025
counterparties experience ancillary liquidity issues, and could generally result in a decline in the ability of Idaho Power’s counterparties to perform on their obligations.
In the 10-K filed Feb 20, 2025
mitigate the effects of energy market price volatility, but there is no assurance these mechanisms will continue to be in place or function as intended.
In the 10-K filed Feb 20, 2025

Sources

Item 1A of each 10-K and 10-Q on EDGAR, quoted exactly. Each paragraph links to the filing at sec.gov.

Also

10-K change: what was reworded or cut, section by section.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/IDA/export.csv") into a cell.

Next:10-K change
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.