RemovedRisk Factors
or at all could adversely affect the quality and cost of Idaho Power's electric service and negatively impact its results of operation.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedRisk Factors
Obligations imposed in connection with hydropower license renewals and permitting may require large capital expenditures, increase operating costs, reduce hydropower generation, and negatively affect IDACORP's or Idaho Power's results of
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedRisk Factors
counterparties experience ancillary liquidity issues, and could generally result in a decline in the ability of Idaho Power’s counterparties to perform on their obligations.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedRisk Factors
Statutory and regulatory factors will limit another party’s ability to acquire IDACORP and could deprive shareholders of the opportunity to gain a takeover premium for their shares of common stock. Even if IDACORP's board of directors favors a sale of the company, a sale would require approval of a number of federal and state regulatory agencies, including the FERC, the IPUC, the OPUC, and the WPSC. The approval process could be lengthy and the outcome uncertain, which may deter otherwise interested parties from proposing or attempting a business combination.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RewordedRisk Factors
Under the new current Presidential Administration, Idaho Power expects several laws, regulations, executive orders, and policies relating to environmental compliance, tax, and other matters to change have changed from those of the previous Presidential Administration and could require IDACORP and Idaho Power and some of their customers to modify their business strategy, activities, and projects due to change or uncertainty in the regulatory environment. Administration, with further changes proposed.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
The Idaho Power is experiencing a rapid addition of new industrial customer load, but if the new load does not meet forecasted power usage ramp rates or amounts, the loss of loads resulting from any of these events load may result in excess infrastructure and stranded costs and require IDACORP and Idaho Power to modify or eliminate large generation, storage, or transmission projects.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
Although Idaho Power continues to make investments in its cybersecurity program, including personnel, technologies, and training of personnel, there There can be no assurance that these systems or their expected functionality Idaho Power's cybersecurity measures will be implemented, maintained, or expanded effectively; effective, nor can security measures completely eliminate the possibility of a cybersecurity breach.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
Idaho Power is participating in three high-voltage transmission line projects projects, has applied for a CPCN for additional gas-fueled generating capacity next to an existing gas power plant, and has also entered into contracts to purchase purchase, own, and own 300 MW of wind generation and 1,320 utilize, 1,400 MWh of new battery storage assets expected to come online from 2025 2026 to 2027, 2028, as well as issued RFPs for new resources, which are intended to help meet increasing customer energy demands.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
This could in turn result in reduced revenues revenues, earnings, and cash flows, as well as write-downs or write-offs if regulators determine that the costs of the projects were incurred imprudently, which could have a material adverse impact on IDACORP's and Idaho Power's financial condition, results of operations, and cash flows.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
The risk of wildfires is exacerbated in forested areas where beetle infestations and rising tree mortality rates have caused a significant increase in the quantity of with standing dead and dying timber, increasing the risk that such trees may fall from either inside or outside Idaho Power's right-of-way into a powerline, igniting a fire and increasing the severity of fires.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
In 2019, Idaho Power announced its long-term goal to serve customers with 100-percent clean energy by 2045, and Idaho Power has announced long-term, medium-term, and short-term and medium-term goals for CO2 emission reductions, which could impact infrastructure resource decisions and costs.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
A significant failure of a participant in the Western EIM to make payments when due on its obligations could have a ripple effect on various Idaho Power counterparties in the power, gas, and derivative markets if those counterparties experience ancillary liquidity issues, and could generally result in a decline in the ability of Idaho Power’s counterparties to perform on their obligations.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
Proposals have included imposing mandatory reductions in GHG emissions, which could increase Idaho Power’s power supply and compliance costs or require generation facilities to be retired early, resulting in potential stranded costs and write-downs or write-offs if Idaho Power is unable to fully recover investments in such facilities.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
These matters are subject to a number of uncertainties, and management is often unable to predict the outcome of such matters; resulting Resulting liabilities could exceed amounts currently reserved or insured against with respect to such matter.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
Changes in the number of customers and customers' use of electricity are affected by a number of factors, such as population growth or decline in Idaho Power's service area, decline, expansion or loss of service area, changes in customer needs and expectations, changes to customer rates, adoption rates of energy efficiency measures, customer-generated power such as from solar panels and gas-fired generators, power, demand-side management requirements, regulation or deregulation, and economic conditions.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedRisk Factors
Rate mechanisms, such as the Idaho FCA for residential and small commercial customers, are designed to address the financial disincentive associated with promoting energy efficiency activities, but there is no assurance that the mechanism will result in full or timely collection of Idaho Power's fixed costs, which are currently collected in large part through the company's volume-based energy rates that are based on historical sales volume. costs.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
Quiet changesRisk Factors
Through its power cost adjustment mechanisms, Idaho Power expects to recover most (but not all) of the any increase in net power supply costs caused by lower hydropower generation.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
Quiet changesRisk Factors
Idaho Power owns certain some of its generation and transmission assets jointly with other owners, with varying ownership interests in such facilities, and Idaho Power plans to develop and own assets jointly in the future.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
•To help meet growing capacity and energy needs in 2027 and beyond, Idaho Power entered into the following transactions in 2025:
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
◦an agreement to purchase the output of a 100 MW solar facility, coupled with a 100 MW battery energy storage agreement, with a scheduled online date of June 2027;
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
◦an agreement to acquire an ownership interest in 250 MW and for rights to an additional 250 MW of northbound capacity on SWIP-N, a planned 285-mile high-voltage transmission line; and
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
◦an agreement to purchase the output of an 80 MW solar facility, with a scheduled online date of June 2027.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
•During 2025, several key projects achieved notable milestones, underscoring significant progress towards Idaho Power addressing peak capacity and energy needs in 2025 and beyond, including the following:
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
◦Idaho Power commenced construction on the B2H transmission line, with an expected in-service date of late 2027;
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
◦Idaho Power began receiving power under a 20-year agreement to utilize storage capacity from a third-party 150 MW battery storage facility;
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
◦80 MW of company-owned battery storage facilities came online, with another 250 MW of company-owned battery storage commencing construction; and
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
◦Idaho Power filed a CPCN request with the IPUC for 167 MW of natural gas-fueled generating capacity next to the existing Bennett Mountain power plant, with an expected in-service date in 2028.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
•In June 2025, Idaho Power filed with the Idaho and Oregon public utility commissions its 2025 IRP, its forecast of load and resources for the next 20 years, including the preferred portfolio of resources necessary to meet predicted demands.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
Idaho Power's customer growth of 2.3 percent added $25.2 million to Idaho Power's operating income in 2025 compared with 2024. Usage per retail customer, net of associated power supply costs and power cost adjustment and FCA mechanisms, decreased operating income by $6.5 million in 2025 compared with 2024. During 2025, usage per customer decreased for most customer classes. Milder temperatures during the year reduced the demand for both space heating and air conditioning. This decrease was partially offset by an increase in irrigation usage per customer, as lower precipitation during the summer led irrigation customers to run irrigation pumps more frequently. Partially offsetting the revenue impact of decreased usage per customer, a decrease in the deferral of residential and small commercial customer revenues through the FCA mechanism positively impacted retail revenues by $6.8 million.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
AddedMD&A
Other O&M expenses in 2025 were $9.6 million higher than in 2024. This increase was primarily driven by inflationary pressures on labor-related costs, professional services, and increases in statutory fees assessed by regulators.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RemovedMD&A
•Idaho Power reached new winter and summer peaks during 2024. Idaho Power's new winter peak demand of 2,719 MW and summer peak demand of 3,793 MW were reached on January 16, 2024 and July 22, 2024, respectively. The prior highest demand peaks were 2,604 MW and 3,751 MW, reached in December 2022 and June 2021, respectively.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
•In connection with its resource planning process, Idaho Power has updated the estimate of load growth that it intends to use for its 2025 IRP. While subject to adjustment, Idaho Power currently plans to use an 8.3 percent annual rate of growth in retail sales volumes over the 2025-2029 time period, representative of anticipated continued strong growth in Idaho Power's service area.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
customer was relatively flat for most customer classes, with irrigation customers representing an increase, as higher temperatures during the summer led irrigation customers to run irrigation pumps more frequently.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
Transmission wheeling-related revenues, net of PCA impacts, decreased $3.0 million during 2024 compared with 2023. Effective January 1, 2024, financial settlement of transmission line losses were subject to the PCA mechanism, as approved in the 2023 Settlement Stipulation, resulting in a smaller contribution of those revenues to net income compared with 2023 when the financial settlement of transmission losses was not subject to the PCA mechanism.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
Other O&M expenses in 2024 were $61.1 million higher than in 2023, primarily related to approximately $17.7 million of increased pension-related expenses and an approximate $29.5 million increase in wildfire mitigation program and related insurance expenses. Both of these increases were partially offset by increases in retail revenues, as more of those costs are now recovered in base rates pursuant to the 2023 Settlement Stipulation. Inflationary pressures on labor-related costs also contributed to the increase in other O&M expenses. These increases were partially offset by an $8.5 million increase in deferral of other O&M expenses related to the conversion from coal to natural gas for two units at the Jim Bridger plant.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
Non-operating expense, net, increased $2.2 million in 2024 compared with 2023. Interest expense on long-term debt increased in 2024 compared with 2023, due primarily to an increase in long-term debt balances. In addition, Idaho Power's earnings from its investment in BCC decreased due to a decrease in the amount included and recovered in base rates pursuant to the 2023 Settlement Stipulation. These increases were partially offset by an increase in AFUDC income in 2024 compared with 2023, as the average construction work in progress balance was higher. Additionally, interest income increased due to higher average cash balances and interest rates compared with 2023.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
Given the limited-scope nature of the filing Idaho Power made in 2024 and its ongoing infrastructure investment, Idaho Power believes it is likely that it will file a general rate case in Idaho during 2025, as early as May 2025.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
•Regulatory and Environmental Compliance Costs; Coal Plant Retirements: Idaho Power is subject to extensive federal and state laws, policies, and regulations, as well as regulatory actions and audits by agencies and quasi-governmental agencies, including the FERC, the North American Electric Reliability Corporation, and the Western Electricity Coordinating Council. Compliance with these requirements directly influences Idaho Power's operating environment and affects Idaho Power's operating costs. Moreover, environmental laws and regulations may increase the cost of constructing new facilities, may increase the cost of operating generation plants, may require that Idaho Power install additional pollution control devices at existing generating plants, may result in penalties for non-compliance, even where inadvertent, or may require that Idaho Power curtail or cease operating certain generation plants. Idaho Power expects to spend significant amounts on environmental compliance and controls for the foreseeable future. Due to economic factors in part associated with the costs of compliance with environmental regulation, Idaho Power accelerated the retirement date of its North Valmy plant, ceasing participation in coal-fired operations at one unit in 2019 and planning to cease its participation in coal-fired operations at the remaining unit by year-end 2025. Idaho Power's jointly-owned coal plant in Boardman, Oregon, ceased operations as planned in October 2020. In 2022, the IPUC approved Idaho Power's request to allow the coal-related assets at the Jim Bridger plant to be fully depreciated and recovered by end-of-year 2030. Idaho Power's 2023 IRP identified a preferred resource portfolio and action plan that included the conversion from coal to natural gas of two units at the Jim Bridger plant in 2024, the two units at the North Valmy plant in 2026, and the remaining two units at the Jim Bridger plant in 2030. Units 1 and 2 at the Jim Bridger plant were successfully converted to natural gas in the second quarter of 2024. In July 2024, Idaho Power executed an agreement with its co-owner to facilitate the planned conversion of the two units at the North Valmy plant from coal to natural gas by mid-2026.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
•Water Management and Relicensing of Hydropower Projects: Because of Idaho Power's reliance on stream flow in the Snake River and its tributaries, Idaho Power participates in numerous proceedings and venues that may affect its
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
water rights, seeking to preserve the long-term availability of its rights for its hydropower projects. Also, Idaho Power is involved in renewing its long-term federal licenses for the HCC, its largest hydropower generation source, and for American Falls, its second largest hydropower generation source. Given the number of parties involved, Idaho Power's relicensing costs have been and are expected to continue to be substantial. As of the date of this report, Idaho Power cannot determine the ultimate terms of, and costs associated with, any resulting long-term licenses for the HCC or American Falls hydroelectric facilities.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
Other Operations and Maintenance Expenses: Other O&M expenses increased $61.1 million in 2024 compared with 2023, primarily related to approximately $17.7 million of increased pension-related expenses and an approximate $29.5 million increase in wildfire mitigation program and related insurance expenses. Both of these increases were partially offset by increases in retail revenues, as more costs are now recovered in base rates pursuant to the 2023 Settlement Stipulation. Inflationary pressures on labor-related costs also contributed to the increase in other O&M expenses. These increases were partially offset by an $8.5 million increase in deferral of other O&M expenses related to the conversion from coal to natural gas for two units at the Jim Bridger plant.
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RemovedMD&A
•changes in pension and postretirement benefits plan contributions and expenses combined to increase IDACORP and Idaho Power cash flows by $49 million, which was primarily due to the timing and amount of funding decisions and an increase in the amount of pension-related expenses approved for recovery in base rates pursuant to the 2023 Settlement Stipulation; and
Read it in 10-K Feb 20, 2025 at sec.govopen_in_new
RewordedMD&A
December 31, 2025 December 31, 2024 December 31, 2023 IDACORP(2) IDACORP(1) Idaho Power IDACORP(2) IDACORP(1) Idaho Power Revolving credit facility $ 100,000 $ 400,000 $ 100,000 $ 400,000 Commercial paper outstanding — — — — Identified for other use(1) use(2) — (19,885) — — (19,885) Net balance available $ 100,000 $ 380,115 400,000 $ 100,000 $ 380,115 (1) American Falls bonds that Idaho Power could be required to purchase prior to maturity under the optional or mandatory purchase provisions of the bonds, if the remarketing agent for the bonds were unable to sell the bonds to third parties. Holding company only.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
December 31, 2024 December 31, 2023 IDACORP(2) Idaho Power IDACORP(2) Idaho Power Revolving credit facility $ 100,000 $ 400,000 $ 100,000 $ 400,000 Commercial paper outstanding — — — — Identified for other use(1) — (19,885) — (19,885) Net balance available $ 100,000 $ 380,115 $ 100,000 $ 380,115 (1) (2) American Falls bonds that Idaho Power could be have been required to purchase prior to maturity under the optional or mandatory purchase provisions of the bonds, if the remarketing agent for the bonds were unable to sell the bonds to third parties.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
Description Effective Date Estimated Annualized Rate Impact (millions)(1) (in millions of dollars)(1) 2025 Idaho general rate case 1/1/2026 $ 110.0 2025 Oregon rate adjustment 1/1/2026 (0.6) 2025 Idaho PCA 6/1/2025 (94.8) 2025 Idaho FCA 6/1/2025 (39.8) 2024 Idaho limited-issue rate case 1/1/2025 $ 50.1 2023 Oregon general rate case 10/15/2024 6.7 2024 Idaho PCA 6/1/2024 (35.7) 2024 Idaho FCA 6/1/2024 11.7 2023 Oregon general rate case 10/15/2024 6.7 2023 Idaho general rate case 1/1/2024 54.7 2023 Idaho PCA 6/1/2023 105.1 2023 Idaho FCA 6/1/2023 (10.1) (1) The annual amount collected or refunded in rates is typically not recovered or refunded on a linear basis (i.e., 1/12th per month), and is instead recovered or refunded in proportion to retail sales volumes.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
Net income attributable to IDACORP, Inc. - December 31, 2023 $261.2 2024 $289.2 Retail revenues per MWh, net of power cost adjustment and FCA mechanisms 52.7 49.6 Customer growth, net of associated power supply costs and power cost adjustment mechanisms 19.0 25.2 Usage per retail customer, net of associated power supply costs and power cost adjustment and FCA mechanisms 4.5 Transmission wheeling-related revenues, net of PCA mechanism impacts (3.0) (6.5) Other O&M expenses (61.1) (9.6) Depreciation and amortization expense (28.1) (27.7) Other changes in operating revenues and expenses, net 30.8 (3.8) Increase in Idaho Power operating income 14.8 27.2 Non-operating expense, net (2.2) (22.8) Additional ADITC amortization 29.8 10.5 Income tax expense, excluding additional ADITC amortization (18.6) 20.4 Total increase in Idaho Power net income 23.8 35.3 Other IDACORP changes (net of tax) 4.2 (1.0) Net income attributable to IDACORP, Inc. - December 31, 2024 $289.2 2025 $323.5
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
Customer rates, excluding revenues related to power cost adjustment mechanisms and net of FCA mechanism revenues, mechanisms, increased retail revenues by $52.7 $49.6 million in 2024 2025 compared with 2023, 2024, due primarily to the an overall increase in Idaho base rates, effective January 1, 2024, rate increase for 2025, from the outcome of the 2024 Idaho Power’s Idaho retail customers under the 2023 Settlement Stipulation. Limited-Issue Rate Case.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
Other changes in operating revenues These decreases were partially offset by recovery of costs of a new finance lease through Idaho Power's power cost adjustment mechanism rates and expenses, net, increased operating income by $30.8 million in 2024 compared to 2023, due partially to a decrease in net power supply expenses that were not deferred for future recovery in rates through Idaho Power's power cost adjustment mechanisms.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
The decreases changes were primarily due to income tax return adjustments for state taxes and plant-related flow-through items, and increased ADITC amortization at Idaho Power under its Idaho regulatory mechanism, described in Note 3 - “Regulatory Matters” to the consolidated financial statements included in this report, offset partially by an increase in income taxes due to higher income before income taxes. report.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
In addition, property taxes contributed to the increase from 2023 to Other changes in operating revenues and expenses, net, decreased operating income by $3.8 million in 2025 compared with 2024, due primarily to the successful conclusion of multi-year litigation efforts challenging Idaho and Oregon property tax valuations, which resulted in refunds of prior year taxes being finalized in 2024. 2024, which did not reoccur in 2025.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
In April 2018, Following Idaho Power's application, the IPUC issued an order in April 2018 approving a settlement stipulation signed by Idaho Power, among the IPUC staff, and a third-party intervenor parties recognizing that a total of $216.5 million in expenditures were reasonably incurred, and therefore prudently incurred and, therefore, should be eligible for inclusion in customer rates at in a later date. future rate proceeding.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
Depending Actual expenditures and their timing could deviate substantially from Idaho Power's expected expenditures depending on factors such as RFP results, the timing of project in-service dates, estimated load and resource balances and customer growth, the nature and quantity of resources owned versus acquired under PPAs or similar agreements, and the outcome of regulatory proceedings.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
Idaho Power estimates that the annual costs it will incur to obtain a new long-term license for the HCC, license, including AFUDC but excluding costs expected to be incurred for complying with the license after issuance, are likely to post-issuance compliance cost, will range from $35 million to $45 million until issuance of the license. license is
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
RewordedMD&A
On December 31, 2024, the IPUC issued its order (Order) in the 2024 Idaho Limited-Issued Rate Case, providing that The 2025 Settlement Stipulation provided for Idaho Power to implement revised tariff schedules designed to increase annual Idaho-jurisdictional retail revenue by $50.6 approximately $110.0 million, or 3.7 7.48 percent, effective January 1, 2025. 2026.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
Quiet changesMD&A
Amounts deferred during the PCA year are primarily recovered or refunded during the subsequent June 1 through May 31 period.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new
Quiet changesMD&A
In March 2023, PacifiCorp initiated the pre-construction phase of approximately 620 miles of 500-kV transmission line from the Populus substation near Downey, Idaho, to the Hemingway substation near Boise, Idaho.
Read it in 10-K Feb 19, 2026 at sec.govopen_in_new