Screener / SEC EDGAR /CIK 0001057877 /10-K filed Feb 19, 2026, compared with Feb 20, 2025 /Numbers from the XBRL of the 10-Ks
NYSE Utilities · Electric Utilities

Idacorp Inc IDA

Compare with peers Embed
The 10-K against last year's

280 changes: 56 added, 31 removed, 189 reworded, 4 quiet changes

10-K Feb 19, 2026 vs Feb 20, 2025

10-K 0001057877-26-000028 (Feb 19, 2026) vs 10-K 0001057877-25-000014 (Feb 20, 2025)

Every paragraph, and how much of it changed

One bar per paragraph, in the order of the 10-K. Height and colour show the share of its words not in the closest paragraph a year earlier; the tallest bars are new paragraphs.

Risk Factors

82 paragraphs · 7 new · 46 reworded · 5 gone · 10-K Feb 19, 2026 against Feb 20, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 69 · 46% changed Every version of it
Idaho Power’s energy risk management policy and programs relating to economically hedging commodity exposures and credit risk may not always perform as intended, and as a result, IDACORP and Idaho Power may suffer losses. Idaho Power enters into transactions to buy and sell power, natural gas, and transmission service, enters into transactions to hedge its positions in coal, natural gas, power, and other commodities, and enters into economic hedge transactions to mitigate in part exposure to variable commodity prices. IDACORP and Idaho Power could recognize losses as a result of volatility in the market value of these contracts or if a counterparty fails to perform. The derivative instruments used for hedging might not offset the underlying exposure being mitigated as intended, due to pricing inefficiencies or other terms of the derivative instruments, and any such failure to mitigate exposure could result in losses. Certain of Idaho Power's purchase or sale, hedging, and derivative agreements may result in the receipt of, or posting of, collateral with counterparties. Fluctuations in commodity prices that lead to the posting of collateral with counterparties negatively impact liquidity, and downgrades in Idaho Power's credit ratings may lead to additional collateral posting requirements. In 2024, Idaho Power recorded losses on economic hedges of $63.3 million, compared with $16.2 million of losses in 2023. At times, Idaho Power’s energy risk management policy results in Idaho Power entering into economic hedges in an environment where prices are high, and if prices are lower at the time the economic hedge settles, Idaho Power will record losses on the economic hedges. Depending on the volume of economic hedges and the degree of price volatility, those losses can be substantial, and the power cost adjustment mechanisms generally provide that Idaho Power will incur a portion of those losses. Forecasts of future fuel needs and loads and available resources to meet those loads are inherently uncertain and may cause Idaho Power to over- or under-hedge actual resource needs, exposing the company to market risk on the over- or under-hedged position. To the extent that commodity markets are illiquid, Idaho Power may not be able to execute its risk management strategies, which could result in undesired over-exposure to unhedged positions that Idaho Power may not be able to collect in customer rates. The FERC may take action to limit volatility in the energy market by imposing price limits or other market restrictions to control rates in market-based sales, which could adversely affect the companies' financial results. As a result, risk management actions, or the failure or inability to manage commodity availability and price and counterparty risk, may adversely affect IDACORP’s and Idaho Power’s financial condition and results of operations. Idaho Power has additional indirect credit exposures to financial institutions in the form of letters of credit provided as security by power suppliers under various purchased power contracts, by vendors for infrastructure development projects, and by customers or potential customers. If any of the credit ratings of the letter of credit issuers were to drop below investment grade, the vendor, supplier, customer, or potential customer would need to replace the security with an acceptable substitute, which may be impracticable and may expose Idaho Power to losses resulting from a default of the counterparty. If the security were not replaced, the counterparty could be in default under the contract and Idaho Power's remedies for default may be inadequate to fully compensate Idaho Power for its losses. Further, the bankruptcy or insolvency of a counterparty to commodity or other transactions could impair Idaho Power’s ability to collect amounts receivable from those counterparties, potentially including the ability to collect or retain collateral posted by a counterparty.
Paragraph 12 · 44% changed Every version of it
circumstances imprudently, which could result in write-offs and have a material effect adverse impact on IDACORP's and Idaho Power’s Power's financial condition and condition, results of operations. operations, and cash flows.
Paragraph 72 · 41% changed Every version of it
The performance of pension and postretirement benefit plan investments, increasing health care costs, and other factors impacting plan costs and funding obligations could adversely affect IDACORP's and Idaho Power's financial condition and results of operations - primarily cash flows and liquidity. Idaho Power provides a noncontributory defined benefit pension plan covering most employees, as well as a defined benefit postretirement benefit plan (consisting of health care and death benefits) that covers eligible retirees. Costs of providing these benefits are based in part on the value of the plans' assets and, therefore, adverse investment performance for these assets or the failure to maintain sustained growth in pension investments over time could increase Idaho Power’s plan costs and funding requirements related to the plans. Idaho Power's self-insured costs of health care benefits for eligible employees and retirees have increased in recent years and Idaho Power believes that future legislative changes related to the provision of health care benefits and other external market conditions and factors, could cause such costs to could continue to rise. As benefit costs continue to rise, there is no assurance that the IPUC and OPUC will continue to allow recovery.
Paragraph 57 · 39% changed Every version of it
operations and financial condition. Since 2003, Idaho Power has been engaged in an effort to renew its federal license for its largest hydropower generation source, the HCC. Relicensing and ongoing permitting requirements include an extensive public review process that involves numerous natural resource issues and environmental conditions. The existence of endangered and threatened species in the watershed may result in major operational changes to the region’s hydropower projects, which may be reflected in hydropower licenses, including for the HCC and the American Falls facility. Federal land use agencies may also impose conditions under the FPA that could impact costs and operations if FERC deems them necessary for the adequate protection and utilization of the public lands and reservations of the United States. In addition, new agency requirements and new interpretations of existing laws and regulations could be adopted or become applicable to hydropower facilities, which could further increase required expenditures for flood control, marine life recovery and endangered species protection and may reduce the amount of hydropower generation available to meet Idaho Power’s generation requirements. Idaho Power cannot predict the requirements that might be imposed during the relicensing and permitting process, the financial impact of those requirements, whether a new multi-year license will ultimately be issued, and whether the IPUC or OPUC will allow recovery through rates of the substantial costs incurred in connection with the licensing process and subsequent compliance. Imposition of onerous conditions in the relicensing and permitting processes could result in Idaho Power incurring significant capital expenditures, increase operating costs (including power purchase costs), and reduce hydropower generation, which could negatively affect results of operations and financial condition.
Paragraph 19 · 30% changed Every version of it
In addition, state and federal legislation and regulations have been proposed in recent years and may be implemented in the future, intended to limit the severity and impact of climate change. Proposals have included imposing mandatory reductions in GHG emissions, which could increase Idaho Power’s power supply and compliance costs or require generation facilities to be retired early, resulting in potential stranded costs and write-downs or write-offs if Idaho Power is unable to fully recover investments in such facilities. For additional information relating to legislation, regulations, and legal proceedings related to environmental matters, see Part II - Item 7 - MD&A - "Environmental Matters” in this report.
Paragraph 18 · 29% changed Every version of it
In addition, state and federal legislation and regulations have been proposed in recent years and may be implemented in the future, intended to limit the severity and impact of climate change. Proposals have included imposing mandatory reductions in GHG emissions, which could increase Idaho Power’s power supply and compliance costs or require generation facilities to be retired early, resulting in potential stranded costs and write-downs or write-offs if Idaho Power is unable to fully recover investments in such facilities. For additional information relating to legislation, regulations, and legal proceedings related to environmental matters, see Part II - Item 7 - MD&A - "Environmental Matters” in this report.
Paragraph 11 · 28% changed Every version of it
Idaho Power is possible that such experiencing a rapid addition of new industrial and commercial customers may customer load, but if the new load does not meet forecasted power usage ramp rates or amounts. The amounts, the loss of loads resulting from any of these events load may result in excess infrastructure and stranded costs and require IDACORP and Idaho Power to modify or eliminate large generation, storage, or transmission projects. This could in turn result in reduced revenues revenues, earnings, and cash flows, as well as write-downs or write-offs if regulators determine that the costs of the projects were incurred imprudently, which could have a material adverse impact on IDACORP's and Idaho Power's financial condition, results of operations, and cash flows.
Paragraph 67 · 26% changed Every version of it
Stakeholder actions and regulatory activity related to sustainability matters, particularly global climate change and reducing GHG emissions, could negatively impact IDACORP and Idaho Power. The power and gas utility industry faces stakeholder scrutiny related to sustainability matters. Certain stakeholders, such as investors, customers, suppliers, and lenders focus on the impact and social cost associated with climate change. Customers, suppliers, or other stakeholders could pursue, and in some cases have pursued, alternatives to Idaho Power's services or business as a result of their sustainability-related expectations. GHG emissions, including, most significantly CO2, could be further restricted in the future in response to additional state and federal regulatory requirements, increased scrutiny, and changing stakeholder expectations with respect to environmental and climate change programs, judicial decisions, and international accords. If new laws, regulations, or enforcement policies were to become effective, they could result in significant additional compliance and remediation costs that could negatively impact Idaho Power's future financial position, results of operations, and cash flows if such costs are not timely recovered through regulated rates. In addition, the focus on climate change and regulatory and legal requirements may result in Idaho Power facing adverse reputational risks associated with certain of its operations producing GHG emissions. If Idaho Power is unable to satisfy the climate-related expectations of certain stakeholders, IDACORP and Idaho Power may suffer reputational harm, which could cause IDACORP’s stock price to decrease or cause certain investors and financial institutions not to purchase the companies’ debt or equity securities or otherwise provide the companies with capital or credit on favorable terms, which may cause IDACORP’s and Idaho Power’s cost of capital to increase.

MD&A

303 paragraphs · 49 new · 162 reworded · 26 gone · 10-K Feb 19, 2026 against Feb 20, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 88 · 50% changed
Idaho Power continues to pursue significant enhancements to its utility infrastructure in an effort to ensure an adequate supply of electricity, to provide service to new customers, and to maintain system reliability. Idaho Power's existing hydropower and thermal generation facilities also require continuing upgrades and component replacement. Cash capital expenditures, excluding AFUDC and net costs of removing assets from service, were $981 million in 2024 and $591 million in 2023. Idaho Power expects an increase in capital expenditures over the next several years, with estimated total capital expenditures of up to $6.1 $7.2 billion over the period from 2025 2026 through 2029. 2030.
Paragraph 22 · 49% changed
The following is a summary of Year Ended December 31, 2025 2024 2023 Idaho Power's Power net income, net income $315,862 $280,605 $256,810 Net income attributable to IDACORP, and IDACORP's Inc. $323,472 $289,174 $261,195 Weighted average outstanding shares – diluted 54,806 52,615 50,806 IDACORP, Inc. earnings per diluted share for the years ended December 31, 2024, 2023, and 2022 (in thousands, except earnings per share amounts): $5.90 $5.50 $5.14
Paragraph 251 · 48% changed
Developments in Regulation of Sage Grouse Habitat: In 2016, a group of lawsuits were filed in federal court to challenge the BLM's sage grouse resource management and land use plan revisions that became effective in 2015 under the Federal Land Policy and Management Act. The lawsuits challenge the plans and associated EISs across the sage grouse range, including in Idaho and North Dakota, and allege that the plans fail to ensure that sage grouse populations and habitats will be protected and restored in accordance with the best available science and legal mandates. Further, the lawsuits challenge certain exemptions provided for the B2H and GWW transmission line projects. Idaho Power has intervened in the proceedings in an effort to support the exemptions provided for in the BLM's plans. If the exemptions are overturned, Idaho Power may be required to re-route the projects, which could lead to substantially higher construction and permitting costs and could delay construction. As of the date of this report, the above lawsuits are stayed, as the parties and the courts have agreed that the processes initiated by the BLM may result in further administrative actions that could remove the need for the lawsuits.
Paragraph 205 · 47% changed
Also in December 2024, In September 2025, Idaho Power filed an application with the IPUC to grant for a CPCN for Idaho Power to acquire and own two battery storage facilities with a total of 100 167 MW of operating natural gas-fueled generating capacity next to address Idaho Power's the existing Bennett Mountain power plant to meet an identified capacity deficiency deficit in 2026. As of the date of this report, the IPUC's decision is pending. 2028, as well as
Paragraph 171 · 47% changed
As of the date of this report, Idaho Power believes issuance of anticipates that the FERC could issue a new HCC license by the FERC will be as early as 2026. Idaho Power is unable to predict in 2027 or thereafter. However, the exact timing that timing, as well as the FERC will issue a new license or the ultimate total capital investment and ongoing operating and maintenance costs Idaho Power will incur in complying required to comply with a the new license. license remain uncertain. Idaho Power estimates that the annual costs it will incur to obtain a new long-term license for the HCC, license, including AFUDC but excluding costs expected to be incurred for complying with the license after issuance, are likely to post-issuance compliance cost, will range from $35 million to $45 million until issuance of the license. Upon issuance of a long-term license, Idaho Power expects that the annual capital expenditures and operating and maintenance expenses associated with compliance with the terms and conditions of the long-term license could also be substantial. In December 2016, Idaho Power filed an application with the IPUC requesting a determination that Idaho Power's expenditures of $220.8 million through year-end 2015 on relicensing of the HCC were prudently incurred, and thus eligible for future inclusion in retail rates in a future rate proceeding. In April 2018, the IPUC issued an order approving a settlement stipulation signed by Idaho Power, the IPUC staff, and a third-party intervenor recognizing that a total of $216.5 million in expenditures were reasonably incurred, and therefore should be eligible for inclusion in customer rates at a later date. is
Paragraph 67 · 46% changed
•Customers: Customer growth •FCA Mechanism: A decrease in the deferral of 2.6 percent increased residential and small commercial customer revenues through the FCA mechanism positively affected retail revenues by $30.5 $6.8 million in 2024 2025 compared with 2023. 2024.
Paragraph 273 · 45% changed
As of the date of this report, Idaho Power continues to evaluate the specific impacts the Good Neighbor Plan could have on its operations at the North Valmy plant. If the Good Neighbor Plan January 2026 proposal to approve the Nevada SIP is implemented in Nevada, finalized, Idaho Power anticipates that, under certain conditions, it could reduce that the ability to use Nevada SIP would not affect the full available output, or require additional controls for NOx and/or the purchase current operations of allowances in order to utilize the full available output, at the North Valmy plant during the EPA defined ozone season (May through September). plant.
Paragraph 29 · 44% changed
Depreciation and amortization expense increased $28.1 $27.7 million in 2024 2025 compared to 2023, with 2024, due primarily to an increase in plant-in-service. Additionally, the start of operations at a leased battery storage facility in the second quarter of 2025 contributed modestly to the increase through amortization of a related right-of-use asset.

A paragraph is matched with the one last year that shares the most of its words; under half in common makes it new. The paragraphs shown are the 8 reworded the most in each section.

The paragraph that changed most in each section

The redline

Marked against last year's 10-K: cut words struck through, new words highlighted.

MD&A227 words changed in this paragraph; it is 44% similar to last year's version.
The permitting phase of the B2H project was subject to federal review and approval by various federal agencies. Federal agency records of decision have been received and all lawsuits challenging the federal rights-of-way have been resolved. In the separate State of Oregon permitting process, the state's Oregon's Energy Facility Siting Council (EFSC) approved Idaho Power's site certificate in September 2022. The Oregon Department of Energy subsequently issued 2022 followed by a final order and site certificate. Idaho Power is pursuing two amendments to the site certificate to accommodate route changes, many of which are for the benefit of landowners along the route, and to enhance constructability. certificate, both contested but upheld in subsequent judicial proceedings. In September 2023, EFSC approved Idaho Power's first amendment request. One party contested the EFSC's approval of the first amendment in Union County Circuit Court. On October 28, 2024, the Union County Circuit Court issued an order to dismiss the proceeding. Separately, in August 2024, EFSC approved Idaho Power's second amendment request. The approval of the second amendment is being contested, and a decision of the Oregon Supreme Court in the case is pending. During the second quarter of 2023, the IPUC, OPUC, and WPSC granted Idaho Power and PacifiCorp their respective CPCNs related to the construction of the B2H project. In June 2025, three parties filed complaints with the OPUC seeking reconsideration of the CPCN granted for B2H, but in November 2025, the OPUC upheld the B2H CPCN. Those parties have now filed three complaints in the Baker County and Union County Circuit Courts challenging the OPUC decision. These cases remain pending. In addition, in September 2025, two parties filed complaints in Morrow County Circuit Court alleging that the Oregon Department of Energy and the Oregon Energy Facility Siting Council improperly modified the Fire Protection and Suppression Plan. Idaho Power has moved to dismiss that claim, and the case remains pending.

Source: Item 7, 10-K 0001057877-26-000028 vs Item 7, 10-K 0001057877-25-000014

Risk Factors212 words changed in this paragraph; it is 39% similar to last year's version.
Factors contributing to lower hydropower generation can increase costs and negatively impact IDACORP's and Idaho Power's financial condition and results of operations. Idaho Power derives a significant portion of its power supply from its hydropower facilities. During 2024 2025 and 2023, 54 2024, 52 percent and 55 54 percent, respectively, of Idaho Power's electric power from Idaho Power-owned generation was from hydropower facilities. Due to Idaho Power’s heavy reliance on hydropower generation, the impacts of factors such as precipitation and snowpack, the timing of run-off, requirements for flood control, and the availability of water in the Snake River Basin can significantly affect its operations. The combination of a long-term trend of declining Snake River base flows, over-appropriation of water, and periods of drought have led to water rights disputes and proceedings among surface water and ground water irrigators and the State of Idaho. Recharging the Eastern Snake Plain Aquifer by diverting surface water to porous locations and permitting it to sink into the aquifer is one approach to the over-appropriation dispute. Diversions from the Snake River for aquifer recharge or the loss of water rights reduce Snake River flows available for hydropower generation. When hydropower generation is reduced, Idaho Power must increase its use of more expensive thermal generating resources and market power purchases; therefore, costs increase and opportunities for wholesale energy sales are reduced, reducing revenues and potentially earnings. Through its power cost adjustment mechanisms, Idaho Power expects to recover most (but not all) of the increase in net power supply costs caused by lower hydropower generation. The timing of recovery of the increased costs, however, may not occur until the subsequent power cost adjustment year, adversely affecting cash flows and liquidity.

Source: Item 1A, 10-K 0001057877-26-000028 vs Item 1A, 10-K 0001057877-25-000014

Accounting Policies142 words changed in this paragraph; it is 32% similar to last year's version.
In November 2023, September 2025, the Financial Accounting Standards Board (FASB) FASB issued Accounting Standards Update (ASU) 2023-07, Segment Reporting (Topic 280): ASU 2025-06, Intangibles (Subtopic 350-40): Targeted Improvements to Reportable Segment Disclosures, the Accounting for Internal-Use Software which expands annual amends certain aspects of the accounting for and interim disclosure requirements for reportable segments, primarily through enhanced disclosures about significant segment expenses. of software costs. This ASU is effective for annual periods beginning after December 15, 2023, and for interim periods beginning after December 15, 2024, 2027, with early adoption permitted. IDACORP and Idaho Power adopted this ASU on January 1, 2024, for annual periods, and subsequently on January 1, 2025, for interim periods. The amendments in this ASU are required to be applied prospectively and may be applied either retrospectively or using a modified prospective transition method. IDACORP and Idaho Power are currently evaluating the impact that adoption of this ASU will have been applied retrospectively, as required. See Note 17 - "Segment Information" for expanded disclosure required by this ASU. on their respective consolidated financial statements.

Source: Item 8, Note 1 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES, 10-K 0001057877-26-000028 vs Item 8, Note 1 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES, 10-K 0001057877-25-000014

Sentences and paragraphs added, removed or reworded

Every change, by type

Sentences and paragraphs of IDA's Risk Factors and MD&A, 10-K Feb 19, 2026 against 10-K Feb 20, 2025. Each links to the text at sec.gov.

Quiet changes are sentences kept from last year with one to four words changed, at least one of them a hedge, a modal or a qualifier (may, could, will, not, significant, material…). A year or date rolling forward is not counted.

The full word list

adverse, adversely, all, although, anticipate, anticipates, any, approximately, believe, believes, can, cannot, certain, could, expect, expects, generally, however, if, intend, intends, largely, likely, many, material, materially, may, might, most, must, never, no, not, possible, primarily, probable, should, significant, significantly, some, substantial, substantially, unlikely, will, would

AddedRisk Factors
on average. These projects are subject to usual permitting and construction risks that can adversely affect project costs and the completion time. These risks include, as examples:
Read it in 10-K Feb 19, 2026 at sec.gov
AddedRisk Factors
Factors contributing to lower hydropower generation can increase costs and negatively impact IDACORP's and Idaho Power's financial condition and results of operations. Idaho Power derives a significant portion of its power supply from its hydropower facilities. During 2025 and 2024, 52 percent and 54 percent, respectively, of Idaho Power's electric power from Idaho Power-owned generation was from hydropower facilities. Due to Idaho Power’s heavy reliance on hydropower
Read it in 10-K Feb 19, 2026 at sec.gov
AddedRisk Factors
the co-owners’ willingness or ability to continue their participation or the timing of facility construction, modification, or decommissioning could lead to restrictions and disruptions to operations, adverse financial impacts to Idaho Power, and/or uncertainty related to the resulting cost recovery of such assets.
Read it in 10-K Feb 19, 2026 at sec.gov
AddedRisk Factors
Changes in U.S. trade policy and the impact of tariffs could have an adverse effect on Idaho Power's business and results of operations. The U.S. government has implemented and may continue to implement significant trade policy and tariff actions, including but not limited to tariffs on imported steel and aluminum products, tariffs on certain imports from China, Canada, and Mexico, and baseline tariffs on imports from many other countries. If regulators do not deem prudent the increased costs for Idaho Power's projects or maintenance of its existing facilities resulting from tariffs or other trade policy, Idaho Power may be unable to recover those increased costs through rates in full or at all or on a timely basis. Any inability of Idaho Power to recover increased costs could result in impairment or otherwise materially adversely affect IDACORP's and Idaho Power's financial condition and results of operations. Further, if as a result of increased costs due to tariffs or other trade policies, other resources become more economical, Idaho Power may terminate uneconomical projects and seek to develop those other
Read it in 10-K Feb 19, 2026 at sec.gov
AddedRisk Factors
resources. If any projects are canceled because they are no longer economical, Idaho Power could incur significant cancellation penalties under purchase orders or construction contracts.
Read it in 10-K Feb 19, 2026 at sec.gov
AddedRisk Factors
Volatility or disruptions in the financial markets, failure of IDACORP or Idaho Power to satisfy conditions necessary for obtaining loans or issuing debt securities, and denial of regulatory authority to issue debt or equity securities, may negatively
Read it in 10-K Feb 19, 2026 at sec.gov
Show the other 56
RemovedRisk Factors
Obligations imposed in connection with hydropower license renewals and permitting may require large capital expenditures, increase operating costs, reduce hydropower generation, and negatively affect IDACORP's or Idaho Power's results of
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedRisk Factors
Statutory and regulatory factors will limit another party’s ability to acquire IDACORP and could deprive shareholders of the opportunity to gain a takeover premium for their shares of common stock. Even if IDACORP's board of directors favors a sale of the company, a sale would require approval of a number of federal and state regulatory agencies, including the FERC, the IPUC, the OPUC, and the WPSC. The approval process could be lengthy and the outcome uncertain, which may deter otherwise interested parties from proposing or attempting a business combination.
Read it in 10-K Feb 20, 2025 at sec.gov
RewordedRisk Factors
Under the new current Presidential Administration, Idaho Power expects several laws, regulations, executive orders, and policies relating to environmental compliance, tax, and other matters to change have changed from those of the previous Presidential Administration and could require IDACORP and Idaho Power and some of their customers to modify their business strategy, activities, and projects due to change or uncertainty in the regulatory environment. Administration, with further changes proposed.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
The Idaho Power is experiencing a rapid addition of new industrial customer load, but if the new load does not meet forecasted power usage ramp rates or amounts, the loss of loads resulting from any of these events load may result in excess infrastructure and stranded costs and require IDACORP and Idaho Power to modify or eliminate large generation, storage, or transmission projects.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
Although Idaho Power continues to make investments in its cybersecurity program, including personnel, technologies, and training of personnel, there There can be no assurance that these systems or their expected functionality Idaho Power's cybersecurity measures will be implemented, maintained, or expanded effectively; effective, nor can security measures completely eliminate the possibility of a cybersecurity breach.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
Idaho Power is participating in three high-voltage transmission line projects projects, has applied for a CPCN for additional gas-fueled generating capacity next to an existing gas power plant, and has also entered into contracts to purchase purchase, own, and own 300 MW of wind generation and 1,320 utilize, 1,400 MWh of new battery storage assets expected to come online from 2025 2026 to 2027, 2028, as well as issued RFPs for new resources, which are intended to help meet increasing customer energy demands.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
This could in turn result in reduced revenues revenues, earnings, and cash flows, as well as write-downs or write-offs if regulators determine that the costs of the projects were incurred imprudently, which could have a material adverse impact on IDACORP's and Idaho Power's financial condition, results of operations, and cash flows.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
The risk of wildfires is exacerbated in forested areas where beetle infestations and rising tree mortality rates have caused a significant increase in the quantity of with standing dead and dying timber, increasing the risk that such trees may fall from either inside or outside Idaho Power's right-of-way into a powerline, igniting a fire and increasing the severity of fires.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
In 2019, Idaho Power announced its long-term goal to serve customers with 100-percent clean energy by 2045, and Idaho Power has announced long-term, medium-term, and short-term and medium-term goals for CO2 emission reductions, which could impact infrastructure resource decisions and costs.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
A significant failure of a participant in the Western EIM to make payments when due on its obligations could have a ripple effect on various Idaho Power counterparties in the power, gas, and derivative markets if those counterparties experience ancillary liquidity issues, and could generally result in a decline in the ability of Idaho Power’s counterparties to perform on their obligations.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
Proposals have included imposing mandatory reductions in GHG emissions, which could increase Idaho Power’s power supply and compliance costs or require generation facilities to be retired early, resulting in potential stranded costs and write-downs or write-offs if Idaho Power is unable to fully recover investments in such facilities.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
These matters are subject to a number of uncertainties, and management is often unable to predict the outcome of such matters; resulting Resulting liabilities could exceed amounts currently reserved or insured against with respect to such matter.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
Changes in the number of customers and customers' use of electricity are affected by a number of factors, such as population growth or decline in Idaho Power's service area, decline, expansion or loss of service area, changes in customer needs and expectations, changes to customer rates, adoption rates of energy efficiency measures, customer-generated power such as from solar panels and gas-fired generators, power, demand-side management requirements, regulation or deregulation, and economic conditions.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedRisk Factors
Rate mechanisms, such as the Idaho FCA for residential and small commercial customers, are designed to address the financial disincentive associated with promoting energy efficiency activities, but there is no assurance that the mechanism will result in full or timely collection of Idaho Power's fixed costs, which are currently collected in large part through the company's volume-based energy rates that are based on historical sales volume. costs.
Read it in 10-K Feb 19, 2026 at sec.gov
Quiet changesRisk Factors
Through its power cost adjustment mechanisms, Idaho Power expects to recover most (but not all) of the any increase in net power supply costs caused by lower hydropower generation.
Read it in 10-K Feb 19, 2026 at sec.gov
Quiet changesRisk Factors
Idaho Power owns certain some of its generation and transmission assets jointly with other owners, with varying ownership interests in such facilities, and Idaho Power plans to develop and own assets jointly in the future.
Read it in 10-K Feb 19, 2026 at sec.gov
AddedMD&A
•During 2025, several key projects achieved notable milestones, underscoring significant progress towards Idaho Power addressing peak capacity and energy needs in 2025 and beyond, including the following:
Read it in 10-K Feb 19, 2026 at sec.gov
AddedMD&A
◦Idaho Power filed a CPCN request with the IPUC for 167 MW of natural gas-fueled generating capacity next to the existing Bennett Mountain power plant, with an expected in-service date in 2028.
Read it in 10-K Feb 19, 2026 at sec.gov
AddedMD&A
•In June 2025, Idaho Power filed with the Idaho and Oregon public utility commissions its 2025 IRP, its forecast of load and resources for the next 20 years, including the preferred portfolio of resources necessary to meet predicted demands.
Read it in 10-K Feb 19, 2026 at sec.gov
AddedMD&A
Idaho Power's customer growth of 2.3 percent added $25.2 million to Idaho Power's operating income in 2025 compared with 2024. Usage per retail customer, net of associated power supply costs and power cost adjustment and FCA mechanisms, decreased operating income by $6.5 million in 2025 compared with 2024. During 2025, usage per customer decreased for most customer classes. Milder temperatures during the year reduced the demand for both space heating and air conditioning. This decrease was partially offset by an increase in irrigation usage per customer, as lower precipitation during the summer led irrigation customers to run irrigation pumps more frequently. Partially offsetting the revenue impact of decreased usage per customer, a decrease in the deferral of residential and small commercial customer revenues through the FCA mechanism positively impacted retail revenues by $6.8 million.
Read it in 10-K Feb 19, 2026 at sec.gov
AddedMD&A
Other O&M expenses in 2025 were $9.6 million higher than in 2024. This increase was primarily driven by inflationary pressures on labor-related costs, professional services, and increases in statutory fees assessed by regulators.
Read it in 10-K Feb 19, 2026 at sec.gov
RemovedMD&A
•Idaho Power reached new winter and summer peaks during 2024. Idaho Power's new winter peak demand of 2,719 MW and summer peak demand of 3,793 MW were reached on January 16, 2024 and July 22, 2024, respectively. The prior highest demand peaks were 2,604 MW and 3,751 MW, reached in December 2022 and June 2021, respectively.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
•In connection with its resource planning process, Idaho Power has updated the estimate of load growth that it intends to use for its 2025 IRP. While subject to adjustment, Idaho Power currently plans to use an 8.3 percent annual rate of growth in retail sales volumes over the 2025-2029 time period, representative of anticipated continued strong growth in Idaho Power's service area.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
customer was relatively flat for most customer classes, with irrigation customers representing an increase, as higher temperatures during the summer led irrigation customers to run irrigation pumps more frequently.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
Transmission wheeling-related revenues, net of PCA impacts, decreased $3.0 million during 2024 compared with 2023. Effective January 1, 2024, financial settlement of transmission line losses were subject to the PCA mechanism, as approved in the 2023 Settlement Stipulation, resulting in a smaller contribution of those revenues to net income compared with 2023 when the financial settlement of transmission losses was not subject to the PCA mechanism.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
Other O&M expenses in 2024 were $61.1 million higher than in 2023, primarily related to approximately $17.7 million of increased pension-related expenses and an approximate $29.5 million increase in wildfire mitigation program and related insurance expenses. Both of these increases were partially offset by increases in retail revenues, as more of those costs are now recovered in base rates pursuant to the 2023 Settlement Stipulation. Inflationary pressures on labor-related costs also contributed to the increase in other O&M expenses. These increases were partially offset by an $8.5 million increase in deferral of other O&M expenses related to the conversion from coal to natural gas for two units at the Jim Bridger plant.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
Non-operating expense, net, increased $2.2 million in 2024 compared with 2023. Interest expense on long-term debt increased in 2024 compared with 2023, due primarily to an increase in long-term debt balances. In addition, Idaho Power's earnings from its investment in BCC decreased due to a decrease in the amount included and recovered in base rates pursuant to the 2023 Settlement Stipulation. These increases were partially offset by an increase in AFUDC income in 2024 compared with 2023, as the average construction work in progress balance was higher. Additionally, interest income increased due to higher average cash balances and interest rates compared with 2023.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
Given the limited-scope nature of the filing Idaho Power made in 2024 and its ongoing infrastructure investment, Idaho Power believes it is likely that it will file a general rate case in Idaho during 2025, as early as May 2025.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
•Regulatory and Environmental Compliance Costs; Coal Plant Retirements: Idaho Power is subject to extensive federal and state laws, policies, and regulations, as well as regulatory actions and audits by agencies and quasi-governmental agencies, including the FERC, the North American Electric Reliability Corporation, and the Western Electricity Coordinating Council. Compliance with these requirements directly influences Idaho Power's operating environment and affects Idaho Power's operating costs. Moreover, environmental laws and regulations may increase the cost of constructing new facilities, may increase the cost of operating generation plants, may require that Idaho Power install additional pollution control devices at existing generating plants, may result in penalties for non-compliance, even where inadvertent, or may require that Idaho Power curtail or cease operating certain generation plants. Idaho Power expects to spend significant amounts on environmental compliance and controls for the foreseeable future. Due to economic factors in part associated with the costs of compliance with environmental regulation, Idaho Power accelerated the retirement date of its North Valmy plant, ceasing participation in coal-fired operations at one unit in 2019 and planning to cease its participation in coal-fired operations at the remaining unit by year-end 2025. Idaho Power's jointly-owned coal plant in Boardman, Oregon, ceased operations as planned in October 2020. In 2022, the IPUC approved Idaho Power's request to allow the coal-related assets at the Jim Bridger plant to be fully depreciated and recovered by end-of-year 2030. Idaho Power's 2023 IRP identified a preferred resource portfolio and action plan that included the conversion from coal to natural gas of two units at the Jim Bridger plant in 2024, the two units at the North Valmy plant in 2026, and the remaining two units at the Jim Bridger plant in 2030. Units 1 and 2 at the Jim Bridger plant were successfully converted to natural gas in the second quarter of 2024. In July 2024, Idaho Power executed an agreement with its co-owner to facilitate the planned conversion of the two units at the North Valmy plant from coal to natural gas by mid-2026.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
•Water Management and Relicensing of Hydropower Projects: Because of Idaho Power's reliance on stream flow in the Snake River and its tributaries, Idaho Power participates in numerous proceedings and venues that may affect its
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
water rights, seeking to preserve the long-term availability of its rights for its hydropower projects. Also, Idaho Power is involved in renewing its long-term federal licenses for the HCC, its largest hydropower generation source, and for American Falls, its second largest hydropower generation source. Given the number of parties involved, Idaho Power's relicensing costs have been and are expected to continue to be substantial. As of the date of this report, Idaho Power cannot determine the ultimate terms of, and costs associated with, any resulting long-term licenses for the HCC or American Falls hydroelectric facilities.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
Other Operations and Maintenance Expenses: Other O&M expenses increased $61.1 million in 2024 compared with 2023, primarily related to approximately $17.7 million of increased pension-related expenses and an approximate $29.5 million increase in wildfire mitigation program and related insurance expenses. Both of these increases were partially offset by increases in retail revenues, as more costs are now recovered in base rates pursuant to the 2023 Settlement Stipulation. Inflationary pressures on labor-related costs also contributed to the increase in other O&M expenses. These increases were partially offset by an $8.5 million increase in deferral of other O&M expenses related to the conversion from coal to natural gas for two units at the Jim Bridger plant.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
•changes in pension and postretirement benefits plan contributions and expenses combined to increase IDACORP and Idaho Power cash flows by $49 million, which was primarily due to the timing and amount of funding decisions and an increase in the amount of pension-related expenses approved for recovery in base rates pursuant to the 2023 Settlement Stipulation; and
Read it in 10-K Feb 20, 2025 at sec.gov
RewordedMD&A
December 31, 2025 December 31, 2024 December 31, 2023 IDACORP(2) IDACORP(1) Idaho Power IDACORP(2) IDACORP(1) Idaho Power Revolving credit facility $ 100,000 $ 400,000 $ 100,000 $ 400,000 Commercial paper outstanding — — — — Identified for other use(1) use(2) — (19,885) — — (19,885) Net balance available $ 100,000 $ 380,115 400,000 $ 100,000 $ 380,115 (1) American Falls bonds that Idaho Power could be required to purchase prior to maturity under the optional or mandatory purchase provisions of the bonds, if the remarketing agent for the bonds were unable to sell the bonds to third parties. Holding company only.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
December 31, 2024 December 31, 2023 IDACORP(2) Idaho Power IDACORP(2) Idaho Power Revolving credit facility $ 100,000 $ 400,000 $ 100,000 $ 400,000 Commercial paper outstanding — — — — Identified for other use(1) — (19,885) — (19,885) Net balance available $ 100,000 $ 380,115 $ 100,000 $ 380,115 (1) (2) American Falls bonds that Idaho Power could be have been required to purchase prior to maturity under the optional or mandatory purchase provisions of the bonds, if the remarketing agent for the bonds were unable to sell the bonds to third parties.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
Description Effective Date Estimated Annualized Rate Impact (millions)(1) (in millions of dollars)(1) 2025 Idaho general rate case 1/1/2026 $ 110.0 2025 Oregon rate adjustment 1/1/2026 (0.6) 2025 Idaho PCA 6/1/2025 (94.8) 2025 Idaho FCA 6/1/2025 (39.8) 2024 Idaho limited-issue rate case 1/1/2025 $ 50.1 2023 Oregon general rate case 10/15/2024 6.7 2024 Idaho PCA 6/1/2024 (35.7) 2024 Idaho FCA 6/1/2024 11.7 2023 Oregon general rate case 10/15/2024 6.7 2023 Idaho general rate case 1/1/2024 54.7 2023 Idaho PCA 6/1/2023 105.1 2023 Idaho FCA 6/1/2023 (10.1) (1) The annual amount collected or refunded in rates is typically not recovered or refunded on a linear basis (i.e., 1/12th per month), and is instead recovered or refunded in proportion to retail sales volumes.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
Net income attributable to IDACORP, Inc. - December 31, 2023 $261.2 2024 $289.2 Retail revenues per MWh, net of power cost adjustment and FCA mechanisms 52.7 49.6 Customer growth, net of associated power supply costs and power cost adjustment mechanisms 19.0 25.2 Usage per retail customer, net of associated power supply costs and power cost adjustment and FCA mechanisms 4.5 Transmission wheeling-related revenues, net of PCA mechanism impacts (3.0) (6.5) Other O&M expenses (61.1) (9.6) Depreciation and amortization expense (28.1) (27.7) Other changes in operating revenues and expenses, net 30.8 (3.8) Increase in Idaho Power operating income 14.8 27.2 Non-operating expense, net (2.2) (22.8) Additional ADITC amortization 29.8 10.5 Income tax expense, excluding additional ADITC amortization (18.6) 20.4 Total increase in Idaho Power net income 23.8 35.3 Other IDACORP changes (net of tax) 4.2 (1.0) Net income attributable to IDACORP, Inc. - December 31, 2024 $289.2 2025 $323.5
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
Customer rates, excluding revenues related to power cost adjustment mechanisms and net of FCA mechanism revenues, mechanisms, increased retail revenues by $52.7 $49.6 million in 2024 2025 compared with 2023, 2024, due primarily to the an overall increase in Idaho base rates, effective January 1, 2024, rate increase for 2025, from the outcome of the 2024 Idaho Power’s Idaho retail customers under the 2023 Settlement Stipulation. Limited-Issue Rate Case.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
Other changes in operating revenues These decreases were partially offset by recovery of costs of a new finance lease through Idaho Power's power cost adjustment mechanism rates and expenses, net, increased operating income by $30.8 million in 2024 compared to 2023, due partially to a decrease in net power supply expenses that were not deferred for future recovery in rates through Idaho Power's power cost adjustment mechanisms.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
The decreases changes were primarily due to income tax return adjustments for state taxes and plant-related flow-through items, and increased ADITC amortization at Idaho Power under its Idaho regulatory mechanism, described in Note 3 - “Regulatory Matters” to the consolidated financial statements included in this report, offset partially by an increase in income taxes due to higher income before income taxes. report.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
In addition, property taxes contributed to the increase from 2023 to Other changes in operating revenues and expenses, net, decreased operating income by $3.8 million in 2025 compared with 2024, due primarily to the successful conclusion of multi-year litigation efforts challenging Idaho and Oregon property tax valuations, which resulted in refunds of prior year taxes being finalized in 2024. 2024, which did not reoccur in 2025.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
In April 2018, Following Idaho Power's application, the IPUC issued an order in April 2018 approving a settlement stipulation signed by Idaho Power, among the IPUC staff, and a third-party intervenor parties recognizing that a total of $216.5 million in expenditures were reasonably incurred, and therefore prudently incurred and, therefore, should be eligible for inclusion in customer rates at in a later date. future rate proceeding.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
Depending Actual expenditures and their timing could deviate substantially from Idaho Power's expected expenditures depending on factors such as RFP results, the timing of project in-service dates, estimated load and resource balances and customer growth, the nature and quantity of resources owned versus acquired under PPAs or similar agreements, and the outcome of regulatory proceedings.
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
Idaho Power estimates that the annual costs it will incur to obtain a new long-term license for the HCC, license, including AFUDC but excluding costs expected to be incurred for complying with the license after issuance, are likely to post-issuance compliance cost, will range from $35 million to $45 million until issuance of the license. license is
Read it in 10-K Feb 19, 2026 at sec.gov
RewordedMD&A
On December 31, 2024, the IPUC issued its order (Order) in the 2024 Idaho Limited-Issued Rate Case, providing that The 2025 Settlement Stipulation provided for Idaho Power to implement revised tariff schedules designed to increase annual Idaho-jurisdictional retail revenue by $50.6 approximately $110.0 million, or 3.7 7.48 percent, effective January 1, 2025. 2026.
Read it in 10-K Feb 19, 2026 at sec.gov
Quiet changesMD&A
In March 2023, PacifiCorp initiated the pre-construction phase of approximately 620 miles of 500-kV transmission line from the Populus substation near Downey, Idaho, to the Hemingway substation near Boise, Idaho.
Read it in 10-K Feb 19, 2026 at sec.gov

Sources

The two latest 10-Ks on EDGAR, section by section. Each change links to the text at sec.gov.

Also

New risk factors: paragraphs with nothing like them last year, quoted in full.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/IDA/export.csv") into a cell.

Next:Related parties
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.