Screener / SEC EDGAR /CIK 0001878848 /10-K filed Aug 27, 2026, compared with Aug 28, 2025 /Numbers from the XBRL of the 10-Ks
Nasdaq Financials · Financial Services

IREN Ltd IREN

Compare with peers Embed
The 10-K against last year's

696 changes: 217 added, 184 removed, 288 reworded, 7 quiet changes

10-K Aug 27, 2026 vs Aug 28, 2025

10-K 0001878848-26-000052 (Aug 27, 2026) vs 10-K 0001878848-25-000063 (Aug 28, 2025)

Every paragraph, and how much of it changed

One bar per paragraph, in the order of the 10-K. Height and colour show the share of its words not in the closest paragraph a year earlier; the tallest bars are new paragraphs.

Risk Factors

531 paragraphs · 150 new · 212 reworded · 120 gone · 10-K Aug 27, 2026 against Aug 28, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 27 · 50% changed Every version of it
Expansion The continued expansion of our HPC and AI services could increase Cloud Services business exposes us to evolving competitive, operational, legal and regulatory risks to our business in ways we cannot predict. risks, including emerging regulation of artificial intelligence.
Paragraph 199 · 50% changed Every version of it
The potential physical impacts of climate change on our properties and operations are highly uncertain and would be particular to vary with the geographic circumstances in of the areas in which we operate. operate, and could lead to damage to equipment, power supply disruptions, project delays, and other interruptions that could harm our business and subject us to substantial costs. These may include natural disasters and extreme weather events (including extreme heat), changes in rainfall and storm patterns and intensities, water shortages, changing sea levels and changing temperatures. Natural disasters and other weather-related events have increased in severity in recent years and may become more frequent, such as the 2025 Canadian wildfires, which continue to rise during a dry, hot summer. In addition, Texas has experienced devastating flooding and numerous power outages as a result of severe storms and hurricanes. The increased prevalence of natural disasters and other impacts attributable to climate change may materially and adversely impact the cost of production, operational efficiency and financial performance of our operations. Further, any impacts to our business and financial condition as a result of climate change are likely to occur over a sustained period of time and are therefore difficult to quantify with any degree of specificity. For example, extreme weather events may result including wildfires in adverse physical effects on portions of our infrastructure, which could impact the operational efficiency of our assets or disrupt our supply chain and ultimately our business operations. In addition, disruption of transportation, power and distribution systems could result in delays to potential expansion plans, additional costs or reduced operational efficiency. British Columbia
Paragraph 23 · 49% changed Every version of it
We may seek to raise additional capital through future offerings of debt securities (including potentially convertible debt securities), which would rank senior to our Ordinary shares upon our bankruptcy debt, equity or liquidation, and future offerings of equity securities, which may be senior to our Ordinary shares for the purposes of dividend and liquidating distributions. An issuance of additional equity equity-linked securities or securities with a right to convert into equity, such as convertible bonds or warrant bonds, other financing arrangements, which could adversely affect the market price of our Ordinary shares and would shares, dilute the economic and voting interests of shareholders. We may be required our shareholders, rank senior to accept our Ordinary shares and subject us to terms that restrict our ability to incur additional indebtedness or to take other actions including terms that require us to maintain specified liquidity or other ratios that could otherwise business operations, and such financing may not be in the interests of our shareholders. As the timing and nature of any future offering would depend available on market conditions and other factors beyond our control, it is not possible to predict or estimate the amount, timing, or nature of future offerings. favorable terms, if at all.
Paragraph 224 · 49% changed Every version of it
•our products or solutions •the GPUs, networking and storage equipment we deploy, and the cluster architectures and software on which our services rely, may become obsolete due to rapid advancements in technology and changes in consumer customer requirements and preferences; and
Paragraph 278 · 49% changed Every version of it
We currently transfer rely on banks, financial institutions, insurance providers, digital asset trading platforms, over-the-counter (“OTC”) (i.e. non-exchange) trading desks and custodians in connection with our remaining Bitcoin mining operations, including the daily liquidation of mined Bitcoin. We generally sell the Bitcoin we mine to Kraken on a daily basis, which is then exchanged for fiat currency on the Kraken exchange or currently via its OTC Kraken, with Coinbase onboarded as an alternative digital asset trading desk on a daily basis. We platform, and we currently aim to withdraw fiat currency proceeds from Kraken on a daily basis, utilizing Etana Custody, a third-party custodian, to facilitate the transfer of such proceeds to one or more of our banks or other financial institutions. We have onboarded Coinbase as an alternative digital asset trading platform to liquidate However, pending liquidation or withdrawal, any Bitcoin that we mine, although we have not utilized the Coinbase platform as of June 30, 2025. If Kraken, Coinbase, Etana Custody or any such other fiat currency held with a digital asset trading platform or custodian suffers excessive redemptions or withdrawals is exposed to security incidents, insolvency, suspension of digital assets or fiat currencies, or suspends redemptions or withdrawals of digital assets or fiat currencies, as applicable, any Bitcoin we have transferred to such platform that has not yet been exchanged for fiat currency, as well as any fiat currency that we have not yet withdrawn, as applicable, would be at risk. See “—Digital asset trading platforms for Bitcoin may be subject to varying levels of regulation, which exposes our digital asset holdings to risks.”
Paragraph 313 · 48% changed Every version of it
It is also unclear how our status as an infrastructure provider for customers developing and deploying AI/ML applications, as opposed to developing such applications ourselves, will affect the applicability of these If we violate existing or proposed AI regulatory frameworks and other restrictions with respect regimes or use our infrastructure services for unlawful or noncompliant purposes, we could be subject to any HPC and AI services we may offer from time to time. However, it regulatory investigations, fines, reputational damage, or contractual liability. It is possible that such regimes regulatory frameworks will impose obligations on infrastructure providers, such as us, providers to oversee, monitor monitor, or restrict the use of AI systems that are trained or deployed on their systems, and/or to ensure data center or AI platforms. The costs of compliance with such regulatory frameworks multiple evolving laws, rules, and other restrictions. If regulations from different jurisdictions related to AI could increase our customers violate existing cost of doing business or proposed regulatory regimes or other restrictions, or if they use our services for unlawful, harmful or non-compliant purposes, require us to change how we could be subject to regulatory investigations, regulatory fines, reputational damage or contractual liability for any such actions, even if we do not control the customer applications. Further, HPC and AI services customers increasingly are looking to pass through their regulatory obligations and other liabilities to their outsourced data center providers, and we may not be able to limit our liability or damages operate in an event of loss suffered by such customers whether as a result of our breach of an agreement or otherwise. certain jurisdictions.
Paragraph 140 · 46% changed Every version of it
Any These developments demonstrate that potential policy-driven actions and future actions by Governments, or the issuance of any new legislation, government orders or regulations, may reduce the availability and/or increase the cost of electricity in the geographic locations in which our operating facilities are located or desired to be located, and could have a materially adverse impact on our business. See also “—Risks Related to Our Business—Any electricity outage, non-supply or limitation of electricity supply, including as a result of political pressures or regulations, or increase in electricity costs may result in material impacts to our operations and financial performance. performance.”
Paragraph 99 · 45% changed Every version of it
raise the cost of acquiring the relevant equipment and potential increases in civil claims against us deploying our AI Cloud Services and could materially and adversely affect our business, financial condition and results of operations.

MD&A

139 paragraphs · 67 new · 59 reworded · 64 gone · 10-K Aug 27, 2026 against Aug 28, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 81 · 49% changed
information. Pursuant On March 4, 2026, the Company filed a new prospectus supplement superseding and replacing the previously filed prospectus supplement relating to the amended and restated Sales Agreement, we may offer and sell our sale of up to $6.0 billion of its Ordinary shares from time to time in an amount not to exceed the lesser of the amount registered on an effective registration statement and for which we have filed a prospectus, and the amount authorized from time to time to be issued and sold under the Sales Agreement by the Board. We may increase the amount of our Ordinary shares that may be sold from time to time pursuant to the Sales Agreement in accordance with the terms of the Sales Agreement. As of August 15, 2025, we had 14, 2026, the Company has issued 57,542,602 47,165,838 Ordinary shares under the Sales Agreement new prospectus supplement at varying prices generating an aggregate of $635.1 million approximately $2.5 billion in gross proceeds, and we have $364.9 million remaining available for sale under our prospectus supplement relating to the Sales Agreement and related registration statement. proceeds. The total number of Ordinary shares outstanding as of August 14, 2026, was 394,058,648.
Paragraph 101 · 48% changed
As noted above, on In August 23, 2025 we entered into an arrangement pursuant to which we 2025, the Group secured approximately $102 million in financing for the prior purchase of approximately 1.0k NVIDIA B200 GPUs and 1.2k NVIDIA B300 GPU’s. The financing is structured as under a 36-month lease for 100% of the purchase price of the GPUs, with fixed monthly lease payments of $2.8 million. The financing structure incorporates payments, and a fair market value purchase option which, at the sole discretion of the Company upon maturity of the 36-month term, allows for the acquisition of the GPU’s at the lower of its prevailing fair market value and 18% of the initial purchase cost of price. The Group also secured approximately $102 million. $96 million under a 24-month lease with fixed monthly payments, and a $1 purchase option at maturity.
Paragraph 64 · 47% changed
Finance expense Other operating expenses for the years ended June 30, 2026 and 2025 and 2024 was $11.0 were $15.2 million and $0.1 $13.3 million, respectively. The respectively, an increase was primarily related to interest expense on the convertible notes issued during of $1.9 million. During the year ended June 30, 2025. 2026, other operating expenses primarily comprised $10.9 million of transaction costs associated with capped call transactions entered into in connection with the issuance of convertible notes and $4.2 million of professional fees related to business acquisitions.
Paragraph 102 · 47% changed
Gain on partial extinguishment In November 2025, the Group further secured approximately $200 million to finance a portion of financial liabilities for the years ended June 30, 2025 Group’s GPU orders under a 24-month lease with fixed monthly payments, and 2024 was $9.1 million and nil, respectively. The gain was primarily related to a supplemental agreement with Bitmain, which decreased the amount due under existing $1 purchase option arrangements for mining hardware. at maturity. See Note 14 of 22. Finance leases to the audited consolidated financial statements included in this Annual Report on Form 10-K for further information.
Paragraph 114 · 46% changed
As of June 30, 2025, 2026, the Group had commitments of $368.8 $13,810.0 million, as compared to $194.6 $368.8 million as of June 30, 2024. The increase in total 2025. These commitments was primarily due to an increase in commitments related to our expansion into HPC and AI services and includes include committed capital expenditure on computer AI hardware and infrastructure related to site development at Horizon 1 at the Childress site and the Sweetwater 1 data center site. The commitments set forth above do not reflect commitments related to hardware purchase agreements entered into after June 30, 2025 as described under “—Hardware Purchase Contracts” above. development.
Paragraph 48 · 46% changed
(4)Impairment (1)Debt conversion inducement expense of assets $111.8 million for the year ended June 30, 2025, 2024 and 2023 was $7.2 million, nil and $105.2 million, respectively. 2026. See “—Results “Results of Operations—Comparison of the years ended June 30, 2026 and 2025 and 2024—Impairment of assets” and “—Results of Operations—Comparison of the years ended June 30, 2024 and 2023—Impairment of assets” —Debt conversion inducement expense” for further information. information on Debt conversion inducement expense.
Paragraph 65 · 46% changed
Other operating expenses for During the years year ended June 30, 2025 and 2024 was $13.3 2025, other operating expenses primarily comprised $5.8 million and $8.1 million, respectively. This increase was primarily due to the recognition of a net loss contingency expense, which included a $20.0 million provision related to the NYDIG settlement of $20 million, settlement, partially offset by the release reversal of the a $13.4 million loss contingency related to the Goods and Services Tax (“GST”) appeal with the CRA. Other operating expenses also included $4.2 million of transaction costs associated with capped call transactions entered into in connection with the issuance of convertible notes and a $1.7 million loss arising from the theft of mining hardware while in transit.
Paragraph 75 · 45% changed
Income tax (provision) (expense) benefit for the years ended June 30, 2026 and 2025 was a benefit of $6.1 million and 2024 was an expense of $(6.6) million and $(3.5) million, respectively. The year-over-year increase change was primarily driven primarily by higher the loss before income taxes for the year ended June 30, 2026, changes in valuation allowances recorded against certain deferred tax expense from accelerated tax depreciation on mining hardware, along with additional provisions for uncertain tax positions assets, and higher non-recoverable withholding taxes in certain jurisdictions. permanent book-to-tax differences, including non-deductible share-based compensation expense, partially offset by non-taxable items.

A paragraph is matched with the one last year that shares the most of its words; under half in common makes it new. The paragraphs shown are the 8 reworded the most in each section.

The paragraph that changed most in each section

The redline

Marked against last year's 10-K: cut words struck through, new words highlighted.

Risk Factors366 words changed in this paragraph; it is 52% similar to last year's version.
We target markets with high levels of renewable lower-carbon energy penetration and procure and retire certified renewable energy certificates equivalent to 100% of our energy is sourced from clean or renewable sources and through the purchase of RECs. purchased electricity. Regulatory constraints placed on energy-intensive industries may restrict or ban the operation of, or increase the cost of operating, data centers and Bitcoin mining or HPC and AI services. Cloud Services. Governmental authorities have pursued and may continue to pursue and implement legislation and regulation that seeks to limit the amount of greenhouse gas produced from electricity generation, which could adversely affect the cost, availability and reliability of the grid electricity on which our ability to source data centers rely, including electricity generated from fossil fuel-fired electric generation fuels, in a potentially material manner. manner, and could intensify competition for renewable energy supply. Potential increases in costs arising from compliance and environmental monitoring may adversely affect our operations and financial performance, as well as our ability to maintain continue procuring and retiring RECs equivalent to 100% of our strategy of striving to power our operations with 100% renewable energy, including through the purchase of RECs. purchased electricity. Additionally, we rely on the purchase of purchased RECs for to match 100% of our renewable energy purchased electricity in Texas, Texas and British Columbia, all of which we purchase acquire through RECs brokers. In British Columbia, we rely on the purchase of RECs for approximately 2% of our renewable energy, all of which is purchased from RECs brokers. If our existing REC brokers were to stop selling RECs to us or otherwise limit the sale thereof, we would have to incur additional expense and resources to obtain sufficient RECs to maintain 100% renewable energy sources matching across our operations, particularly in Texas, where we rely on the purchase of RECs for 100% of our renewable energy, and the cost of purchasing RECs from other sources may be higher. higher, particularly as demand for renewable energy attributes grows, including from other data center operators. More broadly, growing demand for renewable energy driven by the rapid expansion of data centers and AI infrastructure, combined with corporate sustainability commitments across industries, may strain the available supply of RECs and renewable energy in the markets where we operate, which could result in increased costs or reduced availability. If we are unable to procure RECs from an alternative source on acceptable terms or at all, our business, results of operations and financial condition could be adversely impacted. See also ““—Risks Related impacted, including our ability to Our Business—Any meet sustainability requirements under certain customer contracts. Evolving customer sustainability requirements, including carbon-free electricity outage, non-supply or limitation standards, may not be satisfied by our current certificate-based procurement and could require alternative forms of electricity supply, including as a result of political pressures or regulations, or increase in electricity costs may result in material impacts to our operations and financial performance,” “—Bitcoin mining and HPC and AI services are energy-intensive, which may restrict the geographic locations of our operations, in particular, to locations with renewable sources of power,” and “—Government regulators and utilities may potentially restrict the ability of electricity suppliers to provide electricity to Bitcoin miners or HPC and AI service providers, including us, or Bitcoin mining or HPC and AI services generally.” energy procurement at materially higher cost.

Source: Item 1A, 10-K 0001878848-26-000052 vs Item 1A, 10-K 0001878848-25-000063

MD&A216 words changed in this paragraph; it is 34% similar to last year's version.
Our primary cash requirements have been for capital needs to support capital expenditure for the development and construction of our data center platform, and the purchase of GPUs, as well as investments in growth and development initiatives. We are a capital-intensive business that requires significant funding. Our liquidity outlook could be adversely affected by events that materially reduce our access to the capital markets or impair our production capabilities, including, but not limited to to, our ability to maintain our existing operations, failure to effectively execute our growth strategies, falling GPU rental rates, counterparty risks for AI Cloud Services contracts, broader deteriorating macroeconomic conditions, the regulatory and sociopolitical environment related to data center development, the impact of Bitcoin halving events, and significant increases in electricity costs not accompanied by corresponding increases costs. Furthermore, we have generated significant negative cash flows from investing activities as we continue to support the growth of our AI Cloud Services segment. As part of this strategy, we are transitioning our British Columbia and Childress sites to support AI Cloud Services, while continuing to advance development and expansion initiatives across our broader data center portfolio. We anticipate making significant investments for the foreseeable future, including capital requirements associated with our agreement with Microsoft announced in November 2025 (the “Microsoft Agreement”), as well as GPU acquisitions and the price development of Bitcoin, additional data center capacity. We also expect to continue progressing development activities at other sites to support this transition and broader deteriorating macroeconomic conditions. growth plan. We expect these and other planned investments to require substantial additional capital to support the continued expansion in this segment.

Source: Item 7, 10-K 0001878848-26-000052 vs Item 7, 10-K 0001878848-25-000063

Accounting Policies110 words changed in this paragraph; it is 33% similar to last year's version.
the Group’s The CODM evaluates performance and allocates resources primarily using segment gross profit (loss), which is defined as segment revenue less segment cost of revenue (exclusive of depreciation and amortization expenses). The CODM is not provided with segment-specific operating expenses beyond cost of revenue; all other expenses are managed on a consolidated basis, basis. Accordingly, the only expense category included in segment gross profit (loss) is cost of revenue, as presented on there are no other segment items for the Consolidated Statements of Operations and Comprehensive Income (Loss). reportable segments. The Group’s CODM does not evaluate operating segments using performance or allocate resources based on segment asset or liability information nor are there any other performance metrics or measures used to monitor the operations. information. Refer to Note 8. 3. Segment information for further information regarding entity-wide disclosures.

Source: Item 8, Note 2 – Basis of presentation, summary of significant accounting policies and recent accounting pronouncements, 10-K 0001878848-26-000052 vs Item 8, Note 2 – Basis of presentation, summary of significant accounting policies and recent accounting pronouncements, 10-K 0001878848-25-000063

Legal Proceedings82 words changed in this paragraph; it is 45% similar to last year's version.
On August 12, 2025, the Company, the Non-Recourse SPVs, NYDIG, PwC and the Local Representatives entered into a settlement agreement (the “Settlement Agreement”) to fully resolve and terminate all existing and future claims between them arising from the Facilities and the Australian Recognition Proceedings, Canadian Bankruptcy Proceedings and Canadian Receivership Proceeding. Absent a settlement, the Company believes that NYDIG, the Receiver and the Local Representatives would likely have sought to commence additional proceedings and/or bring additional claims against the Company and its affiliates, subsidiaries, directors, officers and shareholders, which would have resulted in, among other things, further litigation, additional legal and other costs, damage to the Company’s reputation and further diversion of management’s attention and resources.

Source: Item 3, 10-K 0001878848-26-000052 vs Item 3, 10-K 0001878848-25-000063

Sentences and paragraphs added, removed or reworded

Every change, by type

Sentences and paragraphs of IREN's Risk Factors and MD&A, 10-K Aug 27, 2026 against 10-K Aug 28, 2025. Each links to the text at sec.gov.

Quiet changes are sentences kept from last year with one to four words changed, at least one of them a hedge, a modal or a qualifier (may, could, will, not, significant, material…). A year or date rolling forward is not counted.

The full word list

adverse, adversely, all, although, anticipate, anticipates, any, approximately, believe, believes, can, cannot, certain, could, expect, expects, generally, however, if, intend, intends, largely, likely, many, material, materially, may, might, most, must, never, no, not, possible, primarily, probable, should, significant, significantly, some, substantial, substantially, unlikely, will, would

AddedRisk Factors
Our business has grown rapidly since our inception. Our business model, which was previously focused on monetizing our data center capacity through Bitcoin mining, has also significantly evolved, and we expect it to continue to do so in the future. During the year ended June 30, 2026, we commenced decommissioning Bitcoin mining hardware and reallocating power and data center capacity toward AI Cloud Services. We aim to substantially complete this transition by December 31, 2026.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedRisk Factors
In addition, we will also need to raise additional capital to fund additional construction at existing or new sites, to develop new sites to increase our data center capacity, and to fund the purchase of additional equipment to increase our operating capacity, continue our development of AI Cloud Services and potentially expand into new markets. In particular, constructing data center facilities for AI Cloud Services requires significant capital expenditures when compared to capital expenditures for Bitcoin mining data center facilities, which was our prior focus. During the fiscal year ended June 30, 2026, we entered into GPU purchase agreements and customer contracts requiring substantial additional capital expenditures, and we expect our capital requirements to remain substantial as we deliver contracted AI Cloud Services capacity and continue to develop our site pipeline. We may experience difficulties with infrastructure development or modification, engineering, or design, which could in the future result in excessive capital expenditures and significant delays. Our efforts to construct and operate data centers may prove more expensive than we currently anticipate and may not result in increased revenue or profitability in the short term or at all.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedRisk Factors
may not be adopted by the market, be profitable, or be viable. Our shorter operating history in AI Cloud Services relative to some competitors could make it more difficult to execute on this growth strategy or adapt to market changes. If we are unsuccessful in continuing to develop and offer AI Cloud Services, our business, results of operations and financial condition could be adversely affected.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedRisk Factors
The target market for our AI Cloud Services is competitive, and competition may intensify with expanding and changing product and service offerings, industry standards, customer and market needs, new entrants and consolidations. Our competitors’ products, services and technologies may be cheaper or provide better functionality or features than ours, which has resulted and may in the future result in lower-than-expected selling prices or demand for our products. Some of our competitors have longer operating histories, larger customer bases, more comprehensive IP portfolios and patent protections, more design wins, and greater financial, sales, marketing and distribution resources than we do. These competitors may be able to acquire market share and/or prevent us from doing so, more effectively identify and capitalize upon opportunities in new markets and end-user trends, more quickly transition their products, and impinge on our ability to procure scarce input materials during a supply-constrained environment, which could harm our business. Some of our customers have in-house expertise and internal development capabilities similar to or more advanced than some of ours and can use or develop their own solutions to replace those we are providing. If we are unable to successfully compete in this environment, demand for our products, services and technologies could decrease, which may negatively impact our business.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedRisk Factors
Our financial outlook and projections, including annualized-run-rate revenue and estimated capital expenditures, are based on various assumptions regarding energy and consumption costs, our ability to secure necessary agreements, the successful deployment of new capacity, market demand for our services, and estimates of construction, equipment, financing and other costs associated with the development, construction and commissioning of our facilities to provide AI Cloud Services. These assumptions are inherently uncertain and subject to numerous business, economic, regulatory, and competitive risks and uncertainties that could cause actual results to differ materially from our expectations. Our actual annualized-run-rate revenue and capital expenditures may differ materially from our current projections.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedRisk Factors
Changes in political and geopolitical conditions may be difficult to predict and may adversely affect our business, prospects, operations and financial performance. For example, changes in political and geopolitical conditions may lead to
Read it in 10-K Aug 27, 2026 at sec.gov
Show the other 71
AddedRisk Factors
There is currently significant uncertainty about the future relationship between the United States and its trading partners with respect to trade policies, tariffs, and similar policies affecting cross-border operations. The U.S. Government has made and continues to make significant changes in U.S. trade policy, specifically tariffs, and may continue to take future actions that could negatively impact our business, including escalating tariffs on the import of goods from U.S. trading partners. Between February 24, 2026 and July 24, 2026, the U.S. government also implemented a global “temporary import surcharge” of 10% on many products, under authorities provided for in Section 122 of the Trade Act of 1974. Upon expiration of the Section 122 temporary import surcharge on July 24, 2026, the U.S. government implemented tariffs of up to 10% or 12.5% on imported commodities from 60 U.S. trading partners, with certain items excepted, under authorities provided under Section 301 of the Trade Act of 1974, following a determination by the U.S. Trade Representative that these trading partners have insufficiently implemented or enforced forced labor laws. Other tariffs, taxes, or trade barriers could be imposed by the U.S. on its trading partners, and those trading partners may impose retaliatory tariffs, taxes, or other trade barriers on the U.S. The U.S. Government has also implemented Section 232 tariffs on various items based on a finding that certain imports threaten to impair U.S. national security, including but not limited to certain articles of steel and aluminum; passenger vehicles, trucks, and automotive components; and articles of copper. The U.S. Government has also imposed, increased, or maintained additional Section 301 tariffs of 7.5%-100% on certain commodities from China. The scope of these tariffs and exclusions is subject to change. Additional trade-related investigations by the U.S. government are in progress and could result in the imposition of additional tariffs, including under Sections 232, 301, 122, and 338.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedRisk Factors
The recent changes in tariff and trade policy underscore the uncertainty regarding the future relationships between the United States and its trading partners. In response to these and other U.S. trade measures, China, Canada, and other affected countries have taken or threatened to take retaliatory actions to respond. Such actions include the imposition of retaliatory tariffs on imports of products of U.S. origin, the imposition of export controls on a wide array of products (including rare earth metals and other critical minerals), as well as other actions. The adoption of retaliatory actions by targeted countries has prompted and could prompt the United States to further increase its tariff measures, and continued escalation of tariffs and trade measures could result in the outbreak of a trade war. The trade and tariff policies of the United States and other countries are currently fluid and subject to further changes.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedRisk Factors
Further, the U.S. Customs and Border Protection or other governmental agencies can dispute the origin of any imports into the U.S., which could in turn result in the imposition of higher tariffs than we previously paid or anticipated with
Read it in 10-K Aug 27, 2026 at sec.gov
RemovedRisk Factors
We began Bitcoin mining in 2019, and our business has grown rapidly since our inception. Our business model has also significantly evolved, and we expect it to continue to do so in the future. As digital assets become more widely available, we expect their services and products to continue to evolve, and we expect that our business model will also need to evolve in order to stay current with the digital asset industry.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedRisk Factors
conditions or otherwise, it could result in reduced customer orders, early order cancellations, the loss of customers, or decreased sales, any of which would adversely affect our business, results of operations and financial condition.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedRisk Factors
As we continue to enter into new markets for HPC and AI services, competitive, operational, legal and regulatory risks may be exacerbated as there is substantial uncertainty about the extent to which artificial intelligence will result in changes that come with risks that we may not be able to anticipate, prevent, mitigate or remediate.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedRisk Factors
imposition of tariffs, surcharges and other similar import or export duties, or trade restrictions including tariff rate quotas, as well as by uncertainty with respect to the potential for such changes.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedRisk Factors
expand into new markets. In particular, constructing data center facilities for HPC and AI services requires significant capital expenditures when compared to capital expenditures for Bitcoin mining data center facilities.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedRisk Factors
As of June 30, 2025, excluding our intercompany indebtedness and liabilities, we had $990 million principal amount of outstanding indebtedness (consisting of $400 million aggregate principal amount of 3.5% convertible senior notes and $500 million aggregate principal amount of 3.25% convertible senior notes due 2029 issued in December 2024 and June 2025, respectively), and approximately $144.1 million of trade and other payables. We have also entered into equipment leasing arrangements with respect to certain GPUs following June 30, 2025 as described under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation—Liquidity and Capital Resources—Equipment Leasing
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedRisk Factors
We have entered into a settlement agreement to terminate and release all claims relating to legal proceedings involving certain of our wholly-owned subsidiaries that previously defaulted on limited recourse equipment financing agreements, noting there can be no assurance as to timing of the final termination of such proceedings.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedRisk Factors
We previously entered into three limited recourse equipment financing facilities (the “Facilities”) through three separate wholly-owned, non-recourse special purpose vehicles of the Company (the “Non-Recourse SPVs”), pursuant to which certain lending entities of New York Digital Investment Group LLC (“NYDIG”) agreed to finance part of the purchase price of certain Bitcoin miners. We announced in November 2022 that the miners owned by two such Non-
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedRisk Factors
Recourse SPVs that secure their respective Facilities produce insufficient cash flow to service their respective debt financing obligations. On November 4, 2022, the Non-Recourse SPVs received notices of defaults under which the lender claimed there was aggregate outstanding indebtedness of approximately $107.8 million (including accrued interest and late fees), which had been declared immediately due and payable. Following receipt of such notices, the approximately 3.6 EH/s of miners owned by such Non-Recourse SPVs ceased operating, which materially reduced our hashrate capacity at that time.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedRisk Factors
While one such Facility was repaid in full in December 2022, the lender under the remaining two Facilities commenced steps to enforce the indebtedness and their asserted rights in the collateral securing such Facilities, and appointed PricewaterhouseCoopers Inc. (“PwC”) as receiver (the “Receiver”) in respect of the applicable Non-Recourse SPVs in February 2023. On June 28, 2023, the Receiver filed an assignment in bankruptcy on behalf of such Non-Recourse SPVs and was appointed as trustee (the “Trustee”). As a result, certain Australian Recognition Proceedings, Canadian Bankruptcy Proceedings and Canadian Receivership Proceedings (each, as defined and in “Item 3. Legal Proceedings”) were commenced against us and/or certain of our affiliates (including the Non-Recourse SPVs). On August 12, 2025, we entered into a settlement agreement with NYDIG, PwC, the Non-Recourse SPVs, and the Local Representatives (as defined and in “Item 3. Legal Proceedings”) to fully resolve and terminate all such proceedings and release all related claims, pursuant to which we have agreed to pay a settlement amount to NYDIG, of which $18.2 million exceeds amounts previously accrued by the Company with respect to such matters. Absent a settlement, the Company believes that NYDIG, the Receiver and the Local Representatives would likely have sought to commence additional proceedings and/or bring additional claims against the Company and its affiliates, subsidiaries, directors, officers and shareholders, which would have resulted in, among other things, further litigation, additional legal and other costs, damage to the Company’s reputation and further diversion of management’s attention and resources. See “Item 3. Legal Proceedings” and Notes 16 and 24 to our audited financial statements for the year ended June 30, 2025 included in this Annual Report on Form 10-K for further information.
Read it in 10-K Aug 28, 2025 at sec.gov
RewordedRisk Factors
For example, under certain types of arrangements for HPC and AI services, such as for Colocation Services, customers increasingly are looking to pass through their regulatory obligations and other liabilities to their outsourced data center providers and we may not be able to limit our liability or damages in an event of loss suffered such customers whether as a result of our breach of an agreement or otherwise.If If such an event of loss occurred, we could be liable for material monetary damages and could incur significant legal fees in defending against such an action, which could adversely affect our financial condition and results of operations.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
Because each Each B Class share is entitled to fifteen votes for every Ordinary share held by the holder of such B Class share, the holders of our B Class shares collectively could control a majority of the combined voting power of our shares and therefore be able to control matters submitted to our shareholders for approval until the redemption of the B Class shares by the Company on the earlier of (i) when the individual founder associated with the holder ceases to be a director due to voluntary retirement; retirement, (ii) an unremedied transfer of B Class shares in breach of our Constitution, (iii) liquidation or winding up of the Company, or (iv) November 17, 2033.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
There are a limited number of digital asset mining and HPC and AI services equipment suppliers in the market today, and the market price and availability of equipment can be volatile based on market supply and demand dynamics, and given Given the long production period to manufacture and assemble hardware and exposure to potential shortages in global semiconductor chip supply, there can we may be no assurance that we can unable to acquire enough hardware or replacement parts on a cost-effective basis, or at all, to meet our obligations under customer contracts or for the ongoing maintenance and expansion of our operations.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
However, if anything were to happen that would cause us to be deemed to be an investment company under the 1940 Act, requirements imposed by the 1940 Act, including limitations on our capital structure, ability to transact business with affiliates, ability to compensate key employees, and our ability to raise money in the U.S. capital markets and from U.S. lenders or to have our shares listed on a U.S. stock exchange, could make it impractical for us to continue our business as currently conducted and/or impair the agreements and arrangements between and among us and our senior management team.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
We may be unable to raise the required capital as a result of the risks described under “—We “Our business is capital intensive, we expect to continue to incur substantial capital expenditures to acquire, maintain and upgrade our hardware over time, to acquire and construct data center facilities, and to grow our business, and we may be unable to raise additional capital needed to fulfill our capital or liquidity needs or needs, grow our business and business, or achieve expansion plans.” our goals.”
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
However, if anything were to happen that would cause us to be deemed to be an investment company under the 1940 Act, requirements imposed by the 1940 Act, including limitations on our capital structure, ability to transact business with affiliates, ability to compensate key employees, and our ability to raise money in the U.S. capital markets and from U.S. lenders or to have our shares listed on a U.S. stock exchange, could make it impractical for us to continue our business as currently conducted and/or impair the agreements and arrangements between and among us and our senior management team.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
For example, in July 2020, the Court of Justice of the EU (“CJEU”) limited how organizations could lawfully transfer personal data from the EEA to the United States by invalidating the EU-US Privacy Shield (under which personal data could be transferred from the EU to United States entities that had self-certified under the Privacy Shield scheme) and imposing further restrictions on use of the standard contractual clauses (a standard form of contract approved by the European Commission as an adequate personal data transfer mechanism, and potential alternative to the Privacy Shield).
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
See “—Bitcoin mining and HPC and AI services “—AI Cloud Services are energy-intensive, which may restrict the geographic locations of our operations, in particular, to locations with renewable sources of power,” and “—Government regulators and utilities may potentially restrict the ability of electricity suppliers to provide electricity to Bitcoin miners or HPC and AI service providers, including us, or Bitcoin mining or HPC and AI services generally.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
There can be no assurance that we will We may not succeed in establishing and maintaining or expanding a customer base for our HPC and AI services Cloud Services business, that we will may not be successful in generating a recurring stream of revenue from that business or whether we can and may not be able to provide the right combination of HPC and AI services. Cloud Services.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
Congress and a number of U.S. federal and state agencies (including FinCEN, OFAC, SEC, CFTC, FINRA, the Consumer Financial Protection Bureau (“CFPB”), the Department of Justice, the Department of Homeland Security, the Federal Bureau of Investigation, the CFPB, DOJ, DHS, FBI, IRS, the Office of the Comptroller of the Currency, the Federal Deposit Insurance Corporation, OCC, FDIC, the Federal Reserve and state financial institution and securities regulators) have been examining the operations of digital asset networks, digital asset users and the Digital Asset Markets, with particular focus on the extent to which digital assets can be used to launder the proceeds of illegal activities, evade sanctions, or fund criminal or terrorist enterprises and the safety and soundness of trading platforms and other service providers that hold or custody digital assets for users.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
While this suspension and amendment have not impacted our existing operations to date, these events demonstrate the The policy-driven actions by Governments, or the issuance of any new legislation, government orders or regulations, may reduce the availability and/or increase the cost of electricity in the geographic locations in which our operating facilities are located or desired to be located, or could otherwise adversely impact our business.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedRisk Factors
Even if we were are able to procure equipment, we may encounter delays and incur added costs as a result of the time it takes to negotiate terms and install new hardware, the pricing, delivery schedule and other terms of any such alternative source may be less favorable, and there can be no assurance that we will may not be able to procure necessary hardware at commercially acceptable prices or at all in order to implement meet our business strategy which includes expanding obligations under customer contracts, remain competitive and diversifying to pursue our revenue sources by offering HPC and AI services or otherwise. growth strategies.
Read it in 10-K Aug 27, 2026 at sec.gov
Quiet changesRisk Factors
We may enter into additional equipment leasing agreements or other equipment financing arrangements from time to time, and may expect to incur additional indebtedness to meet future financing needs.
Read it in 10-K Aug 27, 2026 at sec.gov
Quiet changesRisk Factors
Accordingly, our business, financial conditions, results of operations and prospects may be subject, to a significant an extent, to economic, political and legal developments in China.
Read it in 10-K Aug 27, 2026 at sec.gov
Quiet changesRisk Factors
The amount number of any equity securities issued in connection with an investment or acquisition could constitute a material portion of our then-outstanding Ordinary shares.
Read it in 10-K Aug 27, 2026 at sec.gov
Quiet changesRisk Factors
In many some foreign countries, including countries in which we may conduct business, it may be a local custom that businesses engage in practices that are prohibited by the FCPA, the UK Bribery Act, the Canadian Corruption of Foreign Public Officials Act, section 70.2 of the Australian Criminal Code and other applicable laws and regulations.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
The following discussion and analysis generally discusses fiscal year 2026 and fiscal year 2025 items and year-to-year comparisons between such fiscal years. Discussions of year-to year comparisons between fiscal year 2025 and fiscal year 2024 are not included, and can be found in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II, Item 7 of the Group’s Annual Report for the fiscal year ended June 30, 2025, filed with the SEC on August 28, 2025.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
We own and operate all three layers of the AI Cloud Services stack. The data center layer includes the land, power, substations, buildings and cooling that form the physical foundation of our AI Cloud Services platform. The compute layer includes the GPUs, CPUs, storage, servers and networking deployed within that data center infrastructure. The software layer includes the managed services and enterprise support that enables customers to deploy, operate and manage AI workloads.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
We generate AI Cloud Services revenue by delivering both bare metal compute and managed cloud services to customers supporting AI training and inference workloads. Our customer base includes hyperscalers, frontier labs, AI developers and enterprises. As of June 30, 2026, our operating AI Cloud Services capacity represented approximately 40MW.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
We continue to operate Bitcoin miners at certain of our data centers while we transition this data center capacity toward AI Cloud Services. We aim to substantially complete this transition by December 31, 2026. We generate Bitcoin mining revenue by contributing computing power, or hashrate, to the Bitcoin network and receiving a share of block rewards and transaction fees, and exchanging these Bitcoin for fiat currencies such as USD or CAD. We typically liquidate all the Bitcoin we mine daily and therefore did not have any Bitcoin held on our balance sheet as of June 30, 2026. As of June 30, 2026, our installed Bitcoin mining capacity was approximately 23.2 EH/s, representing approximately 380MW of data center capacity.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
In May 2026, we entered into a strategic partnership with NVIDIA intended to support the deployment over time of up to 5GW of NVIDIA DSX-aligned AI infrastructure across our global data center pipeline. Pursuant to a securities purchase agreement, we granted NVIDIA the right to invest up to $2.1 billion in Ordinary shares, subject to delivery of up to 600,000 GPUs and certain regulatory conditions.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
In June 2026, we completed the acquisition of Nostrum Group, a developer of grid-connected AI data centers based in Spain. In connection with the acquisition, we issued 837,424 Ordinary shares on June 12, 2026 to certain of the sellers thereunder plus approximately EUR 82 million of cash. The acquisition marked our entry into the European market and added several data center sites including an approximately 300MW site in Badajoz, together with an additional development pipeline, and local development, engineering, construction and operations capabilities.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
In August 2026, we completed the acquisition of Mirantis, Inc. (“Mirantis”), a provider of cloud infrastructure software, Kubernetes-based orchestration and enterprise support services. Aggregate consideration was approximately $544 million, payable through the issuance of 12.6 million Ordinary shares plus cash and restricted stock units of approximately $40 million. Mirantis became our direct wholly owned subsidiary and expands our software and operational capabilities for deploying, managing, monitoring and supporting customer workloads.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
On November 2, 2025, we entered into the Microsoft Agreement, pursuant to which we will provide Microsoft Corporation with dedicated GPU services at “Horizon” data center facilities located in Childress, Texas over a five-year average term. The GPU services will be made available to Microsoft Corporation in four tranches (“Horizon 1,” “Horizon 2,” “Horizon 3” and “Horizon 4” data center facilities) targeted for deployment during 2026 (subject to extension in certain circumstances). Horizon 1 was delivered to, and accepted by, Microsoft in August 2026. Horizon 2-4 is targeted for delivery in phases in calendar Q4 2026, with grace periods under the Microsoft Agreement for delivery extending from mid-Q4 of calendar 2026 to the beginning of Q2 of calendar 2027.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
The total contract value is approximately $9.7 billion through 2031, with 20% of the contract value for each tranche to be paid prior to the applicable delivery date and credited against the service fees due and payable after the 24th calendar month of the applicable GPU service term on a pro rata basis. The GPU quantity and the estimated monthly payments are expected to be approximately equal across all four tranches.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
In May 2026, we entered into a five-year cloud services contract with NVIDIA to support its internal AI and research workloads representing approximately $3.4 billion of total contract value.
Read it in 10-K Aug 27, 2026 at sec.gov
AddedMD&A
In July 2026, we entered into multi-year cloud services contracts with leading AI developers including Prometheus, Perplexity and Together AI, representing approximately $2.8 billion in aggregate total contract value.
Read it in 10-K Aug 27, 2026 at sec.gov
RemovedMD&A
Effective this fiscal year, we have transitioned from International Financial Reporting Standards, as adopted by the International Accounting Standards Board (“IFRS”), to GAAP. All comparative figures in this Annual Report have been adjusted to GAAP for consistency. Key impacts of this transition are discussed in “Transition from IFRS to GAAP” and Note 3 to the financial statements included in this Annual Report on Form 10-K.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
We are a leading owner and operator of next-generation data centers powered by 100% renewable energy (whether from clean or renewable energy sources or through the purchase of RECs). Our data centers are purpose-built for power dense computing applications and currently support a combination of GPUs for HPC and AI services and ASICs for Bitcoin mining.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
Our Bitcoin mining operations generate revenue by earning Bitcoin through a combination of Block rewards and transaction fees from the operation of our Bitcoin miners and exchanging these Bitcoin for fiat currencies such as USD or CAD.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
We have been mining Bitcoin since 2019. We typically liquidate all the Bitcoin we mine daily and therefore did not have any Bitcoin held on our balance sheet as of June 30, 2025. To date we have utilized Kraken, a U.S.-based digital asset trading platform, to liquidate the Bitcoin we mine. The mining pools, that we utilize for the purposes of our Bitcoin mining, transfer the Bitcoin that we have mined to Kraken on a daily basis. Such Bitcoin is then exchanged for fiat currency on the Kraken exchange or via its over-the-counter trading desk. We have a backup U.S.-based digital asset trading platform, Coinbase, although we have not utilized Coinbase as of June 30, 2025.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
We are also pursuing a strategy of expanding and diversifying our revenue sources into HPC and AI services, including through the development of purpose-built AI data centers. Our HPC and AI services include AI Cloud Services, launched in 2024, that generates revenue by providing access to cloud-based GPU computing to customers for AI training and interference workloads. We leverage NVIDIA GPUs to serve customers across training and inference workloads. As of June 30, 2025, we had approximately 1.9k NVIDIA H100 and H200 GPUs operating in our data centers. Subsequent to June 30, 2025 we procured, through a combination of purchases and equipment leasing, approximately 5.5k NVIDIA B200 GPUs, 2.3k NVIDIA B300 GPUs and 1.2k NVIDIA GB300 GPUs to be installed at our Prince George site by the end of calendar year 2025, that will bring the total GPU fleet to approximately 10.9k NVIDIA GPUs.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
We are a vertically integrated business, and currently own and operate our computing hardware (consisting of Bitcoin mining ASICs and AI Cloud Services GPUs), as well as our electrical infrastructure and data centers. We generally target development of data centers in regions where there are low-cost and attractive renewable energy sources, with over 80% of our operating data center capacity located in the United States. We have ownership of our proprietary data centers and electrical infrastructure, including the freehold land. This provides us with additional security and operational control over our assets. We believe data center ownership also allows our business to benefit from more sustainable cash flows and operational flexibility in comparison with operators that rely upon third-party hosting services or short-term land leases which may be subject to termination rights, profit sharing arrangements and/or potential changes to contractual terms such as pricing. We assess opportunities to utilize our available data center capacity, land or power capacity, on an ongoing basis, including via potential third-party hosting and alternative revenue sources. We also focus on grid-connected power access which we believe not only helps facilitate a more reliable, long-term supply of power, but also provides us with the ability to support the energy markets in which we operate (for example, through potential participation in demand response, ancillary services provision and load management in deregulated markets such as Texas).
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2. Our 750MW Childress site has been operating since April 2023 and, as of June 30, 2025, has approximately 650MW of operating data center capacity and installed hashrate capacity of approximately 40.1 EH/s. We are currently undertaking an expansion of our data center capacity at Childress to support a direct-to-chip liquid cooling deployment known as “Horizon 1” with an IT load of up to 50MW (based on rack density of up to 200kW, subject to customer requirements) targeting energization by the end of calendar year 2025 for potential growth opportunities for HPC and AI services. As of June 30, 2025, we have purchased RECs in respect of 100% of our energy consumption through to such date at our Childress site.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
Our 1,400MW Sweetwater 1 and 600MW Sweetwater 2 sites are under development and located approximately 40 miles from Abilene, Texas. As of June 30, 2025 we had paid $11.7 million of connection deposits for Sweetwater 1, as well as $13.5 million in connection deposits and $4.1 million in non-refundable connection costs for Sweetwater 2, with such payments facilitating a direct connection to the ERCOT grid. We expect to pay up to $13.5 million in connection deposits over the next 12 months, related to our Sweetwater 2 site. Construction of substation infrastructure has commenced at Sweetwater 1 (along with site establishment works such as construction offices, laydown areas and warehouse construction), and we are targeting grid connection and a substation energization date in the second quarter of calendar year 2026 for Sweetwater 1 and the fourth quarter of calendar year 2027 for Sweetwater 2. Design works are complete for a direct fiber loop between Sweetwater 1 and Sweetwater 2.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
We also have three data center sites in British Columbia, Canada, namely Canal Flats, Mackenzie and Prince George. Our Canal Flats site was acquired from PodTech Innovation Inc. and certain of its related parties in January 2020, and has been operating since 2019. As of June 30, 2025 it had approximately 30MW of data center capacity and hashrate capacity of approximately 1.6 EH/s. Our Mackenzie site has been operating since April 2022 and, as of June 30, 2025, had approximately 80MW of data center capacity and hashrate capacity of approximately 5.2 EH/s. Our Prince George site has been operating since September 2022 and, as of June 30, 2025, had approximately 50MW of data center capacity and hashrate capacity of approximately 3.1 EH/s. Our AI Cloud Service, comprising NVIDIA H100 and H200 GPUs as of June 30, 2025, is also currently operated at our Prince George site.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
Each of our sites in British Columbia are connected to BC Hydro electricity transmission network and have been 100% powered by renewable energy since commencement of operations (currently approximately 98% sourced from clean or renewable sources, including through hydroelectric sources, wind, solar and biomass, as reported by BC Hydro and approximately 2% accounted for by the purchase of RECs). BC Hydro retains the environmental attributes from the renewable energy they sell us. Our contracts with BC Hydro each had an initial term of one year and shall extend until terminated in accordance with the terms of the agreement upon six months' notice.
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
As of June 30, 2025, we have approximately 810MW of operating data center capacity and an installed hashrate capacity of approximately 50 EH/s across our sites in British Columbia (160MW) and Texas (650MW). In addition, as of June 30, 2025, we had approximately 1.9k NVIDIA H100 and H200 GPUs, which are deployed at our Prince George data center and are being used to provide AI Cloud Services to third party customers. Subsequent to June 30, 2025, we procured, through a combination of purchases and equipment leasing, approximately 5.5k NVIDIA B200 GPUs, 2.3k
Read it in 10-K Aug 28, 2025 at sec.gov
RemovedMD&A
NVIDIA B300 GPUs and 1.2k NVIDIA GB300 GPUs to be installed at our Prince George site by the end of calendar year 2025, that will bring the total GPU fleet to approximately 10.9k NVIDIA GPUs.
Read it in 10-K Aug 28, 2025 at sec.gov
RewordedMD&A
(7)Other one-off expense items Other expenses for the year ended June 30, 2025 includes include a one-time liquidation payment incurred in August 2024 resulting from the then transition to spot pricing at the Group’s site at Childress, the reversal of the unrealized loss recorded on fixed price contracted amounts outstanding at June 30, 2024, a litigation related litigation-related settlement provision, loss on mining hardware in transit, transaction costs incurred in December 2024 and June 2025 on entering the Capped Call Transactions in conjunction with the issuance of the 2030 Convertible Notes and 2029 Convertible Notes, one-off professional fees incurred in relation to litigation matters and transaction costs incurred on entering the securities class action. capped call transactions in conjunction with the issuance of the convertible notes.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
This The increase includes a $9.5 $52.8 million increase in accrued payroll taxes relating to stock-based compensation awards, a $23.0 million increase in employee benefits expense related to a rise the increase in the employee headcount as a result of expansion of business operations, a $4.9 $2.9 million increase in the consumption of RECs as a result of continued expansion of the Childress site and a $19.0 $162.4 million increase in stock-based compensation expense primarily related to the issuance of service-based RSUs to the Co-CEOs, the modification of certain stock-based payment awards and the amortization of RSUs issued to employees and directors during the year ended June 30, 2025. expense.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
The increase in net loss income (loss) to net cash from (used in) operating activities primarily reflects non-cash noncash adjustments of $69.8 $978.3 million, which include is driven by unrealized (gain) loss on financial instruments of $(558.5) million, debt conversion inducement expense of $111.8 million, depreciation and amortization of $50.5 million and $417.7 million, stock-based compensation expense of $23.6 $205.0 million, impairment of assets of $638.8 million and change in fair value of assets held for sale of $110.6 million.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
For the year ended June 30, 2025, 2026, the increase in cash outflows of $882.0 $3,342.5 million was primarily attributable to an increase in payments for computer hardware prepayments, hardware, payments for property, plant and equipment equipment, net of mining hardware prepayments, computer hardware, payments consisting for intangible assets for connection rights and land purchase options and payments for the acquisition of prepayments and other assets, and proceeds from disposal of property, plant and equipment. subsidiaries during the year ended June 30, 2026.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
This increase was During the year ended June 30, 2025, other operating expenses primarily due to the recognition comprised $5.8 million of a net loss contingency expense, which included a $20.0 million provision related to the NYDIG settlement of $20 million, settlement, partially offset by the release reversal of the a $13.4 million loss contingency related to the Goods and Services Tax (“GST”) appeal with the CRA.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
Our net cash used in investing activities was $4,723.0 million for the year ended June 30, 2026, compared to net cash used in investing activities of $1,380.5 million for the year ended June 30, 2025, compared to net cash used in investing activities an increase of $498.5 million for the year ended June 30, 2024. $3,342.5 million.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
The increase in selling, general and administrative expenses also included a $9.9 $16.1 million increase in professional fees, a $11.1 $17.4 million increase in sponsorships and marketing, a $2.9 million increase in insurance costs, a $3.1 million increase in property taxes, and a $3.8 $10.5 million increase in non-refundable provincial sales tax tax, and a $6.2 million increase in property taxes as a result of the expansion of our business operations and ongoing expenses as a publicly listed company.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
Our net cash from operating activities was $2,100.4 million for the year ended June 30, 2026, compared to net cash from operating activities of $245.9 million for the year ended June 30, 2025, compared to net cash from operating activities an increase of $52.2 million for the year ended June 30, 2024. $1,854.5 million.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
The increase in unrealized gain (loss) during the year ended June 30, 2025 relates to the changes in fair value of the Capped Call Transactions Transactions, including new capped call transactions entered into in connection with convertible notes issued during the year, and Prepaid Forward Transactions. Transactions during the year ended June 30, 2026.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
(5)Other (4)Other one-off income includes insurance proceeds relating to the theft of mining hardware in transit during the year ended June 30, 2025, gain on recovery of a connection deposit during the year ended June 30, 2024, and net gains on the sale of other assets during the year ended June 30, 2023. 2025.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
Realized gain (loss) on financial assets represent a gain (loss) instruments primarily represents the loss on expired Bitcoin purchase options during the year ended June 30, 2026 and the loss on the electricity purchased and subsequently resold under a power supply agreement at the Group’s Childress site. site during the year ended June 30, 2025.
Read it in 10-K Aug 27, 2026 at sec.gov
RewordedMD&A
Adjusted EBITDA is defined as EBITDA, further adjusted to exclude net income (loss), excluding income tax (expense) benefit, finance expense, interest income, depreciation and amortization, stock-based compensation, compensation expense, foreign exchange gain (loss), impairment of assets, certain other non-recurring income, gain (loss) on disposal of property, plant and equipment, gain (loss) on disposal of subsidiaries, unrealized fair value gain (loss) on financial instruments, debt conversion inducement expense, gain (loss) on partial extinguishment of financial liabilities, increase (decrease) in fair value of assets held for sale and certain other expense items.
Read it in 10-K Aug 27, 2026 at sec.gov

Sources

The two latest 10-Ks on EDGAR, section by section. Each change links to the text at sec.gov.

Also

New risk factors: paragraphs with nothing like them last year, quoted in full.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/IREN/export.csv") into a cell.