164 changes: 47 added, 23 removed, 91 reworded, 3 quiet changes

10-K Feb 26, 2026 vs Feb 20, 2025

10-K 0000003570-26-000005 (Feb 26, 2026) vs 10-K 0000003570-25-000033 (Feb 20, 2025)

Every paragraph, and how much of it changed

One bar per paragraph, in the order of the 10-K. Height and colour show the share of its words not in the closest paragraph a year earlier; the tallest bars are new paragraphs.

Risk Factors

122 paragraphs · 5 new · 51 reworded · 1 gone · 10-K Feb 26, 2026 against Feb 20, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 100 · 48% changed Every version of it
To date, the FERC has issued orders under Section 3 of the NGA authorizing the siting, construction and operation of the six all of our Trains and related facilities of the SPL Project, the three Trains and related facilities of the CCL Project and the seven midscale Trains and related facilities for the Corpus Christi Stage 3 Project, in operation or under construction, as well as orders under Section 7 of the NGA authorizing the construction and operation of the Creole Trail Pipeline and the Corpus Christi Pipeline. all of our pipelines in operation or under construction. In February 2024, certain of our subsidiaries submitted an application to the FERC under the NGA for authorization to site, construct and operate the SPL Expansion Project. In March 2023, Project and in June 2025, certain of our subsidiaries submitted an updated application to the FERC reflecting a two-phased approach to the SPL Expansion Project. In December 2025, we filed an application with the FERC to increase the LNG production capacity of the previously-authorized Corpus Christi Stage 3 Project and CCL Midscale Trains 8 & 9 Project by approximately 5 mtpa and the application remains pending at the FERC. Following our pre-filing in July 2025, in February 2026, we filed an application with the FERC under the NGA for authorization to site, construct and operate the CCL Midscale Trains 8 & 9 Project, for which a positive Environmental Assessment from the FERC was received in June 2024. To date, the DOE has also issued orders under Section 4 of the NGA authorizing SPL, CCL and the Corpus Christi Stage 3 Project to export domestically produced LNG. We currently have the SPL Expansion Project and the CCL Midscale Trains 8 & 9 Project pending non-FTA export approval with the DOE. However, approval is first subject to the receipt of regulatory permit approval from the FERC, responsive to our formal applications. Additionally, we hold certificates under Section 7(c) of the NGA that grant us land use rights relating to the situation of our pipelines on land owned by third parties. If we were to lose these rights or be required to relocate our pipelines, our business could be materially and adversely affected. in a phased approach.
Paragraph 62 · 43% changed Every version of it
There may be impediments continues to exist significant uncertainty about the transport of LNG, such as shortages future relationship between the U.S. and other countries with respect to trade policies, trade agreements, trade restrictions and tariffs. Any resulting unwillingness or inability of LNG vessels worldwide purchasers in such countries to import LNG from the U.S. or operational impacts increases in pricing as a result of retaliatory tariffs on LNG shipping, which exported U.S. LNG, could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
Paragraph 29 · 42% changed Every version of it
Weather events such as major hurricanes and winter storms have caused interruptions or temporary suspension in construction or operations at our facilities or caused minor damage to our facilities. Our risk of loss related to weather events or other disasters is limited by contractual provisions in our SPAs, which can provide under certain circumstances relief from operational events, and partially mitigated by insurance we maintain. Aggregate direct and indirect losses associated with the aforementioned weather events, net of insurance reimbursements, have not historically been material to our Consolidated Financial Statements, and we believe our insurance coverages maintained, existence of certain protective clauses within our SPAs and other risk management strategies mitigate our exposure to material losses. However, future adverse weather events and collateral effects, or other disasters such as explosions, fires, floods or severe droughts, could cause damage to, or interruption of operations at our terminals or related infrastructure, or interruptions to our power supply, which could impact our operating results, increase insurance premiums or deductibles paid and delay or increase costs associated with the construction and development of our Liquefaction Projects or our other facilities. Our LNG terminal infrastructure and LNG facilities located in or near Corpus Christi, Texas and Sabine Pass, Louisiana are designed in accordance with the requirements of 49 Code of Federal Regulations Part 193, Liquefied Natural Gas Facilities: Federal Safety Standards, and all applicable industry codes and standards.
Paragraph 120 · 40% changed Every version of it
Tax laws and regulations are complex and rapidly evolving. We are subject to various types of tax arising from normal business operations taxes in the jurisdictions in which where we operate and transact. Any changes operate. Changes to local, state, domestic or international tax laws laws, their interpretation, enforcement practices and regulations, or their interpretation and application, rates, including those changes related to tariffs and duties, are beyond our control and could affect our tax obligations, profitability compliance costs, financial results and cash flows in the future. In addition, tax rates in the various jurisdictions in which we operate may change significantly due to political or economic factors beyond our control. flows. We continuously monitor and assess proposed tax legislation that could negatively impact our business.
Paragraph 81 · 37% changed Every version of it
As described in General in Items 1. and 2. Business and Properties, we have contracted through our SPAs and IPM agreements approximately 95% of the total anticipated production from the Liquefaction Projects through the mid-2030s, excluding volumes from contracts with terms less than 10 years and volumes that are contractually subject to additional liquefaction capacity beyond what is currently in construction or operation. However, as a result of the factors described above and other factors, the LNG we produce may not remain a long term competitive source of energy internationally, particularly when our existing long term contracts begin to expire. Any significant impediment to the ability to continue to secure long term commercial contracts or deliver LNG from the United States U.S. could have a material adverse effect on our customers and on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
Paragraph 68 · 37% changed Every version of it
•decreased oil and natural gas exploration activities which may decrease the production of natural gas, including as a result of any potential ban on production of natural gas through hydraulic fracturing; in North America;
Paragraph 102 · 35% changed Every version of it
Authorizations obtained from the FERC, DOE and other federal and state regulatory agencies contain ongoing conditions that we must comply with. Failure to comply with or our inability to obtain and maintain existing or newly imposed approvals, permits and filings that may arise due to factors outside of our control such as a U.S. government disruption or shutdown, political opposition or local community resistance to our operations could impede the operation and construction of our infrastructure. In addition, certain of these governmental permits, approvals and authorizations are or may be subject to rehearing requests, appeals and other challenges. There is no assurance that we will obtain and maintain these governmental permits, approvals and authorizations, or that we will be able to obtain them on a timely basis. Any impediment could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
Paragraph 57 · 34% changed Every version of it
While our chartered vessels are operated by the ship owners and we are exposed to risks outside of our own control, we are generally protected through provisions in our charter agreements from transportation disruptions on the part of the ship owner, including disruptions due to off-hire and downtime periods or shipping delays. However, other events outside of our control where we may not be protected may have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.

MD&A

140 paragraphs · 42 new · 62 reworded · 22 gone · 10-K Feb 26, 2026 against Feb 20, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 42 · 50% changed
The $938 million decrease between Net income attributable to Cheniere increased by $2.1 billion during the year ended December 31, 2024 2025 as compared to the same period of 2023 was primarily attributable to a $1.7 billion decrease in CQP’s consolidated net income, 2024 primarily due to $1.5 $2.3 billion of decreases favorable changes in gains from the fair value of its IPM agreements accounted for as derivatives. derivative instruments (before tax and the impact of NCI), largely associated with our derivatives related to IPM agreements, and an $876 million increase in revenues, net of cost of natural gas feedstock, from increased volume of LNG loaded and recognized between the years. Partially offsetting these favorable changes was an increased tax provision of $677 million. The following is an expanded discussion of the significant drivers of the variance in net income attributable to Cheniere by line item:
Paragraph 47 · 49% changed
•$1.7 billion favorable variance •$243 million decrease in sublease and subcharter income tax provision between from our LNG vessels due to fewer days the LNG vessels were subcontracted out and at lower rates in the current year ended December 31, 2024 as compared to the same period of 2023, primarily due to lower taxable earnings as described above; and 2024.
Paragraph 22 · 47% changed
•In May 2024, addition to the above issuer credit rating upgrades, the unsecured CQP Notes were upgraded from BBB- to BBB by S&P in connection June 2025, concurrent with the 2034 assignment of the 2035 CQP Senior Notes issuance, Moody’s Ratings (“Moody’s”) upgraded CQP’s issuer credit rating to Baa2 from Ba1 and rating. S&P also revised CQP’s its outlook to stable from positive. Moody’s also upgraded SPL’s issuer credit rating to Baa1 from Baa2 and revised SPL’s outlook to stable from positive. In July 2024, Fitch Ratings upgraded CCH’s issuer credit rating to BBB+ from BBB with a stable outlook. In October 2024, S&P Global Ratings changed the outlook of CCH’s senior secured debt rating on SPL to positive from stable. stable in December 2025.
Paragraph 105 · 47% changed
CAMT accelerates our cash tax payments for federal income taxes due to near-term deferral of the realization of our existing NOL carryforwards and may cause volatility in future cash tax payments due to variability in adjusted financial statement income. Additionally, our Our cash tax payments may fluctuate over time and may be substantially lower in the periods that influenced by (1) accelerated tax depreciation deductions on qualifying assets, including the Corpus Christi Stage 3 Project is placed into service due to anticipated tax depreciation allowances from and the project. Thus, the ongoing interplay between the CAMT, the CCL Midscale Trains 8 & 9 Project and (2) timing of utilization of our existing NOLs and bonus depreciation eligibility of our Corpus Christi Stage 3 Project is expected to cause volatility in our cash tax payments. net operating loss (“NOL”) carryforwards. See the risk Additions or changes in tax laws and regulations or variables impacting our tax obligations could potentially affect our financial results or liquidity under Risks Relating to Regulations in Item 1A. Risk Factors.
Paragraph 28 · 46% changed
◦Excluding amounts refinanced, ▪In March 2025, SPL redeemed $800 repaid the remaining $300 million of outstanding aggregate principal amount outstanding of its senior secured notes. 5.625% Senior Secured Notes due 2025 (the “2025 SPL Senior Notes”) at maturity.
Paragraph 58 · 44% changed
The $4.7 billion $677 million unfavorable variance between during the year ended December 31, 2024 2025 as compared to the same period of 2023 2024 was primarily substantially all attributable to: to a higher income tax expense due to a $3.0 billion increase in pre-tax income. The effect of the change in our effective tax rate between the comparable periods was not material to our income tax provision.
Paragraph 39 · 42% changed
Year Ended December 31, 2025 2024 Variance LNG revenues (in millions): LNG from the Liquefaction Projects sold under third party long-term agreements (1) $ 14,804 $ 12,144 $ 2,660 LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements (2) 3,794 2,345 6,028 (3,683) 1,449 LNG procured from third parties (2) 226 280 (54) Net derivative gain (loss) 344 (73) 417 Other revenues 267 203 64 Total LNG revenues $ 19,435 $ 14,899 $ 4,536 Volumes delivered as LNG revenues (in TBtu): LNG from the Liquefaction Projects sold under third party long-term agreements (1) 2,095 2,118 (23) LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements (2) 321 207 114 LNG procured from third parties (2) 22 24 (2) Total volumes delivered as LNG revenues 2,438 2,349 89
Paragraph 16 · 41% changed
•In May 2024, CQP issued $1.2 billion February 2026, SPL redeemed the remaining $200 million aggregate principal amount of 5.750% Senior Notes due 2034 (the “2034 CQP Senior Notes”). In June 2024, the net proceeds, together with cash on hand, were used to redeem $1.2 billion of the outstanding aggregate principal amount of SPL’s 5.625% its 5.875% Senior Secured Notes due 2025 2026 (the “2025 “2026 SPL Senior Notes”).

A paragraph is matched with the one last year that shares the most of its words; under half in common makes it new. The paragraphs shown are the 8 reworded the most in each section.

The paragraph that changed most in each section

The redline

Marked against last year's 10-K: cut words struck through, new words highlighted.

Risk Factors286 words changed in this paragraph; it is 37% similar to last year's version.
To date, the FERC has issued orders under Section 3 of the NGA authorizing the siting, construction and operation of the six all of our Trains and related facilities of the SPL Project, the three Trains and related facilities of the CCL Project and the seven midscale Trains and related facilities for the Corpus Christi Stage 3 Project, in operation or under construction, as well as orders under Section 7 of the NGA authorizing the construction and operation of the Creole Trail Pipeline and the Corpus Christi Pipeline. all of our pipelines in operation or under construction. In February 2024, certain of our subsidiaries submitted an application to the FERC under the NGA for authorization to site, construct and operate the SPL Expansion Project. In March 2023, Project and in June 2025, certain of our subsidiaries submitted an updated application to the FERC reflecting a two-phased approach to the SPL Expansion Project. In December 2025, we filed an application with the FERC to increase the LNG production capacity of the previously-authorized Corpus Christi Stage 3 Project and CCL Midscale Trains 8 & 9 Project by approximately 5 mtpa and the application remains pending at the FERC. Following our pre-filing in July 2025, in February 2026, we filed an application with the FERC under the NGA for authorization to site, construct and operate the CCL Midscale Trains 8 & 9 Project, for which a positive Environmental Assessment from the FERC was received in June 2024. To date, the DOE has also issued orders under Section 4 of the NGA authorizing SPL, CCL and the Corpus Christi Stage 3 Project to export domestically produced LNG. We currently have the SPL Expansion Project and the CCL Midscale Trains 8 & 9 Project pending non-FTA export approval with the DOE. However, approval is first subject to the receipt of regulatory permit approval from the FERC, responsive to our formal applications. Additionally, we hold certificates under Section 7(c) of the NGA that grant us land use rights relating to the situation of our pipelines on land owned by third parties. If we were to lose these rights or be required to relocate our pipelines, our business could be materially and adversely affected. in a phased approach.

Source: Item 1A, 10-K 0000003570-26-000005 vs Item 1A, 10-K 0000003570-25-000033

MD&A189 words changed in this paragraph; it is 53% similar to last year's version.
Our long-term counterparty arrangements form the foundation of our business and provide us with significant, stable, long-term cash flows. Through our SPAs and IPM agreements currently in effect, with approximately 15 years of weighted average remaining life as of December 31, 2024, we have contracted approximately 95% of the total anticipated production from the Liquefaction Projects through the mid-2030s, excluding volumes from contracts with terms less than 10 years and volumes that are contractually subject to additional liquefaction capacity beyond what is currently in construction or operation. The majority of our contracts are fixed-priced, long-term SPAs consisting of a fixed fee per MMBtu of LNG plus a variable fee per MMBtu of LNG, with the variable fees generally structured to cover the cost of natural gas purchases, transportation and liquefaction fuel consumed to produce LNG. Since we procure most of our feedstock for LNG production from the U.S., the structure of these contracts helps limit our exposure to fluctuations in U.S. natural gas prices. During 2024, 2025, we continued to grow our portfolio of SPA and IPM agreements, and we believe that continued global demand for natural gas and LNG, as further described in Market Factors and Competition in Items 1. and 2. Business and Properties, will as well as the current geopolitical environment that has intensified the demand for supply security, should enable us to enter into long-term agreements and provide a foundation for additional growth in our business in the future. The continued strength and stability of our long-term cash flows served as the foundation of our updated comprehensive, long-term capital allocation plan announced in June 2024, which includes an increased share repurchase authorization and increased dividends, in addition to a continued decrease in consolidated long-term leverage and investment in accretive organic growth.

Source: Item 7, 10-K 0000003570-26-000005 vs Item 7, 10-K 0000003570-25-000033

Accounting Policies168 words changed in this paragraph; it is 30% similar to last year's version.
stand-alone selling price of each With respect to regasification revenues, we have concluded that SPLNG provides a single performance obligation to its customers on a continuous basis over time because SPLNG is continuously available to provide regasification service on a daily basis with the same pattern of transfer. We have determined that an output method of recognition based on elapsed time best reflects the benefits of this service to the customer and accordingly, LNG regasification capacity reservation fees are recognized as regasification revenues on a straight-line basis over the term of the time the contract was negotiated. respective TUAs. We have concluded that the variable fees under our TUAs meet the exception for allocating variable consideration to specific parts a wholly unsatisfied promise to transfer a distinct good or service that forms part of the contract. a single performance obligation that is a series. As such, the variable consideration for these contracts the TUA is allocated to each distinct molecule of LNG and recognized when the period that distinct molecule of LNG the respective good or service is delivered to the customer. Because of the use of the exception, variable consideration related to the sale of LNG is not included in the transaction price.

Source: Item 8, Note 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES, 10-K 0000003570-26-000005 vs Item 8, Note 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES, 10-K 0000003570-25-000033

Legal Proceedings59 words changed in this paragraph; it is 85% similar to last year's version.
Certain of our subsidiaries We are in discussions with the LDEQ to resolve alleged non-compliance with national emission standards for formaldehyde from combustion turbines at the Sabine Pass LNG Terminal. The allegations are identified in a Consolidated Compliance Order and Notice of Potential Penalty, Tracking No. AE-CN-22-00833 (the “2023 Compliance Order”) issued by the LDEQ on April 12, 2023. In August 2004, the EPA stayed the application of the emission standard to combustion turbines such as those at the Sabine Pass LNG Terminal. In March 2022, the EPA lifted the stay, and in June 2022 our subsidiaries 2022, we petitioned the EPA and LDEQ for approval of additional operating parameters to demonstrate compliance with the emission limitation. The EPA approved the petition remains pending. Our subsidiaries on July 31, 2025 and in October 2025 the LDEQ confirmed that all remaining milestones under the 2023 Compliance Order have been met. We continue to work with the LDEQ to resolve the matters identified in the 2023 Compliance Order, including the petition pending with the EPA. Order. As of December 2024, our subsidiaries have 2025, we had filed test results with the LDEQ indicating that for the 2024 2025 testing period all 44 turbines meet met the relevant compliance standard. We do not expect that any ultimate penalty will have a material adverse impact on our financial results.

Source: Item 3, 10-K 0000003570-26-000005 vs Item 3, 10-K 0000003570-25-000033

Sentences and paragraphs added, removed or reworded

Every change, by type

Sentences and paragraphs of LNG's Risk Factors and MD&A, 10-K Feb 26, 2026 against 10-K Feb 20, 2025. Each links to the text at sec.gov.

Quiet changes are sentences kept from last year with one to four words changed, at least one of them a hedge, a modal or a qualifier (may, could, will, not, significant, material…). A year or date rolling forward is not counted.

The full word list

adverse, adversely, all, although, anticipate, anticipates, any, approximately, believe, believes, can, cannot, certain, could, expect, expects, generally, however, if, intend, intends, largely, likely, many, material, materially, may, might, most, must, never, no, not, possible, primarily, probable, should, significant, significantly, some, substantial, substantially, unlikely, will, would

AddedRisk Factors
tax and the impact of non-controlling interests), substantially all of which were related to commodity derivative instruments indexed to international LNG prices, mainly our IPM agreements.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
The U.S. has recently enacted and proposed to enact significant new tariffs and trade restrictions. Additionally, President Trump has directed various federal agencies to further evaluate key aspects of U.S. trade policy and there has been ongoing discussion and commentary regarding potential significant changes to U.S. trade policies, treaties and tariffs. For example, as part of its Section 301 investigation of the maritime, logistics and shipbuilding sector in China (the “Section 301 Investigation”), the Office of the U.S. Trade Representative (the “USTR”) in April 2025 mandated, among other things, restrictions on maritime transport services for U.S. LNG exports. These measures require that, beginning in April 2029, 1% of U.S. LNG exports must be exported on U.S.-built vessels, with such percentage gradually increasing to 15% in April 2047, with certain exceptions. In its original April 2025 notice, USTR had included the potential suspension of LNG export licenses as a remedy for non-compliance with the U.S. vessel restrictions; however, USTR subsequently removed the suspension language. In November 2025, the White House announced that, as part of the broader economic and trade relations deal with China, it had agreed to defer certain pending tariff and trade measures against China, including suspending for one year the implementation of fees on China-linked vessels pursuant to the Section 301 Investigation. However, the timeline for the U.S.-built vessel requirements for U.S. LNG exports thus far has not been modified. Given the ongoing evolution of the Section 301 Investigation measures, the potential impact of the restrictions on us and the LNG industry remains uncertain.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
Additionally, we have ad valorem legacy property tax incentives secured for the Corpus Christi LNG Terminal, inclusive of the Corpus Christi Stage 3 Project and the CCL Midscale Trains 8 & 9 Project, and the Sabine Pass LNG Terminal that begin to expire starting in 2026 and 2027, respectively, with continuing incentive roll-off thereafter over the longer term. The magnitude of property tax changes once our incentives expire is uncertain, but will be influenced, both in the near and longer term, by various factors including future local tax rates, local tax rate compression dynamics and variation in our assessed
Read it in 10-K Feb 26, 2026 at sec.gov
RemovedRisk Factors
We became subject to the 15% CAMT in 2024. On September 12, 2024, the U.S. Department of Treasury and the Internal Revenue Service (the “IRS”) released proposed regulations relating to the application and implementation of the CAMT. The proposed regulations address a wide range of topics relating to the operation of CAMT; however, significant uncertainty continues to exist regarding many of the operative implementing provisions and regulatory guidance related to the CAMT issued in the future could affect both the timing and amount of our CAMT liability.
Read it in 10-K Feb 20, 2025 at sec.gov
RewordedRisk Factors
To date, the FERC has issued orders under Section 3 of the NGA authorizing the siting, construction and operation of the six all of our Trains and related facilities of the SPL Project, the three Trains and related facilities of the CCL Project and the seven midscale Trains and related facilities for the Corpus Christi Stage 3 Project, in operation or under construction, as well as orders under Section 7 of the NGA authorizing the construction and operation of the Creole Trail Pipeline and the Corpus Christi Pipeline. all of our pipelines in operation or under construction.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
However, we may not be able to purchase or receive physical delivery of natural gas as a result of various factors, including composition changes in the quality of feed gas received from third parties, non-delivery or untimely delivery by our suppliers, depletion of natural gas reserves within regional basins and disruptions to pipeline operations as described in the immediately preceding risk factor Disruptions to the third party supply of natural gas to our pipelines and facilities could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects. factor.
Read it in 10-K Feb 26, 2026 at sec.gov
Show the other 49
RewordedRisk Factors
Such disruptions to our third party supply of natural gas may also be caused by weather events or other disasters described in the immediately preceding risk factor Catastrophic weather events or other disasters could result in an interruption of our operations, a delay in the construction of our Liquefaction Projects, damage to our Liquefaction Projects and increased insurance costs, all of which could adversely affect us. factor.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
However, future adverse weather events and collateral effects, or other disasters such as explosions, fires, floods or severe droughts, could cause damage to, or interruption of operations at our terminals or related infrastructure, which could impact our operating results, increase insurance premiums or deductibles paid and delay or increase costs associated with the construction and development of our Liquefaction Projects or our other facilities.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Additionally as of December 31, 2024, $3.9 2025, $1.2 billion of repurchase authority remained under our share repurchase program authorized by our Board had authorized, Board, which subsequently increased to approximately $10 billion from 2026 through 2030 after a $9 billion increase was increased authorized in June 2024 by $4.0 billion through 2027. February 2026.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Any changes Changes to local, state, domestic or international tax laws laws, their interpretation, enforcement practices and regulations, or their interpretation and application, rates, including those changes related to tariffs and duties, are beyond our control and could affect our tax obligations, profitability compliance costs, financial results and cash flows in the future. flows.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Management’s Discussion and Analysis of Financial Condition and Results of Operations, our net income for the years ended December 31, 2025 and 2024 and 2023 included $1.3 $3.6 billion and $8.0 $1.3 billion of gains, respectively, resulting from changes in the fair values of our derivatives (before tax and the impact of non-controlling interests), substantially all of which were related to commodity derivative instruments indexed to international LNG prices, mainly our IPM agreements.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
In addition, certain laws and regulations authorize regulators having jurisdiction over the construction and operation of our LNG terminals, marine berths and pipelines, including FERC, PHMSA, EPA and the United States Coast Guard, to issue regulatory enforcement actions, which may restrict or limit operations or increase compliance or operating costs.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
The inability to achieve acceptable funding may cause a delay in the development or construction of the CCL Midscale Trains 8 & 9 SPL Expansion Project, the SPL CCL Expansion Project or any additional expansion projects, and we may not be able to complete our business plan, which could have a material adverse effect on our business, contracts, growth strategy, financial condition, operating results, cash flow, liquidity flow and prospects. liquidity.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
While historically we have not incurred significant or prolonged disruptions to our natural gas supply that have resulted in a material adverse impact to our operations, due to the criticality of natural gas supply to our production of LNG, our failure to purchase or receive physical delivery of sufficient quantities of natural gas under circumstances where we may not be protected could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, liquidity and prospects.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
In Following our pre-filing in July 2025, in February 2024, certain of our subsidiaries submitted 2026, we filed an application to with the FERC under the NGA for authorization to site, construct and operate the SPL CCL Expansion Project. Project in a phased approach.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
As of December 31, 2024, 2025, we had, on a consolidated basis, $2.6 $1.1 billion of cash and cash equivalents (of which $270 $182 million was held by CQP), $552 our consolidated variable interest entities (“VIEs”)), $485 million of restricted cash and cash equivalents (of which $109 $22 million was held by CQP), our VIEs), a total of $7.7 $7.2 billion of available commitments under our credit facilities and $23.1 $23.0 billion of total debt outstanding (before unamortized discount and debt issuance costs).
Read it in 10-K Feb 26, 2026 at sec.gov
Quiet changesRisk Factors
Additionally, while our vessel charters allow us to secure fixed rates under long term contracts (in certain cases subject to inflation) and we generally structure our SPAs to recover any increase in such costs, our profitability, particularly relating to our short term or spot LNG sales outside of our SPAs, is largely dependent on the strength of international LNG markets.
Read it in 10-K Feb 26, 2026 at sec.gov
Quiet changesRisk Factors
Further, the IRA includes a charge on methane emissions above certain emissions thresholds employing empirical emissions data that would have applied to our facilities beginning in calendar year 2024.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•Following our pre-filing in July 2025, in February 2026, we filed an application with the FERC under the NGA for authorization to site, construct and operate in a phased approach the CCL Expansion Project, a potential further expansion of the Corpus Christi LNG Terminal, inclusive of four liquefaction trains and supporting infrastructure, with an expected total peak production capacity of up to 24 mtpa of LNG, inclusive of estimated debottlenecking opportunities.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In December 2025, we filed an application with the FERC to increase the LNG production capacity of the previously-authorized Corpus Christi Stage 3 Project and CCL Midscale Trains 8 & 9 Project by approximately 5 mtpa, which remains pending at the FERC.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In March 2025, we received authorization from the FERC under the NGA to site, construct and operate the CCL Midscale Trains 8 & 9 Project, and in June 2025, our Board made a positive FID with respect to the investment in the development, construction and operation of the CCL Midscale Trains 8 & 9 Project and issued a full notice to proceed with construction to Bechtel under a fixed price separated turnkey EPC contract.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In June 2025, certain subsidiaries of CQP updated the SPL Expansion Project’s FERC application, originally filed in February 2024, to reflect a two-phased project, inclusive of three liquefaction trains and supporting infrastructure, maintaining an expected total peak production capacity of up to approximately 20 mtpa of LNG, inclusive of estimated debottlenecking opportunities.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In August 2025, Cheniere announced the execution of a long-term LNG SPA between Cheniere Marketing and JERA Co., Inc. (“JERA”), under which JERA has agreed to purchase approximately 1 mtpa of LNG from Cheniere Marketing on an FOB basis from 2029 through 2050. The purchase price for LNG under the SPA is indexed to the Henry Hub price, plus a fixed liquefaction fee.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In May 2025, Cheniere Marketing entered into an IPM agreement with Canadian Natural Resources Limited to purchase 140,000 MMBtu per day of natural gas at a price based on the Japan Korea Marker, less fixed LNG shipping costs and a fixed liquefaction fee, for a term of approximately 15 years commencing in 2030.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In February 2026, our Board approved an increase in our share repurchase authorization to approximately $10 billion from 2026 through 2030 with a $9 billion increase to the existing authorization.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In August 2025, we amended and restated our $1.25 billion Cheniere Revolving Credit Facility to, among other things, (1) extend the maturity date thereunder, (2) reduce the interest rate and commitment fees payable thereunder and (3) make certain other changes to the terms and conditions of the existing Cheniere Revolving Credit Facility.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
Entity Date Previous Rating Upgraded Rating Rating Agency Outlook Cheniere November 2025 BBB BBB+ S&P Stable CQP November 2025 BBB BBB+ S&P Stable CCH October 2025 BBB BBB+ S&P Positive Cheniere February 2025 BBB- BBB Fitch Stable CQP February 2025 BBB- BBB Fitch Stable
Read it in 10-K Feb 26, 2026 at sec.gov
RemovedMD&A
•In July 2024, Cheniere Marketing entered into a long-term SPA with Galp Trading S.A. (“Galp”), a subsidiary of Galp Energia, SGPS, S.A., under which Galp has agreed to purchase approximately 0.5 mtpa of LNG from Cheniere
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
Marketing on a free-on-board basis for a term of 20 years. Deliveries are expected to commence in the early 2030s and are subject to, among other things, a positive FID with respect to the second train of the SPL Expansion Project (“SPL Train 8”) and includes a limited number of early cargoes to be purchased by Galp prior to the start of SPL Train 8.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
•In June 2024, we received a positive Environmental Assessment from the FERC relating to the CCL Midscale Trains 8 & 9 Project. We expect to receive all remaining necessary regulatory approvals for the project in 2025.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
•In February 2024, certain subsidiaries of CQP submitted an application to the FERC under the NGA for authorization to site, construct and operate the SPL Expansion Project, as well as an application to the DOE requesting authorization to export LNG to FTA countries and non-FTA countries, both of which applications exclude debottlenecking. In October 2024, the authorization from the DOE to export LNG to FTA countries was received for the SPL Expansion Project.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
The LNG market in 2024 remained relatively tight as a result of low supply capacity growth, strong demand outside Europe and continued geopolitical tensions. Global LNG imports registered a very modest growth in 2024, increasing by less than 4 mtpa year on year due to constrained supply from delays to projects under construction, Russian sanctions and a fallow period for new projects coming on-line. Consequently, a recovery in Asia’s LNG consumption had to be satisfied at the expense of other regions. Asian demand increased significantly from 2023, adding over 20 mtpa of import year-over-year. The largest single country contribution to this growth came from China, which increased 6.8 mtpa year-over-year after a slowdown during the previous two years. Growth outside of Asia tightened the balances further this year by increasing the call on supply away from Europe. Egypt and Brazil propelled imports from the Middle East, North Africa and Latin America regions by 6.2 mtpa to a total of 25.5 mtpa in 2024. In contrast, Europe’s imports declined 19% year-over-year, down approximately 22.7 mtpa, due to weak gas-fired power generation demand and sluggish growth in the industrial sector.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
These market conditions contributed to a strong spot price environment albeit annual spot prices in 2024 were overall lower than in the previous year. The TTF monthly settlement prices averaged $10.91/MMBtu in 2024, 20.5% lower than the 2023 average of $13.73/MMBtu. Similarly, the average settlement price for the Japan Korea Marker (“JKM”) was $11.83/MMBtu in 2024, 26.6% lower than the 2023 average of $16.13/MMBtu. The Henry Hub benchmark also dropped from an average settlement price of $2.74/MMBtu in 2023 to $2.27/MMBtu in 2024, down 17.1% year-over-year.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
However, a drop in temperatures in Europe toward the end of 2024 and into the beginning of 2025 has resulted in faster drawdowns from underground storage and a rebound in spot prices relative to the third quarter. This, along with the expiry of the gas transit agreement between Russia and Ukraine on December 31, 2024, is likely to increase the call on LNG imports in the coming months in order to replenish European gas storage facilities to 90% capacity by November 1, as required by the EU each year.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
Net income attributable to Cheniere declined $6.6 billion for the year ended December 31, 2024 as compared to the same period of 2023 and was primarily attributable to $6.7 billion of decreases in gains (before tax and the impact of non-controlling interests) from changes in fair value of derivatives. The majority of the decrease was attributable to our IPM agreements, where the associated gains that are primarily included in cost of sales decreased from $7.0 billion during the year ended December 31, 2023 to $1.5 billion during the year ended December 31, 2024, mainly due to the impact on fair value of the decline and sustained moderation of global LNG and gas price volatility and more subdued changes in the current period relative to the same period of 2023 as global prices and spreads narrowed as a result of market rebalancing. The remaining change in fair value of derivatives was primarily due to an unfavorable shift in long-term U.S. natural gas basis spreads. In addition, there was a $2.8 billion decrease in LNG revenues, net of cost of sales and excluding the effect of derivatives, for the year ended December 31, 2024 as compared to the same period of 2023, the majority of which was attributable to a reduction of volumes sold under short-term agreements as a higher proportion of our LNG was sold under long-term contracts, as further described in Revenues below.
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
•$3.8 billion decrease in revenues generated by our marketing function under short-term agreements between the comparative years due to declining global LNG and gas prices and a reduction of volumes sold under short-term agreements as a result of additional long-term agreements commencing in 2024 as compared to 2023; and
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
•$6.5 billion of decreases in gains from changes in fair value of derivatives included in cost of sales, with the primary drivers of the variance described above under the caption Net income attributable to Cheniere;
Read it in 10-K Feb 20, 2025 at sec.gov
RemovedMD&A
•$1.7 billion decrease between the periods in cost of sales excluding the effect of derivative changes described above, primarily as a result of a $1.6 billion decrease in cost of natural gas feedstock largely due to the decline and sustained moderation of global LNG and gas prices as well as lower U.S. natural gas prices in the current year compared to the prior year.
Read it in 10-K Feb 20, 2025 at sec.gov
RewordedMD&A
Under our long-term SPAs and IPM agreements, as of December 31, 2025, we have contracted substantially all approximately 90% of our the total anticipated production from the Liquefaction Projects through the mid-2030s mid-2030s, excluding volumes from our contracts with terms less than 10 years and volumes from SPAs that are conditional on additional liquefaction capacity that beyond what is currently under in construction or in operation. operation, subject to unilateral waiver by us.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Year Ended December 31, 2025 2024 (in TBtu) 2024 2023 Variance Operational Commissioning Total Operational Commissioning Total Volumes loaded during the current period 2,400 24 2,424 2,327 2,299 28 — 2,327 Volumes loaded during the prior period but recognized during the current period 39 — 39 37 56 (19) — 37 Less: volumes loaded during the current period and in transit at the end of the period (23) (1) (24) (39) (37) (2) — (39) Total volumes recognized in the current period 2,416 23 2,439 2,325 2,318 7 — 2,325
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Derivative instruments, which we use to manage certain risks, are reported at fair value in our Consolidated Financial Statements, unless they satisfy criteria for, and we elect, the normal purchases and normal sales exception which applies the accrual method of accounting, as described in Note 2—Summary of Significant Accounting Policies of our Notes to Consolidated Financial Statements.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Under As described in General, under our SPAs, customers purchase LNG on either an FOB basis (delivered to the customer at the Sabine Pass LNG Terminal or the Corpus Christi LNG Terminal, as applicable) or a DAT DAP basis (delivered to the customer at their specified LNG receiving terminal) generally for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG generally equal to 115% of Henry Hub.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Year Ended December 31, 2025 2024 2023 Proceeds from issuances of debt Cheniere: 2034 Cheniere 5.650% Senior Notes due 2034 $ — $ 1,497 $ Cheniere Revolving Credit Facility 175 — CQP: 5.750% Senior Notes due 2034 — 1,198 2035 CQP Senior Notes 1,198 997 — 5.950% Senior Notes due 2033 — 1,397 SPL:
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
The $938 $224 million decrease between increase during the year ended December 31, 2024 2025 as compared to the same period of 2023 2024 was primarily attributable to a $1.7 billion decrease $477 million increase in CQP’s consolidated net income, income primarily due to $1.5 billion of decreases from favorable changes in gains from the fair value of its IPM agreements accounted for as derivatives. derivative instruments.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
The updated capital allocation plan also In June 2025, we announced updates to our company outlook, which included a plan to increase our quarterly annualized dividend by approximately 15% over 10% to $2.00 $2.22 per common share on an annualized basis, share, which commenced with the dividend pertaining to the third quarter of 2024. 2025.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Our investing net cash outflows in both periods primarily were for the (1) construction costs for the Corpus Christi Stage 3 Project, which were $1.3 billion and $1.5 billion during both the years ended December 31, 2024 2025 and 2023, as well as for optimization and other site improvement projects. 2024, respectively;
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
The $4.7 billion $677 million unfavorable variance between during the year ended December 31, 2024 2025 as compared to the same period of 2023 2024 was primarily substantially all attributable to: to a higher income tax expense due to a $3.0 billion increase in pre-tax income.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Our use of LNG as a cleaner burning transport fuel in our operations has enabled us to claim domestic federal alternative fuel excise tax credits which we are actively pursuing totaling $370 million for the period spanning from 2018 to 2024, preceding the expiration of the incentive program on December 31, 2024.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Business and Properties, will as well as the current geopolitical environment that has intensified the demand for supply security, should enable us to enter into long-term agreements and provide a foundation for additional growth in our business in the future.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Over a remaining fixed term of 18 20 years, we expect to generate liquidity from the approximately 3,825 5,066 TBtu of LNG to be produced from natural gas not yet received under IPM agreements as of December 31, 2024, excluding approximately 665 TBtu related to an IPM agreement that is subject to unsatisfied contractual conditions precedent. 2025.
Read it in 10-K Feb 26, 2026 at sec.gov

Sources

The two latest 10-Ks on EDGAR, section by section. Each change links to the text at sec.gov.

Also

New risk factors: paragraphs with nothing like them last year, quoted in full.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/LNG/export.csv") into a cell.

Next:Related parties
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.