Screener / SEC EDGAR /CIK 0000015615 /10-K filed Feb 26, 2026, compared with Feb 28, 2025 /Numbers from the XBRL of the 10-Ks
NYSE Industrials · Water, Sewer, Pipeline, Comm & Power Line Construction

Mastec Inc MTZ

Compare with peers Embed
The 10-K against last year's

158 changes: 14 added, 15 removed, 126 reworded, 3 quiet changes

10-K Feb 26, 2026 vs Feb 28, 2025

10-K 0000015615-26-000020 (Feb 26, 2026) vs 10-K 0000015615-25-000021 (Feb 28, 2025)

Every paragraph, and how much of it changed

One bar per paragraph, in the order of the 10-K. Height and colour show the share of its words not in the closest paragraph a year earlier; the tallest bars are new paragraphs.

Risk Factors

128 paragraphs · 7 new · 70 reworded · 8 gone · 10-K Feb 26, 2026 against Feb 28, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 50 · 48% changed Every version of it
Because we As acquisitions have grown in part through acquisitions, we have been a component of our growth strategy, our balance sheet includes a significant amount of goodwill goodwill, other intangible assets, and intangible assets. long-lived assets, the value of which is dependent upon certain estimates and assumptions. Under U.S. GAAP, we are required to test goodwill and intangible assets carried in our consolidated balance sheets for possible impairment on an annual basis based upon a fair value approach annually, and whenever events occur that indicate impairment could may exist. We examine relevant events Impairment testing of goodwill involves qualitative assessments and circumstances, such as: macroeconomic conditions, including levels of inflation, market interest rates and supply chain disruptions; any adverse effects of industry and/or market conditions, including quantitative tests to determine the potential effects of regulatory and other uncertainty; uncertainty related to the implementation and pace of spending under governmental infrastructure programs and initiatives; project permitting uncertainty; financial, competitive and other conditions, including declines in the operating performance of our reporting units; entity-specific events; the rates of success on new project awards; the potential effects of longer-term changes in consumer behavior from regulatory, climate-related or other factors; and other adverse changes in the key valuation assumptions contributing to the estimated fair value of our reporting units. These events and circumstances could adversely affect the estimated fair values of the related reporting units and is dependent upon estimates and assumptions. If we determine the fair value of a reporting unit with goodwill is less than its carrying value as a result in of an annual or interim test, an impairment of loss is recognized. We have recorded impairment losses in the recorded balances of goodwill or past, and any future impairments to goodwill, other intangible assets, which or long-lived assets could materially and adversely affect our business, results of operations and financial condition. See Item 7. Management's Discussion and Analysis of Financial Condition - Critical Accounting Estimates and Note 1 - Business, Basis of Presentation and Significant Accounting Policies and Note 3 - Acquisitions, Goodwill and Other Intangible Assets, Net in the notes to the audited consolidated financial statements, which are incorporated by reference. reference, for further information about our critical accounting estimates and significant accounting policies.
Paragraph 102 · 48% changed Every version of it
Regulatory requirements and stakeholder expectations with respect to ESG matters, including climate-change related matters, are rapidly evolving. While the potential effects of climate change are highly uncertain, climate change and climate-related Natural catastrophes or other extreme weather events could result in, among cause supply chain disruptions, resulting in shortages of construction or other things, an increase in extreme weather events, such as floods, hurricanes and wildfires, as well as changes in rainfall patterns, storm patterns and intensities and temperature levels, rising sea levels and limitations on water availability and quality. Our operating results are significantly influenced by weather; therefore, major changes in weather patterns could have a significant effect on our future operating results. Extreme weather conditions could materials, or limit the availability of resources, cause supply chain disruptions or which could impair our ability to complete projects, increase the costs of our projects, reduce productivity, or could cause projects to be delayed or canceled. Severe weather events could also damage ongoing construction projects and lead to increased costs. We could experience project cancellations, reduced demand or reduced productivity if climate change results in a significant increase in adverse weather conditions in a given period, or from potential market-related or macroeconomic effects of climate-related factors that affect our business, which could negatively affect our revenue and profitability. We could also be exposed to increased risk of liability in locations potentially affected by climate-related risks, for example, in areas where the risk of wildfires is increased. The risks associated with the physical effects of climate change have affected, and could continue to negatively affect, our insurance premiums or the amount of coverage that insurers are willing to make available under our insurance policies. In addition, limitations on access to clean water or other natural resources in the communities where we conduct our operations could disrupt our or our customers’ operations and result in work stoppages, project delays, reduced productivity and increased costs. All of the above climate-related factors could negatively affect our business, financial condition and results of operations.
Paragraph 15 · 48% changed Every version of it
In addition, our operations and/or our customers, particularly in the Pipeline Infrastructure segment, could be negatively affected by market and political uncertainty, including from unrest and/or military actions involving oil-producing nations; and a variety of other factors that are beyond our control. Such market volatility can affect our customers’ customer’s investment decisions and subject us to project cancellations, deferrals or unexpected changes in the timing of project work. In particular, a reduction in the price of oil resulting from expanded oil supplies could reduce oil exploration activities that could adversely affect our Pipeline Infrastructure segment.
Paragraph 103 · 48% changed Every version of it
Regulatory requirements and stakeholder expectations with respect to ESG matters, including climate-change related matters, are rapidly evolving. While the potential effects of climate change are highly uncertain, climate change and climate-related events could result in, among other things, an increase in extreme weather events, such as floods, hurricanes and wildfires, as well as changes in rainfall patterns, storm patterns and intensities and temperature levels, rising sea levels and limitations on water availability and quality. Our operating results are significantly influenced by weather; therefore, major changes in weather patterns could have a significant effect on our future operating results. Extreme weather conditions could limit the availability of resources, cause supply chain disruptions or increase the costs of our projects, reduce productivity, or could cause projects to be delayed or canceled. We could experience project cancellations, reduced demand or reduced productivity if climate change results in a significant increase in adverse weather conditions in a given period, or from potential market-related or macroeconomic effects of climate-related factors that affect our business, which could negatively affect our revenue and profitability. We could also be exposed to increased risk of liability in locations potentially affected by climate-related risks, for example, in areas where the risk of wildfires is increased. The risks associated with the physical effects of climate change have affected, and could continue to negatively affect, our insurance premiums costs or the amount of coverage that insurers are willing to make available under our insurance policies. In addition, limitations on access An increase in severe weather events and changes in climate patterns could cause insurers to clean water increase our premiums, limit our coverage or add exclusions to policies, including for wildfire, hurricane or other natural resources climate-related risks. Any of these factors could increase our risk exposure and our cost of insurance coverage in the communities where we conduct our operations could disrupt our or our customers’ operations and result in work stoppages, project delays, reduced productivity and increased costs. All of the above climate-related factors future, which could negatively affect our business, financial condition business and results of operations. cause us to incur additional expenses, or could require us to increase our reliance on self-insurance.
Paragraph 105 · 40% changed Every version of it
Climate-related factors could also affect the projects our customers award. Concerns about climate change could result in new regulations, regulatory actions or requirements related to energy efficiency or reductions in greenhouse gas GHG emissions, any of which could negatively affect our customers, or decrease the number, scope or types of projects they award, which could decrease demand for our services. Demand for power projects, underground pipelines or other projects could be negatively affected by significant changes in weather or by climate-related legislation or regulations. Legislative and/or regulatory responses related Changing customer preferences, including changes in demand for hydrocarbon or clean energy-related products and services, or negative effects from social or political activism, including public protests or local opposition to climate change projects, could also affect the availability of goods, cause project delays or cancellations, increase our costs costs, or otherwise negatively affect our operations. In addition, demand for our services services. Additionally, a transition of existing service offerings to alternative, lower carbon offerings could be negatively affected by market and consumer response to climate-related matters, changes result in technology, and changes in our customers’ expectations lower revenue and/or requirements for companies in their supply chains, which could affect their selection reduced levels of service providers or require those in their supply chain to meet certain climate and/or ESG-related goals or disclosure requirements. Our ability to compete could also be affected by labor shortages resulting from lack of available skilled labor for new or emerging climate-related technologies. Additionally, if our stakeholders, including our customers, do not have a favorable view of our values and profitability.
Paragraph 101 · 40% changed Every version of it
Regulatory requirements and stakeholder expectations with respect to ESG sustainability matters, including climate-change related matters, matters relating to a changing climate, are rapidly evolving. While the potential effects of climate change are highly uncertain, climate change and climate-related events could result in, among other things, an increase in extreme weather events, such as floods, hurricanes and wildfires, as well as changes in rainfall patterns, storm patterns and intensities and temperature levels, rising sea levels and limitations on water availability and quality. Our operating results are significantly influenced by weather; therefore, major changes in weather patterns could have a significant effect on our future operating results. Extreme weather conditions could limit the availability of resources, cause supply chain disruptions or increase the costs of our projects, reduce productivity, or could cause projects to be delayed or canceled. We could experience project cancellations, reduced demand or reduced productivity if climate change results in a significant increase in adverse weather conditions in a given period, or from potential market-related or macroeconomic effects of climate-related factors that affect our business, which could negatively affect our revenue and profitability. We could also be exposed to increased risk of liability in locations potentially affected by climate-related risks, for example, in areas where the risk of wildfires is increased. The risks associated with the physical effects of climate change have affected, and could continue to negatively affect, our insurance premiums or the amount of coverage that insurers are willing to make available under our insurance policies. In addition, limitations on access to clean water or other natural resources in the communities where we conduct our operations could disrupt our or our customers’ operations and result in work stoppages, project delays, reduced productivity and increased costs. All of the above climate-related factors could negatively affect our business, financial condition and results of operations.
Paragraph 109 · 40% changed Every version of it
Compliance with any new laws or regulations relating to the reduction of greenhouse gases GHG could result in significant required changes to our operations and a significant increase in the cost of conducting our business. In addition, our reputation could suffer and/or we could experience a reduction in the amount of future work we are awarded if our operations are perceived to result in high levels of greenhouse gas emissions or to otherwise pose environmental risks. Reductions in project awards, project deferrals, delays or cancellations, or increases in costs related to the effects of climate change, climate change initiatives or climate change regulations could have a material adverse effect on our results of operations, cash flows and liquidity.
Paragraph 4 · 39% changed Every version of it
We build renewable energy and other infrastructure for which the development may be partially dependent upon federal tax credits, including from the IIJA and IRA, and for renewable infrastructure, existing renewable portfolio standards and other tax federal or state tax incentives. The IIJA and IRA provide for funding in many of the markets in which we operate. Delays and uncertainty related to the implementation and pace of spending, or to project permitting or other matters under the IIJA, IRA and/or other programs, has caused, and could continue to cause, uncertainty related to the timing of our current and future project work expectations. Additionally, if our customers are not able to realize the expected benefits of the IIJA or IRA, it could reduce demand for our services. The new presidential administration has included as part of its agenda potential changes to U.S. tax laws. The details of these changes have not yet emerged, but may include reducing the corporate tax rate for domestic oil and gas production, repealing green energy tax credits and extending certain provisions of the Tax Cuts and Jobs Act of 2017 (“TCJA”). In early February 2025, President Trump announced 25% tariffs on imports from Canada (10% tariff in the case of oil) and Mexico, which tariffs were subsequently delayed until early March 2025, a 10% tariff on imports from China (which President Trump subsequently doubled), and a 25% tariff on all steel and aluminum imports into the United States. Many political and economic commentators believe that the impacts of extending certain tax benefits pursuant to the TCJA and new tariffs could potentially cause inflationary pressure that could, in turn, contribute to increases in market interest rates and a decrease in U.S. economic growth. We cannot predict, however, whether, when, or to what extent these potential changes in law or policy will become effective, nor can we predict the long-term impact of these potential changes on the industries in which we operate. Elimination elimination of, reduction of, or changes to the IIJA, IRA, existing renewable portfolio standards, environmental policies, tax incentives and/or similar programs, including as a result of the change in administration in the United States, programs could negatively affect demand for our services. In July 2025, OBBBA was signed into law, and while it extended many provisions of the Tax Cuts and Jobs Act of 2017 (“TCJA”), it also accelerated the phaseout of certain clean energy tax credits established under the IRA, including the clean electricity investment and clean energy production credits for solar and wind projects, which may reduce longer term demand for such projects. We cannot predict, however, whether, when, or to what extent these changes in governmental programs and spending policies will impact the industries in which we operate in the long term.

MD&A

144 paragraphs · 7 new · 84 reworded · 7 gone · 10-K Feb 26, 2026 against Feb 28, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 11 · 47% changed
During 2023, 2025, we completed four five acquisitions, including, within our Communications segment, certain of the assets of a telecommunications company specializing in wireless services; and a telecommunications construction company specializing in broadband and fiber-to-the-home initiatives in the New England area. Additionally, we acquired certain which included all of the equity interests of two equipment companies, both of the following: (i) within our Communications segment: a telecommunications construction company, which are included acquisition was effective in July; (ii) within our Pipeline Infrastructure segment. segment: a construction company specializing in roadway infrastructure, which acquisition was effective in August; and (iii) within our Clean Energy and Infrastructure segment: a construction company specializing in construction management and design-build services, which acquisition was effective
Paragraph 12 · 46% changed
During 2023, in December. Additionally, we completed four acquisitions, including, acquired certain operations and assets of a business specializing in install-to-the-home services included within our Communications segment, effective in November, and, effective in July, we acquired certain of the assets of a telecommunications company specializing in wireless services; and a telecommunications construction company specializing in broadband and fiber-to-the-home initiatives in the New England area. Additionally, we acquired certain of the equity interests of two an equipment companies, both of company, which are is included within our Pipeline Infrastructure segment.
Paragraph 131 · 45% changed
5.900% Senior Notes. We have $600 $550 million aggregate principal amount of 4.500% 5.900% senior unsecured notes due August June 15, 2028 2029 (the “4.500% “5.900% Senior Notes”). The 4.500% Senior Notes are subject to certain provisions and covenants, as more fully described in Note 7 - Debt in the notes to the audited consolidated financial statements, which is incorporated by reference.
Paragraph 130 · 42% changed
4.500% Senior Notes. We have $600 million aggregate principal amount of 4.500% senior unsecured notes due August 15, 2028 (the “4.500% Senior Notes”). The 4.500% Senior Notes are subject to certain provisions and covenants, as more fully described in Note 7 - Debt in the notes to the audited consolidated financial statements, which is incorporated by reference.
Paragraph 132 · 42% changed
6.625% Senior Notes. We have $600 $75 million aggregate principal amount of 4.500% 6.625% senior unsecured notes due August 15, 2028 2029 (the “4.500% “6.625% Senior Notes”). The 4.500% Senior Notes are subject to certain provisions and covenants, as more fully described in Note 7 - Debt in the notes to the audited consolidated financial statements, which is incorporated by reference.
Paragraph 85 · 42% changed
Revenue. The increase in revenue was due primarily due to higher levels of heavy civil project activity, offset, primarily in part, by lower levels of our renewable and certain industrial and other infrastructure project work, due to various factors affecting timing of project work. projects.
Paragraph 43 · 37% changed
Cost estimation processes used for recognizing revenue over time under the cost-to-cost method require management to make significant assumptions and judgments. Total transaction price and cost estimation processes are based primarily on the professional knowledge and experience of our project managers, operational and financial professionals, and other professional expertise, as warranted. Management reviews estimates of total contract transaction price and costs on an ongoing basis. Changes in job performance, job conditions and management’s assessment of the estimated amount and probability of variable consideration are factors that influence estimates of the total contract transaction price, total costs to complete those contracts and our profit recognition. Changes in these factors could result in revisions to the amount of revenue recognized in the period in which the revisions are determined, which revisions could materially affect our consolidated results of operations for that period. Provisions for losses on uncompleted contracts are recorded in the period in which such losses are estimated based on management’s experience and judgment. For the year ended December 31, 2024, project profit was affected by less than 5% as a result of changes in contract estimates included in projects that were in process as of December 31, 2023. Changes in recognized revenue, net, as a result of changes in total contract transaction price estimates, including from variable consideration, and/or changes in cost estimates, related to performance obligations satisfied or partially satisfied in prior periods, for the year ended December 31, 2024, positively affected revenue by approximately 0.1%.
Paragraph 134 · 37% changed
As of December 31, 2024, On June 26, 2025, we had $285 entered into a new $600 million outstanding of an senior unsecured five-year term loan agreement (the “Five-Year “2025 Term Loan”) Loan Facility”) which matures on June 26, 2028 and the loans thereunder are not subject to amortization. In the second quarter of 2025, we used the proceeds from the 2025 Term Loan Facility, together with available cash, to repay the $328.1 million term loan under our Existing Credit Agreement and the remaining $277.5 million of our Five-Year Term Loan that is due would otherwise have matured on October 7, 2027. The Five-Year 2025 Term Loan Facility is subject to certain provisions and covenants, as more fully described in Note 7 8 - Debt in the notes to the audited consolidated financial statements, which is incorporated by reference.

A paragraph is matched with the one last year that shares the most of its words; under half in common makes it new. The paragraphs shown are the 8 reworded the most in each section.

The paragraph that changed most in each section

The redline

Marked against last year's 10-K: cut words struck through, new words highlighted.

Risk Factors333 words changed in this paragraph; it is 43% similar to last year's version.
We build renewable energy and other infrastructure for which the development may be partially dependent upon federal tax credits, including from the IIJA and IRA, and for renewable infrastructure, existing renewable portfolio standards and other tax federal or state tax incentives. The IIJA and IRA provide for funding in many of the markets in which we operate. Delays and uncertainty related to the implementation and pace of spending, or to project permitting or other matters under the IIJA, IRA and/or other programs, has caused, and could continue to cause, uncertainty related to the timing of our current and future project work expectations. Additionally, if our customers are not able to realize the expected benefits of the IIJA or IRA, it could reduce demand for our services. The new presidential administration has included as part of its agenda potential changes to U.S. tax laws. The details of these changes have not yet emerged, but may include reducing the corporate tax rate for domestic oil and gas production, repealing green energy tax credits and extending certain provisions of the Tax Cuts and Jobs Act of 2017 (“TCJA”). In early February 2025, President Trump announced 25% tariffs on imports from Canada (10% tariff in the case of oil) and Mexico, which tariffs were subsequently delayed until early March 2025, a 10% tariff on imports from China (which President Trump subsequently doubled), and a 25% tariff on all steel and aluminum imports into the United States. Many political and economic commentators believe that the impacts of extending certain tax benefits pursuant to the TCJA and new tariffs could potentially cause inflationary pressure that could, in turn, contribute to increases in market interest rates and a decrease in U.S. economic growth. We cannot predict, however, whether, when, or to what extent these potential changes in law or policy will become effective, nor can we predict the long-term impact of these potential changes on the industries in which we operate. Elimination elimination of, reduction of, or changes to the IIJA, IRA, existing renewable portfolio standards, environmental policies, tax incentives and/or similar programs, including as a result of the change in administration in the United States, programs could negatively affect demand for our services. In July 2025, OBBBA was signed into law, and while it extended many provisions of the Tax Cuts and Jobs Act of 2017 (“TCJA”), it also accelerated the phaseout of certain clean energy tax credits established under the IRA, including the clean electricity investment and clean energy production credits for solar and wind projects, which may reduce longer term demand for such projects. We cannot predict, however, whether, when, or to what extent these changes in governmental programs and spending policies will impact the industries in which we operate in the long term.

Source: Item 1A, 10-K 0000015615-26-000020 vs Item 1A, 10-K 0000015615-25-000021

MD&A257 words changed in this paragraph; it is 45% similar to last year's version.
Financing Activities. Net cash used in financing activities for the year ended December 31, 2024 2025 was $1,090 $283 million, as compared with net cash used in financing activities of $351 $1,090 million in 2023, 2024, for an increase a decrease in cash used in financing activities of approximately $739 $807 million. The increase was primarily due to repayments, For the year ended December 31, 2025, we had $56 million of borrowings, net of borrowings, of repayments, under our credit facility and term loans, which increased as compared with $1,154 million of repayments, net of borrowings, for the same period in 2024, for a decrease in cash used in financing activities of $1,209 million. The decrease in cash used in financing activities from the above was offset, in part, by $1,022 an increase in net proceeds of Senior Notes for the year ended December 31, 2024 of $326 million, consisting of $550 million in proceeds from our 5.900% Senior Notes and $224 million of repayments made on our 6.625% Senior Notes. Share repurchases totaled approximately $77 million for the year ended December 31, 2024 as compared with 2025, whereas there were no share repurchases for the same period in 2023, and the payment of $224 million upon the repurchase and redemption in full of our 6.625% IEA Senior Notes. Payments 2024. Additionally, payments of acquisition-related contingent consideration included within financing activities totaled $25 million in 2024 as compared to $22 million in 2023. increased by $18 million. Total payments of acquisition-related contingent consideration, including payments in excess of acquisition-date liabilities, which are classified within operating activities, totaled $26 $49 million in 2024 for the year ended December 31, 2025 as compared with $39 $26 million for the same period in 2023. Additionally, cash payments for acquisition-related contingent assets related to the 2021 acquisition of HMG totaled approximately $12 million in 2024, whereas in 2023, there were no payments. Payments to holders of our non-controlling interests increased by $18 million in 2024 as compared with 2023, primarily related to distributions to minority interest holders. The above described increases in cash used in financing activities were offset, in part, by $550 million of net proceeds received from the issuance of our 5.900% Senior Notes in the second quarter of 2024.

Source: Item 7, 10-K 0000015615-26-000020 vs Item 7, 10-K 0000015615-25-000021

Accounting Policies161 words changed in this paragraph; it is 55% similar to last year's version.
2024 2025 Assessment. During the first quarter of 2024, the 2025, certain reporting units within the Communications and Power Delivery operating segment segments were restructured to more closely align with the segment’s segments’ end markets and to better correspond with the operational management reporting structure of both segments. Under both the segment, including from the effects of the Company’s recent transformative acquisition efforts. Under the new current and previous reporting unit structure, structures, each of the five components within the Communications and Power Delivery operating segment segments is a reporting unit. Management performed goodwill impairment testing under both the current and previous reporting unit structure and determined that no goodwill impairment existed, and under structures. Based on the new reporting unit structure results of the quantitative assessments, the estimated fair values of all but one of the impacted reporting units substantially exceeded their carrying values. values as of March 31, 2025, therefore no goodwill impairment existed. A 100 basis point increase in the discount rate would not have resulted in any of the tested reporting units’ carrying values exceeding their fair values. As of March 31, 2024, the reporting unit that did not substantially exceed its carrying value had approximately $47.1 million of goodwill. This reporting unit’s estimated fair value exceeded its carrying value by approximately 16%. Significant assumptions used in testing this reporting unit included terminal values based on a terminal growth rate of 3%, 5 years of discounted cash flows prior to the terminal value, including revenue growth and EBITDA margin assumptions, and a weighted average discount rate of 12%.

Source: Item 8, Note 1 – Business, Basis of Presentation and Significant Accounting Policies, 10-K 0000015615-26-000020 vs Item 8, Note 1 – Business, Basis of Presentation and Significant Accounting Policies, 10-K 0000015615-25-000021

Legal Proceedings72 words changed in this paragraph; it is 85% similar to last year's version.
The Company currently contributes, and in the past, has contributed, to plans that are underfunded, and, therefore, could have potential liability associated with a voluntary or involuntary withdrawal from, or termination of, these plans. As of December 31, 2024, 2025, the Company does not have plans to withdraw from, and is not aware of circumstances that would reasonably lead to material claims against it, in connection with the MEPPs in which it participates. There can be no assurance, however, that the Company will not be assessed liabilities in the future, including in the form of a surcharge on future benefit contributions or increased contributions on underfunded plans. The amount the Company could be obligated to pay or contribute in the future cannot be estimated, as these amounts are based on future levels of work of the union employees covered by these plans, investment returns, which could be negatively affected by economic and market conditions, and the level of underfunding of such plans. In 2022, the Company paid $2.8 million to settle a withdrawal liability assumed in connection with the HMG acquisition, for which it recognized a gain of $0.5 million for the year ended December 31, 2022. Additionally, in connection with the IEA acquisition, acquisition in 2022, the Company assumed a multiemployer pension plan withdrawal liability (the “IEA withdrawal liability”), liability, under which IEA was obligated to make monthly payments of approximately $10,000. As of December 31, 2024 and 2023, 2024, the remaining obligation approximated $1.3 million and $1.8 million, respectively. In January 2025, which the Company settled its IEA withdrawal liability in January 2025 by issuing a lump-sum payment for the remaining obligation of $1.3 million. payment.

Source: Item 3, via Note 15 – Commitments and Contingencies, 10-K 0000015615-26-000020 vs Item 3, via Note 14 – Commitments and Contingencies, 10-K 0000015615-25-000021

Sentences and paragraphs added, removed or reworded

Every change, by type

Sentences and paragraphs of MTZ's Risk Factors and MD&A, 10-K Feb 26, 2026 against 10-K Feb 28, 2025. Each links to the text at sec.gov.

Quiet changes are sentences kept from last year with one to four words changed, at least one of them a hedge, a modal or a qualifier (may, could, will, not, significant, material…). A year or date rolling forward is not counted.

The full word list

adverse, adversely, all, although, anticipate, anticipates, any, approximately, believe, believes, can, cannot, certain, could, expect, expects, generally, however, if, intend, intends, largely, likely, many, material, materially, may, might, most, must, never, no, not, possible, primarily, probable, should, significant, significantly, some, substantial, substantially, unlikely, will, would

AddedRisk Factors
During the year ended December 31, 2025, the U.S. government announced significant trade policy and tariff actions on imports from a broad set of countries, including Canada, Mexico, European Union member states, Japan, Germany and China, in response to which many countries announced retaliatory trade actions, including tariffs on U.S. exports or bans by foreign countries on certain of their exports. These actions have increased the cost of importing certain construction materials into the U.S., including steel, concrete and solar panels, and have caused disruption and uncertainty to both international trade and supply chains. More recently, on February 20, 2026, the U.S. Supreme Court ruled that certain trade tariffs imposed by the U.S. federal government under the IEEPA were unconstitutional. Following the U.S. Supreme Court’s decision, the U.S. presidential administration announced its intention to invoke other laws to collect tariffs and announced new tariffs on imports from all countries, in addition to any existing non-IEEPA tariffs. Significant uncertainty remains regarding the status of existing and newly announced tariffs, potential changes or pauses to such tariffs, tariff levels, and whether further additional tariffs or other retaliatory actions may be imposed, modified, or suspended.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
The duration, extent and effects of these tariffs and trade actions cannot be predicted with certainty but these and other trade policies could increase costs of key construction equipment and components thereof, as well as materials required for our customers’ projects (including steel, concrete, copper and solar panels), which could cause our customers to reconsider or reduce their capital expenditures, or could affect our customers’ capital spending plans and demand for our services. Accordingly, these trade actions and the widespread uncertainty and international tensions resulting therefrom, including, without limitation, effects on interest rates and on the value of the U.S. dollar relative to other currencies, could materially and adversely affect our business, financial condition and results of operations.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
actual results from related estimates on a large project, or on several smaller projects, could be material. Any such adjustments could result in reduced profitability and negatively affect our results of operations.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
The FCPA and similar anti-bribery laws in other jurisdictions prohibit U.S.-based companies and their intermediaries from making improper payments for the purpose of obtaining or retaining business. We pursue opportunities in certain parts of the world that experience
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
Climate impacts could negatively affect our or our customers’ operations from damage to properties, assets or locations associated with projects in backlog, causing projects to be delayed or canceled. Climate impacts could also result in decreased availability of, or limitations on access to, clean water or other natural resources in the communities where we conduct our operations, which could disrupt our or our customers’ operations and result in work stoppages, project delays, reduced productivity and increased costs. All of the above climate-related factors could negatively affect our business, financial condition and results of operations.
Read it in 10-K Feb 26, 2026 at sec.gov
Show the other 48
RemovedRisk Factors
In addition, our operations and/or our customers, particularly in the Pipeline Infrastructure segment, could be negatively affected by market and political uncertainty, including from unrest and/or military actions, such as heightened geopolitical tensions and conflicts, including the Russia-Ukraine conflicts and the escalated tensions in the Middle East, among others.
Read it in 10-K Feb 28, 2025 at sec.gov
RemovedRisk Factors
We may encounter difficulties in engineering or delays in designs or in the availability or receipt of materials or equipment provided by the customer or a third-party, certain of which have long lead-times. We may also encounter delays related to permitting and environmental approval processes; schedule changes; delays from failure of our customers to obtain rights-of-way in a timely manner; weather-related delays; delays by
Read it in 10-K Feb 28, 2025 at sec.gov
RemovedRisk Factors
later than originally expected, or not at all. From time to time, we experience postponements, cancellations and reductions in expected future work due to changes in our customers’ spending plans, market volatility, changes in governmental permitting, regulatory delays and/or other factors.
Read it in 10-K Feb 28, 2025 at sec.gov
RemovedRisk Factors
If our credit rating is downgraded, it could increase borrowing costs on our variable rate indebtedness, and/or increase the cost of renewing or obtaining new debt financing or make it more difficult to renew, obtain or issue new debt financing in the future.
Read it in 10-K Feb 28, 2025 at sec.gov
RemovedRisk Factors
disproportionate to operating performance. Volatility in the market price of our common stock could cause shareholders to lose some or all of their investment in our common stock.
Read it in 10-K Feb 28, 2025 at sec.gov
RewordedRisk Factors
If we do not adapt to or comply with stakeholder expectations and standards on ESG matters as they continue to evolve, or if we are perceived to have not responded appropriately or quickly enough to growing concern for ESG concerns related to sustainability and sustainability issues, climate-related matters, regardless of whether there is a regulatory or legal requirement to do so, it we could result in experience a loss of business and an inability be unable to attract and retain customers and talented personnel, or we could face an increase in sustainability or climate-related litigation and suffer reputational damage and/or increased risk of potential litigation, damage, all of which could adversely affect our business, results of operations and financial condition, and could result in an increase in our cost of capital and/or a decline in the price per share of our common stock.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Unfavorable market conditions, including rising or elevated levels of inflation or and/or interest rates, changes to tariffs and/or trade policies affecting macroeconomic conditions, including inflation, as well as the industries we serve and related projects and expenditures, access to capital, material and costs, supply chain disruptions or political, disruptions, political regulatory or market uncertainty, including economic downturns and heightened geopolitical tensions and conflicts, could reduce capital expenditures in the industries we serve or could adversely affect our customers and result in decreased demand for our services.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
See Management's Discussion and Analysis of Financial Condition - Critical Accounting Estimates and Note 1 - Business, Basis of Presentation and Significant Accounting Policies and Note 3 - Acquisitions, Goodwill and Other Intangible Assets, Net in the notes to the audited consolidated financial statements, which are incorporated by reference. reference, for further information about our critical accounting estimates and significant accounting policies.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Extreme Natural catastrophes or other extreme weather conditions events could cause supply chain disruptions, resulting in shortages of construction or other materials, or limit the availability of resources, cause supply chain disruptions or which could impair our ability to complete projects, increase the costs of our projects, reduce productivity, or could cause projects to be delayed or canceled.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Additionally, if our stakeholders, including our customers, do not have a favorable view of our values and practices with respect to climate and/or sustainability-related matters, we could suffer reputational risk and reduced demand for our services, or an increase in our cost of, or a reduction in the availability of, capital.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
In addition, the U.S. federal government has continued to raise concerns about the heightened potential for cyberattacks generally as a result of heightened geopolitical tensions from nation-states and conflicts, including the Russia-Ukraine and Israel-Hamas conflicts and the escalated tensions in the Middle East, among others. decentralized cybercriminal groups.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
We cannot predict, however, whether, when, or to what extent these potential changes in law or policy governmental programs and spending policies will become effective, nor can we predict the long-term impact of these potential changes on the industries in which we operate. operate in the long term.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Even if Inflation rates in the United States have increased significantly over the past several years and, while recent inflationary pressures moderate, pressure has somewhat abated, we expect our labor, materials and fuel costs, in particular, to remain elevated if we continue to expand our operations and volume of work.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Oil and gas prices are subject to large fluctuations in response to changes in supply and demand, including from: production and export/import volatility, climate change initiatives policies, and demand for alternative energy sources; disruptions in global economic activity; legislative activity, including from global sanctions and regulatory changes; and a variety of other factors that are beyond blockades;
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Additionally, our business is managed by a number of key executive and operational officers, many of whom have extensive industry experience, and we We are also dependent upon retaining and recruiting qualified management to execute our business strategy.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
In addition, demand for our services could be negatively affected by market and consumer response to climate-related matters, new or changing compliance obligations of our customers, changes in technology, and changes in our customers’ expectations and/or requirements for companies in their supply chains, which have affected, and could affect continue to affect, their selection of service providers or require those in their supply chain to meet certain climate and/or ESG-related sustainability-related goals or disclosure requirements. requirements, which could also increase our costs.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Changes to laws, governmental regulations and policies, including those pertaining to governmental permitting, tax incentives and incentives, government funding programs and spending policies, as well as advances in artificial intelligence and government policies, including spending policies, related to artificial intelligence, could affect demand for our services services, or cause delays in the timing of projects or cancellations of current or planned future projects.
Read it in 10-K Feb 26, 2026 at sec.gov
Quiet changesRisk Factors
A significant portion of our 18-month backlog is attributable to master service agreements and other service agreements, none of which do not require our customers to purchase a minimum amount of services and are cancelable on short or no advance notice.
Read it in 10-K Feb 26, 2026 at sec.gov
Quiet changesRisk Factors
In the ordinary course of our business, we may become are subject to lawsuits, indemnity or other claims, which could materially and adversely affect our business, results of operations and cash flows.
Read it in 10-K Feb 26, 2026 at sec.gov
Quiet changesRisk Factors
For example, new certain domestic and international laws and regulations relating to ESG sustainability matters, including environmental sustainability, climate change, human rights and human capital management have been adopted or are under consideration, some of which include specific, target-driven disclosure requirements or obligations.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
During the year ended December 31, 2025, the U.S. government announced or imposed a variety of tariff or other trade actions, in response to which many countries have announced retaliatory trade actions, including tariffs on U.S. exports or bans by foreign countries on certain of their exports. These actions have increased the cost of importing certain construction materials into the U.S., including steel, concrete, copper and solar panels, and have caused disruption and uncertainty to both international trade and supply chains, in turn affecting project demand and timing. More recently, on February 20, 2026, the U.S. Supreme Court ruled that certain trade tariffs imposed by the U.S. federal government under the IEEPA were unconstitutional. Following the U.S. Supreme Court’s decision, the U.S. presidential administration announced its intention to invoke other laws to collect tariffs and announced new tariffs on imports from all countries, in addition to any existing non-IEEPA tariffs. Significant uncertainty remains regarding the status of existing and newly announced tariffs, potential changes or pauses to such tariffs, tariff levels, and whether further additional tariffs or other retaliatory actions may be imposed, modified, or suspended. While the duration, extent and effects of these tariffs and trade actions cannot be predicted with certainty, these policy changes could impact our ability to execute projects and have a material adverse effect on our business, financial condition, and results of operations.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
Further, on July 4, 2025, OBBBA was signed into law in the United States increasing federal support for oil and gas production while reducing support for renewable energy and infrastructure. Notably, the OBBBA accelerates the phaseout of certain clean energy tax credits established under the IRA, including the clean electricity investment and clean energy production credits for solar and wind projects, which may reduce longer term demand for such projects. Under the new provisions, these credits will no longer be available for projects placed in service after December 31, 2027, unless construction begins on or before July 4, 2026, pursuant to a grandfathering rule. Projects that qualify under this rule must still meet continuity requirements to remain eligible. At the same time, the OBBBA contains other provisions to incentivize oil and gas development as well as to support energy infrastructure such as carbon capture and energy storage. The OBBBA, along with other evolving trade and immigration policies, may have both positive and negative effects on our business, including, but not limited to, shifts in the timing, type and scope of customer projects, fluctuations in demand for our services, and changes in capital and labor costs, including availability.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
Recent acquisitions. Subsequent to December 31, 2025, we completed one acquisition of an infrastructure services company that specializes in water and wastewater distribution networks in the south central region of the United States, which will be included within our Clean Energy and Infrastructure segment.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
For the year ended December 31, 2025, we completed our annual impairment test of goodwill as part of which we performed a qualitative assessment of all reporting units and concluded that it was more likely than not that the fair value of each reporting unit was greater than its carrying value. Accordingly, a quantitative goodwill impairment test was not required for any of our reporting units, and no goodwill impairment was recognized in 2025.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
Revenue. Revenue was generally flat as compared with 2024, due primarily to an increase in other infrastructure-related work, offset by lower levels of midstream pipeline project activity.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
material amounts due from customers experiencing financial difficulties. Based on current information, we expect to collect substantially all of our outstanding accounts receivable balances within the next twelve months.
Read it in 10-K Feb 26, 2026 at sec.gov
RemovedMD&A
Although the Federal Reserve has periodically lowered short-term interest rates since September 2024, interest rates, particularly long-term rates, remain elevated and the timing, direction and extent of any future interest rate changes remain uncertain. We expect 2025 to continue to be a dynamic macroeconomic environment, with elevated market interest rates and continuing, but moderating levels of cost inflation and potential market volatility, any or all of which could adversely affect our costs and customer demand. These conditions could also affect the cost of capital of both us and our customers, as well as our customers’ plans for capital investments and ongoing maintenance expenditures, which could negatively affect demand for our services. We could also experience negative effects from possible longer-term changes in consumer and customer behavior due to regulatory, climate-related or other factors. In addition, the impact of tariffs and other trade policies, immigration policies, as well as changes in federal government support for renewable power and other infrastructure projects, may have both negative and positive effects on the demand for our services, capital costs, labor costs and availability and costs of our operations.
Read it in 10-K Feb 28, 2025 at sec.gov
RemovedMD&A
During 2022, we completed five acquisitions including: (i) within our Clean Energy and Infrastructure segment: IEA, a leading utility-scale infrastructure solutions provider in North America, with expertise in renewable energy and heavy civil projects, as well as rail and environmental remediation services; and a company specializing in the production of concrete and aggregate products; (ii) within our Pipeline Infrastructure segment: an infrastructure construction company focusing on water, sewer and utility projects and with expertise in excavation and site work; (iii) within our Communications segment: a telecommunications company specializing in wireline services; and (iv) within our Power Delivery segment: a company specializing in the construction of overhead high voltage transmission lines.
Read it in 10-K Feb 28, 2025 at sec.gov
RemovedMD&A
transaction price, are recognized in the period in which such losses are determined. Factors impacting our costs of revenue, excluding depreciation and amortization, and project profit, include:
Read it in 10-K Feb 28, 2025 at sec.gov
RemovedMD&A
Based on the results of the qualitative assessments for the year ended December 31, 2024, we performed quantitative testing for (i) two reporting units within the Communications operating segment; (ii) one reporting unit within the Clean Energy and Infrastructure operating segment; and (iii) one reporting unit within the Pipeline Infrastructure operating segment. Factors considered by management in determining the reporting units for which quantitative assessments were performed included the effects of current or expected changes in market conditions on the future business outlook, including, as described above, the potential future effects of macroeconomic trends and events, industry, market and regulatory factors, climate-related or other factors, rates of success on new project awards and levels of operating activity.
Read it in 10-K Feb 28, 2025 at sec.gov
RemovedMD&A
Based on the results of the quantitative assessments, the estimated fair values of all of the tested reporting units were determined to substantially exceed their carrying values. A 100 basis point increase in the discount rate would not have resulted in any of the tested reporting units’ carrying values exceeding their fair values.
Read it in 10-K Feb 28, 2025 at sec.gov
RemovedMD&A
For the Years Ended December 31, 2024 2023 2022 Net cash provided by operating activities $ 1,121.6 $ 687.3 $352.3 Net cash used in investing activities $ (157.5) $ (178.1) $(821.2) Net cash (used in) provided by financing activities $ (1,090.2) $ (351.0) $480.9
Read it in 10-K Feb 28, 2025 at sec.gov
RewordedMD&A
For the year ended December 31, 2024, As part of our annual impairment test of goodwill, we performed perform a qualitative assessment for of our goodwill and indefinite-lived intangible assets reporting units by examining relevant events and circumstances that could have an effect on their a reporting unit’s fair values, value, such as: macroeconomic trends and events, including: including levels of inflation, market interest rates and/or supply chain disruptions; industry and/or market conditions, including the potential effects of regulatory and other uncertainty, including uncertainties, such as uncertainty related to the implementation and pace of spending under governmental infrastructure programs and initiatives; initiatives and project permitting uncertainty; issues; financial, competitive and other conditions, including declines in the operating performance of our reporting units; entity-specific events; the potential effects of longer-term units, and/or long-term changes in consumer behavior due to regulatory, climate-related or other factors, behavior; entity-specific events; and other relevant factors or events that could affect earnings and cash flows.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Capital expenditures totaled $260 million, or $204 million, net of asset disposals, for the year ended December 31, 2025, as compared with $149 million, or $83 million, net of asset disposals, for the same period in 2024, as compared with $193 million, or $109 million, net of asset disposals, in 2023, for a decrease an increase in cash used in investing activities of approximately $26 $121 million, due primarily to lower levels support operational growth and the replacement of equipment purchases. older machinery and equipment.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
The decrease increase in general and administrative expenses was due primarily due to a $64 million reduction an increase in acquisition professional fees, the effects of timing of ordinary course legal matters, and integration costs, a decrease in information technology expenses and an increase in gains on sales of assets, net, offset, in part, by an increase a decrease in compensation expense and the effects of timing of ordinary course legal and other settlement matters. provision for credit losses.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
As a percentage of revenue, EBITDA decreased by approximately 60 340 basis points, or $16 $72 million, due primarily to a combination of reduced project efficiencies and mix, efficiencies, including from a reduction in revenue on midstream pipeline projects, the effects of project mix, and the effects of certain overhead costs incurred to maintain operating capacity in support of expected future project work, including due to regulatory effects, offset, in part, by a reduction of approximately $9 million in certain acquisition and integration costs. work.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Corporate expenses for the year ended December 31, 2024 2025 not related to the above-described items increased by approximately $41 $7 million as compared with the same period in 2023, 2024, due primarily to increases in compensation expense and other administrative expenses, including professional fees, offset, in part, by the effects of timing of ordinary course legal and other settlement matters, increases in compensation expense, information technology, travel, and other administrative expenses, offset, in part, by a reduction in professional fees and certain acquisition and integration costs. matters.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
On a consolidated basis, revenue increased by $308 $1,996 million driven by our segment results as follows: revenue increased in our Communications segment by approximately $201 $815 million, or 6%, 32%, in our Clean Energy and Infrastructure segment by approximately $130 $607 million, or 3%, 15%, in our Power Delivery segment by approximately $563 million or 16%, and in our Pipeline Infrastructure segment by approximately $61 $4 million, or 3%, and decreased in our Power Delivery segment by approximately $53 million or 2%. remaining generally flat as compared with the prior year.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Non-cash stock-based compensation expense 34.0 32.7 33.3 27.4 Amortization of intangible assets 131.2 139.9 169.2 135.9 Loss on extinguishment of debt — 11.3 — — Changes in fair value of acquisition-related contingent items 0.7 10.7 (13.9) (3.4) Acquisition and integration costs — — 71.9 86.0 Losses, net, Losses on fair value of investment — — 0.2 7.7 Project results from non-controlled joint venture — — (2.8) Bargain purchase gain — — (0.2) Total adjustments, pre-tax $ 165.9 $ 194.6 $ 260.8 $ 250.7 Income tax effect of adjustments (a) (44.7) (44.8) (74.0) (58.6) Statutory and other tax rate effects (b) (5.0) (0.9) 4.6 5.5 Adjusted net income $ 538.2 $ 348.3 $ 144.1 $ 231.4 Net income attributable to non-controlling interests 23.0 36.6 2.7 0.5 Adjusted net income attributable to MasTec, Inc. $ 515.2 $ 311.7 $ 141.4 $ 230.9
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
GAAP measures exclude, as applicable to the respective periods, non-cash stock-based compensation expense; loss on extinguishment of debt; changes in fair value of acquisition-related contingent items; acquisition and integration costs related to certain acquisition activity, as more fully described below; fair value gains or losses, net, on an investment; project results from an acquisition-related proportionately consolidated non-controlled Canadian joint venture that was underway at the time of the related acquisition, which joint venture was managed by a third party and automatically terminated upon completion of the project; the bargain purchase gain from a prior year acquisition; and, for Adjusted Net Income, Adjusted Net Income Attributable to MasTec, Inc. and Adjusted Diluted Earnings Per Share, amortization of intangible assets, the effects of statutory and other tax rate changes, and the tax effects of the adjusted items.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
For the year ended December 31, 2024, acquisitions contributed $19 million of revenue, whereas organic The increase in revenue decreased by approximately $72 million as compared with 2023, was due primarily to lower higher levels of project activity, including timing-related decreases activity in transmission and distribution-related project work, including due to regulatory effects, as well as lower higher levels of certain facilities and infrastructure-related project work.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Non-cash stock-based compensation expense 0.43 0.41 0.43 0.36 Amortization of intangible assets 1.67 1.77 2.16 1.78 Loss on extinguishment of debt — 0.14 — — Changes in fair value of acquisition-related contingent items 0.01 0.14 (0.18) (0.04) Acquisition and integration costs — — 0.92 1.13 Losses, net, Losses on fair value of investment — — 0.00 0.10 Project results from non-controlled joint venture — — (0.04) Bargain purchase gain — — (0.00) Total adjustments, pre-tax $ 2.11 $ 2.47 $ 3.33 $ 3.29 Income tax effect of adjustments (a) (0.57) (0.57) (0.94) (0.77) Statutory and other tax rate effects (b) (0.06) (0.01) 0.06 0.07 Adjusted diluted earnings per share $ 6.55 $ 3.95 $ 1.81 $ 3.01
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
We have experienced, and may continue to experience, direct and indirect negative effects on our business and operations from economic, market and regulatory conditions, including the level of interest rates; inflationary effects on the costs of labor, materials and fuel; supply chain disruptions; uncertainty related to the implementation and pace of spending under governmental programs and initiatives related to infrastructure and other industrial investment, delays and uncertainty related to project permitting and/or other regulatory matters or uncertainty, including, but not limited to, as a result of a temporary pause on new and renewed federal permits and leasing for wind turbine projects announced by President Trump in January 2025, with no end date to such pause specified; uncertainty; climate, environmental and sustainability-related matters; changes in technology, tax and other incentives; potential market volatility that could negatively affect demand for future projects, and/or delay existing project timing or cause increased project costs; and public health matters.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
“Risk Factors” under “Unfavorable market conditions, including rising or elevated levels of inflation or and/or interest rates, changes to tariffs and/or trade policies affecting macroeconomic conditions, including inflation, as well as the industries we serve and related projects and expenditures, access to capital, material and costs, supply chain disruptions or political, disruptions, political regulatory or market uncertainty, including economic downturns and heightened geopolitical tensions and conflicts, could reduce capital expenditures in the industries we serve or could adversely affect our customers and result in decreased demand for our services.” for discussion pertaining to opportunities in the industries we serve and potential effects of market conditions.
Read it in 10-K Feb 26, 2026 at sec.gov

Sources

The two latest 10-Ks on EDGAR, section by section. Each change links to the text at sec.gov.

Also

New risk factors: paragraphs with nothing like them last year, quoted in full.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/MTZ/export.csv") into a cell.

Next:Related parties
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.