RewordedRisk Factors
The Infrastructure Investment and Jobs Act and Act, Inflation Reduction Act Act, and "One Big Beautiful Bill" present opportunities for federal grants grants, loans and tax incentives intended to hasten the future economy-wide deployment of various greenhouse gas emission reducing technologies and approaches. aimed at electrical infrastructure development.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
We expect to typically be responsible for any project costs not covered by grants federal funding on further investments related to this Act. these Acts although there is no guarantee we will be successful in obtaining any such grants.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
We have been awarded grant funds for specific projects through the Infrastructure Investment and Jobs Act, and we plan to pursue additional opportunities available to us under this Act, however, under the Trump Administration, the status of additional funding under these Acts is unclear at this time. Acts.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
In addition, the suppliers and transporters under these agreements may not be required to provide the commodity or service under certain circumstances, such as in the event of a natural disaster.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
Security threats continue to evolve and adapt. adapt, notably with artificial intelligence which may be used to enhance malicious cyber-attacks.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
We have seen increased interest for electric service from emerging industries such as data crypto mining and hydrogen production, data mining, to support artificial intelligence, which are both large consumers of electricity.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
We and our third-party vendors vendors, many of whom leverage artificial intelligence capabilities, have been subject to, and will likely continue to be subject to, attempts to gain unauthorized access to systems and/or confidential data, or to disrupt operations.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
Further alteration of the regulatory landscape in which we operate, including a change in our the authorized return on equity, cost of capital, may harm our financial position and results of operations.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
In addition to the potential for physical risk related to climate change risks (discussed below), climate change, and the risks related to our transition to a lower carbon economy, creates financial risk.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedRisk Factors
Economic conditions may be impacted by insufficient financial sector liquidity or inflationary pressures, leading to potential increased unemployment, which could impact the ability of our customers to pay timely, increase customer bankruptcies, and could lead to increased bad debt.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
On July 4, 2025, the legislation known as the “One Big Beautiful Bill” was signed into law, which includes significant changes to federal tax law and other regulatory provisions that may impact the Registrants. The Registrants will consider the legislation’s provisions, such as changes to tax credits for renewables, and the potential impact on future investment decisions.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
In May 2025, SB 998 was passed into law and became effective August 29, 2025. This legislation allows rate-regulated retail electric service providers, such as OG&E, to receive CWIP recovery of new natural gas generation capacity, if those proposed generation sources are approved by the OCC under existing statutory review procedures, and sets specific timelines for the OCC to review proposed projects. SB 998 also allows utilities to establish a regulatory asset to defer 90 percent of depreciation expense and return associated with qualified plant investments, that are not classified as transmission or new generation, for recovery over an allowed 20-year period in a future rate review filing. OG&E began deferring such costs to a regulatory asset in September 2025, as further discussed in Note 1 within "Item 8. Financial Statements and Supplementary Data."
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
In March 2025, Act 373 was signed into law by the Governor of Arkansas. Act 373 enables rate-regulated retail electric providers, such as OG&E, to receive CWIP recovery of "strategic investments," including (i) new electric generating facilities, including transportation and storage facilities for associated fuel, (ii) upgrades, expansions, or fuel conversions of electric generating facilities, including transportation and storage facilities for associated fuel, and (iii) new or upgraded electric transmission facilities, including substations. All projects are subject to review and approval by the APSC. Act 373 further authorizes use of a rider to recover approved strategic investments that are not being recovered through previously approved rates, upon approval of the project by the APSC.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
(B)Changed primarily due to timing of power delivery, power supply and enterprise services projects.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
Short-term debt decreased $177.3 million, or 37.8 percent, primarily due to proceeds from OG&E's $350.0 million senior notes issuance in April 2025 and OGE Energy's equity issuance in November 2025, which proceeds were used to pay down short-term debt, partially offset by increased borrowings for general operating needs. The Registrants borrow on a short-term basis, as necessary, through the issuance of commercial paper.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
In addition, OGE Energy's liquidity was further enhanced in 2025 by FSAs, entered into in conjunction with OGE Energy's November 2025 public equity offering, which as of December 31, 2025 could have been physically settled with common shares in exchange for cash of $193.0 million. For more information concerning the FSAs, see Note 8 within "Item 8. Financial Statements and Supplementary Data."
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
(A)Transmission includes the Fort Smith to Muskogee transmission project discussed in Note 14 within "Item 8. Financial Statements and Supplementary Data," with projected capital expenditures of approximately $70 million in 2026, $80 million in 2027, $65 million in 2028, and $35 million in 2029.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
(B)Capital expenditures associated with the SPP's 2025 Integrated Transmission Plan, including the Seminole to Shreveport Transmission Line that is discussed in Note 14 within "Item 8. Financial Statements and Supplementary Data," will be included in OG&E's capital plan upon final notice to construct acceptances.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
(C)Generation capacity projects include the Tinker Air Force Base, Horseshoe Lake Units 11 and 12, and Horseshoe Lake Units 13 and 14 generation projects. Additional generation capacity projects will be included in OG&E's capital plan when final preapproval orders are received.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
On April 14, 2025, Moody's Investors Service revised their ratings outlook on both OGE Energy and OG&E from stable to negative. Moody's Investors Service indicated that the revised outlook reflects pressure related to OG&E's capital expenditure plan and higher debt levels at the holding company.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
On November 18, 2025, S&P's Global Ratings revised their ratings outlook on OG&E from stable to negative and affirmed their stable ratings outlook on OGE Energy. S&P's Global Ratings indicated the revised outlook for OG&E reflects the elevated wildfire exposure and the mitigation efforts needed to reduce such risks.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
AddedMD&A
In November 2025, OGE Energy entered into a public offering of approximately $397 million (9,226,744 shares) of its common stock, which included 4,613,372 common shares that were issued and sold by OGE Energy to the underwriters and 4,613,372 common shares that are subject to FSAs. Total cash proceeds received in November 2025 related to the public offering was $192.4 million. Settlement of the FSAs, which is at OGE Energy's discretion, is expected to occur no later than 18 months following the completion of the offering.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RemovedMD&A
(C)Increased primarily due to initiating new customer service that includes a demand component.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
(C)Increased primarily due to capacity agreements in order for OG&E to meet generation requirements.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
Allowance for equity funds used during construction increased $6.1 million, or 31.4 percent, primarily due to higher construction work in progress balances resulting from increased spending on new generation and information technology projects.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
(A)OG&E expects to continually evaluate the capital prioritization for transmission, distribution, technology, and generation investments based on the evolving capacity, reliability, and economic growth needs of the electrical power system.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
On October 2, 2024, OG&E caused the refinancing of its Garfield industrial authority bonds, series due January 1, 2025. The $47.0 million in bonds are now due October 1, 2039, and will continue to be remarketed on a weekly basis.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
The EPA revised the NAAQS for ozone in 2015. Although Oklahoma complies with the revised standard, the Federal Clean Air Act of 1970, as amended, requires states to submit to the EPA for approval a SIP to prohibit in-state sources from contributing significantly to nonattainment of the NAAQS in another state. On October 28, 2018, Oklahoma submitted its SIP to the EPA related to these "Good Neighbor" requirements. On January 31, 2023, the EPA disapproved the SIPs of 19 states, including Oklahoma. On March 2, 2023, the Oklahoma Attorney General and the ODEQ jointly filed a Petition for Review of the SIP disapproval in the Tenth Circuit. On March 16, 2023, OG&E filed a Petition for Review of the SIP disapproval in the Tenth Circuit. On June 6, 2023, OG&E, together with the Oklahoma Attorney General and other parties, jointly filed a motion with the Tenth Circuit requesting a stay of the EPA’s disapproval of the Oklahoma SIP; the stay was granted on July 27, 2023. On February 27, 2024, the Tenth Circuit issued a decision to transfer venue to the U.S. Court of Appeals for the District of Columbia and vacated oral argument originally scheduled for March 21, 2024 but did not vacate the stay it granted. On March 28, 2024, the Oklahoma Attorney General, on behalf of the parties noted above, petitioned the U.S. Supreme Court to review the Tenth Circuit’s decision to transfer the SIP disapproval cases to the D.C. Circuit, and on April 24, 2024, the D.C. Circuit ordered that the cases be held in abeyance pending action by the U.S. Supreme Court. On October 21, 2024, the U.S. Supreme Court granted review of the Tenth Circuit’s venue decision. On November 6, 2024, the D.C. Circuit ordered that the cases remain in abeyance pending the U.S. Supreme Court’s review of the Clean Air Act’s venue provision. Briefing is ongoing at the U.S. Supreme Court. On January 24, 2025, the EPA asked the U.S. Supreme Court to hold the briefing schedule in abeyance because the EPA’s acting administrator has determined that the agency should reassess the basis for and soundness of the underlying disapproval action. However, on February 6, 2025, the U.S. Supreme Court denied the EPA's motion to hold the case in abeyance. Oral argument at the U.S. Supreme Court is set to be scheduled for March 2025. The timing of a U.S. Supreme Court decision or further action at the D.C. Circuit is unknown.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
In a separate but related matter, on April 6, 2022, the EPA also published a proposed FIP related to the "Good Neighbor" requirements intended to reduce interstate NOX emissions contributions. OG&E filed comments to the proposed FIP with the EPA on June 21, 2022. On June 5, 2023, the EPA published a final FIP for 23 states, including Oklahoma. The issuance of the FIP resulted from the EPA's aforementioned SIP disapprovals. Among other changes, the EPA finalized a revision of the current Oklahoma NOX emissions budget for electric generating units, including OG&E's units, which began in 2023. Under the terms of the FIP, the emissions budget will decline over time based on the level of reductions that the EPA has determined is achievable through particular emissions controls. OG&E’s analysis indicates that Oklahoma’s state budget for 2026 will be reduced by 34.5 percent from 2023 levels and that for 2027 it will be reduced by 50 percent from 2021 levels. In October 2023, several state and industry petitioners filed emergency applications for a stay of the EPA’s Good Neighbor FIP in the U.S. Supreme Court. On June 27, 2024, the U.S. Supreme Court granted the emergency applications and stayed the EPA's final FIP, pending review of petitioners' challenges in the D.C. Circuit Court. On February 6, 2025, the EPA requested that the D.C. Circuit Court not issue an opinion and place the case in abeyance for 60 days in order for the new EPA leadership to determine how they want to proceed in the litigation.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
In light of the issuance of the FIP, OG&E has been evaluating various control strategies to reduce emissions at its generating units, which can range from some combination of purchase of emission allowances, installation of selective catalytic reduction controls, conversion of coal-fired units to gas-fired units or retirement and replacement of capacity. OG&E submitted its final 2024 IRP to the OCC and APSC on March 29, 2024. The IRP evaluates various potential compliance options related to the EPA's Good Neighbor FIP. Due to the uncertainty relating to the disapproval of the SIP and implementation of the FIP, OG&E cannot determine the cost to comply with certainty, as such costs are dependent upon the timing and outcome of the litigation discussed above, the particular control strategies ultimately selected for each unit, the terms and timing of regulatory approvals required from the OCC and APSC and the time period necessary to complete the projects. However, OG&E preliminarily estimates that the cost of compliance with the FIP as issued could be approximately $2.4 billion to $2.8 billion in total, including $100 million to $300 million over the 12- to 18-month
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
period following effectiveness of the FIP. OG&E expects that it would seek recovery of any necessary environmental expenditures to address state and federally mandated environmental upgrades, but there is no guarantee that all of such expenditures will be approved for recovery or will be approved for recovery on a timely basis.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
OG&E monitors possible changes in legal standards for emissions of greenhouse gases, including CO2, sulfur hexafluoride and methane. As discussed below, recently promulgated federal rules under the Biden Administration will potentially impose requirements on fossil fuel assets, but the Trump Administration is evaluating energy-related regulations impacting reliability and affordability. If these recently promulgated rules are implemented and enforced as currently written or if legislation or regulations are passed at the federal or state levels in the future requiring mandatory reductions of CO2 and other greenhouse gases at OG&E's facilities, this could result in significant additional compliance costs that would affect OG&E's future financial position, results of operations and cash flows if such costs are not recovered through regulated rates.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
On May 9, 2024, the EPA published its final rule addressing emission guidelines under Section 111(d) for existing fossil fuel fired steam units, including both coal-fired and oil/gas-fired steam units, and revising performance standards under Section 111(b) for new gas turbines. Unlike the proposed rules, the final rules do not address existing simple and combined-cycle combustion turbine units which are now addressed in a separate rulemaking with proposed rules expected later in the first quarter of 2025.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RemovedMD&A
The EPA also addressed existing natural gas-fired boilers under Section 111(d) with emissions rates based on a unit’s annual capacity factor. OG&E’s existing gas boilers currently meet the new requirements and therefore no additional compliance steps beyond reporting are expected.
Read it in 10-K Feb 19, 2025 at sec.govopen_in_new
RewordedMD&A
Residential $1,205.8 $1,148.5 $1,040.4 Commercial 978.2 839.1 688.4 Industrial 265.3 254.1 240.5 Oilfield 242.8 227.7 211.9 Public authorities and street light 276.1 262.0 234.9 System sales revenues 2,968.2 2,731.4 2,416.1 Provision for rate refund and tax refund 3.0 (3.0) 2.0 Integrated market 91.6 74.5 71.6 Transmission 159.4 152.9 143.0 Other 37.9 29.5 41.6 Total operating revenues $3,260.1 $2,985.3 $2,674.3 MWh sales by classification (In millions) Residential 9.7 9.8 9.6 Commercial 12.4 10.5 8.5 Industrial 4.2 4.1 4.2 Oilfield 4.4 4.3 4.4 Public authorities and street light 3.1 3.0 3.1 System sales 33.6 32.0 29.7 Integrated market 0.8 0.8 Total sales 34.4 32.8 30.5 Number of customers 913,305 906,952 896,102 Weighted-average cost of energy per kilowatt-hour (In cents) Natural gas 3.911 2.640 2.976 Coal 2.744 3.083 3.385 Total fuel 3.343 2.637 2.926 Total fuel and purchased power 3.502 3.139 2.837 Degree days (A) Heating - Actual 3,052 2,791 3,092 Heating - Normal 3,568 3,572 3,568 Cooling - Actual 2,060 2,313 2,215 Cooling - Normal 1,890 1,893 1,893
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Depreciation and amortization expense increased $32.9 $20.3 million, or 6.5 3.8 percent, primarily due to additional assets being placed into service and increased amortization of certain regulatory assets, partially offset by deferrals of allowable depreciation and amortization expense of $12.7 million to a decrease regulatory asset in depreciation expense due to new depreciation rates effective accordance with SB 998 as of July 1, 2024 resulting from the Oklahoma general rate review interim order received further discussed in November 2024. Note 1 within "Item 8.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
(In millions) $ Change Fuel, purchased power and direct transmission expense (A) $ 164.7 183.5 Price variance (B) 104.3 66.4 Non-residential demand and related revenues (C) 28.1 15.1 New customer growth 22.0 11.6 Guaranteed Flat Bill program (C) 7.8 Wholesale transmission revenue 8.5 4.8 Other (0.1) Quantity impacts (includes weather) (1.6) 0.5 Industrial and oilfield sales (3.2) Guaranteed Flat Bill program (1.5) Quantity impacts (primarily weather) (D) (11.7) (13.4) Change in operating revenues $ 311.0 274.8
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Year Ended December 31 (Dollars in millions) 2025 2024 2023 Operating revenues $3,260.1 $2,985.3 $2,674.3 Fuel, purchased power and direct transmission expense 1,259.9 1,076.4 911.7 Other operation and maintenance 531.0 514.1 505.0 Depreciation and amortization 559.8 539.5 506.6 Taxes other than income 109.4 109.7 99.4 Operating income 800.0 745.6 651.6 Allowance for equity funds used during construction 26.0 25.5 19.4 Other net periodic benefit income (expense) (1.6) 6.5 expense 10.3 1.6 Other income 17.3 12.5 23.9 Other expense 2.6 4.5 6.3 Interest expense 225.5 214.4 199.9 Income tax expense 105.1 93.2 68.8 Net income $499.8 $469.9 $426.4 Operating revenues by classification:
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
The Registrants cannot assure that future events, Future developments, such as changes in existing laws, the promulgation introduction of new laws or regulations, or the development or discovery emergence of new facts or conditions will not cause them to incur conditions, may result in significant costs. costs for the Registrants.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
On June 28, 2024, In February 2026, the EPA entered into proposed to approve the Oklahoma SIP revision, and a 2024 consent decree which requires the EPA to propose action on the Oklahoma SIP no later than December 31, 2025 and take final action no later than December 31, 2026.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Year Ended December 31 (In millions) 2025 2024 2023 $ % Change Change Net cash provided from operating activities (A) $ 1,137.1 $812.8 $ 1,232.3 $(419.5) (34.0) $324.3 39.9 Net cash used in investing activities (B) $ (1,126.6) $(1,161.2) $ (1,272.1) $110.9 (8.7) $34.6 (3.0) Net cash (used in) provided from (used in) financing activities (C) $ (10.9) $348.8 $ (48.1) $396.9 $(359.7) *
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Accounts Receivable and Accrued Unbilled Revenues increased $33.7 $108.8 million, or 12.0 34.5 percent, primarily due to an increase in billings to OG&E's retail customers reflecting higher usage in 2025 compared to 2024 and new rates as approved in the Oklahoma general rate review interim order received in November 2024. receivables related to customer connections.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
OG&E has completed OG&E's installation of dry bottom ash handling technology at an affected facility and is evaluating options at another affected facility to comply complies with the final 2024 rule by the December 31, 2029 compliance date. requiring facilities to cease
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Other Current Assets increased $30.1 decreased $17.2 million, or 51.2 19.3 percent, primarily due to an increase SPP security deposit refunds received during 2025, as well as a decrease in SPP deposits, the SPP transmission formula rate true-up and under-recovered riders. true-up.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Fuel Clause Under Recoveries increased $112.7 changed $130.5 million and Fuel Clause Over Recoveries decreased $11.2 million, or 54.6 percent, from an under recovery to an over recovery, primarily due to lower higher recoveries from OG&E retail customers as compared to the actual cost of fuel and purchased power.
Read it in 10-K Feb 18, 2026 at sec.govopen_in_new
RewordedMD&A
Baseload units, those defined as units with a capacity factor factors greater than 40 percent, are also subject required to a phase two requirement based on achieve 90 percent CO₂ capture of CO2 with a compliance deadline of by January 1, 2032.