AddedRisk Factors
During the year ended December 31, 2025, ENTRA1 entered into a non-binding agreement with TVA under which ENTRA1 and TVA will collaborate to develop plants to provide TVA with up to 6 gigawatts of new nuclear power generation. This agreement satisfied the criteria for NuScale’s payment of Milestone Contribution 1 for 72 NPMs for an approximate cost of $507 million. Under the PMA, the Company will be obligated to make Milestone Contribution 2 to ENTRA1, or its designated affiliate upon the execution by ENTRA1, or its designated affiliate, of a binding power purchase agreement, energy off-take agreement or document with a Third Party in connection with the development of an Energy Project or the deployment of one or more NPMs into a potential Energy Project, in the amount of approximately $16 million per NPM included in such binding agreement.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedRisk Factors
While the anticipated execution of such binding agreement by ENTRA1 would be considered a favorable development for NuScale, Milestone 2 Contributions, like Milestone 1 Contributions (each as defined in Note 9 of the Notes to the Consolidated Financial Statements, are not conditioned on the execution of a contract between ENTRA1 and NuScale. We cannot assure you that any ENTRA1 Energy Project that triggers Milestone 1 Contributions or Milestone 2 Contributions (including the TVA project) will result in any revenue generating contract between ENTRA1 and NuScale, as only Milestone 3 (as defined inNote 9 of the Notes to the Consolidated Financial Statements are conditioned on the execution of such a revenue generating contract.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedRisk Factors
In addition, while the number of NPMs in respect to which Milestone 1 Contributions and Milestone 2 Contributions are required at any one time is limited under the PMA, once an Energy Project advances from the Milestone 1 stage to the Milestone 2 stage (or from the Milestone 2 stage to the Milestone 3 stage), the limits for those Milestone Contributions will reset for the number of NPMs included such Energy Project. As a result, NuScale could be obligated to make additional Milestone Contribution 1 payments without any assurances that any revenue generating contract with ENTRA1 will be entered into with respect to either the original or the new project. Absent such revenue generating contracts, NuScale would be obligated to pay ENTRA1 the Milestone Contributions without receiving any revenue in return, which would materially adversely affect our financial condition and results of operations.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedRisk Factors
Our Supply Base is Constrained, and Until We Enter Into a Binding Contract to deliver NPMs, Our Ability to Secure Commitments from Our Suppliers may be Limited, which Introduces Risks Relating to Schedule, Cost and Quality as Competitors Place Orders from the Same Constrained Supply Base.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RemovedRisk Factors
We have not yet commercialized or sold NPMs, and a number of factors could prevent, delay or hinder commercialization.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
Competitors in China and Russia currently operate commercial SMRs and may have advantages in marketing their SMRs to potential customers.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
Any failure to effectively incorporate updates to the design, construction and operations of NuScale SMR-based plants to ensure cost competitiveness could reduce the marketability of the NuScale design and has the potential to impact deployment schedules.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
Our supply base may not be able to scale to the production levels necessary to meet sales projections.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
NuScale does not have manufacturing assets and relies on third party manufacturers to build our NPMs and associated equipment. Moreover, we are dependent on future supplier capability to meet production demands attendant to our forecasts. If our supply chain cannot meet the schedule demands of the market, our projected sales revenues could be materially impacted.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
Lack of availability, trade restrictions, tariffs and costs of component raw materials may affect the manufacturing processes for plant equipment and increase our costs.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
Recent global supply chain disruptions have negatively affected both the availability and cost of raw materials, component manufacturing and deliveries. Such disruptions may result in delays in equipment deliveries and cost escalations that could adversely affect our business.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
If we are unable to continue as a going concern, we may be forced to liquidate our assets and the values we receive for our assets in liquidation or dissolution could be significantly lower than the values reflected in our financial statements.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
Our SDA applications may not be approved, and any rework necessary to address NRC concerns could significantly delay the commercialization of our products.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
At the end of 2022, we submitted SDA applications to approve a NuScale-based 6 plant design and to raise the licensed output of our NPM from 50 MWe to 77 MWe. The NRC accepted the application in July of 2023 and has begun the technical review. There is no assurance that the SDA will be approved, or approved in a timely manner (including as a result of recent personnel reductions in federal government and any future reductions), and any revisions necessary to address concerns the NRC may have could significantly delay the commercialization of our products, which could have a material adverse effect on our business and financial condition.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
In an effort to halt the outbreak of COVID-19, a number of countries, including the United States, previously placed significant restrictions on travel, many businesses announced extended closures, and many businesses and governmental agencies allowed employees to work remotely, which in some cases may reduce the effectiveness of those employees. If there is a resurgence in COVID-19 cases or a similar health crisis, travel restrictions and business closures may in the future adversely affect our operations locally and worldwide, including our ability to obtain regulatory approvals and to manufacture, market, sell or distribute our products, which could materially and adversely affect our business.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedRisk Factors
A shareholder class action lawsuit claims that NuScale and members of management made materially false and/or misleading statements and failed to disclose material adverse facts about the Company’s business, operations and prospects, and specifically about certain of the Company’s agreements with customers. While two causes of action were filed, these lawsuits have been consolidated before the same judge in the federal district court in Oregon.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RewordedRisk Factors
While Although such exchanges could be treated as trading in the interests of NuScale LLC for purposes of testing “publicly traded partnership” status, the A&R NuScale LLC Agreement contains restrictions on redemptions and exchanges of interests in NuScale LLC LLC, which are designed to comply with certain safe harbors provided for under applicable United States federal income tax law, and NuScale Corp may also impose additional restrictions on exchanges that are intended it determines to prevent be necessary or advisable so that NuScale LLC entities from being is not treated as a “publicly traded partnership” for United States federal income tax purposes.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
If our operations grow as planned, we may need to expand our sales and marketing, research and development, and our supply and manufacturing functions, and there is no guarantee that we will be able to scale the business and the manufacture of NPMs as planned, as there is no guarantee that we will be able to find suitable locations or partners for the expanded manufacture and operation of our NPMs or to broaden our internal capabilities.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
This The termination of the Strategic Alliance Agreement or any of the agreements with our strategic partners described above could substantially hinder our ability to expand our production capacity and installation of NuScale power plants and could materially and adversely affect our business and our prospects. business, prospects, financial condition, results of operations and/or reputation.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
Accordingly, we believe NuScale Corp may also impose additional restrictions on exchanges LLC is operated such that it determines to be necessary or advisable so that NuScale LLC is not treated as a “publicly traded partnership” taxable as a corporation for United States federal income tax purposes.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
Although we instituted the Plan in January 2024 to reduce our cost base and focus resources on key strategic areas, in the long term we We expect our expenses and capital expenditures to increase in connection with our ongoing activities, including developing and advancing our SMR and other products and services, obtaining further NRC design certifications of and SDAs for our SMR and completing our manufacturing preparation and trials.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
Sales Any such sales under the ATM Program, or our “at-the-market” offering programs, any future similar programs or other issuance by us of shares, our Class A common stock, will result in dilution of existing stockholders. stockholders and increase the number of shares available for resale.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
Pursuant to the Tax Receivable Agreement, NuScale Corp will be required to pay to certain Legacy NuScale Equityholders 85% 85%, of the net cash tax savings from certain tax benefits, if any, that it realizes (or in certain cases is deemed to realize) as a result of any increases in tax basis and related other tax benefits resulting from any exchange by the TRA Holders of NuScale LLC Class B units for shares of Class A common stock or cash in the future, and those payments may be substantial. future.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
This A significant portion of our total outstanding shares may be sold into the market, which could cause the market price of shares of Class A common stock to drop significantly, even if our business is doing well, and, if we are issuing issue new shares, result in dilution to stockholders.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
(“RoPower”) and NuScale reaching a binding engineering, procurement, and construction (“EPC”) contract with Fluor. Fluor or (ii) ENTRA1 signing a purchase power agreement (“PPA”) with a third party and NuScale entering into an original equipment manufacturing (“OEM”) agreement.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
Although NuScale’s business is to design and sell technology rather than to construct and own or operate power plants, we must design our technology so it complies with such laws and regulations, which could require us to incur additional costs and expenses or redesign our technology in order to comply with such laws and regulations.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
As part of We also have a shelf registration on a Form S-3 (Commission File No. 333-272342), which allows NuScale may to offer Class A common stock, debt securities, warrants, and/or units consisting of some or all of the securities in any combination, the combination with an aggregate offering price of securities of which must not exceed $500,000,000. $500 million.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
We are currently named in a number of purported class action lawsuits (see “Legal Proceedings”), and In addition to this lawsuit, from time to time, we may become involved in various legal proceedings relating to other matters, including intellectual property, commercial, product liability, employment, class action, whistleblower and other litigation and claims, and governmental and other regulatory investigations and proceedings.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
Quiet changesRisk Factors
We will be are subject to taxes in the United States and certain foreign jurisdictions.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
Quiet changesRisk Factors
As a result, our losses may be larger than anticipated, and we may not achieve profitability when expected or at all; all and, even if we do, we may not be able to maintain or increase profitability.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
Quiet changesRisk Factors
First, procuring patent rights in multiple jurisdictions would could be cost prohibitive because individual patent offices in different jurisdictions will have to examine each patent application separately.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
Quiet changesRisk Factors
Similarly, if we were unable to secure export authorization, we may need to implement design changes to our NPM to address issues with our domestic supplier supply chain, which may increase costs or result in delays in delivery of new plants and subsequent additional NPMs if and when ordered.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Our mission is to provide scalable advanced nuclear technology to produce electricity, heat and clean water to improve the quality of life for people around the world. We are commercializing a modular, scalable electric Light Water Reactor nuclear power plant, that we believe will deliver safer scalable, cost-effective and reliable carbon free power. Our core technology, the NPM, can generate 77 MWe, with a focus on the integration of components, simplification or elimination of systems and use of passive safety features. We believe that this results in a safe and highly reliable power plant suitable to be sited close to where electricity, water desalinization, hydrogen production or process heat is needed.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Since our founding in 2007, we have made significant progress towards commercializing the first SMR in the United States. In September 2020, our 12-module design (currently approved for 160 million watts of thermal power
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
or 50 MWe per NPM) became the first and only SMR to receive an SDA from the NRC. In May 2025, the NRC finalized their review and approved our second SDA application and the associated licensing topical reports for our 6-unit 77 MWe NPM design, giving customers in the United States the ability to reference the approved design and SDA for expedited construction and operating licensing for a plant that is using the NuScale SMR technology.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
NuScale has contracted with ENTRA1 as our global strategic partner for commercialization and development of power plants utilizing NPMs. ENTRA1 holds the exclusive rights for the worldwide commercialization, distribution, sales and development of our products, services and power plants. In this strategic partnership, the Company collaborates on joint development initiatives and financially contributes alongside the partnership in joint activities which may be recoverable as part of its development costs. ENTRA1 can decide whether to participate in a commercial opportunity. If ENTRA1 declines to participate in a commercial opportunity, NuScale may pursue the opportunity on its own.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Demand for energy in foreign markets is currently being driven by population growth, industrialization and urbanization with countries in Asia contributing the most to international growth. Rising living standards, driven by economic growth, has increased the need for residential electricity, a trend that is expected to increase in the coming years, with Asia forecasted to account for nearly 60% of global growth in electricity consumption through 2050.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
The Company has currently one international customer: RoPower Nuclear S.A. (“RoPower”), which is a joint venture established by S.N. Nuclearelectrica S.A. (“Nuclearelectrica”) and Nova Power & Gas S.A. In July 2024, NuScale and RoPower signed a technology licensing agreement, which granted RoPower a right to use certain intellectual property of NuScale’s. In the third quarter of the 2024 fiscal year, Nuclearelectrica and RoPower signed the Front-End Engineering and Design (“FEED”) Phase 2 contract with Fluor, a related party to NuScale. FEED Phase 2 included tasks related to the development of a Class 3 plant cost estimate, as well as support to RoPower with its regulatory and stakeholder engagements. NuScale completed their scope of FEED Phase 2 as a subcontractor to Fluor. On February 12, 2026 the Romanian Government approved the investment decision for the Doicesti SMR plant project, allowing for the ability to seek secured financing to further feasibility studies, and site-specific design work prior to any construction moving forward. This is a positive step in support of the project to the next phase. During the coming months, RoPower is authorized to advance the licensing and geotechnical work, finalize a pre-engineering, procurement and construction (“EPC”) contract, and begin negotiating contracts for long lead items. We anticipate that the pre-EPC activities will have an estimated duration of up to 15 months and will include, among other things, the development of a Class 2 cost estimate for the project. NuScale has yet to commence, but looks forward to negotiating definitive agreements related to our scopes
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
within the elements of project finalization, construction, equipment installation and testing, plant commissioning, and post commercial operation date on-going technical support.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
With ENTRA1 we continue to develop our international customer interest as we foresee a significant customer demand over the long-term to be outside of the United States as industry trends like decarbonization, an increasing demand for renewable energy alternatives, and changes in broader economic and geopolitical conditions continue to grow. Our collective team puts significant effort into developing dialogue with foreign governments and corporations in order to educate and market our technology.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Demand for energy in the United States is currently being driven by the significant growth in the data center industry, particularly as artificial intelligence (“AI”) deployment, cloud computing adoption, and digital transformation initiatives accelerate across sectors. Further, the United States government has identified nuclear technology as imperative to the country’s national security objectives and ordered the expansion of American nuclear energy capacity to 400 gigawatts by 2050, or nearly 400% the current capacity.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
On August 27, 2025, NuScale LLC and ENTRA1 executed a PMA. Under the PMA, NuScale is named the key supplier to future ENTRA1 Energy Projects (as defined in Note 9 in the accompanying consolidated financial statements) with respect to the supply of SMR technology. The PMA also includes a negotiated maximum sale price for each NPM to be delivered and installed in an ENTRA1 Energy Project, subject to adjustments. It is anticipated that NuScale will enter into agreements for the delivery and installation of NPMs with ENTRA1.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
On September 2, 2025, the Tennessee Valley Authority (“TVA”) announced the signing of a non-binding agreement under which ENTRA1 and TVA will collaborate to develop plants to provide TVA with up to 6 gigawatts of new nuclear power generation, with ENTRA1’s immediate strategy being the utilization of NuScale’s SMR equipment inside ENTRA1 Energy PlantsTM.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Under the PMA, we are focused on our expanded ENTRA1 partnership positioning their ENTRA1 Energy Plants™ with NuScale SMRs inside first to TVA. The PMA also positions us to serve hyperscaler, technology, industrial and micro-grid customers in sectors that include direct air capture, water desalinization, hydrogen production and mission critical facilities.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RemovedMD&A
“our” or “we” refer to NuScale Power, LLC (“NuScale LLC”) prior to the Transaction, and to NuScale Power Corporation (“NuScale Corp”) following the consummation of the Transaction.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
Our mission is to provide scalable advanced nuclear technology to produce electricity, heat and clean water to improve the quality of life for people around the world. We are changing the power that changes the world by creating an energy source that is smarter, cleaner, safer and cost competitive.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
Our small modular reactor (“SMR”), known as NuScale Power Module (“NPM”), provides a scalable power plant solution incorporating enhanced safety, improved affordability and extended flexibility for diverse electrical and process heat applications. Our scalable design provides carbon-free energy at a reduced cost when compared with gigawatt-sized nuclear facilities.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
Since our founding in 2007, we have made significant progress towards commercializing the first SMR in the United States. In 2017, we submitted our Design Certification Application (“DCA”) to the U.S. Nuclear Regulatory Commission (“NRC”). On August 28, 2020, the NRC issued its Final Safety Evaluation Report, representing the NRC’s completion of its technical review. On September 11, 2020, the NRC issued its Standard Design Approval (“SDA”) of our NPM and scalable plant design. With this phase of NuScale’s DCA now complete, customers may proceed with plans to develop NuScale SMR-based power plants with the understanding that the NRC has approved the safety aspects of the NPM and plant design. We expect our operating losses and negative operating cash flow to grow until the commercialization of the NPM. On January 19, 2023, the NRC published in the Federal Register a final rule that certifies NuScale’s SMR design for use in the United States, which became effective 30 days after publication.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
The Company currently has only one “Class 1” customer: RoPower Nuclear S.A. (“RoPower”), which is a joint venture established by S.N. Nuclearelectrica S.A. (“Nuclearelectrica”) and Nova Power & Gas S.A. In November 2023, we entered into the Release Agreement with CFPP LLC, the Company’s first customer, pursuant to which the Company agreed to terminate the Development Cost Reimbursement Agreement (“DCRA”), as amended, and our Long Lead Material Reimbursement Agreement (“LLM Agreement”). CFPP LLC was receiving funding for approximately 79% of its qualified project costs, including the long-lead materials (“LLM”), under a cooperative agreement with the Department of Energy (“DOE”). Under the Release Agreement, we agreed to repay CFPP LLC’s Net Development Costs. Upon final settlement of the LLM Agreement, and once DOE is compensated for its investment in the LLM (stemming from DOE’s funding under its cost share agreement with CFPP LLC), NuScale will obtain all rights and obligations associated with the LLM.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
In December 2021, NuScale LLC entered into an Agreement and Plan of Merger (the “Merger Agreement”) with Spring Valley Acquisition Corp. (“Spring Valley”) and Spring Valley Merger Sub, LLC (“Merger Sub”), a wholly owned subsidiary of Spring Valley. Pursuant to the Merger Agreement, Merger Sub merged with and into NuScale LLC (the “Merger”), with NuScale LLC surviving the Merger (the “Surviving Company”), Spring Valley being renamed NuScale Corp, and NuScale LLC continuing to be held as a wholly controlled subsidiary of NuScale Power Corporation in an “Up-C” structure. On May 2, 2022, the transactions contemplated by the Merger Agreement, including the Merger (collectively the “Transaction”) were completed.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
The Transaction is shown as a reverse recapitalization under GAAP. Spring Valley is the acquired company, with NuScale LLC treated as the acquirer. This determination reflects Legacy NuScale Equityholders holding a majority of the voting power of NuScale Corp, NuScale LLC’s pre-merger operations being the majority post-merger operations of NuScale Corp and NuScale LLC’s management team retaining similar roles at NuScale Corp. Accordingly, although NuScale Corp (f/k/a Spring Valley) is the parent company, GAAP dictates that the financial statements of NuScale Corp represent a continuation of NuScale LLC’s operations, with the Transaction being treated as though NuScale LLC issued ownership interests for Spring Valley, accompanied by a recapitalization. The net assets of NuScale LLC are stated at historical cost,
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
with no incremental goodwill or other intangible assets recorded for the effects of the Transaction. The consummation of the Transaction resulted in NuScale LLC receiving cash equal to $341.5 million and assuming Warrant liabilities valued at $47.5 million.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
In September 2020, we became the first and only company to receive NRC SDA for a small modular reactor. We believe our commercialization activities are being completed at a pace that can support delivery of NPMs to a client site as early as 2029. In December 2022, we signed a contract for Front-End Engineering and Design (“FEED”) work with RoPower to advance the deployment of our NPMs to Romania. Under Phase 1 of the contract, we defined the major site and specific inputs for a NuScale 6-module power plant to be deployed at the Doicesti Power Station site in Romania. We expect the site in Romania to use six modules and to be commercially operable as early as 2030.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
For the year ended December 31, 2022, sponsored cost share totaling $0.2 million that was previously included in Interest income (expense) has been reclassified to Sponsored cost share to conform to the current year presentation on the accompanying consolidated statements of operations. No such reclassifications were required for 2023.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
For the year ended December 31, 2022, amounts totaling $4.2 million and $3.5 million were reclassified out of G&A expenses and into R&D expenses and Other expenses, respectively, to conform to the current year presentation. No such reclassification was required in 2023.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RemovedMD&A
The increase in revenue was attributable to activities in support of the Engineering, Procurement and Construction Development Agreement for CFPP, as well as nuclear technologies consulting services.
Read it in 10-K Mar 3, 2025 at sec.govopen_in_new
RewordedMD&A
As our commercialization activities advance, we have continued to enter When the Company was focused on R&D activities, the Company entered into cost share agreements with various entities, including both governmental and private, private entities, under which the Company is reimbursed for specific R&D certain activities.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
Subsequent to As of December 31, 2024, the Company issued and 2025, we have sold 4,548,127 shares of Class A common stock for the gross and net proceeds an aggregate sales price of $102,416 and $99,855, respectively, $750,000 under the Q4 2025 ATM Program.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
Sponsored cost share decreased due to the Company hitting the cost share cap with DOE, USTDA DOE and RoPower United States Trade and Development Agency (“USTDA”) during the termination of 2025 fiscal year as the CFPP contract. Company continues to focus on commercialization.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
Subsequent to During the year ended December 31, 2024, 2025, the Company issued and sold 4,548,127 57,112,216 shares of Class A common stock for the gross and net proceeds of $102,416 $1,327.6 million and $99,855, $1,299.7 million, respectively, under associated with the Q4 2025 ATM Program.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
Riley Securities, Inc. and Inc., Canaccord Genuity LLC and Tuohy Brothers Investment Research, Inc. as sales agents under which the Company may offer offered and sell sold shares of our Class A common stock, having an aggregate sales price of up to $200.0 $750.0 million (“ATM (the “Q4 2025 ATM Program”).
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
This discussion may contain forward-looking statements based upon current expectations that involve risks and uncertainties. uncertainties, including, but not limited to, those described under the section entitled “Risk Factors” included in this Form 10-K.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
In January 2023, May 2025, the Company submitted an NRC finalized their review and approved the Company’s SDA Application application and the associated licensing topical reports to the NRC for NuScale’s 6-unit 77 MWe NPM design.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
On November 8, 2024, August 11, 2025, NuScale entered into a new sales agreement (the “Q3 2025 Sales Agreement Agreement”) with UBS Securities LLC, TD Securities (USA) LLC, UBS Securities LLC, B.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
Riley Securities, Inc. and Inc., Canaccord Genuity LLC and Tuohy Brothers Investment Research, Inc. as sales agents under which the Company may was able to offer and sell shares of our Class A common stock, having an aggregate sales price of up to $200.0 $500.0 million (“ATM (the “Q3 2025 ATM Program”).
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
General and administrative (“G&A”) expenses consist of compensation costs for personnel in executive, finance, accounting, human resources resources, and other administrative functions. functions and professional fees paid for accounting, auditing and consulting services, insurance costs and facility costs.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
We consider an accounting judgment, estimate or assumption to be critical when (1) the estimate or assumption is complex in nature or requires a high degree of judgment and (2) the use of different judgments, estimates and assumptions could have a material impact on our financial statements.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
On November 8, 2024, 7, 2025, NuScale entered into a new sales agreement (the “Q4 2025 Sales Agreement Agreement”) with UBS Securities LLC, TD Securities (USA) LLC, UBS Securities LLC, B.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new