RewordedRisk Factors
The Decreases or delays in the level of federal, state and local government spending for infrastructure and other public projects could adversely affect the number of projects available to us in the future.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
We are subject to risks related to government contracts (including government shutdowns and funding considerations) and related procurement regulations.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedRisk Factors
As of December 31, 2024, 2025, our total debt was $534.1 $407.4 million, with $24.1 $14.6 million classified as current debt.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Diluted earnings per common share for 2025 was $1.51 compared to diluted loss per common share of $3.13 for 2024. Adjusted diluted earnings per common share, which is a non-GAAP financial measure and excludes share-based compensation expense (and the associated tax benefit) for 2025 was $4.29, compared to an adjusted diluted loss per common share of $2.37 for 2024. The improvement for 2025 was primarily due to the factors discussed above that resulted in the change in income (loss) from construction operations for such period. Refer to the Non-GAAP Financial Measures section below for further information and a reconciliation of the Company's financial results reported under generally accepted accounting principles in the United States (“GAAP”) to the reported adjusted results.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Consolidated new awards in 2025 were $7.4 billion compared to $12.8 billion in 2024. The Civil and Building segments were the primary contributors to the new awards activity in 2025. Significant new awards and contract adjustments in 2025 included the $1.87 billion Midtown Bus Terminal Replacement - Phase 1 project in New York; the $1.18 billion Manhattan Tunnel project in New York; a healthcare facility project in California valued at approximately $1 billion; a $538 million healthcare project in California; $241 million of additional funding for the Apra Harbor Waterfront Repairs project in Guam; a $182 million military defense project in Guam; a $155 million education facility project in California; $131 million of additional funding for an electrical project in Texas; and another electrical project in Texas valued at more than $100 million. The Company has continued to be successful in winning its share of major new project opportunities due to a combination of its strategic bidding approach and favorable market dynamics, including limited competition in select markets for some of the larger projects. This environment, which is supported by strong public funding and demand, has allowed the Company to differentiate itself and deliver compelling proposals that align with the customer’s goals and expectations. The Company expects that this environment will continue for the foreseeable future.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
With respect to potential concerns regarding the U.S. government’s scrutiny and curtailment of federal funding for certain projects, as well as concerns about recent federal government shutdowns and varying new tariff policies that have been and may continue to be implemented, the Company does not currently anticipate any significant impacts to its business related to these factors. Most of the Company’s major projects are funded at the state or local level, or with some combination of federal, state and local funding. For projects that are wholly or partially funded with federal dollars, the funding for those projects has already been committed and/or those projects are strategically important to the United States. Despite this, there have recently been, and there may in the future be, occasions where even previously authorized and committed funding is withheld by the government, which could delay the progress of certain projects or the awards of new projects. The Company does not anticipate any material adverse impacts to its financial results as the result of such temporary project delays.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Specifically related to potential tariff impacts, the Company utilizes a pre-award and post-award strategy. As part of its pre-award strategy, the Company’s detailed estimating process includes consideration of anticipated cost increases over the performance period of the contract, as well as additional contingencies to address other potential incremental costs related to unforeseen risks. Prior to its bid or proposal submission, the Company also works to negotiate favorable contract provisions that provide entitlement for certain compensable events, which may include price escalation and allowances. Once the project is awarded, the Company’s strategy shifts to entering into purchase orders or “buy-outs” of materials, such as steel and concrete, as well as large pieces of equipment at the onset of projects, which mitigate the risk of future equipment and commodity price increases by passing that risk to vendors. Also at that time, the Company enters into fixed-price contracts with its key project subcontractors whereby the risk of unforeseen escalation is transferred to the subcontractors. The Company benefits from its long-term relationships with key suppliers, vendors and subcontractors, which minimize supply chain disruptions that could arise as a result of tariffs. While the Company believes this strategy appropriately mitigates the current risk of potential tariff impacts, there could be other unforeseen future developments. The Company will continue to monitor and assess its exposure to the economic environment.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
To supplement our audited Consolidated Financial Statements presented under GAAP, we are presenting certain
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
non-GAAP financial measures. These non-GAAP financial measures are intended to provide additional insights that facilitate the comparison of our past and present performance, and they are among the indicators management uses to assess the Company’s financial performance and to forecast future performance. By presenting these non-GAAP financial measures, we aim to provide investors and stakeholders with a clearer understanding of our operating results and enhance transparency with respect to the key financial metrics used by our management in its financial and operational decision-making.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
These non-GAAP financial measures, which exclude share-based compensation expense for the years ended December 31, 2025, 2024 and 2023 (as well as the tax benefit associated with the expense), consist of adjusted net income (loss) attributable to the Company and adjusted earnings (loss) per share. We exclude share-based compensation expense because this expense could result in significant volatility in our reported earnings, driven primarily by fluctuations in the expense recognized for certain long-term incentive compensation awards with payouts that are indexed to the Company’s common stock. By adjusting for share-based compensation, our non-GAAP measures present a supplemental depiction of our operational performance and financial health. This approach allows stakeholders to focus on our core operational efficiency and profitability without the variable impact to earnings caused by significant changes in our stock price. Our non-GAAP measures are intended to offer a consistent basis for evaluating the Company’s performance, which management believes is meaningful to stakeholders.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
The non-GAAP financial measures included in this Annual Report on Form 10-K as calculated by the Company are not necessarily comparable to similarly titled measures reported by other companies. Additionally, these non-GAAP financial measures are not meant to be considered as indicators of performance in isolation from or as a substitute for the most directly comparable measures prepared in accordance with GAAP and should be read only in conjunction with financial information presented on a GAAP basis.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Reconciliations of these non-GAAP financial measures are found in the table below:
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Reconciliation of Non-GAAP Financial Measures Year Ended December 31, (in millions, except per common share amounts) 2025 2024 2023 Net income (loss) attributable to Tutor Perini Corporation, as reported $ 80.4 $ (163.7) $ (171.2) Plus: Share-based compensation expense(a) 150.0 40.4 12.3 Less: Tax benefit provided on share-based compensation expense (1.3) (0.7) (0.8) Adjusted net income (loss) attributable to Tutor Perini Corporation $ 229.1 $ (124.0) $ (159.7) Diluted earnings (loss) per common share, as reported $ 1.51 $ (3.13) $ (3.30) Plus: Share-based compensation expense impact per diluted share 2.81 0.77 0.24 Less: Tax benefit provided on share-based compensation expense per diluted share (0.03) (0.01) (0.02) Adjusted diluted earnings (loss) per common share $ 4.29 $ (2.37) $ (3.08)
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
(a)The amount represents share-based compensation expense recorded during the years ended December 31, 2025, 2024 and 2023. This includes expense associated with certain long-term incentive compensation awards that have payouts indexed to the Company’s common stock. As such, significant fluctuations in the price of the Company’s common stock during any reporting period have caused and could continue to cause significant fluctuations in the reported expense. The increase in the expense for the year ended December 31, 2025 as compared to the prior-year periods was driven by the substantial increase in the price of the Company’s stock during the 2025 period.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
AddedMD&A
Revenue for 2025 increased 34% compared to 2024, and set a new record for the segment. The substantial growth was primarily due to increased project execution activities on certain newer, larger and higher-margin projects, all of which have substantial scope of work remaining.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RemovedMD&A
Legal judgments or decisions during 2024 resulted in net unfavorable impacts of $167.7 million, including $101.6 million pertaining to an unexpected adverse arbitration decision on a legacy dispute related to a completed Civil segment bridge project in California, which the Company is appealing; $17.7 million due to an unfavorable judgment on a completed Specialty Contractors segment mass-transit project in California; and $17.4 million due to an unfavorable legal ruling on a completed Civil segment highway project in Virginia.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
Legal judgments or decisions during 2023 resulted in net unfavorable impacts of $122.2 million, including an adverse legal ruling on a completed mixed-use project in New York, which resulted in a non-cash charge of $83.6 million, of which $72.2 million impacted the Building segment and $11.4 million impacted the Specialty Contractors segment, and a $24.7 million non-cash charge that resulted from an adverse court ruling on a Specialty Contractors segment educational facilities project in New York.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
Settlements during 2024 had a net unfavorable impact of $45.8 million, which included an unfavorable adjustment of $20.0 million associated with the settlement of a legacy dispute related to a completed Building segment government facility project in Florida and the net unfavorable impact of various other settlements that were individually immaterial. The impact of these unfavorable adjustments was partially offset by a favorable adjustment of $18.4 million due to a settlement of a claim associated with a completed Civil segment highway tunneling project in the western United States.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
Settlements during 2023 had a net favorable impact of $8.4 million, which included favorable adjustments totaling $58.1 million resulting from the settlement of change orders and changes in estimates due to improved performance on a Civil segment project on the West Coast. This favorable impact was mostly offset by the net unfavorable impacts from other settlements including the net unfavorable impact of $14.4 million from a settlement that affected multiple components of a Civil segment mass-transit project in California. This settlement included the resolution of certain ongoing disputes and increased the expected profit from work to be performed in the future. The settlement resulted in an unfavorable non-cash adjustment of $23.2 million to one component of the project that is nearing completion, partially offset by a favorable adjustment of $8.8 million on the other component of the project that has substantial scope of work remaining. The net unfavorable impact in 2023 from these two adjustments is expected to be mitigated by the increased profit generated from future work on the project. Other settlements in 2023 included a $13.1 million unfavorable non-cash impact (split evenly between the Civil and Building segments) related to a completed transportation project in the Northeast and the net unfavorable impact of various other settlements that were individually immaterial.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
Other significant project charges during 2024 had a net unfavorable impact of $36.4 million, as discussed above, which consisted of the negative impact from changes in estimates on various projects, mostly offset by positive impacts from improved productivity and efficiencies on certain projects. Other significant project charges during 2024 included unfavorable adjustments of $25.9 million on a Building segment government building project in Florida that is now nearing completion, primarily due to increased costs associated with external subcontractors and resolution of certain delay change orders, $15.1 million due to changes in estimates on an otherwise profitable Civil segment mass-transit project in California that is nearly complete, and the net favorable impact of changes in estimates on various other projects that were individually immaterial. All of these project charges and changes in estimates were due to changes in facts and circumstances that were identified in 2024.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
Other significant project charges during 2023 had a net unfavorable impact of $117.2 million, and included $62.2 million of unfavorable non-cash adjustments due to changes in estimates on the electrical and mechanical scope of a completed transportation project in the Northeast associated with changes in the expected recovery on certain unapproved change orders resulting from ongoing negotiations; an unfavorable adjustment of $16.9 million on a Specialty Contractors segment multi-unit residential project in New York due to changes in estimates resulting from incremental costs to complete the project and ongoing negotiations on unapproved change orders; a $14.9 million unfavorable adjustment due to changes in estimates due to recent negotiations and incremental cost incurred during project closeout (split evenly between the Civil and Building segments) on the same completed transportation project in the Northeast discussed above; a $14.6 million unfavorable adjustment on a Building segment government building project in Florida primarily due to increased costs associated with an external subcontractor; and the net unfavorable impact of changes in estimates on various other projects that were individually immaterial. All of these project charges and changes in estimates were due to changes in facts and circumstances that were identified in 2023.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
Revenue for 2024 increased 12% compared to 2023, primarily due to a net increase in project execution activities driven by certain large mass-transit projects in California and Hawaii, two airport projects in the Northern Mariana Islands, and the tunneling component of an energy project in British Columbia, partially offset by reduced project execution activities on a mass-transit project in the Midwest that is nearing completion. The increase was also partially offset by an unfavorable adjustment related to an unexpected adverse arbitration decision on a legacy dispute related to a completed bridge project in California, which the Company is appealing.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
The decrease in income from construction operations was also partially offset by a net favorable impact of $9.6 million due to the absence of the following prior-year adjustments: 1) a net unfavorable adjustment of $14.4 million due to the aforementioned settlement that affected multiple components of a mass-transit project in California; 2) an unfavorable adjustment of $14.2 million due to changes in estimates on the Civil segment’s portion of a completed transportation project in the Northeast primarily related to the settlement of certain change orders, changes in estimates associated with recent negotiations and incremental cost incurred during project closeout; and 3) net favorable adjustments totaling $19.0 million for a project on the West Coast.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
Operating margin was 6.5% for 2024 compared to 10.5% in 2023. The decrease in operating margin for 2024 was primarily due to the aforementioned unfavorable adjustment of $101.6 million related to the unexpected adverse arbitration decision on a legacy dispute related to a completed bridge project in California.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
Revenue for 2024 decreased 15% compared to 2023, principally due to reduced project execution activities on various electrical and mechanical projects in New York and Florida and an industrial facility project in Arizona, all of which are completed or nearing completion. The decrease was partially offset by the absence of certain prior-year unfavorable adjustments described in the paragraph below.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
Other income, net increased by $2.7 million in 2024 compared to 2023 primarily due to an increase in interest income associated with a larger amount of cash on hand in 2024 compared to the prior year.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RemovedMD&A
2024 compared to the prior year. Both periods benefited from strong cash collections related to project execution activities on newer and ongoing projects, as well as significant cash collections associated with the resolution of previously disputed matters.
Read it in 10-K Feb 27, 2025 at sec.govopen_in_new
RewordedMD&A
The improvement increase in income from construction operations in 2025 was also primarily due to contributions related to an overall net increase in project execution activities that totaled $172.1 million and a lower amount of net unfavorable adjustments in 2025 driven by 1) various changes in estimates the estimate at completion for project charges, net of positive various projects, including: 1) impacts from improved productivity and efficiencies on certain projects, net of project charges, which had an aggregate net favorable impact of $104.3 million in 2025 compared to a net unfavorable impact of $36.4 million in 2024 compared to $117.2 million in 2023, partially offset by 2024; 2) certain legal judgments or decisions that had net unfavorable impacts totaling $32.5 million in 2025 compared to $167.7 million in 2024 compared to $122.2 million in 2023; 2024; and 3) various settlements that had a net unfavorable impact of $45.8 million in 2024 compared to a net favorable impact of $8.4 million in 2023; and 4) temporary aggregate negative project adjustments of $78.7 million in 2025 compared to $97.2 million in 2024 compared to $79.2 million in 2023 due to both the successful negotiation of significant lower margin (and lower risk) change orders and increases in unapproved work on various projects, the temporary impacts to earnings of which are expected to reverse themselves over the remaining lives of the projects.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
Net cash used in financing activities during 2024 2025 was $393.3 $184.8 million, which was primarily driven by a $354.6 $130.8 million net repayment of debt (including the 2024 Senior Notes issuance $121.9 million repayment of $400 million and the 2017 Senior Notes redemption of $500 million, as well as additional principal prepayments remaining balance on the Term Loan B, all of which are B discussed below in Debt), $25.1 million of payments for debt issuance costs related to debt transactions during the year Debt) and $23.3 $51.7 million of cash distributions to noncontrolling interests, partially offset by $15.2 million of cash contributions from noncontrolling interests.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
The decrease was primarily due to These prior-year net unfavorable adjustments in 2024, including included $101.6 million in the third quarter pertaining to the aforementioned an unexpected adverse arbitration decision on a legacy dispute related to a completed bridge project in California, which the Company is appealing; a temporary non-cash impact of $31.8 million in the fourth quarter for a project on the West Coast, which primarily resulted from significant changes that have been negotiated, or are being negotiated, that negotiated and carry lower margin (and lower risk) that reduced the project’s percentage of completion and overall margin percentage; $17.4 million due to an unfavorable legal ruling on a completed highway project in Virginia; and $15.1 million due to changes in estimates on an otherwise profitable mass-transit project in California that is nearly complete. complete, partially offset by a prior-year favorable adjustment of $18.4 million due to a settlement of a claim associated with a completed highway tunneling project in the western United States.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
The items that caused a lower higher effective tax rate in 2024 2025 as compared to 2023 2024 were primarily higher non-deductible compensation expenses and an increase in the valuation allowance, expenses, partially offset by higher earnings attributable to noncontrolling interests (for which income taxes are not the responsibility of the Company), federal income tax credits and state income taxes.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
Net cash used in financing activities during 2024 was $393.3 million, which was primarily driven by a $354.6 million net repayment of debt (including the 2024 Senior Notes issuance of $400 million and the 2017 Senior Notes redemption of $500 million, as well as additional principal prepayments on the Term Loan B, all of which are discussed below in Debt), debt, $25.1 million of payments for debt issuance costs related to debt transactions during the year and $23.3 million of cash distributions to noncontrolling interests, partially offset by $15.2 million of cash contributions from noncontrolling interests.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
For Additionally, the first time in four years, Federal Reserve lowered interest rates were lowered in September 2024, the fall of 2024 and further reduced rates in the second half of 2025, and some economists expect further continued interest rate reductions in 2025, 2026, though the actual timing and extent of any future such rate reductions remains uncertain.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
The significant improvement was also principally due to contributions related to the increased project execution activities discussed above that totaled $26.6 million, partially offset by and the impact absence of certain prior-year unfavorable adjustments in 2024 of adjustments, including $25.9 million on the a completed government building project in Florida mentioned above, which is now nearing completion, primarily due to increased costs associated with external subcontractors and resolution of certain delay change orders, orders and $20.0 million associated with the settlement of a legacy dispute related to a completed government facility project in Florida.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
Consolidated backlog as of December 31, 2024 2025 was $18.7 $20.6 billion, up 84% 10% compared to $10.2 $18.7 billion as of December 31, 2023, and set a new all-time record that far exceeded the previous record backlog of $14.0 billion reported for the third quarter of 2024.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
As of December 31, 2024, 2025, the mix of backlog by segment was 49% for Civil, 36% for Building and 15% for Specialty Contractors, compared to 47% for Civil, 38% for Building and 15% for Specialty Contractors, compared to 42% for Civil, 41% for Building and 17% for Specialty Contractors at the end of 2023. 2024.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
The increase in share-based compensation expense corporate general and administrative expenses in 2025 compared to 2024 was primarily due to a substantial increase in the Company’s share-based compensation expense that resulted from a higher stock price during the 2024 period, price, which impacted the fair value of liability-classified awards.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
The outlook for the Company’s revenue growth over the next several years is remains highly favorable, particularly favorable due to strong new award bookings in 2024, of large, long-duration projects over the past two years, as well as other significant new awards that have been and could are expected to be booked in 2025. the future.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
RewordedMD&A
The improvement was partially offset also driven by a reduction in net unfavorable adjustments in 2025, primarily due to the absence of certain 2024 prior-year unfavorable adjustments on several completed projects due to the impact of judgments and settlements totaling that totaled $57.2 million, million in 2024, including $17.7 million due to an unfavorable judgment on a completed mass-transit project in California and certain other adjustments that were individually immaterial.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new
Quiet changesMD&A
Significant new New awards and contract adjustments in 2024 included the $1.66 billion City Center Guideway and Stations project in Hawaii; the $1.13 billion Newark AirTrain Replacement project in New Jersey; the $1.1 billion Kensico-Eastview Connection Tunnel project in New York; the Civil segment’s share of both the $3.76 billion Manhattan Jail project and the $2.95 billion Brooklyn Jail project, both in New York; $479 million of additional funding for certain mass-transit projects in California; $331 million for the Apra Harbor Waterfront Repairs project in Guam; and the Company’s proportionate share of the $1.3 billion Connecticut River Bridge Replacement project in Connecticut.
Read it in 10-K Feb 26, 2026 at sec.govopen_in_new