AddedRisk Factors
TXNM has incurred and expects to incur additional material non-recurring expenses in connection with the proposed Merger and completion of the transactions contemplated by the Merger Agreement. Further, even if the proposed Merger is not completed, TXNM will need to pay certain costs relating to the proposed Merger incurred prior to the date the proposed Merger was abandoned, such as legal, accounting, financial advisory, filing, and printing fees.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedRisk Factors
If the Merger is not completed for any reason, the ongoing business of TXNM may be adversely affected and, without realizing any of the anticipated benefits of having completed the Merger, TXNM would be subject to a number of risks, including the following:
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedRisk Factors
•TXNM may experience negative reactions from the financial markets, including a decline of its stock price (which may reflect a market assumption that the Merger will be completed)
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedRisk Factors
•TXNM may experience negative reactions from its customers, regulators and employees
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RemovedRisk Factors
In June 2024, PNM filed the 2025 Rate Request for a two-phase implementation of a $3.0 billion increase in total rate base. The increase includes investments in transmission, distribution, and generation facilities to ensure safe, reliable delivery of electricity and a request for an ROE of 10.45%. An adverse outcome in the 2025 Rate Request could negatively impact PNM’s financial position, results of operation, and cash flows. See Note 17.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedRisk Factors
In the first round of the CAA regional haze program, BART determinations were made for both SJGS and Four Corners, requiring the facilities to reduce the levels of visibility-impairing emissions, including NOx, through the installation of control technology, resulting in operating cost increases. Deadlines for SIPs for the second planning period were in July 2021 which NMED was unable to meet. NMED is currently preparing its next regional haze SIP and notified PNM that it will not be required to submit a regional haze four-factor analysis for SJGS since PNM retired its share of SJGS in 2022.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedRisk Factors
In February 2024, EPA proposed to impose a federal implementation plan on New Mexico to address the interstate transport of ozone and its precursors, referred to by EPA as the “good neighbor” rule. If finalized as proposed, compliance with the rule would require specified fossil fuel-fired generating resources to participate in an ozone-season NOx emission allowance trading program that will limit total NOx emissions from all affected units within the state of New Mexico. In December 2024, EPA pulled its proposed rule from the OMB and did not specify if and when the rule might be resubmitted for review.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedRisk Factors
The conditional conversion feature of the Convertible Notes, if triggered, may adversely affect TXNM’s financial condition and operating results.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedRisk Factors
In the event the conditional conversion feature of the Convertible Notes is triggered, holders of Convertible Notes will be entitled to convert the Convertible Notes at any time during specified periods at their option. If one or more holders elect to convert their Convertible Notes, to the extent TXNM is required to pay cash to settle a portion of its conversion obligation, it could adversely affect TXNM’s liquidity. In addition, even if holders do not elect to convert their Convertible Notes, to the extent TXNM is required to pay cash to settle a portion of its conversion obligations, TXNM would be required under applicable accounting rules to reclassify all or a portion of the outstanding principal of the Convertible Notes as a current rather than long-term liability, which would result in a material reduction of its net working capital.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedRisk Factors
The accounting method for the Convertible Notes could have a material effect on TXNM’s reported financial results.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedRisk Factors
In August 2020, the Financial Accounting Standards Board issued Accounting Standards Update No. 2020-06, Debt—Debt with Conversion and Other Options (Subtopic 470-20) and Derivatives and Hedging—Contracts in Entity’s Own Equity (Subtopic 815-40): Accounting for Convertible Instruments and Contracts in an Entity’s Own Equity (“ASU 2020-06”), which amends the accounting standards for convertible debt instruments that may be settled entirely or partially in cash upon conversion. ASU 2020-06 eliminates requirements to separately account for liability and equity components of such convertible debt instruments and eliminates the ability to use the treasury stock method for calculating diluted earnings per share for
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedRisk Factors
convertible instruments whose principal amount may be settled using shares. Instead, ASU 2020-06 requires (i) the entire amount of the security to be presented as a liability on the balance sheet and (ii) application of the “if-converted” method for calculating diluted earnings per share. Under the “if-converted” method, diluted earnings per share will generally be calculated assuming that all the Convertible Notes were converted solely into shares of common stock at the beginning of the reporting period, unless the result would be anti-dilutive, which could adversely affect TXNM’s diluted earnings per share. However, if the principal amount of the convertible debt security, such as the Convertible Notes, being converted is required to be paid in cash and only the excess is permitted to be settled in shares, the if-converted method will produce a similar result as the “treasury stock” method prior to the adoption of ASU 2020-06 for such convertible debt security.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedRisk Factors
ASU 2020-06 became effective for TXNM as of the start of fiscal year end 2022 and as such TXNM did not bifurcate the liability and equity components of the Convertible Notes on its balance sheet and TXNM used the if-converted method of calculating diluted earnings per share. To the extent TXNM is required to pay cash to settle the principal amount of the Convertible Notes upon conversion, with only the excess permitted to be settled in shares of TXNM’s common stock, the application of the if-converted method will produce a similar result as the treasury stock method prior to the adoption of ASU 2020-06. The effect of the treasury stock method is that the shares issuable upon conversion of such Convertible Notes are not included in the calculation of diluted earnings per share except to the extent that the conversion value of such Convertible Notes exceeds their principal amount. The requirement that the principal amount of the Convertible Notes upon conversion must be paid in cash could adversely affect TXNM’s liquidity.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedRisk Factors
TXNM cannot be sure whether other changes may be made to the current accounting standards related to the Convertible Notes, or otherwise, that could have a material effect on its reported financial results.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RewordedRisk Factors
It is also possible that unsatisfactory outcomes of these matters, the financial impact of climate change regulation or legislation, other environmental regulations, the result of litigation, the adequacy and timeliness of cost recovery mechanisms, and other business considerations, could jeopardize the economic viability of certain generating facilities or the ability or willingness of individual participants to continue their participation through the periods currently contemplated in the agreements governing those facilities.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
TXNM’s restated articles of incorporation and by-laws include a number of provisions that may have the effect of discouraging persons from acquiring large blocks of TXNM’s common stock or delaying or preventing a change in control of TXNM.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
However, despite steps the Company may take to detect, mitigate, and/or eliminate threats and respond to security incidents, the techniques used by those who wish to obtain unauthorized access, and possibly disable or sabotage systems and/or abscond with information and data, change frequently and continue to evolve with the use of artificial intelligence and the Company may not be able to protect against all such actions.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
In addition to the restrictions in the Merger Agreement discussed above, TXNM’s restated articles of incorporation and by-laws include a number of provisions that may have the effect of discouraging persons from acquiring large blocks of TXNM’s common stock or delaying or preventing a change in control of TXNM.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
As discussed under Climate Change Issues, this type of generation is subject to the existing and future EPA or state regulations requiring regarding GHG reductions. reductions for this type of generation are under review.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
Although there is uncertainty about the timing and form of the implementation of EPA’s regulations regarding GHG emissions, climate change, CCRs, power plant emissions, changes to the ambient air quality standards, and other environmental issues, the promulgation and implementation of such regulations could have a material impact on operations.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
In addition, advances made in the capabilities of energy storage have further decreased power production and peak usage through the dispatch of more battery systems.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
PNM has a 7.3% undivided interest in PVNGS that represented 6.7% 6.1% of PNM’s total generating capacity as of December 31, 2024. 2025.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
For example, the indenture governing the Convertible Notes Indenture requires TXNM, subject to certain exceptions, to repurchase the Convertible Notes for cash upon the occurrence of a fundamental change (as defined in the Convertible Notes Indenture) indenture) and, in certain circumstances, to increase the conversion rate for a holder that converts its Convertible Notes in connection with a make-whole fundamental change (as defined in the Convertible Notes Indenture). indenture).
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
TXNM is not restricted under the terms of the indentures governing the Convertible Notes Indenture or the TXNM 2025 Junior Subs from incurring additional debt, securing existing or future debt, recapitalizing its debt or taking a number of other actions.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
This could negatively impact the Company’s ability to incur additional indebtedness on acceptable terms and would result in an increase in the interest rates applicable under the Company’s credit facilities.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedRisk Factors
TXNM and its subsidiaries currently have a significant amount of indebtedness, including the Convertible Notes. Notes and TXNM 2025 Junior Subs.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
On May 18, 2025, TXNM, Parent, and Merger Sub (both Parent and Merger Sub are affiliates of Blackstone Infrastructure) entered into the Merger Agreement pursuant to which Merger Sub will merge with and into TXNM, with TXNM surviving the Merger as a direct, wholly-owned subsidiary of Parent. Pursuant to the Merger Agreement, each issued and outstanding share of the common stock of TXNM (other than those listed in Note 22) at the Effective Time will be converted into the right to receive $61.25 in cash, without interest.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
The proposed Merger has been unanimously approved by the Board and was approved by the TXNM shareholders at a special meeting held on August 28, 2025. The waiting period under the HSR Act in connection with the Merger has expired without any objections or concerns having been raised, both the FCC and FERC approved the application, and the PUCT approved the unanimous settlement, satisfying four of the conditions to closing of the Merger Agreement. Consummation of the Merger remains subject to the satisfaction or waiver of certain customary conditions, including, without limitation, no Legal Restraint, and the receipt of certain required regulatory approvals (including the NMPRC and the NRC). TXNM has filed applications for regulatory approval of the Merger with the NMPRC (Note 17). The Merger Agreement does not contain any financing condition and is currently expected to close in the second half of 2026.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
On December 11, 2025, TXNM and Blackstone Infrastructure reached a unanimous settlement with parties in the Merger proceeding filed with the PUCT, that was approved on February 6, 2026. On February 20, 2026, FERC approved the proposed Merger rejecting claims related to data centers, private equity ownership, and speculative cross-subsidization relying on existing state ring-fencing protections in New Mexico and Texas. See Note 17.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
TXNM and its utilities are aware of the important roles they play in enhancing economic vitality in their service
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
Throughout 2025, PNM held in-person community events focused on wildfire safety and educating customers about the PSPS process and wildfire mitigation efforts to protect the public. These gatherings are designed to share critical information, coordinate with local resources, and listen to feedback from local communities. PNM hosted four events in High Fire Risk Areas (“HFRA”) across New Mexico in 2025 and expects to host similar events in 2026. In addition, PNM included local emergency managers in its periodic meetings, referred to as “wildfire tabletops,” in 2025. Each of these engagements builds and strengthens our preparedness as a Company for wildfire prevention and response.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
In November 2025, TNMP filed the TNMP Base Rate Review with the PUCT, requesting recovery of $2.8 billion of rate base, a requested ROE of 10.4%, and a 47.54% equity ratio. The TNMP Base Rate Review also includes increases in operations and maintenance expenses that are not recovered through semi-annual TCOS and DCRF filings, excludes increases in interest expense resulting from refinancing of debt associated with the proposed Merger, and requests recovery of $20.5 million associated with Hurricane Beryl restoration costs over a five-year period. If approved by the PUCT, the new rates are expected to become effective in mid-2026. See Note 17.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
The 2025 New Mexico Legislative session included several bills that were passed to support economic development, clean energy, grid modernization, and wildfire preparedness. Amongst the bills passed were companion bills: New Mexico Senate Bill 169 (the “Site Readiness Bill”) and New Mexico Senate Bill 170 (the “Power Readiness Bill”).
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
The Site Readiness Bill creates a dedicated funding mechanism and a structured process for identifying, assessing, and preparing strategic economic development sites across the state, designed to position New Mexico to compete with other states actively investing in site readiness. It appropriates approximately $24 million for the site readiness fund for site-characterization studies of proposed economic development sites and site preparations of strategic economic development sites. The Site Readiness Bill also creates the Strategic Economic Development Site Advisory Committee to advise the New Mexico Economic Development Department (“NMEDD”) in selecting sites and awarding funding. The Power Readiness Bill is
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
intended to reduce risk, lead times, and regulatory uncertainty in acquiring additional generation resources and in building large-scale infrastructure needed to competitively serve economic development customers that create jobs. It allows a public utility to annually increase generation capacity by up to 10% of the public utility’s total system peak load. The Power Readiness Bill also shortens the time for regulatory approval of CCN filings for new, major infrastructure and allows a public utility to defer costs of economic development projects, placing them into a regulatory asset until a customer signs a contract or begins taking service. In December 2025, PNM filed an application for approval of two projects under the Power Readiness Bill; the Westpointe and Mesa Del Sol Substations (See Note 17).
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
In the fourth quarter of 2025, PNM initiated its 2026 IRP process which will cover the 20-year planning period from 2026 through 2046. Consistent with historical practice, PNM is receiving public input from interested parties as part of this process. PNM expects to file its 2026 IRP with the NMPRC on or before September 1, 2026.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
Under the terms of the Merger Agreement, TXNM has agreed not to declare, set aside, make or pay any dividend or other distribution, payable in cash, stock, property or otherwise, with respect to any of its equity securities, or make any other actual, constructive or deemed dividend or distribution in respect of any of its equity securities (except (i) TXNM may continue the declaration and payment of regular quarterly cash dividends on TXNM common stock for each quarterly period ending after the date of the Merger Agreement, in an amount not to exceed $0.4275 in 2026, with usual record and payment dates for such quarterly dividends in accordance with past dividend practice, (ii) for any cash dividend or cash distribution by a wholly-owned subsidiary of TXNM to TXNM or another wholly-owned subsidiary of TXNM, and (iii) a “stub period” dividend to holders of record of TXNM common stock as of immediately prior to the Effective Time equal to the product of (1) the number of days from the record date for payment of the last quarterly dividend paid by TXNM prior to the Effective Time, multiplied by (2) a daily dividend rate determined by dividing the amount of the last quarterly dividend paid prior to the Effective Time by ninety-one).
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
AddedMD&A
Other income (deductions): Lower CIAC $ (0.7) Higher equity AFUDC 4.0 Interest on Texas Sales and Use Tax refund 2.1 Other 0.5 Net Change $ 5.9
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RemovedMD&A
In 2023, the Texas Legislature enacted HB 2555, permitting an electric utility to seek approval of, and cost recovery for, a system resiliency plan. On August 28, 2024, TNMP filed its first SRP with the PUCT designed to benefit customers through enhanced resiliency of its distribution system, as intended under HB 2555. The SRP includes approximately $600 million of capital investments and approximately $151 million of other related costs over three years. Investments in the SRP are prioritized based on customer benefit, physical protection of infrastructure, foundational investments in operational and cybersecurity technologies and wildfire risk reduction and are focused on lower-performing areas in the context of reliability. The SRP is subject to PUCT approval over 180 days as stated in Texas legislation.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
On December 11, 2024, TNMP filed an unopposed settlement with the PUCT. The settlement includes $565.8 million of capital investments over 2025 through 2027, reflecting 94% of TNMP’s proposed plan investments. The settlement also encompasses $128.2 million of operations and maintenance expenses associated with several programs, including vegetation management and wildfire mitigation.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
On June 14, 2024, PNM filed an application with the NMPRC for a general increase in retail electric rates. The application proposes an increase of $174.3 million in retail revenues which is comprised of a $92.2 million increase in base rates and a $82.1 million increase in revenues collected under PNM’s FPPAC and reflects an ROE of 10.45%. The proposed base rate changes would be implemented in two phases, with the first phase effective July 1, 2025 and the second phase effective January 1, 2026. The requested changes reflect recovery of needed investments across distribution, transmission, and generation facilities to ensure safe reliable delivery of electricity, increased operations and maintenance expenses to meet operational needs including wildfire risk mitigation, necessary costs to service customers associated with ESAs previously approved by the NMPRC, and adjustments to Four Corners depreciation rates to recover remaining plant investments through July 2031, the expected abandonment date of the facility.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
On November 26, 2024, PNM filed its unopposed comprehensive stipulation with the NMPRC. Key components include an increase of $105.0 million in retail revenues with the first phase effective July 1, 2025, and the second phase effective April 1, 2026, reflecting an ROE of 9.45%.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
PNM has also experienced growing demand, including a new system peak recorded in 2023. PNM investments are aimed at advancing the infrastructure beyond its original architecture to a more flexible and redundant system accommodating
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
At PNM, an increase in transmission investments also supports growing transmission demands across the system and are recovered through an annual FERC formula rate mechanism based on a usage-based system allocation.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
PNM has a Chief Sustainability Officer responsible for developing and implementing the Company’s business strategy and positions on environmental and sustainability policy issues and is charged with establishing organization-wide policies,
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
strategies, goals, objectives and programs that advance sustainability and ensure compliance with regulations. The role serves as the Company’s primary contact with various regulatory agencies and stakeholder groups on environmental matters. In addition, the role leads environmental justice work that considers environmental and social impacts of PNM programs and projects on affected communities.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
PNM has announced an agreement partnering with Sandia National Laboratories in research and development projects focused on energy resiliency, clean energy, and national security. The partnership demonstrates TXNM’s commitment to sustainability and its support of projects that further its carbon-free generation goals and plans for a reliable, resilient, and secure grid to deliver New Mexico’s clean energy future. PNM also joined the Electric Power Research Institute (“EPRI”) Climate READi (Resilience and Adaptation) Initiative, a three-year initiative to develop a comprehensive and consistent approach to physical climate risk and facilitate the analysis and application of appropriate climate data among all stakeholders to enhance the planning, design and operation of a resilient power system. In addition, PNM’s Time-of-Day pilot approved in the 2024 Rate Change final order incentivizes customers, through price signals, to use energy during the day when renewable generation is abundant.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
The Infrastructure Investment and Jobs Act, also commonly known as the Bipartisan Infrastructure Law (“BIL”), was signed into law in 2021. This act represents a “once-in-a-generation” investment designed to modernize and upgrade America’s infrastructure. The BIL includes historic investments to upgrade the transmission and distribution systems to improve reliability and resilience, and to facilitate the deployment of more affordable and cleaner energy across the country.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
In October 2024, PNM was selected for two grants from the DOE. The first grant supports the design, construction, and operation of a Virtual Power Plant (“VPP”) that will enable PNM to leverage small, intermittent energy resources on its distribution system to enhance grid management. The second grant was in the Advanced Reliability and Resiliency Operations for Wind and Solar (“ARROWS”) program, in which GridBeyond Ltd, as principal grantee, will receive $3.9 million in DOE funding and PNM will provide the in-kind, $3.9 million local match. The program aims to demonstrate the provision of grid services from utility-owned solar and storage assets using GridBeyond Ltd artificial intelligence (“AI”) powered distributed energy resource management system technology. The AI-powered system will be used to forecast, optimize, and control resources such as wind, solar, and batteries on PNM’s power grid in real-time, and enable GridBeyond Ltd and other partners to collect, analyze, and quantify the overall energy savings that PNM is able to provide with these resources.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RemovedMD&A
PNM also participates in various grants including a joint submission with Sandia National Laboratories on a project application to DOE for the Flexible and Innovative Transformer Technologies program, where PNM is anticipating matching expected costs incurred by Sandia National Laboratories of $0.4 million, and a $2.0 million grant awarded to the National Renewable Energy Laboratory through DOE, for a project called Protection of Inverter Dependent Transmission Systems.
Read it in 10-K Feb 28, 2025 at sec.govopen_in_new
RewordedMD&A
(In millions) Higher costs for the remaining interests in PVNGS, partially offset by lower plant maintenance at Four Corners and administrative costs at gas fired plants, Four Corners, and the disposition of the PVNGS Unit 2 Leased Interests plants $ 2.0 8.5 Higher regulatory disallowances property taxes associated with increased utility plant in 2023, primarily resulting from the 2024 Rate Change (70.7) service 5.8 Unrecoverable portion of San Juan & Four Corners Coal Mine reclamation remeasurements remeasurement related to the capped surface mine liability in 2024 9.0 (Note 16) (10.4) Unrecoverable portion of Four Corners Coal Mine reclamation remeasurement related to the capped surface mine liability (Note 16) 0.7 Higher allocated depreciation and amortization expense from Corporate and Other 8.3 1.8 Higher employee related expenses partially offset by lower related, outside services services, and vegetation management expenses 2.1 3.2 Higher capitalization of administrative and general expenses due to higher construction expenditures (2.2) (3.5) Higher allocated charitable contributions from Corporate and Other related to the 2025 Rate Request 1.5 Higher insurance premiums primarily related to wildfire risk 3.8 5.6 Higher costs associated with rate riders included in Utility utility margin 7.3 5.1 Other 1.3 (0.4) Net Change $ (39.1) 17.9
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
(In millions) Transmission rate relief/load – Transmission cost of service rate increases in May 2023, September 2023, March 2024, September 2024, March 2025, and September 2024 2025, partially offset by a decrease in ERCOT approved demand $ 21.2 13.0 Distribution rate relief – Distribution cost of service rate increases in September 2023, July 2024, November 2024, June 2025, and November 2024 14.1 December 2025 31.0 Volumetric-based consumer usage/load – Weather normalized KWh sales increased 1.8%; 2.8%; the average number of volumetric consumers increased 1.8% 2.2 2.5 Demand based consumer usage/load – Weather normalized demand-based MW sales for large commercial and industrial consumers excluding retail transmission customers decreased 1.2% (1.7) increased 5.3% 5.2 Leap Year - Increase Decrease in revenue due to additional day in 2024 0.3 (0.3) Weather – Primarily due to warmer Colder weather in the first and fourth quarters of 2025 was partially offset by milder weather in the second and third quarter quarters of 2023 (3.5) Impact 2025 1.1 Impacts of fully amortized AMS charges 6.2 Deferral revenues recorded under HB 5247 Note 17 17.5 Decrease in deferral of excess deferred income tax benefits refunded through base rates 7.8 (1.6) Rate riders and other – Impacts of rate riders, including the Includes transmission cost recovery factor, factor and energy efficiency rider, and rate case expense rider which are partially offset in operating expense and depreciation and amortization (0.2) expenses 3.1 Net Change $ 46.4 71.5
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
(In millions) Retail customer usage/load –Weather normalized retail KWh sales increased 1.5% 0.1% for residential customers customers, 1.0% for commercial customers, and 12.5% 14.3% for industrial customers $ 20.9 8.0 Weather – Hotter Milder weather in the third quarter of 2023 partially offset by milder weather in the remaining quarters of 2024 (6.7) 2025 (14.0) Leap Year - Increase Decrease in revenue due to additional day in 2024 1.9 (1.9) Transmission – Decrease Increase in revenues primarily due to higher formula rates partially offset by lower market prices and lower volumes in 2024, partially offset by the FERC Order 864 settlement in 2023 and an EPE refund in 2024 (13.3) 1.4 Rate relief – Increase in revenue approved in 2024 2025 Rate Change 15.0 27.7 Capacity arrangements – Energy Additional energy storage agreements starting in the third fourth quarter of 2023, partially offset by purchase agreements in 2023 2024 and sales agreements in 2024 (6.5) Rate Credits – SJGS abandonment settlement 2024, partially offset with sales agreement in 2023 128.7 2024 Rate Change – PVNGS Unit 1 Leased Interest regulatory liability in 2023 38.4 2025 (41.4) Rate riders and other – Includes renewable energy, FPPAC, energy efficiency, energy transition charge, and transportation electrification riders which are partially offset in operating expenses, depreciation and amortization, other income (deductions) (deductions), and interest charges 25.5 11.1 Net Change $ 203.9 (9.1)
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
(In millions) Lower vegetation management Higher employee related and outside services expenses partially offset by higher employee related lower vegetation management expenses and outside services $ (1.0) 0.8 Higher property tax taxes due to increased utility plant in service 3.2 2.3 Higher capitalization of administrative and general expenses due to higher construction expenditures (5.5) (6.3) Higher allocated depreciation and amortization expense from Corporate and Other 3.5 Regulatory disallowance related to notice of violation settlement in 2023 (Note 17) (1.2) 0.9 Higher insurance premiums primarily related to wildfire risk 3.3 2.6 Regulatory settlement 3.5 Costs related to the Merger 2.2 Other 0.5 (0.4) Net Change $ 2.8 5.6
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
These increases were partially offset by regulatory disallowances related to San Juan and Four Corners Coal mine reclamation remeasurements in 2024, lower demand-based load at TNMP, lower transmission margin at PNM, higher employee related operating expenses at PNM and TNMP, increased depreciation at PNM and amortization approved in PNM’s 2024 Rate Change and TNMP due to increased plant in service at PNM and TNMP, service, capacity arrangements at PNM, milder weather at TNMP and PNM, and higher interest charges at PNM, TNMP PNM and Corporate and Other. TNMP.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
Among other things, earnings in the year ended December 31, 2024 2025, benefited from rate relief approved in PNM’s 2024 Rate Change, higher transmission and distribution rates at TNMP, higher volumetric and demand-based load at TNMP, impacts of revenues recorded under HB 5247 at TNMP, higher weather normalized retail load at PNM, increased revenue at PNM approved in the 2025 Rate Change and increased performance on PNM’s NDT, coal mine reclamation and SJGS decommissioning investment securities. higher transmission margin at PNM.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
Revolving Credit Facility $ 184.3 209.1 $49.7 $ 112.2 $144.7 $441.2 56.5 $315.3 PNM New Mexico Credit Facility 35.0 40.0 — — 35.0 40.0 Letters of credit — — 3.1 3.1 Total short-term debt and letters of credit 219.3 112.2 147.8 479.3 249.1 49.7 59.6 358.4 Remaining availability as of February 14, 2025 13, 2026 $ 220.7 190.9 $250.3 $ 87.8 $152.2 $460.7 240.4 $681.6 Invested cash as of February 14, 2025 13, 2026 $ — $1.0 $ — $0.9 $0.9 $1.0
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
On February 14, April 23, 2025, TNMP PNM entered into an agreement (the “TNMP the PNM April 2025 Bond Note Purchase Agreement”) Agreement with institutional investors for the sale and issuance of $140.0 $300.0 million aggregate principal amount of its 5.19% TNMP first mortgage bonds (the “TNMP two series of the PNM April 2025 Bonds”) SUNs, offered in private placement transactions.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
On February 14, July 31, 2025, TNMP PNM entered into an agreement (the “TNMP the PNM July 2025 Bond Note Purchase Agreement”) Agreement with institutional investors for the sale and issuance of $140.0 $350.0 million aggregate principal amount of its 5.19% TNMP first mortgage bonds (the “TNMP two series of the PNM July 2025 Bonds”) SUNs offered in private placement transactions.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
The shutdown of SJGS Units 2 and 3 resulted in a reduction of GHG emissions for the entire station of approximately 54% for 2018, reflecting a reduction of 32% of allowing PNM to attain GHG emissions from reductions goals set forth by the Company’s owned interests in SJGS, below 2005 levels. ETA, discussed below.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
In addition, A CCN requesting approval of a new transmission line and the application seeking to defer costs of two economic development projects filed under SB 170 support economic development and projects included in the approved Grid Modernization Application Plan will improve customers’ ability to customize their use of energy and modernize PNM’s electric grid through infrastructure and technology improvements.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new
RewordedMD&A
The Convertible Notes TXNM 2025 Junior Subs bear interest at a rate of 5.75% 7.000% per year, payable semi-annually in arrears on June 1 January 31 and December 1 July 31 (subject to TXNM’s right to defer interest payments) and mature on June 1, 2054, July 31, 2056, unless earlier converted, redeemed, or repurchased redeemed in accordance with their terms.
Read it in 10-K Feb 27, 2026 at sec.govopen_in_new