The 10-K against last year's

456 changes: 80 added, 92 removed, 277 reworded, 7 quiet changes

10-K Mar 2, 2026 vs Mar 6, 2025

10-K 0002007855-26-000013 (Mar 2, 2026) vs 10-K 0002007855-25-000010 (Mar 6, 2025)

Every paragraph, and how much of it changed

One bar per paragraph, in the order of the 10-K. Height and colour show the share of its words not in the closest paragraph a year earlier; the tallest bars are new paragraphs.

Risk Factors

526 paragraphs · 30 new · 199 reworded · 39 gone · 10-K Mar 2, 2026 against Mar 6, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 217 · 50% changed Every version of it
The design, construction and operation of the facilities constituting our projects, as well as the export of LNG and the transportation of natural gas, are highly regulated activities. Certain of our development projects remain subject to the application for and/or receipt of several material federal, state and local governmental and regulatory approvals and permits, as described further under Item 1.—Business—Governmental Regulation of this Form 10-K. Approvals of FERC and DOE under Sections 3 and 7 of the Natural Gas Act, or the NGA, as well as several other material governmental and regulatory approvals and permits, including under the Clean Air Act, or the CAA, and the Clean Water Act, or the CWA, are required in order to construct and operate an LNG facility and a natural gas pipeline, and to export the LNG produced at our projects. See also Item 1.—Business—Environmental Regulation of this Form 10-K. Our projects that have obtained needed approvals and permits remain subject to extensive regulation.
Paragraph 222 · 48% changed Every version of it
While We have other planned projects that have not yet received required authorizations from FERC has or DOE. We have recently filed for, but not yet obtained, authorizations for certain projects such as Plaquemines Expansion Project and our requests to increase the authorized the siting, construction and operation output of the Calcasieu existing Plaquemines Project and the Plaquemines Project, as well as of CP2 Project without adding any new facilities. We have not yet made any filings to the related pipelines under Sections 3 and 7 of the NGA, additional authorizations from the Commission and/or staff of FERC, as applicable, to FERC or DOE regarding any other future project or any expansions. As we proceed with the construction of facilities our efforts to obtain regulatory approvals for the Plaquemines Project and to complete commissioning and place facilities into commercial service, are required as part of FERC’s ongoing regulation of our projects. We such projects, we may face additional regulatory risks or delays from time to time as they are based on various factors outside of our control. There can be no assurance that we regulatory risks or issues from FERC or other regulatory agencies will not face interfere with our prevent our plans to develop these additional regulatory risks from FERC. projects.
Paragraph 284 · 48% changed Every version of it
As more fully discussed in these "Risk Factors", the Calcasieu Project, the Plaquemines Project, the CP2 Project, the CP3 Project, the Delta Project, any potential bolt-on —Risk Factors, our existing and future projects, and expansions and any other natural gas liquefaction and export facilities that we may decide to develop in the future thereof, involve operational risks, including the following:
Paragraph 513 · 47% changed Every version of it
We face risks related Certain policies and statements of the current Trump administration have given rise to the uncertainty regarding the future of international trade agreements and the United States’ position on international trade. For example, in April 2025, the Trump administration announced broad reciprocal tariffs on imports from all countries. This
Paragraph 198 · 47% changed Every version of it
In addition, the holders of preferred units or Class B units in Calcasieu Holdings, or the Investors, will have the right to appoint a majority of the board of managers of Calcasieu Holdings, or the Step-In Right, upon the occurrence of certain trigger events. Such trigger events, events include if the Calcasieu Project does not commence commercial operation by the date that is 45 days prior to the date certain under the Calcasieu Pass Credit Facilities, if an event of default occurs under the Calcasieu Pass Credit Facilities, and if certain distributions continue to accrue at Calcasieu Funding after COD. Because Calcasieu Holdings is the sole member of the entity that wholly owns the Calcasieu Project and the TransCameron Pipeline, the Step-In Right not only gives the Investors significant control over Calcasieu Holdings but also over the Calcasieu Project and the TransCameron Pipeline. The Investors’ interests may differ from our interests or those of our stockholders, and therefore the Investors may not always exercise the control in a way that benefits us or our stockholders, which may have a negative impact on our business, financial conditions and results of operations. Facilities
Paragraph 165 · 47% changed Every version of it
We may be required to use a substantial portion of our cash and capital resources to pay interest and principal on our indebtedness, as well as cash distributions or other required payments on preferred equity of our subsidiaries. Such payments may reduce the funds available to us to construct and complete the Plaquemines Project, the CP2 Project, the CP3 Project, the Delta Project or any expansion thereof or other natural gas liquefaction and export facility we may develop, to acquire our LNG tankers, and for working capital, capital expenditures, and other corporate purposes, and limit our ability to obtain additional financing. This may in turn limit our ability to implement our business strategy, heighten our vulnerability to downturns in our business, the industry or in the general economy, and limit our flexibility in planning for, or reacting to, changes in our business and the industry.
Paragraph 353 · 46% changed Every version of it
More generally, the regulatory approval process for many LNG and natural gas infrastructure projects has become increasingly slower and more difficult, due in part to federal, state and local concerns related to natural gas exploration and production, pipeline activities and associated environmental impacts, and increased opposition to the natural gas industry and related infrastructure. We have not yet obtained the requisite regulatory authorizations for all of our planned projects. For instance, additional authorizations are still required from FERC for the CP2 Project as we proceed with its construction and commissioning consistent with the terms and conditions in FERC’s authorization. Furthermore, while we have proposed to increase the authorized production capacity of both the Plaquemines and CP2 projects, neither FERC nor DOE has yet authorized those increases. Similarly, we only recently applied for authorizations for the Plaquemines Expansion Project. The requisite regulatory approvals and authorizations, authorizations for all of these projects potentially may be delayed, conditioned, or even when obtained, have increasingly been subject to judicial challenge by activists requesting that issued approvals and denied.
Paragraph 316 · 45% changed Every version of it
For example, under the Baker Hughes Master Agreement, if we fail to enter into purchase orders for the liquefaction systems and the power plant for our future development projects by certain mutually agreed dates or to begin making scheduled payments, then Baker Hughes’ obligations to supply such equipment will expire unless Baker Hughes agrees to extend those dates. In addition, Baker Hughes has agreed to reserve manufacturing capacity for purposes of fabricating equipment to be supplied under the agreement. While we have executed the applicable purchase orders for the Plaquemines Project and the CP2 Project, we have not yet executed any such purchase orders for the potential bolt-on expansion for the Plaquemines Project, the CP3 Project or the Delta Project. If we do not execute applicable purchase orders by the applicable dates in the agreement, Baker Hughes may utilize the relevant manufacturing capacity for other purposes and delivery of equipment by Baker Hughes under the agreement could be delayed. Based on our anticipated project schedule, we currently expect that we will be in a position to deliver the purchase orders for the CP3 Project, and the purchase orders for the Delta Project to Baker Hughes by the applicable deadlines in the Baker Hughes Master Agreement, as such deadlines may be amended from time to time. However, if a project is delayed for any reason (including the reasons described elsewhere in this "Risk Factors" section), Baker Hughes’ obligations with respect to the remaining equipment to be delivered would expire unless we either (i) deliver the applicable purchase order and commence making payments on the agreed schedule, or (ii) agree with Baker Hughes on an extension of the applicable deadline under the agreement. There can be no assurance that we would be able to negotiate any such extension on terms that are acceptable to us or at all, or that we will have the financial resources to make the scheduled payments with respect to a purchase order prior to commencement of construction and financing of the relevant project.

MD&A

181 paragraphs · 50 new · 110 reworded · 53 gone · 10-K Mar 2, 2026 against Mar 6, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 4 · 50% changed
ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS For discussion of the Company's year ended December 31, 2024 compared to the year ended December 31, 2023, refer to Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations in our 2024 Form 10-K filed with the SEC on March 6, 2025.
Paragraph 7 · 50% changed
Our Financial Results. Our net income from operations for the year ended December 31, 2024 decreased $1.9 billion, from $3.6 billion in 2023 2025 increased compared to $1.7 billion in 2024, the prior year primarily due to higher sales volumes at our Plaquemines Project from the decrease commencement of LNG production in income from operations December 2024 and continued ramp up of $3.1 billion, from $4.9 billion in 2023 to $1.8 billion in 2024. LNG production during 2025. This decrease was primarily partially offset by lower weighted average LNG sales prices at our Calcasieu Project due to a reduction in the weighted average price commencement of LNG commissioning sales in 2024 compared to 2023. The impact on net income attributable to volumes sold was less significant between under its post-COD SPAs and the periods. higher cost of feed gas.
Paragraph 111 · 50% changed
As of December 31, 2024, 2025, our subsidiaries had approximately $29.6 $34.8 billion in outstanding debt, which consisted of $11.1 billion of debt incurred or guaranteed by debt, primarily the VGLNG Senior Secured Notes, and approximately $18.5 $23.7 billion in of project-level debt financing. In addition, our project‑level equity investment subsidiaries for the Calcasieu Project, Calcasieu Holdings and Calcasieu Funding, have issued preferred units for total gross proceeds of $1.3 billion, with an aggregate liquidation preference of approximately $2.2 billion outstanding as of December 31, 2024, some of which require us to make preferential cash distributions to the holders under certain circumstances.
Paragraph 87 · 50% changed
CP2 Project. We currently estimate that the total project costs Total Project Cost for Phases 1 and 2 of the Plaquemines CP2 Project will be approximately $23.3 $32.5 billion to $23.8 billion, including EPC contractor profit $33.5 billion. Approximately $9.9 billion of the Total Project Cost for Phases 1 and contingency, owners’ costs and financing costs. Of 2 of the total project costs for the Plaquemines Project, approximately $19.8 billion had CP2 Project has been paid for as of December 31, 2024 and had obtained approximately $15.0 billion of project-level debt financing comprised of an approximately $12.9 billion term loan facility and $2.1 billion working capital revolving facility, and made an aggregate of approximately $8.1 billion of equity contributions. As of December 31, 2024, approximately $12.7 billion of such project-level debt financing was outstanding, and we had additional available borrowing capacity of approximately $940 million thereunder. 2025. We believe we the CP2 Project will have sufficient cash and access to substantial cash from the CP2 Construction Term Loan and future proceeds from commissioning cargo proceeds LNG sales to fund the construction and completion of the Plaquemines Project based on our current estimate Phase 1 of the total project costs. However, we may make additional equity contributions project. We intend to finance the extent that total project costs exceed construction and development of Phase 2, including the low-end related owners’ costs, through one or more sources of the range of estimated total project costs above and that such costs exceed the available project-level debt and equity financing and net proceeds from the sale of commissioning cargos. financing.
Paragraph 50 · 49% changed
•a $208 $908 million favorable unfavorable change in cash from on the settlement of Plaquemines Project interest rate swaps due to $203 million in net cash received swaps, which were partially settled during the year ended December 31, 2023 as compared to $5 million net cash paid to settle interest rate swaps during the year ended December 31, 2022; and 2025;
Paragraph 39 · 48% changed
◦an increase of $915 •$609 million primarily due to advanced equipment payments related to higher costs of feed gas primarily at the CP2 Calcasieu Project; and
Paragraph 71 · 48% changed
•an increase in proceeds cost of sales of $3.8 billion from project credit facilities of $3.9 billion higher LNG sales volumes due to proceeds from the Plaquemines Credit Facilities commencement of $7.8 billion during the year ended LNG production in December 31, 2024 as compared to proceeds and continued ramp up of $3.9 billion during the same period in 2023; LNG production throughout 2025;
Paragraph 76 · 47% changed
•an increase in proceeds from the project credit facilities revenue of $2.2 billion generated from the sale of LNG produced by our LNG facilities and sold through our sales and shipping business, primarily due to an increase in proceeds from the Plaquemines Credit Facilities of $2.8 billion, partially offset by a decrease in proceeds from the Calcasieu Pass Credit Facilities of $626 million; and LNG sales volumes.

A paragraph is matched with the one last year that shares the most of its words; under half in common makes it new. The paragraphs shown are the 8 reworded the most in each section.

The paragraph that changed most in each section

The redline

Marked against last year's 10-K: cut words struck through, new words highlighted.

Risk Factors346 words changed in this paragraph; it is 55% similar to last year's version.
In particular, we granted holders of the VGLNG Senior Secured Notes and the lenders under the VGLNG Revolving Credit Facility a first-priority lien in substantially all of the existing and future assets of VGLNG, including the direct wholly-owned subsidiaries of VGLNG that directly or indirectly own the Calcasieu Project, the Plaquemines Project, the CP2 Project, any future projects and any related pipeline. Additionally, we granted certain of our lenders under the Calcasieu Pass Credit Facilities and holders of the VGCP Senior Secured Notes: (i) a first-priority perfected security interest in substantially all of VGCP’s and TCP’s existing and after-acquired personal property, including, without limitation, proceeds, insurance policies, agreements, permits and bank accounts; (ii) a mortgage on all material leasehold and fee interests of VGCP, including, without limitation, the Calcasieu Project site; (iii) a first-priority perfected security interest in 100% of the equity interests in certain subsidiaries relating to the Calcasieu Project; and (iv) all proceeds of the foregoing as collateral. In addition, Calcasieu Pass Pledgor, LLC granted the lenders and holders of the VGCP Senior Secured Notes a first-priority perfected security interest in all of the equity interests in VGCP and TCP. We also granted certain of our lenders under the Plaquemines Credit Facilities and holders of the VGPL Senior Secured Notes: (i) a first-priority perfected security interest in substantially all of Plaquemines’ and Gator Express’ existing and after-acquired personal property, including, without limitation, proceeds, insurance policies, agreements, permits and bank accounts; (ii) a mortgage on all material leasehold and fee interests of Plaquemines, including, without limitation, the Plaquemines Project site; (iii) 100% of the membership interests in Plaquemines and Gator Express; and (iv) all proceeds of the foregoing as collateral. We granted certain of our lenders under the CP2 Credit Facilities: (i) a first-priority perfected security interest in substantially all of CP2's and CP Express’ existing and after-acquired personal property, including, without limitation, proceeds, insurance policies, agreements, permits and bank accounts; (ii) a mortgage on all material leasehold and fee interests of CP2, including, without limitation, the CP2 Project site; (iii) 100% of the membership interests in CP2 and CP Express; and (iv) all proceeds of the foregoing as collateral. Further, we granted certain of our lenders under the CP2 EBL Facility (i) a first-priority perfected security interest in substantially all of CP2 Holdings’ existing and after-acquired personal property, including, without limitation, proceeds, insurance policies, agreements, permits and bank accounts; (ii) 100% of the membership interests in CP2 Holdings; and (iii) all proceeds of the foregoing as collateral. Furthermore, we granted certain of our lenders under the Blackfin Credit Facilities: (i) a first-priority perfected security interest in substantially all of Blackfin Pipeline, LLC's and Blackfin Supply, LLC's existing and after-acquired personal property including, without limitation, proceeds, insurance policies, agreements, permits and bank accounts; (ii) a mortgage on certain material real property interests of Blackfin Pipeline, LLC, and Blackfin, Supply, LLC; (iii) a first-priority perfected security interest in 100% of the equity interests in Blackfin Pipeline, LLC and Blackfin Supply, LLC; and (iv) all proceeds of the foregoing as collateral. As a result, the lenders creditors under any such indebtedness could proceed to foreclose against such collateral securing the applicable indebtedness following an event of default, which would have a material adverse impact on our business, financial condition, cash flows and results of operations.

Source: Item 1A, 10-K 0002007855-26-000013 vs Item 1A, 10-K 0002007855-25-000010

MD&A249 words changed in this paragraph; it is 37% similar to last year's version.
Project costs and development expenses. We currently have five greenfield and expansion projects in various stages of construction and development. We expect our development, construction and commissioning expenses costs for any particular project to increase significantly as we approach and commence the construction phase, and we expect these expenses will continue to be significant until the commissioning phase has been completed and the relevant project reaches its COD. Moreover, our project costs may be higher than we currently estimate due to many factors outside of our control, which could lead to higher development, construction and commissioning expenses for our projects. In addition, we expect to increase our project‑dedicated staff as we progress towards the commencement of construction of the CP2 Project, the CP3 Project and the Delta Project and when we subsequently commence operation at our facilities. As a result, we anticipate that operating and maintenance expenses will increase significantly as we approach commissioning and operation of our projects (as was the case for the Calcasieu Project). We outsource certain major equipment maintenance activities under long-terms service arrangements, but our various operating subsidiaries are responsible for performing day-to-day operations and maintenance work for our projects. See Item 1.—Business—Major Consultants and Contractors of this Form 10-K for more information. Once one of our projects has commenced full commercial operations, we anticipate that the timing of the operating and maintenance costs under the long-term service arrangements for that project will be relatively predictable, subject to inflation, and will generally increase during periods in which regularly scheduled or other maintenance is performed. Increases in operating and maintenance expenses would impact our operating margins. Further, we anticipate that insurance premiums for LNG projects may increase due to losses and claims that have arisen or been experienced in respect of other unrelated projects in other regions, or losses and claims that are large enough to impact the broader insurance market even if an LNG project is not involved.

Source: Item 7, 10-K 0002007855-26-000013 vs Item 7, 10-K 0002007855-25-000010

Legal Proceedings142 words changed in this paragraph; it is 31% similar to last year's version.
We are involved, and in the future may become involved, in various claims, lawsuits, administrative, regulatory and other proceedings incidental to the ordinary course of our business from time to time. For example, We regularly analyze current information and, as necessary, provide accruals for probable liabilities on the Calcasieu Project is currently in arbitration proceedings with seven SPA customers for the Calcasieu Project. See Item 1A.—Risk Factors—Risks Relating to Regulation and Litigation—We are involved and may in the future become involved in disputes and legal proceedings and Item 1A.—Risk Factors—Risks Relating to Regulation and Litigation—If we are unsuccessful in any current or potential future arbitration proceedings with customers, the amounts that we are required to pay may be substantial or certain eventual disposition of our post-COD SPAs may be terminated, which may lead to an acceleration of all our debt for the relevant project of this Form 10-K. In addition, as of December 31, 2024 certain of our former employees filed proceedings, including in Virginia federal court, seeking aggregate damages of approximately $214 these matters.

Source: Item 3, 10-K 0002007855-26-000013 vs Item 3, 10-K 0002007855-25-000010

Accounting Policies91 words changed in this paragraph; it is 72% similar to last year's version.
In September 2023, Venture Global was party to certain reorganization transactions (the "Reorganization Transactions") whereby Venture Global Partners, LLC ("Legacy VG Partners"), a then wholly-owned subsidiary of Venture Global Partners II, LLC ("VG Partners") and controlling shareholder of Venture Global LNG, Inc ("VGLNG"), merged with and into Venture Global (the "2023 Merger"), with VG Partners receiving 2.0 billion shares of Venture Global's Class A common stock, after giving effect to the Stock Split, in exchange for 100% of its equity interests in Legacy VG Partners. In connection with the Reorganization Transactions, the non-controlling VGLNG shareholders, holding shareholders that held 84,272 shares of VGLNG's issued and outstanding Series C common stock, stock received 381 million shares of Class A common stock of Venture Global, in a 4,520.3317-for-one exchange, after giving effect to the Stock Split, exchange for their shares of VGLNG (the "NCI Acquisition"). All prior shares of Series A, Series B and Series C VGLNG common stock of VGLNG were retired upon completion of the Reorganization Transactions in September 2023. No cash was exchanged as part of the Reorganization Transactions and Venture Global incurred $40 million of third-party transaction costs in connection with its formation and the issuance of its shares of Class A common stock.

Source: Item 8, Note 2 – Summary of Significant Accounting Policies, 10-K 0002007855-26-000013 vs Item 8, Note 2 – Summary of Significant Accounting Policies, 10-K 0002007855-25-000010

Sentences and paragraphs added, removed or reworded

Every change, by type

Sentences and paragraphs of VG's Risk Factors and MD&A, 10-K Mar 2, 2026 against 10-K Mar 6, 2025. Each links to the text at sec.gov.

Quiet changes are sentences kept from last year with one to four words changed, at least one of them a hedge, a modal or a qualifier (may, could, will, not, significant, material…). A year or date rolling forward is not counted.

The full word list

adverse, adversely, all, although, anticipate, anticipates, any, approximately, believe, believes, can, cannot, certain, could, expect, expects, generally, however, if, intend, intends, largely, likely, many, material, materially, may, might, most, must, never, no, not, possible, primarily, probable, should, significant, significantly, some, substantial, substantially, unlikely, will, would

AddedRisk Factors
In addition to our post-COD SPAs, we have also entered into certain Firm-start SPAs. Our ability to satisfy our obligations under such Firm-start SPAs following the applicable firm start dates will depend in part on our ability to produce sufficient LNG cargos, either before or after COD, or in excess of nameplate capacity. While we expect to produce sufficient LNG volumes prior to the start date of each Firm-start SPA, there can be no assurance that our projects or bolt-on expansions will not be delayed, in which case we may not produce sufficient LNG to meet our obligations under the relevant Firm-start SPAs.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedRisk Factors
Similarly, under certain SPAs for the sale of commissioning cargos and certain sales by VG Commodities, our customers pay a fixed fee or a fee based on an index other than Henry Hub (such as the TTF or JKM benchmarks), and in such cases our operating margins may be reduced in the event of an increase in the price at which we are required to purchase feed gas relative to the relevant fixed fee or alternate index, or in the event of a reduction in the price of the relevant index used to calculate the fee under the relevant SPA relative to the price at which we are required to purchase feed gas.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedRisk Factors
We depend on third-party natural gas suppliers to provide the natural gas necessary to operate our liquefaction facilities. Significant sustained declines in natural gas prices, oversupply in natural gas markets or crude, or materially adverse changes in the cost structure or profitability of upstream producers could cause producers to shut-in, curtail or reduce production from existing wells and defer or cancel planned drilling activity. Natural gas supply curtailments or shut-ins, whether due to low commodity prices, operational constraints, government actions, weather, or other market conditions, could limit the volume of natural gas available to us, and may significantly increase our feed gas costs, constrain our ability to operate our facilities at expected utilization levels, and have a material adverse effect on our business, financial condition, results of operations and future growth prospects.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedRisk Factors
In periods of low or volatile natural gas prices, producers may elect to reduce output from higher-cost wells or delay completion of drilled but uncompleted wells, which may lead to reduced supply in the natural gas markets where we obtain our feed gas. Such supply variability could, among other things, result in increased competition for available natural gas supplies and reduced reliability of delivery commitments from suppliers. Our inability to obtain sufficient natural gas on commercially reasonable terms, or at all, could adversely affect our relationships with our customers and counterparties, who rely on us to deliver contracted volumes of LNG.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedRisk Factors
Additionally, regulatory actions, pipeline infrastructure constraints, extreme weather events, or other force majeure occurrences affecting our supply regions could exacerbate upstream production curtailments and further limit the availability of natural gas. While we seek to mitigate these risks through long-term supply arrangements, portfolio diversification and pipeline connectivity, there can be no assurance that such measures will fully protect us from the effects of upstream production slowdowns or curtailments. Any prolonged or widespread reduction in upstream natural gas production could have a material adverse effect on our business, financial condition, results of operations and future growth prospects.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedRisk Factors
Certain metrics that we track and may present are illustrative and are subject to a number of assumptions, and any real or perceived inaccuracies in such metrics may adversely affect our business and reputation.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedRisk Factors
We track and may present from time to time certain metrics that are illustrative and not independently verified by any third party. Such metrics may be based on a range of assumptions, such as the development, completion and commissioning of the relevant projects (including obtaining any required regulatory approvals), estimated contracted
Read it in 10-K Mar 2, 2026 at sec.gov
Show the other 71
AddedRisk Factors
We anticipate that insurance premiums for LNG projects may increase due to a continuing increase in demand by LNG projects seeking insurance coverage, and losses and claims that have arisen or been experienced in
Read it in 10-K Mar 2, 2026 at sec.gov
AddedRisk Factors
Our LNG business and the development of domestic LNG facilities and projects generally is based on assumptions about the future availability and price of natural gas and LNG, and the prospects for international
Read it in 10-K Mar 2, 2026 at sec.gov
AddedRisk Factors
In addition, our project financing credit agreements require our projects to maintain certain historical debt service coverage ratios, respective to each project and upon achieving certain milestones.
Read it in 10-K Mar 2, 2026 at sec.gov
RemovedRisk Factors
Additionally, we may at times contract commissioning cargos on a forward basis and, as a result, these sales of commissioning cargos may be uncorrelated with movements in spot LNG prices.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedRisk Factors
As a result, we have experienced, and expect to continue to experience during the remainder of the commissioning phase, significant volatility in the proceeds we have generated from the sales of commissioning
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedRisk Factors
For example, VGCP notified all customers under the Calcasieu Project post-COD SPAs of the anticipated delay to COD, indicating that such delay constitutes a force majeure event. As a result of such designation, the time period within which to achieve COD in such SPAs would be extended and such customers will not be entitled to terminate as a result of failure to designate COD until June 2025, at the earliest. All of such customers have questioned whether, and most have disputed in arbitration proceedings that, the delay constitutes a force majeure event, and they could assert that they are entitled to terminate their SPAs because COD did not occur by March 2024.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedRisk Factors
In addition, the CP2 Foundation SPAs include termination rights in favor of the customer and us if certain conditions precedent are not satisfied by us or waived by the customer by a certain date including that we receive all LNG export authorizations by that date. Because of the rehearing order issued by FERC on November 27, 2024 that required a supplemental environmental review and the delay in issuance of authorizations to proceed with construction on the CP2 Project until FERC issues a further merits order and the temporary pause on new authorizations of natural gas exports to Non-FTA Nations described under Item 1.—Business—Governmental Regulation—DOE Export Authorizations, some of our customers under the CP2 Foundation SPAs or we may elect to terminate such SPAs if the related conditions precedent are not satisfied by the applicable deadline. Such dates certain have passed in two of the CP2 Foundation SPAs and are upcoming in March 2025 in the remaining CP2 Foundation SPAs. Although most customers have agreed to extend their original deadlines until March 2025, we are negotiating extensions with all of the CP2 Foundation SPA customers. There can be no assurance that we will come to an agreement regarding an extension with such customers, and if we do not come to an agreement, either we or such customers may elect to terminate their respective SPA after the applicable grace period. Further, there can be no assurance that we will be able to secure any necessary extensions on similar terms with the CP2 Foundation SPA customers or at all if the future deadlines are not met in the event of further delays or otherwise.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedRisk Factors
Total contracted revenue is based on certain assumptions and is presented for illustrative purposes only and actual sales under our SPAs may differ materially from such illustrative operating results.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedRisk Factors
inflation and assumed Henry Hub gas price used in such calculation, and any such differences could be material. As a result, actual revenue generated under those SPAs will likely differ from the total contracted revenue included in this Form 10-K, and any such differences could be material. Investors should not place undue reliance on our illustrative calculations of the total contracted revenue.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedRisk Factors
For example, the Plaquemines Project is being constructed pursuant to two integrated EPC contracts, one per phase, or the Plaquemines EPC Contracts, that VGPL entered into with KZJV, LLC, or KZJV, a limited liability company that is owned by Kellogg Brown & Root LLC, or KBR EPC Member, and Zachry Industrial, Inc., or Zachry Industrial. In May 2024, Zachry Industrial, along with Zachry Holdings, Inc., or Zachry Holdings, one of
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedRisk Factors
the parent guarantors under the Plaquemines EPC Contracts for the Plaquemines Project, and certain of their affiliates filed for bankruptcy protection under Chapter 11 of the U.S. bankruptcy code, or the Zachry Bankruptcy. In February 2025, Zachry Industrial and its affiliates had their Chapter 11 plan confirmed by the bankruptcy court. Although it is our understanding that KZJV, Zachry Industrial, and KBR EPC Member are committed to avoiding any disruption to the Plaquemines Project, and that Zachry Industrial has assumed the Plaquemines EPC Contracts following its bankruptcy proceedings, there can be no assurance that the Zachry Bankruptcy will not have a material adverse impact on the project. In addition, the Zachry Bankruptcy may result in the exercise of any applicable termination or step-in rights in connection with the KZJV limited liability company agreement and any related arrangements as well as disputes between KBR EPC Member and Zachry Industrial, or their parent guarantors, with respect to the KZJV joint venture and their respective obligations in connection with the Plaquemines EPC Contracts, which may adversely impact KZJV’s, its members’ or its parent guarantors’ willingness or ability to perform their respective contractual obligations in connection with the Plaquemines EPC Contracts and related parent guarantees. Such events may also constitute an event of default under the Plaquemines EPC Contracts. If KZJV is unable or unwilling to perform according to the negotiated terms and timetable of the Plaquemines EPC Contracts, we may decide to engage a substitute EPC contractor, which could result in material cost increases and/or delays in the ability of both phases of the Plaquemines Project to achieve commercial operations. There also can be no assurance that we would be able to enter into an EPC contract with any such substitute EPC contractor on similar terms, or at all. Further, the Zachry Bankruptcy resulted in an event of default under the related project financing for the Plaquemines Project. While the relevant lenders waived such event of default, there can be no assurance they would waive any further events of default that occur in the future, and the occurrence of any such further event of default, if not waived, would allow the lenders to accelerate such project financing and foreclose on the collateral securing such financing. Any of the foregoing could result in material delays or termination of the Plaquemines Project, and could have a material adverse impact on our ability to complete the Plaquemines Project on our anticipated schedule and budget, or at all.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedRisk Factors
and export facilities, could exceed our available funds and result in our failure to complete such projects or assets and thereby negatively impact our business and limit our growth prospects.
Read it in 10-K Mar 6, 2025 at sec.gov
RewordedRisk Factors
Our receipt of newbuild LNG tankers could Deliveries may be delayed, delayed or cancelled or otherwise not completed because of, due to, among other things, quality quality, warranty, or engineering problems or issues, failure to deliver the LNG tanker in accordance with the meet contractual specifications, changes in governmental regulations or maritime self-regulatory organization standards, delays to in equipment delivery of equipment by third-party suppliers, work stoppages or other labor disturbances at the shipyard, disruptions, shipyard capacity constraints, bankruptcy or other financial liquidity issues of shipbuilders or liquidity problems of the shipbuilder, a backlog of orders at the shipyard, sellers, political or economic disturbances in the country or region where the vessel is being built, vessels are constructed, weather interference or catastrophic events, shortages of or delays in the receipt of necessary construction materials, materials such as steel, and or our inability to finance the purchase of the LNG tanker. satisfy payment or other contractual obligations.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
Although we do not expect this version If safety standards were to be issued become more stringent in its current form, any future rule implementing these mandates under PIPES Act may require operators of pipelines and facilities the future, it could cause us, like other similarly situated companies, to make operational changes or modifications at their our facilities to meet standards beyond current requirements, which changes or modifications that may result in additional capital costs, possible operational delays and increased costs of operation that, in some instances, may be significant.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
The loss In addition, if one of earnings our LNG tankers, or costs to subcharter replacement tankers while these LNG tankers are being repaired any vessels we charter, were involved in an accident with the potential risk of environmental impacts or contamination, the resulting media coverage and potential liability, including regulatory penalties, sanctions, fines and litigation, could have a material adverse effect on our reputation, our current or future business, contracts, financial condition, operating results, cash flow, financing requirements, liquidity and prospects.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
There can be no assurance that any opposition, appeals or other litigation, which may be entered after the granting of authorization by FERC (as in the existing appeal) or DOE (once it issues the non-FTA authorization), will not be successful or not delay our ability to develop the CP2 Project, the CP3 Project or the Delta Project, any bolt-on expansion to any of our projects we pursue in the future, or any other project future projects or expansions we may seek to develop.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
As of December 31, 2024, we do not have any 2025, our material sales, sales and operating cash flow or operating history, other than has been limited to sales of LNG from our Calcasieu Project (including short-term sales of commissioning cargos, sales under our post-COD SPAs, and sales of LNG from excess capacity) and the short-term sales of LNG commissioning cargos from the Calcasieu Plaquemines Project prior to commencing commercial operations.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
We cannot predict whether our applications, approvals or permits will attract significant opposition or whether the permitting process will be lengthened due to complexities and appeals, including uncertainty and delays in the timetable on which the DOE will issue the non-FTA export authorization for the CP2 Project and for authorize increases in the expected annualized peak output liquefaction capacity for the Calcasieu Plaquemines Project and exports from, the Plaquemines Projects, Expansion Project, as well as for the FERC and DOE to act on future applications for the CP3 Project, the Delta Project our other future projects or any potential bolt-on expansion opportunities in our projects in the future, expansions, litigation by environmental groups and other advocates concerned about the impact of our projects on climate change and pollution as well as resistance by local communities due to environmental, health and safety concerns.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
While we believe we have sufficient cash and access to substantial commissioning cargo proceeds to fund the completion of the Plaquemines Project and the construction and commissioning of Phase 1 of the CP2 Project based on our current estimate of the total project costs, Total Project Costs, the development, construction and financing of Phase 2 of the CP2 Project, the CP3 Project, the Delta Project and any potential bolt-on expansions, as well as any our other current and future projects we develop, and expansions, will require significant additional funding.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
These estimates are based primarily upon our construction cost experiences with the Calcasieu Project and the Plaquemines Project and the pricing included in the CP2 Phase 1 EPC Contract, and They also reflect the current inflationary environment environment, the potential impact of tariffs in place as of December 31, 2025, as well as the fact that the pipeline for the CP2 Project is expected to be longer and more expensive than the pipelines for the Calcasieu Project and the Plaquemines Project.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
The complaint asserts claims under Sections 11 11, 12, and 15 of the Securities Act on behalf of a putative class of all persons and entities who purchased or otherwise acquired our Class A common stock pursuant and/or traceable to the registration statement for the IPO. IPO and contends that certain statements made by the Company and certain of its officers and directors in the registration statement and prospectus for the IPO were allegedly false or misleading and seeks unspecified damages on behalf of the putative class.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
Although we do not expect this version to be issued in its current form, any Any future rule implementing these mandates under PIPES Act may require operators of pipelines and facilities to make operational changes or modifications at their facilities to meet standards beyond current requirements, which changes or modifications may result in additional capital costs, possible operational delays and increased costs of operation that, in some instances, may be significant. requirements.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
In particular, following COD of the Calcasieu Project, but prior to Furthermore on and after August 19, 2027, no distributions from Calcasieu Funding will be to VGLNG are permitted to VGLNG, its indirect parent, until Calcasieu Funding has redeemed in cash any accrued distributions on its all of such preferred units, which are owned by a third party. units.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedRisk Factors
A delay in COD of the Calcasieu Plaquemines Project or Phase 1 or 2 of the Plaquemines CP2 Project beyond a certain deadline could also result in an event of default under the Calcasieu Pass Credit Facilities or the Plaquemines Credit Facilities, respectively, and/or certain investors exercising step-in rights to control, directly the CP2 Credit Facilities, or indirectly, certain of our subsidiaries and the Calcasieu Project. CP2 EBL Facility, respectively.
Read it in 10-K Mar 2, 2026 at sec.gov
Quiet changesRisk Factors
Our ability to optimize sales of LNG cargos that are not otherwise committed will depend depends on our ability to negotiate sales that meet our objective of balancing profit, duration and risk.
Read it in 10-K Mar 2, 2026 at sec.gov
Quiet changesRisk Factors
In addition, if we are unable to deliver any contracted volume in full, our customers will generally be entitled to reimbursement of some or all costs and expenses for replacement LNG.
Read it in 10-K Mar 2, 2026 at sec.gov
Quiet changesRisk Factors
Any delays in implementing any of the measures required for the phased start-up of our facilities or in obtaining any the necessary regulatory approvals, and any additional costs associated with the phased start-up of our facilities, could have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, financing requirements, liquidity and prospects.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
During the year ended December 31, 2025, the Company's sales and shipping business met the criteria to be a reportable segment. Prior to the year ended December 31, 2025, sales and shipping was not quantitatively material for reporting purposes and was combined with corporate activities as corporate, other and eliminations. Prior period presentations included within Item 7. ––Management's discussion and Analysis of Financial Condition and Results of Operations of this form 10-K has been recast to conform to the current segment reporting structure.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
Years ended December 31, 2025 2024 Income from operations $ 5,156 $ 1,763 LNG volumes exported Cargos 380 141 TBtu 1,415.4 508.4 LNG volumes sold (TBtu) 1,408.8 500.6 Weighted average price of LNG volumes sold (per MMBtu) Liquefaction fee (1) $ 5.87 $ 7.28 Commodity fee 3.93 2.61 Weighted average price of LNG volumes sold $ 9.80 $ 9.89
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
Calcasieu Project. Our initial LNG export facility declared COD and commenced the sale of LNG to its customers under our post-COD SPAs on April 15, 2025. Prior to COD, the Calcasieu Project sold LNG under LNG Commissioning Sales Agreements.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
Calcasieu Project Years ended December 31, 2025 2024 LNG volumes exported Cargos 146 140 TBtu 539.3 504.5 LNG volumes sold (TBtu) 538.5 501.6 Weighted average price of LNG volumes sold (per MMBtu) Fixed liquefaction fee $ 3.63 $ 7.15 Commodity fee 3.95 2.61 Weighted average price of LNG volumes sold $ 7.58 $ 9.76
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
Plaquemines Project Years ended December 31, 2025 2024 LNG volumes exported Cargos 234 1 TBtu 876.1 3.9 LNG volumes sold (TBtu) 876.1 3.9 Weighted average price of LNG volumes sold (per MMBtu) Fixed liquefaction fee $ 6.62 $ 7.29 Commodity fee 3.93 3.95 Weighted average price of LNG volumes sold $ 10.55 $ 11.24
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
CP2 Project. In June 2025, we commenced site work on our third LNG export facility, following receipt of final approval and notices to proceed with on-site construction from the FERC. In July 2025, Phase 1 of the CP2 Project achieved FID and obtained $15.1 billion in project financing to fund the development and construction of Phase 1 of the CP2 Project. During the year ended December 31, 2025, we incurred $6.5 billion of project costs primarily associated with construction activities and purchases of equipment procurement, of which $6.3 billion was capitalized and $203 million was expensed.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
In February 2026, the CP2 Project executed a 20-year post-COD SPA for the delivery of 1.5 mtpa from Phase 2 of the CP2 Project, increasing the total expected capacity post-COD under contract from 26.0 mtpa to 27.5 mtpa.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
Our Strategic Developments. In 2025, we formally initiated the development process for the Plaquemines Expansion Project with expected annual peak production capacity of 31.0 mtpa. See Item 1A.—Business for further discussion.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
We took delivery of four LNG tankers during the year ended December 31, 2025, and one LNG tanker in the first quarter of 2026. This brought our total owned fleet of LNG tankers to seven with an additional two LNG tankers that are currently under construction and will be delivered in 2026. In 2025, we used our LNG tankers to transport 61 cargos from our LNG facilities.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
In September 2025, Blackfin entered into the Blackfin Credit Facilities totaling $1.6 billion. Proceeds from the Blackfin Credit Facilities were used to reimburse $889 million to VGLNG for prior expenditures related to the development and construction of the Blackfin Pipeline.
Read it in 10-K Mar 2, 2026 at sec.gov
AddedMD&A
In November 2025, VGLNG entered into the VGLNG Revolving Credit Facility totaling $2.0 billion. Proceeds from the VGLNG Revolving Credit Facility will be used for general corporate purposes of VGLNG and its subsidiaries.
Read it in 10-K Mar 2, 2026 at sec.gov
RemovedMD&A
On January 27, 2025, the Company effectuated an approximately 4,520.3317-for-one forward stock split of its Class A common stock in connection with its IPO which was completed on January 27, 2025. All Class A common stock share and per share amounts in these consolidated financial statements have been retroactively adjusted to reflect the impact of the Stock Split. See Item 8.—Financial Statements and Supplementary Data—Note 25 – Subsequent Events for further discussion of the IPO.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedMD&A
Calcasieu Project. In 2024, production and sales of LNG from our initial LNG export facility remained ongoing, although not at full nameplate capacity levels, while we continued to address significant remaining work related to commissioning, carryover completions, rectification, reliability testing, and other incomplete aspects of the facility. Sales from our Calcasieu Project commenced in March 2022. LNG cargos exported in 2024 totaled 140 (504.5 TBtu of LNG) compared to 143 (506.0 TBtu of LNG) in 2023.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedMD&A
CP2 Project. In 2024, we significantly advanced the development of our third LNG project, amidst a fluctuating political and regulatory environment. During the year, we incurred $2.7 billion of project costs primarily associated with engineering and design, equipment procurement, and off-site manufacturing work, a portion of which was capitalized and a portion of which were expensed. In 2024, we issued purchase orders and notices to proceed thereunder to Baker Hughes for both the liquefaction train and power island systems for Phase 2 of the project, among other development and procurement activities. We also continued to see change in regards to the CP2 Project’s regulatory landscape, as discussed below:
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedMD&A
•FERC authorization. In June 2024, we received authorization from FERC to site, construct and operate the CP2 Project. In July 2024, a group of opponents, composed mostly of environmental groups, filed a request for rehearing of FERC’s authorization. In November 2024, FERC issued an order on rehearing that, among other things, (i) generally rejected the opposition’s arguments, (ii) stated that FERC would prepare a supplemental EIS to further address air impacts of certain emissions, and (iii) that FERC will address the emissions topic in a future order. In addition, FERC announced that, due to its initiation of supplemental environmental review, it will not issue authorizations to proceed with construction until the
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedMD&A
•DOE non-FTA authorization. In January 2024, the Biden administration announced a temporary pause on approvals from the DOE to export natural gas to Non-FTA Nations. In January 2025, President Trump issued an Executive Order that, among other things, directed the DOE to resume reviews of such export applications.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedMD&A
Our Strategic Advancements. In July 2024, we took delivery of our first two of nine LNG tankers that we have contracted to construct and/or acquire. In addition, in 2024, we executed two medium-term and two short-term charters for additional LNG tankers, bringing our shipping portfolio to a total of thirteen vessels. In 2024, eight of our cargos from LNG produced by the Calcasieu Project and the Plaquemines Project were sold or in-transit on as delivered terms utilizing our owned or chartered LNG tankers. In 2024, we signed an agreement for 1 mtpa of regasification capacity, or approximately 12 cargos annually, at the Alexandroupolis LNG regasification terminal in Greece for five years, which is expected to begin in October 2025.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedMD&A
LNG Market Environment. In 2024, average LNG prices experienced a significant decline compared to 2023 as a result of various supply and demand factors, including high inventories in Europe and relatively stable natural gas supply conditions. In the U.S., the Henry Hub natural gas spot price averaged $2.25 per MMBtu in 2024 a decline of 11% from 2023. In Europe, the Title Transfer Facility, or TTF, price averaged $10.89 per MMBtu in 2024, a decline of 15% from 2023. The Japan-Korea-Marker, or JKM, price, a key benchmark for LNG in East Asia, averaged $11.91 per MMBtu in 2024, a decline of 14% from 2023. See Item 1A.—Risk Factors—Risks Relating to Our Business—Our ability to generate proceeds from sales of commissioning cargos is subject to significant uncertainty and volatility in such proceeds, given significant volatility in spot-market prices of this Form 10-K.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedMD&A
◦Contract price under our SPAs. Our existing post-COD SPAs will require our export customers to pay us a fixed facility charge per MMBtu, plus a variable commodity charge per MMBtu, in an amount equal to, depending on the applicable SPA, 115% or more of the Henry Hub gas price. The fixed facility charge varies across our post-COD SPAs and a portion of the fixed facility charge will be adjusted for inflation. For any additional post-COD SPAs that we may enter into in the future which include a fixed facility charge, that amount will be based on several factors, including market conditions at the time we enter into the relevant contract. Final terms for any additional post-COD SPAs we may enter into in the future will not be known until those contracts are executed and will impact our future revenue, as well as our operating margins.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedMD&A
◦Henry Hub gas price. As described above, the variable commodity charge under our post-COD SPAs requires our customers to pay 115% or more of the Henry Hub gas price per MMBtu, which is intended to cover the price of the feed gas and gas transportation costs, and is also intended to cover certain of our operating expenses and partially adjust for inflation. We anticipate that any additional post-COD SPAs we enter into in the future will similarly require our export customers to pay a similar variable commodity charge. As a result, changes in the Henry Hub gas price will impact our future revenue, as well as our operating margins. In addition, there may be differences, and such differences may be material, between the actual price we pay for feed gas and the Henry Hub gas price used to calculate the variable commodity charges payable by our customers under the relevant post-COD SPAs, which could affect our operating margins.
Read it in 10-K Mar 6, 2025 at sec.gov
RemovedMD&A
Seasonality. Seasonal weather can affect demand for LNG and accordingly can impact our ability to sell LNG during the commissioning of our facilities or once our facilities achieve their respective CODs. We have already begun experiencing, and we expect to experience for our other projects, the effects of market volatility and fluctuation in seasonal demand for LNG in our existing markets. For example, temperature and weather in the markets we supply, as well as the amount of natural gas in storage in such markets, may affect both power demand
Read it in 10-K Mar 6, 2025 at sec.gov
RewordedMD&A
Years ended December 31, Change 2025 2024 2023 ($) (%) REVENUE $ 13,769 $ 4,972 $ 7,897 $ (2,925) (37)% 8,797 177% OPERATING EXPENSE Cost of sales (exclusive of depreciation and amortization 1,351 1,684 (333) (20)% shown separately below) 5,920 1,351 4,569 NM Operating and maintenance expense 975 589 391 198 51% 386 66% General and administrative expense 433 312 224 88 121 39% Development expense 344 635 490 145 30% (291) (46)% Depreciation and amortization 941 322 277 45 16% Insurance recoveries, net — (19) 19 (100)% 619 192% Total operating expense 8,613 3,209 3,047 162 5% 5,404 168% INCOME FROM OPERATIONS 5,156 1,763 4,850 (3,087) (64)% 3,393 192% OTHER INCOME (EXPENSE) Interest income 151 244 172 72 42% (93) (38)% Interest expense, net (1,454) (584) (641) 57 (9)% (870) 149% Gain (loss) on interest rate swaps (220) 774 174 600 NM (994) 128% Loss on financing transactions (267) (14) (123) 109 (89)% (253) NM Loss on foreign currency transactions (3) — (3) NM Total other income (expense) (1,793) 420 (418) 838 (200)% (2,213) NM INCOME BEFORE INCOME TAX EXPENSE 3,363 2,183 4,432 (2,249) (51)% 1,180 54% Income tax expense 630 437 816 (379) (46)% 193 44% NET INCOME $ 2,733 1,746 $ 3,616 $ (1,870) (52)% 987 57% Less:
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
In May 2023, VGLNG December 2025, VGPL issued $2.25 $3.0 billion aggregate principal amount of 8.125% Senior Secured Notes senior secured notes, consisting of $1.75 billion of senior secured notes due 2028, 2030 or the VGLNG 2028 Notes, VGPL 2030 notes, and $2.25 a $1.25 billion aggregate principal amount of 8.375% Senior Secured Notes senior secured notes due 2031, 2034 or the VGLNG 2031 Notes. VGPL 2034.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
Given that we have not executed certain contracts to construct the CP2 Project, including the EPC contract with respect to Phase 2 of the CP2 Project, this This estimate is based upon the contracts that we have in place for the CP2 Project and our construction cost experiences with the Calcasieu Project and the Plaquemines Project, as well as expected costs to construct longer pipelines for the CP2 Project than for the Calcasieu Project and the Plaquemines Project.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
Our ability to generate cash proceeds from such sales, revenue, and the amount of any such associated cash proceeds that we are able to generate, will be contingent upon achieving COD at each of our projects, and will vary depending on the following key factors: fixed liquefaction fee under our Contracted SPAs, the variable commodity fee indexed to the Henry Hub price of gas, as well as the volume and sales prices of LNG produced in excess of committed sales under Contracted SPAs.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
CP2 Construction Term Loan 9,390 CP2 Working Capital Facility 740 Plaquemines Working Capital Facility 637 Calcasieu Pass Working Capital Facility 231 Plaquemines Construction Term Loan 313 Plaquemines 279 Blackfin TLA Facility 371 Blackfin Working Capital Facility 627 75 VGLNG Revolving Credit Facility 2,000 Total available borrowing capacity under our credit facilities 1,171 13,492 Total cash and available borrowing capacity $ 5,785 16,917
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
For further discussion, see Item 1A.—Risk Factors—Risks Relating to Regulation and Litigation—If we are unsuccessful in any current or potential future arbitration legal proceedings with customers, the amounts that we are required to pay may be substantial or certain of our post-COD SPAs may be terminated, which may lead to an acceleration of all our debt for the relevant project and adversely impact the trading price of our Class A common stock, Note 4 – Revenue from Contracts with Customers in Item 8.—Financial Statements and Supplementary Data of this Form 10-K, and Part I Item 3.—Legal Proceedings of this Form 10-K.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
We anticipate obtaining significant additional financing financing, and incurring related financing fees and interest expense in connection with interest, for the development of Phase 2 of the CP2 Project, the CP3 Project, the Delta Project, our greenfield and expansion projects, our pipeline development projects, and our LNG tankers, and any bolt-on expansions or future LNG projects. tankers.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
Activities relating to certain development stage projects reported in corporate, other and our shipping business, eliminations include immaterial operating segments, overhead costs not directly associated with our LNG projects reportable segments (for example, general and administrative and marketing expenses) expenses), and inter-segment eliminations are not material and therefore are included in corporate, other and eliminations.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
Our ability to generate cash proceeds from such sales, and the amount of any such cash proceeds revenue that we are able to generate, will depend primarily on the volume of LNG that has been contracted under post-COD SPAs and the amount of LNG that we are able to produce at any project in excess of the nameplate capacity, our ability to negotiate sales of such uncommitted capacity and excess LNG, as well as the market price for LNG at the time of such sales or the terms of any SPA we are able to negotiate with respect to such sales. executed.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
This increase decrease was primarily due to an increase in early lower development activities and personnel costs related to that were expensed of $282 million as a result of the CP2 Project, partially offset by the Plaquemines Project being deemed declared probable in March 2022, during 2025, and the majority of the costs to develop the facility subsequently being capitalized.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
Net income attributable to redeemable stock of subsidiary was $167 million for the year ended December 31, 2025, a $23 million, or 16%, increase from $144 million for the year ended December 31, 2024, a $14 million, or 11%, increase from $130 million during the year ended December 31, 2023. 2024.
Read it in 10-K Mar 2, 2026 at sec.gov
RewordedMD&A
Net income attributable to non-controlling interests was $36 million for the year ended December 31, 2025, a $23 million, or 39%, decrease from $59 million for the year ended December 31, 2024, a $746 million, or 93%, decrease from $805 million during the year ended December 31, 2023. 2024.
Read it in 10-K Mar 2, 2026 at sec.gov

Sources

The two latest 10-Ks on EDGAR, section by section. Each change links to the text at sec.gov.

Also

New risk factors: paragraphs with nothing like them last year, quoted in full.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/VG/export.csv") into a cell.

Next:Related parties
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.