10-K 0000811156-26-000004 (2026-02-10) vs 10-K 0000811156-25-000036 (2025-02-11)
| Section | Compared text | Words now | Changed |
| Risk Factors | Item 1A | 6,422 |
12.8% |
| MD&A | Item 7 | 13,112 |
32.2% |
| Legal Proceedings | Item 3, via Note 4 – Contingencies and Commitments | 2,564 |
20.5% |
| Accounting Policies | Item 8, Note 1 – Significant Accounting Policies | 1,374 |
1.3% |
The redline: what was cut and what was added
In each section, the paragraph that changed most, marked against last year's 10-K:
cut words struck through, new words highlighted and underlined.
MD&A 142 words changed in this paragraph; it is 39% similar to last year's version.
Retention Incentive Program: Under its Clean Energy Plan, Consumers will retire the The retirement of J.H. Campbell coal-fueled generating units in 2025. In order is subject to ensure necessary staffing at J.H. Campbell through retirement, temporary extensions under emergency orders issued by the U.S. Secretary of Energy. As a result, Consumers has implemented a retention incentive program. The aggregate cost of the J.H. Campbell program through 2025 is estimated measures to be less than $50 million; Consumers ensure appropriate staffing levels and expects to recognize $5 incur up to $4 million during each 90‑day emergency order period. Consumers will seek recovery of these retention benefit costs in 2025. The MPSC has approved deferred accounting treatment from FERC, consistent with rate recovery sought for these costs; these expenses are deferred as a regulatory asset. other costs of complying with the emergency orders. For additional details on this program, see Item 8. Financial Statements and Supplementary Data—Notes to the Consolidated Financial Statements—Note 19, 20, Exit Activities and Asset Sales. For additional details on the emergency orders, see Item 8. Financial Statements and Supplementary Data—Notes to the Consolidated Financial Statements—Note 3, Regulatory Matters.
Source: Item 7, 10-K 0000811156-26-000004 vs Item 7, 10-K 0000811156-25-000036
Risk Factors 133 words changed in this paragraph; it is 66% similar to last year's version.
Consumers has announced a long-term strategy for delivering clean, reliable, resilient, and affordable energy, including a plan to end the use of coal in owned generation in 2025, and other subsidiaries of CMS Energy have plans to develop and operate clean energy assets. The MPSC, FERC, other regulatory authorities, or other third parties may prohibit, delay, or impair some or all of CMS Energy’s and Consumers’ planned acquisitions or development of owned or purchased electric generation and storage capacity. Consumers’ planned electric generation capacity, including renewable generation or storage projects, may be adversely impacted by interconnection delays at MISO or in the footprints of other regional transmission organizations, and/or by interconnection costs. CMS Energy and Consumers and its contractors may be unable to acquire, site, construct timely, and/or permit generation and storage capacity, including some or all of the generation and storage capacity proposed in Consumers’ plan. CMS Energy and Consumers’ ability to implement their plans may be affected by environmental regulations, global supply chain disruptions, import tariffs, and changes in the cost, availability, and supply of generation and storage capacity. While CMS Energy and Consumers continue to advocate for advances in commercially available technologies required to reduce or eliminate greenhouse gases on a cost-effective basis at scale, such advances are largely outside of CMS Energy’s and Consumers’ control. Advancements in technology related to items such as battery storage, carbon capture/storage, and electric vehicles may not become commercially available or economically feasible as projected. Customer programs such as energy efficiency and demand response may not realize the projected levels of customer participation.
Source: Item 1A, 10-K 0000811156-26-000004 vs Item 1A, 10-K 0000811156-25-000036
Legal Proceedings 80 words changed in this paragraph; it is 68% similar to last year's version.
In order to enforce their rights under the contract and parent guaranty, and to pursue appropriate damages, Consumers and DTE Electric filed a complaint against TAES and Toshiba in the U.S. District Court for the Eastern District of Michigan in 2022. TAES and Toshiba filed a motion to dismiss the complaint, along with an answer and counterclaims seeking approximately $15 million in damages related to payments allegedly owed under the parties’ contract. As a co-owner of Ludington, Consumers would be liable for 51 percent of any such damages, if liability and damages were proven. The court denied the motion to dismiss filed by TAES and Toshiba. The parties are engaged in ongoing litigation, including discovery, pursuant to a court-ordered schedule. Consumers believes the counterclaims filed by TAES and Toshiba are without merit, but cannot predict the financial impact or outcome of this matter. An unfavorable outcome could have a material adverse effect on CMS Energy’s and Consumers’ financial condition, results of operations, or liquidity.
Source: Item 3, via Note 4 – Contingencies and Commitments, 10-K 0000811156-26-000004 vs Item 3, via Note 3 – Contingencies and Commitments, 10-K 0000811156-25-000036
Accounting Policies 19 words changed in this paragraph; it is 87% similar to last year's version.
Cash and Cash Equivalents and Restricted Cash and Cash Equivalents: Cash and cash equivalents include short-term, highly liquid investments with original maturities of three months or less. Restricted cash and cash equivalents are held primarily for the repayment of securitization bonds and funds held in escrow. Cash and cash equivalents may also be restricted to pay other contractual obligations such as leasing of coal railcars. These amounts are classified as current assets since they relate to payments that could or will occur within one year.
Source: Item 8, Note 1 – Significant Accounting Policies, 10-K 0000811156-26-000004 vs Item 8, Note 1 – Significant Accounting Policies, 10-K 0000811156-25-000036
Every change, by type
Sentences and paragraphs of CMS's Risk Factors and MD&A, 10-K 2026-02-10 against 10-K 2025-02-11.
Each links to the text at sec.gov.
Quiet changes are sentences kept from last year with one to four words changed, at least one of them a hedge, a modal or a qualifier
(may, could, will, not, significant, material…). A year or date rolling forward is not counted.
The full word list
adverse, adversely, all, although, anticipate, anticipates, any, approximately, believe, believes, can, cannot, certain, could, expect, expects, generally, however, if, intend, intends, largely, likely, many, material, materially, may, might, most, must, never, no, not, possible, primarily, probable, should, significant, significantly, some, substantial, substantially, unlikely, will, would
AddedRisk Factors
FERC issued an advance notice of proposed rulemaking in response to the Secretary of the DOE’s direction to FERC to consider the advance notice of proposed rulemaking as a means to standardize and expedite interconnection procedures and agreements for large electric loads. If FERC asserts jurisdiction over the distribution components of large-load customers’ interconnections to the transmission system, or allows large-load customers to directly purchase electricity from wholesale markets, it could have a material adverse effect on CMS Energy and Consumers.
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedRisk Factors
Consumers also faces regulatory uncertainty resulting from the U.S. Secretary of Energy’s emergency orders issued under the Federal Power Act and associated DOE regulations, which direct continued
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedRisk Factors
operation of the J.H. Campbell, as well as similar prior or future executive actions, including the January 2025 and April 2025 executive orders related to energy supply and reliability. The Federal Power Act, DOE regulations, and U.S. Secretary of Energy emergency orders all provide for cost recovery associated with continued operations, but there is not currently a FERC-approved MISO Tariff for recovery of compliance costs associated with the continued operation of J.H. Campbell, and continued operation of J.H. Campbell is not contemplated in Consumers’ current MPSC rates or rate filings at the MPSC. Consumers is pursuing cost recovery at FERC but cannot predict the outcome of those efforts or the impact of other executive actions.
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedRisk Factors
Alternatively, this rapid expansion of data centers and resulting increase in demand for electric power in MISO and in Consumers’ service territory may not develop as anticipated. Efforts to attract data center developers could be unsuccessful as other utilities and regions compete for these projects, which may limit future load growth. In addition, local zoning, permitting, land‑use constraints, and other external factors outside Consumers’ control could impede data center development. If these challenges arise and cannot be effectively mitigated, the anticipated benefits of data center load growth may not materialize. Further, even when data center customers enter into contracts to purchase utility service, there is a risk they may not fulfill their contractual or tariff obligations.
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedRisk Factors
A work interruption or other union actions could adversely affect CMS Energy and Consumers.
Read it in 10-K 2026-02-10 at sec.gov ↗
RemovedRisk Factors
Alternatively, this rapid expansion of data centers and resulting increase in demand for electric power in MISO and in Consumers’ service territory may not develop as planned.
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedRisk Factors
CMS Energy’s and Consumers’ risk or that they will not result in net liabilities to CMS Energy or Consumers as a result of future volatility.
Read it in 10-K 2025-02-11 at sec.gov ↗
RewordedRisk Factors
In addition, any delay or default in payment or performance, including inadequate performance, of contractual obligations (such as contractual obligations by third parties to perform work, supply equipment, provide services, and meet related specifications or requirements), could have a material adverse effect on CMS Energy and Consumers.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
No assurance can be made that these strategies will be successful in managing CMS Energy’s and Consumers’ risk or that they will not result in net liabilities to CMS Energy or Consumers as a result of future volatility.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
Changes to the tariffs or business practice manuals of certain wholesale market operators such as MISO, PJM, or ERCOT, or corresponding impacts such as interconnection delays for new electric generation or storage projects, could also have a material adverse effect on CMS Energy and Consumers.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
Consumers has announced a long-term strategy for delivering clean, reliable, resilient, and affordable energy, including a plan to end the use of coal in owned generation in 2025, and other subsidiaries of CMS Energy have plans to develop and operate clean energy assets.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
At December 31, 2024, 2025, unions represent 46 45 percent of Consumers’ employees and 22 percent of NorthStar Clean Energy’s employees.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
If the amount of ROA limit were sales increased, this new ROA-like ROA‑like community solar system program were allowed, or electric generation service in Michigan were further deregulated, it could have a material adverse effect on CMS Energy and Consumers.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
It also specifies an inflow and outflow rate method that must be implemented by the MPSC and provides federal funding for low-income distributed generation. MPSC.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
Consumers expects to incur additional substantial costs related to the remediation of its former MGP sites and other response activity costs at a number of other former sites, including, but not limited to, sites of retired coal-fueled electric generating units and sites containing coal ash and related materials, under NREPA, RCRA, CERCLA and related state and federal regulations.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
The consumption of electric energy typically increases in the summer months, due primarily to the use of air conditioners and other cooling equipment, while peak demand for natural gas occurs in the winter due to colder temperatures and the resulting use of natural gas as heating fuel.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
Regulators could face competitive or political pressures to avoid or limit rate increases for a number of reasons, including affordability concerns, economic downturn in the state, downturn, reliability and economic justice concerns, or decreased customer base, among others.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
Furthermore, any state or federal legislation legislation, regulation, order, or other action concerning CMS Energy’s or Consumers’ operations could also have a material adverse effect.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedRisk Factors
Federal, state, and local environmental laws laws, regulations and rules, orders, as well as international accords and treaties, could require CMS Energy and Consumers to install additional equipment for emission controls, undertake heat-rate improvement projects, purchase carbon emissions allowances, curtail or extend operations, invest in generating capacity with fewer carbon dioxide emissions, or take other significant steps to manage or lower the emission of greenhouse gases.
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•expanded the statutory cap on distributed generation resources to 10 percent of the electric utility’s five‑year average peak load
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
To meet these objectives, Consumers is executing a multi-faceted strategy. This strategy involves taking steps to end the use of coal, including the retirement of the D.E. Karn coal-fueled generating units, totaling 515 MW of nameplate capacity, in 2023 and obtaining MPSC approval to retire J.H. Campbell, totaling 1,407 MW of nameplate capacity. The retirement of J.H. Campbell is subject to temporary extensions under emergency orders issued by the U.S. Secretary of Energy. For a more detailed
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•connected over 140,000 customers with $60 million in energy-bill assistance and helped make over $100 million in statewide aid available for 2026, reinforcing Consumers’ commitment to affordability
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•began operations at Muskegon Solar Energy Center, a 1,900‑acre project generating 250 MW of clean energy to power 40,000 homes and businesses, supporting Michigan’s energy needs and advancing the company’s long‑term clean energy strategy
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•reached an agreement with a new data center expected to add more than 1 GW of incremental load growth in our service territory, supporting long-term sales growth and delivering economic benefits for Michigan
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•expanded the use of drone technology enabling faster, safer inspections of 400 miles of hard-to-reach power lines and infrastructure resulting in reduced average outage time per customer and improved storm recovery capabilities
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•announced the launch of “Green Giving,” a program enabling the general public to contribute to renewable energy while offering financial benefits to low-income customers, along with a new Residential Renewable Energy Program, which allows customers of all income levels to subscribe and match their energy usage with renewable energy sources, supporting clean energy initiatives
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•moved forward with an aggressive plan to enhance grid reliability for nearly 2 million homes and businesses by clearing trees along 8,000 miles of power lines and creating a modern, stronger, and more resilient power grid through infrastructure upgrades and technology investments
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•deployed eight state-of-the-art vehicles that survey the company’s nearly 30,000‑mile gas distribution system to find methane emissions, enhancing safety and reliability for Consumers’ natural gas customers
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•experienced success with the underground power line pilot program in early 2025, with pilot areas seeing 100‑percent reduction in storm-related outages and improved customer satisfaction
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
During 2025, the federal government took numerous executive actions related to tariffs and trade, alleviating regulatory burdens, and environmental regulations and enforcement, among other areas of potential impact. Many of these actions require further implementation by federal agencies and departments, and some of these actions will likely be subject to further judicial review. CMS Energy and Consumers continue to monitor these executive actions and will continue taking steps to deliver consistently on the triple bottom line.
Read it in 10-K 2026-02-10 at sec.gov ↗
AddedMD&A
•Resource adequacy and reliability—To maintain reliability during the transition, Consumers purchased the Covert Generating Station, representing 1,200 MW of nameplate capacity, in 2023. Additionally, in September 2025, Consumers entered into a new 10‑year PPA with the MCV Partnership for the purchase of up to 1,240 MW of capacity and associated energy from the MCV Facility, effective June 1, 2030.
Read it in 10-K 2026-02-10 at sec.gov ↗
RemovedMD&A
•capital expenditures of $7 billion through 2028; this amount is $3 billion higher than proposed in the previous plan
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
•maintenance and operating spending of $1.7 billion through 2028, reflecting an increase of $300 million over the previous plan
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
In November 2023, Michigan enacted the 2023 Energy Law, which among other things:
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
Consumers filed updates to its renewable energy plan in November 2024 and plans to file updates to its Clean Energy Plan in 2026. Together, these updated plans will serve as Consumers’ blueprint to meeting the requirements of the 2023 Energy Law by focusing on increasing the generation of renewable energy, deploying energy storage, helping customers use less energy, and offering demand response programs to reduce demand during critical peak times.
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
•ending the use of coal in owned generation in 2025, 15 years sooner than initially planned
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
•soliciting capacity from sources able to deliver to Michigan’s Lower Peninsula, including battery storage facilities
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
•the co-location of battery energy storage with its renewable energy assets to optimize those assets
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
Net-zero greenhouse gas emissions target for the entire business by 2050: This goal incorporates greenhouse gas emissions from Consumers’ natural gas delivery system, including suppliers and
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
•created a Clean Energy Workforce Development Program for people employed in the building trades to receive training and certifications in the areas of advanced energy efficiency, lead abatement, and other work
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
•buried power lines in multiple Michigan communities under a targeted undergrounding pilot program in efforts to improve electric service for Consumers’ electric customers
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
•began installation of nearly 3,000 line sensors, 100 automatic transfer reclosers, and 1,200 iron utility poles to improve electric reliability and help prevent power outages
Read it in 10-K 2025-02-11 at sec.gov ↗
RemovedMD&A
•expanded Consumers’ MI Clean Air program to include several renewable natural gas projects being developed and constructed across Michigan, increasing options for customers to offset emissions associated with their natural gas use
Read it in 10-K 2025-02-11 at sec.gov ↗
RewordedMD&A
In Millions CMS Energy, including Consumers Year Ended December 31, 2023 $2,309 2024 $2,370 Reasons for the change Higher net income $139 $55 Non‑cash transactions1 76 133 Unfavorable impact of changes in core working capital,2 due primarily to lower collections fluctuations in gas prices and lower prices on gas sold to customers (266) Favorable higher undercollections of PSCR (107) Unfavorable impact of changes in other assets and liabilities, due primarily to lower tax-credit sale proceeds from the sale of and higher service restoration3 and renewable energy tax credits3 112 expenditures (216) Year Ended December 31, 2025 $2,235 Consumers Year Ended December 31, 2024 $2,370 Consumers Year Ended December 31, 2023 $2,430 $2,446 Reasons for the change Higher net income $142 $120 Non‑cash transactions1 (2) (26) Unfavorable impact of changes in core working capital,2 due primarily to lower collections fluctuations in gas prices and lower prices on gas sold to customers (248) Favorable higher undercollections of PSCR (102) Unfavorable impact of changes in other assets and liabilities, due primarily to proceeds from the sale of higher income tax payments to CMS Energy and service restoration3 and renewable energy tax credits3 124 expenditures (200) Year Ended December 31, 2024 $2,446 2025 $2,238
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
While inflationary pressures and tariffs could impact supply chain availability and pricing, CMS Energy and Consumers have experienced some supply chain disruptions and inflationary pressures, they have taken are taking steps to help mitigate the impact on their ability to provide safe safe, reliable, affordable, clean, and reliable equitable energy in service to of their customers.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
In order to To continue providing controllable sources of electricity to customers while expanding its investment in renewable energy, customers, Consumers purchased the Covert Generating Station, a natural gas-fueled generating facility with representing 1,200 MW of nameplate capacity, in May 2023. 2023 and has solicited additional capacity from controllable sources of electricity to customers.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
In Billions Payments Due December 31, 2024 2025 Less Than One Year Total CMS Energy, including Consumers Long-term debt $ 1.2 1.0 $ 16.5 18.9 Interest payments on long-term debt 0.7 13.2 0.8 15.1 Purchase obligations 2.4 11.4 20.6 AROs — 2.6 0.1 2.7 Total obligations $ 4.3 $ 43.7 57.3 Consumers Long-term debt $ 0.5 0.6 $ 12.2 13.2 Interest payments on long-term debt 0.5 8.2 8.0 Purchase obligations 2.1 10.4 19.7 AROs — 2.5 0.1 2.6 Total obligations $ 3.1 3.3 $ 33.3 43.5
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
In Millions Projected 12-Month Period Ending February 28 2026 Components of the requested rate increase October 31 2027 Investment in rate base $ 144 108 Operating and maintenance costs 10 Sales and other revenue 41 65 Cost of capital 60 Subtotal $ 255 Surcharge 22 66 Sales/gross margin 1 Total $ 277 240
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
In Millions Projected 12-Month Period Ending February 28 2026 Components of the requested rate increase April 30 2027 Investment in rate base $ 144 192 Operating and maintenance costs 10 157 Cost of capital 67 Sales and other revenue 41 Cost of capital 60 7 Subtotal $ 255 423 Surcharge 22 24 Total $ 277 447
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
In December 2024, Consumers filed an application with September 2025, the MPSC seeking issued an order authorizing an annual rate increase of $248 million $157.5 million, based on a 10.25‑percent 9.80‑percent authorized return on equity for the projected 12‑month period ending October 31, 2026. equity.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
Under its Clean Energy Plan, Consumers will eliminate the use of coal in owned generation in 2025 and does not expect this rule these proposed changes will have a significant impact on its existing gas- and oil-fueled steam electric generating assets or its Clean Energy Plan. assets.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
In Millions Years Ended December 31 2025 2024 2023 Change Electric utility $ 719 $ 681 $ 550 $ 131 38 Gas utility 409 328 315 13 81 NorthStar Clean Energy 71 63 67 (4) 8 Corporate interest and other (138) (79) (55) (24) (59) Net Income Available to Common Stockholders $ 1,061 $ 993 $ 877 $ 116 68
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
Notably, these These rules do not address existing combustion turbine electric generating units, though the EPA has announced that it will release a draft rule for these types of units at a later time. units.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
Regardless of the outcome of this litigation and which version of the rule applies, Consumers expects NorthStar Clean Energy complies with this regulation will and expects it to have minimal financial and operational impact in the near and/or long term.
Read it in 10-K 2026-02-10 at sec.gov ↗
RewordedMD&A
Notably, these These rules do not address existing combustion turbine electric generating units, though the EPA has announced that it will release a draft rule for these types of units at a later time. units.
Read it in 10-K 2026-02-10 at sec.gov ↗
Quiet changesMD&A
Purchase obligations arise from long-term contracts for the purchase of commodities and related services, primarily long-term PPAs, and construction and service agreements.
Read it in 10-K 2026-02-10 at sec.gov ↗
Quiet changesMD&A
In March 2024, the EPA published a lower fine particulate matter NAAQS, which will likely could result in newly designated nonattainment areas in Michigan starting in 2026.
Read it in 10-K 2026-02-10 at sec.gov ↗
Quiet changesMD&A
During 2024, owners and operators were required to assess if whether an inactive facility contains a legacy surface impoundment and then, for identified locations, proceed with the compliance schedule.
Read it in 10-K 2026-02-10 at sec.gov ↗
Quiet changesMD&A
In March 2024, the EPA published a lower fine particulate matter NAAQS, which will likely could result in newly designated nonattainment areas in Michigan starting in 2026.
Read it in 10-K 2026-02-10 at sec.gov ↗
Quiet changesMD&A
NorthStar Clean Energy’s operations may be are subject to various federal, state, and local environmental laws and regulations.
Read it in 10-K 2026-02-10 at sec.gov ↗
Quiet changesMD&A
In March 2024, the EPA published a lower fine particulate matter NAAQS, which will likely could result in newly designated nonattainment areas in Michigan starting in 2026.
Read it in 10-K 2026-02-10 at sec.gov ↗