Screener / SEC EDGAR /CIK 0001691303 /10-K filed Feb 12, 2026, compared with Feb 13, 2025 /Numbers from the XBRL of the 10-Ks
NYSE Energy · Silver Ores

Warrior MET Coal, Inc. HCC

Compare with peers Embed
New in the 10-K 9 paragraphs with nothing like them in the 10-K filed Feb 13, 2025 New in the 10-Q 1 paragraphs not in the 10-Q filed Aug 5, 2026 10-Q against the 10-K 3 risk factor paragraphs and sentences added or reworded

New risk paragraphs, branching off last year

Each branch is a paragraph in Risk Factors with nothing like it in the 10-K filed Feb 13, 2025. A box jumps to the paragraph as filed, below.

9 new

Paragraphs with nothing like them in last year's 10-K

Quoted exactly

9 paragraphs in Risk Factors of the 10-K filed Feb 12, 2026 with nothing like them in the 10-K filed Feb 13, 2025. Quoted exactly. Paragraphs that were only edited are under 10-K change.

We spent approximately $240.3 million on the development of Blue Creek in 2025, $956.8 million on the project to date and expect to invest approximately $50.0 to $75.0 million in 2026 for the final construction of the Blue Creek mine. The continued development, commissioning, ramp-up and integration of Blue Creek involves numerous risks, including, but not limited to, the following:

Read in the 10-K

•unanticipated equipment malfunctions or breakdowns, including longwall equipment, ventilation systems and other critical infrastructure;

Read in the 10-K

•local infrastructure conditions and other logistical challenges; including rail, port or workforce availability;

Read in the 10-K

•our ability to hire and retain qualified construction, commissioning, operations and maintenance personnel.

Because Blue Creek is in the early stages of ramp‑up, we are subject to additional risks specific to achieving stable, full‑capacity longwall operations, including lower‑than‑expected early production rates, lower recovery, higher unit costs during the ramp period, operational disruptions, ventilation or methane‑related constraints, equipment performance issues, and the timing and execution of planned longwall moves. Any of these factors could result in extended downtime, lower throughput, diminished yields, unplanned capital expenditures, reduced sales volumes, higher transportation or demurrage costs, or lower realized pricing, which could adversely affect our profitability and cash flows during the ramp‑up period.

Read in the 10-K

increase transportation and port costs significantly. Further, delays of ocean vessels could affect our revenues, costs and relative competitiveness compared to the supply of steelmaking coal and other products from our competitors.

Read in the 10-K
Show the other 2

On January 19, 2023, the DOL proposed revisions to regulations under the Black Lung Benefits Act governing authorization of self-insurers, which was then subsequently revised as part of the final rules published on December 12, 2024, which became effective on January 13, 2025. The final rules require, among other requirements, all self-insured operators to post security of at least 100 percent of their projected black lung liabilities. On January 14, 2025, we received a letter from the DCMWC outlining the new procedures and application process for authorizing operators to self-insure under the new

regulations. The letter outlined authorization form requirements and provided a 60-day period for the submission of the required documents. Subsequently, on February 20, 2025, we received another letter from the DCMWC stating that the 60-day deadline to provide information was no longer applicable and no information was required to be submitted at this time. DCWMC further stated that additional guidance would be provided in due course after consultation with the new DOL leadership. For additional information see “Part I, Item 1. Business-Environmental and Regulatory Matters-Workers’ Compensation and Black Lung.” Our estimated total black lung liabilities as of December 31, 2025 were $36.1 million (net of the black lung trust). In future years, the DOL could require us to increase the amount of the collateral which could negatively impact our cash flows.

Read in the 10-K

We are responsible for assessing the operating effectiveness of internal controls over financial reporting and we may conclude that our internal controls over financial reporting are ineffective. During the course of the preparation of our consolidated financial statements, we evaluate our internal controls to identify and correct deficiencies in our internal controls

Read in the 10-K

Paragraphs in the 10-Q filed Nov 4, 2026 that were not in the one before

New in the latest 10-Q

1 paragraph in the 10-Q filed Nov 4, 2026 with nothing like it in the 10-Q filed Aug 5, 2026 (at least half the words must differ; new numbers alone do not count). Quoted exactly, grouped by the item heading above them. This is text that changed, not a judgement of how serious it is.

Financial statements and notes

Steelmaking coal demand in China remained the primary driver of seaborne market conditions during the third quarter of 2026. Chinese coking coal mine utilization rates remained near 70%, a six-year seasonal low, despite government measures aimed at increasing production, with approximately 50 mines still suspended as of late September and mine inventories recovering only modestly from historically low levels. These supply constraints supported elevated import demand even as Chinese steel profitability weakened and hot metal production declined modestly during the quarter. Market participants increasingly expect domestic supply conditions to improve during the fourth quarter of 2026 as mine restart approvals progress and Mongolian coal exports recover from earlier logistical and fuel supply disruptions. In India, steel demand remained resilient and domestic steel prices strengthened following the monsoon season, although buyers continued to resist elevated seaborne coking coal prices. Demand in Europe and other Atlantic Basin markets remained relatively stable, supported by blast furnace steel production and ongoing raw material requirements despite broader economic and steel market uncertainties.

Read in the 10-Q

The 10-Q's risk factors against the 10-K

Item 1A of the 10-Q filed Nov 4, 2026 against Item 1A of the 10-K filed Feb 12, 2026. A 10-Q repeats only the risks that changed, so a 10-K paragraph that is missing from it is not counted as removed. Added is a paragraph with nothing like it in the 10-K, Reworded a sentence that is in both with several words changed, Quiet changes a sentence in both where one to four words changed and one is a hedge or a modal (cut words struck through, new words highlighted). Text on the page, not a score; each links to the filing at sec.gov.

Reworded10-Q Nov 4, 2026 vs 10-K Feb 12, 2026
Any of the risk factors described below or elsewhere Risk Factors” in this our 2025 Annual Report Report, which could significantly and adversely materially affect our business prospects, business, financial condition and results of operations. or future results.

Read it in the 10-Q at sec.govThe 10-K sentence

Phrases used for the first time

Two-word phrases in Risk Factors of the 10-K filed Feb 12, 2026 that are in none of the 1 earlier 10-Ks stored, back to Feb 13, 2025

amended abl ×32remaining development ×11continued development ×3construction commissioning ×3experience delays ×2operational challenges ×2remaining construction ×2development commissioning ×2equipment ventilation ×2ventilation systems ×2longwall moves ×2stable full ×2full capacity ×2capacity longwall ×2
Where each one is used
  • amended abl: •Any declaration and payment of future dividends to holders of our common stock may be limited by restrictive covenants of our Amended ABL Facility and the indenture governing the Notes (the "Indenture"), and will be on the sole discretion of the Board and will also depend on many factors;
  • remaining development: •We may be unsuccessful or experience delays or operational challenges in completing the remaining development and ramp-up of Blue Creek, which could significantly affect our operations and/or limit our long-term growth;
  • continued development: We commenced longwall operations at Blue Creek in October 2025, eight months ahead of schedule. Although this represents a significant milestone in the development of Blue Creek, the completion of the remaining construction activities and the successful ramp‑up and operation of the longwall involve substantial...
  • construction commissioning: We commenced longwall operations at Blue Creek in October 2025, eight months ahead of schedule. Although this represents a significant milestone in the development of Blue Creek, the completion of the remaining construction activities and the successful ramp‑up and operation of the longwall involve substantial...
  • experience delays: •We may be unsuccessful or experience delays or operational challenges in completing the remaining development and ramp-up of Blue Creek, which could significantly affect our operations and/or limit our long-term growth;
  • operational challenges: •We may be unsuccessful or experience delays or operational challenges in completing the remaining development and ramp-up of Blue Creek, which could significantly affect our operations and/or limit our long-term growth;
  • remaining construction: We commenced longwall operations at Blue Creek in October 2025, eight months ahead of schedule. Although this represents a significant milestone in the development of Blue Creek, the completion of the remaining construction activities and the successful ramp‑up and operation of the longwall involve substantial...
  • development commissioning: We spent approximately $240.3 million on the development of Blue Creek in 2025, $956.8 million on the project to date and expect to invest approximately $50.0 to $75.0 million in 2026 for the final construction of the Blue Creek mine. The continued development, commissioning, ramp-up and integration of Blue Creek...

The 10-K at sec.gov

Used at least twice, small words left out. Counted, not picked: a phrase can be new because the company renamed something.

What was taken out

5 paragraphs of last year's Risk Factors with nothing like them now. The longest are quoted.

Across all companies
In addition, we have become increasingly dependent upon digital technologies, including information systems, infrastructure and cloud applications and services, to operate our businesses, process and record financial and operating data, communicate with our employees and business partners, analyze seismic and drilling information, estimate quantities of
In the 10-K filed Feb 13, 2025
Accordingly, required permits may not be issued or renewed in a timely fashion or at all, or permits issued or renewed may be conditioned in a manner that may restrict our ability to efficiently and economically conduct our mining activities, any of which would materially reduce our production, cash flow and profitability.
In the 10-K filed Feb 13, 2025
Certain transactions, including public offerings by us or our stockholders and redemptions may cause us to undergo an “owner shift” which by itself or when aggregated with other owner shifts that we have undergone or will undergo could cause
In the 10-K filed Feb 13, 2025
sustained failure to be able to market our coal during such periods would have a material adverse effect on our business, results of operations, cash flows and ability to pay dividends to our stockholders.
In the 10-K filed Feb 13, 2025

Sources

Item 1A of each 10-K and 10-Q on EDGAR, quoted exactly. Each paragraph links to the filing at sec.gov.

Also

10-K change: what was reworded or cut, section by section.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/HCC/export.csv") into a cell.

Next:10-K change
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.