Cheniere Energy, Inc. LNG
New risk paragraphs, branching off last year
Each branch is a paragraph in Risk Factors with nothing like it in the 10-K filed Feb 20, 2025. A box jumps to the paragraph as filed, below.
Paragraphs with nothing like them in last year's 10-K
5 paragraphs in Risk Factors of the 10-K filed Feb 26, 2026 with nothing like them in the 10-K filed Feb 20, 2025. Quoted exactly. Paragraphs that were only edited are under 10-K change.
tax and the impact of non-controlling interests), substantially all of which were related to commodity derivative instruments indexed to international LNG prices, mainly our IPM agreements.
•changes in governmental regulations or maritime self-regulatory organizations’ regulations;
The U.S. has recently enacted and proposed to enact significant new tariffs and trade restrictions. Additionally, President Trump has directed various federal agencies to further evaluate key aspects of U.S. trade policy and there has been ongoing discussion and commentary regarding potential significant changes to U.S. trade policies, treaties and tariffs. For example, as part of its Section 301 investigation of the maritime, logistics and shipbuilding sector in China (the “Section 301 Investigation”), the Office of the U.S. Trade Representative (the “USTR”) in April 2025 mandated, among other things, restrictions on maritime transport services for U.S. LNG exports. These measures require that, beginning in April 2029, 1% of U.S. LNG exports must be exported on U.S.-built vessels, with such percentage gradually increasing to 15% in April 2047, with certain exceptions. In its original April 2025 notice, USTR had included the potential suspension of LNG export licenses as a remedy for non-compliance with the U.S. vessel restrictions; however, USTR subsequently removed the suspension language. In November 2025, the White House announced that, as part of the broader economic and trade relations deal with China, it had agreed to defer certain pending tariff and trade measures against China, including suspending for one year the implementation of fees on China-linked vessels pursuant to the Section 301 Investigation. However, the timeline for the U.S.-built vessel requirements for U.S. LNG exports thus far has not been modified. Given the ongoing evolution of the Section 301 Investigation measures, the potential impact of the restrictions on us and the LNG industry remains uncertain.
Additionally, we have ad valorem legacy property tax incentives secured for the Corpus Christi LNG Terminal, inclusive of the Corpus Christi Stage 3 Project and the CCL Midscale Trains 8 & 9 Project, and the Sabine Pass LNG Terminal that begin to expire starting in 2026 and 2027, respectively, with continuing incentive roll-off thereafter over the longer term. The magnitude of property tax changes once our incentives expire is uncertain, but will be influenced, both in the near and longer term, by various factors including future local tax rates, local tax rate compression dynamics and variation in our assessed
property values over time. During the year ended December 31, 2025, our ad valorem property tax incurred was approximately $89 million across the Cheniere complex.
Paragraphs in the 10-Q filed Oct 29, 2026 that were not in the one before
New in the latest 10-Q
15 paragraphs in the 10-Q filed Oct 29, 2026 with nothing like them in the 10-Q filed Aug 6, 2026 (at least half the words must differ; new numbers alone do not count). Quoted exactly, grouped by the item heading above them. This is text that changed, not a judgement of how serious it is.
Financial statements and notes
In June 2026, we designated the NPNS scope exception under Accounting Standards Codification Topic 815, Derivatives and Hedging, for certain IPM agreements providing for natural gas deliveries along the U.S. Gulf Coast. This designation
Read in the 10-Q
The following table shows the total net notional amounts of our Commodity Derivatives:
Read in the 10-Q
Three Months Ended September 30, Nine Months Ended September 30, 2026 2025 2026 2025 ─────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────── Other revenues Operating agreement and construction management agreement with equity method investee(1) $ $ $ $ 1 Cost of sales Natural gas transportation and storage agreements with equity method investees(1) 1 — 1 — Operating and maintenance expense Natural gas transportation and storage agreements with equity method investees(1) 13 8 32 24 Natural gas transportation and storage agreements with other related party(2) — — — 28
Read in the 10-Q
(1)Income taxes paid during the nine months ended September 30, 2025 included $380 million of CAMT that was subsequently refunded in December 2025.
Read in the 10-Q
ü indicates that the applicable regulatory approval or development milestone has been received or completed, as applicable, and may remain subject to conditionality
Read in the 10-Q
Show the other 10
(1) In September 2026, we received a draft environmental impact statement from the FERC relating to the CCL Expansion Project.
Read in the 10-Q
(2) Commercial support for the SPL Expansion Project and the CCL Expansion Project includes definitive agreements entered into by project entities and affiliates, including agreements available for assignment or novation to the applicable project entity.
Read in the 10-Q
(3) We have obtained commitments for a term loan credit facility to finance the construction costs of the first phase of the SPL Expansion Project that are not expected to be funded with available cash. Closing and funding under the financing remain subject to customary conditions, including the issuance of a positive FID with respect to the first phase of the SPL Expansion Project.
Read in the 10-Q
• In September 2026, we received a final environmental impact statement from the FERC relating to the SPL Expansion Project.
Read in the 10-Q
• In October 2026, SPL and CCL entered into long-term LNG SPAs with QatarEnergy to supply in aggregate up to 4 mtpa of LNG on an FOB basis beginning in the early 2030s through 2054, with 1 mtpa subject to, among other things, a positive FID with respect to the first phase of the SPL Expansion Project.
Read in the 10-Q
• In September 2026, Cheniere Marketing entered into a long-term LNG SPA with Petrobras to supply 0.8 mtpa of LNG on an FOB basis for 22 years.
Read in the 10-Q
(1) For certain delivered LNG sales, volumes recognized as revenue may differ from loaded volumes due to normal transit-related consumption and losses, including boil-off gas and vessel heel.
Read in the 10-Q
(3) For certain delivered LNG sales, volumes recognized as revenue may differ from loaded volumes due to normal transit-related consumption and losses, including boil-off gas and vessel heel.
Read in the 10-Q
Global natural gas and LNG markets continue to experience supply constraints, liquefaction capacity limitations, shipping and transit disruptions affecting key global LNG trade routes and heightened geopolitical uncertainty in key producing and consuming regions. These conditions may contribute to continued volatility in global natural gas and LNG prices and fluctuations in regional price differentials. While our long-term contractual arrangements provide a significant degree of stability to our cash flows, a portion of our results remains exposed to changes in global natural gas and LNG prices and regional price differentials, including through LNG volumes sold under short-term agreements, optimization activities and certain derivative instruments. Accordingly, the extent to which favorable global LNG pricing and regional price differentials contributed to our results during 2026 may not recur in future periods, and changes in these market conditions could have either a favorable or unfavorable effect on our future results of operations and cash flows.
Read in the 10-Q
(2) Available commitments represent total commitments less loans outstanding and letters of credit issued under each of our credit facilities as of September 30, 2026. Additionally, we have secured commitments for a term loan credit facility to finance the construction costs of the first phase of the SPL Expansion Project, as discussed above in Overview, and to amend and extend the maturity of our $2.0 billion of aggregate revolving credit facilities at CQP and SPL, including the
Read in the 10-Q
The 10-Q's risk factors against the 10-K
Item 1A of the 10-Q filed Oct 29, 2026 against Item 1A of the 10-K filed Feb 26, 2026.
A 10-Q repeats only the risks that changed, so a 10-K paragraph that is missing from it is not counted as removed.
Added is a paragraph with nothing like it in the 10-K, Reworded a sentence that is in both with several words changed,
Quiet changes a sentence in both where one to four words changed and one is a hedge or a modal
(cut words struck through, new words highlighted).
Text on the page, not a score; each links to the filing at sec.gov.
What the 10-Q itself says about its risk factors:There have been no material changes from the risk factors disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 2025.
Read in the 10-Q
1 paragraph in the 10-Q's Item 1A, and none of them adds, rewords or quietly edits a paragraph of the 10-K's.
Phrases used for the first time
Two-word phrases in Risk Factors of the 10-K filed Feb 26, 2026 that are in none of the 1 earlier 10-Ks stored, back to Feb 20, 2025
Where each one is used
- ccl expansion: As of December 31, 2025, we had, on a consolidated basis, $1.1 billion of cash and cash equivalents (of which $182 million was held by our consolidated variable interest entities (“VIEs”)), $485 million of restricted cash and cash equivalents (of which $22 million was held by our VIEs), a total of $7.2 billion of...
- section investigation: The U.S. has recently enacted and proposed to enact significant new tariffs and trade restrictions. Additionally, President Trump has directed various federal agencies to further evaluate key aspects of U.S. trade policy and there has been ongoing discussion and commentary regarding potential significant changes to...
- immediately preceding: In addition to restrictions on the ability of us, CQP, SPL and CCH to make distributions or incur additional indebtedness, as further described in the immediately preceding risk factor, the agreements governing our indebtedness also contain various other covenants that may prevent us from engaging in beneficial...
- preceding risk: In addition to restrictions on the ability of us, CQP, SPL and CCH to make distributions or incur additional indebtedness, as further described in the immediately preceding risk factor, the agreements governing our indebtedness also contain various other covenants that may prevent us from engaging in beneficial...
- north american: •changes in regulatory, tax or other governmental policies regarding exported North American LNG, natural gas or alternative energy sources, which may reduce the demand for exported North American LNG and/or natural gas;
- american lng: •changes in regulatory, tax or other governmental policies regarding exported North American LNG, natural gas or alternative energy sources, which may reduce the demand for exported North American LNG and/or natural gas;
- property tax: Additionally, we have ad valorem legacy property tax incentives secured for the Corpus Christi LNG Terminal, inclusive of the Corpus Christi Stage 3 Project and the CCL Midscale Trains 8 & 9 Project, and the Sabine Pass LNG Terminal that begin to expire starting in 2026 and 2027, respectively, with continuing...
- otherwise volatile: Our use of derivative instruments, including our IPM agreements, to manage risks could have a significant adverse or otherwise volatile effect on our earnings reported under GAAP and our liquidity.
Used at least twice, small words left out. Counted, not picked: a phrase can be new because the company renamed something.
What was taken out
1 paragraph of last year's Risk Factors with nothing like them now. The longest are quoted.
Sources
Item 1A of each 10-K and 10-Q on EDGAR, quoted exactly. Each paragraph links to the filing at sec.gov.
Also
10-K change: what was reworded or cut, section by section.
Work with it