Screener / SEC EDGAR /CIK 0001334933 /10-K filed Sep 29, 2026, compared with Sep 24, 2025 /Numbers from the XBRL of the 10-Ks
NYSE Materials · Miscellaneous Metal Ores

Uranium Energy Corp UEC

Compare with peers Embed
SEC comment letters, last 20 years

2 reviews of UEC's filings by SEC staff

UPLOAD and CORRESP
Reviews 2 latest letter Feb 29, 2024
Questions asked 25 each answered in the company's own letter
No closing letter 0 reviews without a letter saying the staff completed it

When the SEC's staff reviews a filing, it writes to the company with numbered questions, and the company answers each one in a letter. SEC publishes the exchange once the review is over, at least 20 business days later. A question is not an accusation; most reviews end with the company adding detail to its next filing.

How the reviews went

Every review on EDGAR, from the first staff letter to the letter that closes it

  1. 1. Staff letters 5 UPLOAD
  2. 2. Questions in them 25 numbered comments
  3. 3. Company replies 7 CORRESP
  4. 4. Reviews closed 2 of 2 closing letter

Half the closed reviews took 81 days or less from the first letter to the closing letter.

Form 10-K for the Fiscal Year Ended July 1, 2023

2024-02-29 to 2024-05-02 · 6 questions · 2 letters from the SEC, 3 from the company
Review closed 2024-05-02
Results discussion (MD&A)
Item 2. Description of Properties, page 28
SEC asked (1)
It appears there are inconsistencies between the notes to the summary resource table and certain individual property resource tables. For example, note 4 to Table 2.5 indicates a long-term uranium price of $40 per pound for ISR projects and $65 per pound for conventional projects, however Table 2.41 on page 87 discloses pricing of $56 per pound.
Rest of the question

Additionally, note 5 to Table 2.5 states that resources are 100% attributable to the company, however Table 2.42 on page 93 states that the resources in the table are based on UEC's 49.0975% equity in the project. We also note that you have included two tables identified as Table 2.42, including Table 2.42 on page 93 and Table 2.42 on page 90. Please revise to ensure the pricing and attributable resource disclosures are consistent between individual property resource tables and the summary resource table, and correct the table numbers listed with each table.

UEC answered
In this respect the Company notes and confirms that:

●

The Company has now updated each of mineral resource estimate information contained in the footnotes to each of the following Tables for the following Company Projects in the filed Form 10-K/A as follows: Table 2.5 (Mineral Resources); Table 2.6 (Year over Year Changes); Table 2.8 (Irigaray Project); Table 2.10 (Christensen Ranch Project); Table 2.12 (Moore Ranch Project); Table 2.14 (Reno Creek Project); Table 2.16 (Ludeman Project); Table 2.18 (Allemand Ross Project); Table 2.20 (Barge Project); Table 2.22 (Jab/West Project); Table
Rest of the answer

2.24 (Charlie Project); Table 2.26 (Nine Mile Lake Project); Table 2.28 (Red Rim Project); Table 2.30 (Clarkson Hill Project); Table 2.33 (Palangana Project); Table 2.35 (Burke Hollow Project); Table 2.37 (Goliad Project); Table 2.39 (Salvo Project); Table 2.40 (Anderson Project); Table 2.42 (Horseshoe-Raven Project); and Table 2.43 (Shea Creek Project); in order to clearly set forth:

● the long-term uranium price utilized for each Project;

● the point of reference utilized for each Project;

● the cut-grade utilized for each Project; and the metallurgical recovery factor utilized for each Project.

In this respect the Company notes, for example, that footnotes 3. and 4. in Table 2.5 (Mineral Resources) of the filed Form 10-K/A now provide as follows:

3. The point of reference for mineral resources is in-situ at the Project.

4. Mineral Resources are estimated using a long-term uranium price of $40 per pound for ISR projects and $65 per pound for conventional projects, except for the Canadian projects where a price of $56 per pound was used for the Roughrider Project, a price of $75 per pound was used for the Horseshoe-Raven Project, a price of $50 per pound was used for the Shea Creek Project, a price of $50 per pound was used for the Christie Lake Project and a price of $62 per pound was used for the Millennium Project.”;

The Company has now clarified that the mineral resources in each of Tables 2.5 and 2.42 are 100% attributable to the Company, and in this respect the Company notes that footnote 5. in Table 2.5 (Mineral Resources) of the filed Form 10-K/A now provides as follows:

5. Mineral Resources in the table above are 100% attributable to the Company. Where JV projects have resources that are attributable to other companies, these resources are not listed in this table.”;

The Company has now re-labelled the second Table 2.42 in the filed Form 10-K/A to be “Table 2.43” and, in addition, has now re-labelled Tables 2.43 as “Table 2.44” as well; and

The Company confirms that it has ensured that the pricing and attributable resource disclosures are consistent between individual property resource tables and the summary resource table in the filed Form 10-K/A;

and we hope and trust that this is now clear and satisfactory in this regard.

“2.

We note that several of the properties that have been included in Table 2.6, Year over Year Changes in Mineral Resources, were acquired during the fiscal year ending 2023, however resource estimates related to these properties are reflected in the fiscal year ending 2022. Please revise as necessary.”

Company Response:

In this respect the Company notes and confirms that Table 2.6 (Year over Year Changes) in the filed Form 10-K/A has now been revised to indicate that the Company did NOT have any resource estimates for its Canadian Projects for its fiscal year ending 2022, such that the year over year (fiscal 2022 to fiscal 2023) change in mineral resource updates for the Company’s material properties in Canada only changed by 100% for Indicated pounds; and we hope and trust that this is now clear and satisfactory in this regard.

As necessary please revise all individual property mineral resource tables to include the point of reference, the price, the cut-off grade, and the metallurgical recovery factor as required by Item 1304(d)(1) of Regulation S-K.”

Company Response:

In this respect the Company notes and confirms, as indicated above, that the Company has now updated each of mineral resource estimate information contained in the footnotes to each of the following Tables for the following Company Projects in the filed Form 10-K/A as follows: Table 2.5 (Mineral Resources); Table 2.6 (Year over Year Changes); Table 2.8 (Irigaray Project); Table 2.10 (Christensen Ranch Project); Table 2.12 (Moore Ranch Project); Table 2.14 (Reno Creek Project); Table 2.16 (Ludeman Project); Table 2.18 (Allemand Ross Project); Table 2.20 (Barge Project); Table 2.22 (Jab/West Project); Table 2.24 (Charlie Project); Table 2.26 (Nine Mile Lake Project); Table 2.28 (Red Rim Project); Table 2.30 (Clarkson Hill Project); Table 2.33 (Palangana Project); Table 2.35 (Burke Hollow Project); Table 2.37 (Goliad Project); Table 2.39 (Salvo Project); Table 2.40 (Anderson Project); Table 2.42 (Horseshoe-Raven Project); and Table 2.43 (Shea Creek Project); in order to clearly set forth:

the long-term uranium price utilized for each Project;

the point of reference utilized for each Project;

the cut-grade utilized for each Project; and the metallurgical recovery factor utilized for each Project;

“Item 15. Exhibits, Financial Statement Schedules

96.4 page 151

We note that you have assumed a cut-off grade of 0.05% U308 for your Horseshoe-Raven mineral resource, however you have not included underground mining costs in the cut-off grade calculation. Mining costs must be included in the cut-off calculation in order to establish a reasonable prospect of economic extraction; similar to mining costs that were included in the Roughrider Uranium technical report summary, provided as Exhibit 96.10.

Please revise the technical report summary to include mining costs in the cut-off grade calculation, and revise the resource disclosure as necessary.

Please review your other technical report summaries to ensure that mining costs have been included in the cut-off grade, as necessary.”

Company Response:

In this respect the Company notes and confirms that, in accordance with the now updated and filed TRS respecting the Horseshoe-Raven Project, and as now set forth in the filed Form 10-K/A:

The filed TRS now includes mining costs in its cut-off grade calculation;

The filed TRS and related Form 10-K/A resource disclosure uses a cut-off grade of 0.05% U3O8, and that the cut-off grade was determined utilizing a current uranium price of $75 per pound a metallurgical recovery rate of 95%; and

The Company has reviewed its other technical report summaries to ensure that mining costs had been utilized in their respective cut-off grade calculations;

“5.

We note that disclosures under Reliance on Other Experts, on page 134 of the Technical Report Summary, include categories of information beyond those that are permissible under Item 1302(f)(1) of Regulation S-K.

For example, in one paragraph of this section, the qualified person indicates that there has been reliance with regard to content in Section 10, exclusively on information and data supplied by UEX.

Please discuss this observation with the qualified person and arrange to obtain and file a revised technical Report Summary that is consistent with the requirements in Item 1302(f)(2) of Regulation S-K.

We generally anticipate that qualified persons would validate and discuss information utilized in preparing the report that is not within categories listed in the guidance referenced above, in an alternate and corresponding section of the report.”

Company Response:

In this respect the Company notes and confirms that, in accordance with the now updated and filed TRS respecting the Horseshoe-Raven Project, Section 25 of the TRS has now been revised to remove the two (last) paragraphs incorporated therein wherein references to reliance by the TRS QPs on both prior metallurgical testing and recovery and processing/water treatment and general and administrative costs were previously provided for and which were previously beyond those categories that are permissible under Item 1302(f)(1) of Regulation S-K; and we hope and trust that this is now clear and satisfactory in this regard.

We hope and trust that each of the foregoing responses and the Company’s now filed Form 10-K/A and updated TRS are clear, satisfactory and fully responsive to the Comment Letter; however, should the SEC have any further questions or concerns respecting any of the same please do not hesitate to contact the undersigned, at 604.691.7445, at the SEC’s convenience at any time.

We thank the SEC in advance for its prompt attention to and its continued cooperation in this matter and, in the interim, we remain,

Yours very truly,

Read in the reply
In its next report

First report after the company's reply of Apr 2, 2024: 10-Q filed Jun 10, 2024 ↗, against the 10-Q filed Dec 11, 2023 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 2. Description of Properties, page 28
SEC asked (2)
We note that several of the properties that have been included in Table 2.6, Year over Year Changes in Mineral Resources, were acquired during the fiscal year ending 2023, however resource estimates related to these properties are reflected in the fiscal year ending 2022. Please revise as necessary.
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 2, 2024: 10-Q filed Jun 10, 2024 ↗, against the 10-Q filed Dec 11, 2023 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 2. Description of Properties, page 28
SEC asked (3)
As necessary please revise all individual property mineral resource tables to include the point of reference, the price, the cut-off grade, and the metallurgical recovery factor as required by Item 1304(d)(1) of Regulation S-K.
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 2, 2024: 10-Q filed Jun 10, 2024 ↗, against the 10-Q filed Dec 11, 2023 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.4, page 151
SEC asked (4)
We note that you have assumed a cut-off grade of 0.05% U3O8 for your Horseshoe-Raven mineral resource, however you have not included underground mining costs in the cut-off grade calculation. Mining costs must be included in the cut-off calculation in order to establish a reasonable prospect of economic extraction; similar to mining costs that were included in the Roughrider Uranium technical report summary,
Rest of the question

provided at Exhibit 96.10. Please revise the technical report summary to include mining costs in the cut-off grade calculation, and revise the resource disclosure as necessary. Please review your other technical report summaries to ensure that mining costs have been included in the cut-off grade, as necessary.

UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 2, 2024: 10-Q filed Jun 10, 2024 ↗, against the 10-Q filed Dec 11, 2023 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.4, page 151
SEC asked (5)
We note that disclosures under Reliance on Other Experts, on page 134 of the Technical Report Summary, include categories of information beyond those that are permissible under Item 1302(f)(1) of Regulation S-K. For example, in one paragraph of this section, the qualified person indicates there has been reliance with regard to content in Section 10, exclusively on information and data supplied by UEX.
Rest of the question

Please discuss this observation with the qualified person and arrange to obtain and file a revised technical Report Summary that is consistent with the requirements in Item 1302(f)(2) of Regulation S-K. We generally anticipate that qualified persons would validate and discuss information utilized in preparing the report that is not within the categories listed in the guidance referenced above, in an alternate and corresponding section of the report. We remind you that the company and its management are responsible for the accuracy and adequacy of their disclosures, notwithstanding any review, comments, action or absence of action by the staff.

UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 2, 2024: 10-Q filed Jun 10, 2024 ↗, against the 10-Q filed Dec 11, 2023 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.4, page 102
SEC asked
We note your revisions to the technical report summary in response to prior comment 4, pertaining to disclosures of the cut-off grade and the inclusion of underground mining costs in the cut-off grade calculation. For example we note that the cut-off grade has stayed the same with the inclusion of underground mining costs, however you have increased the commodity pricing and decreased the processing costs.
Rest of the question

The types of changes proposed in your response may be considered in an updated or new technical report summary, to support disclosures that may be made in a future periodic report, though would generally not be appropriate as revisions to a prior technical report summary. Please revise the technical report summary to include the underground mining cost and the original assumptions reported with your July 31, 2023 annual report. We would expect the revised calculations to increase the cut-off grade resulting in a reduction in mineral resources. Please coordinate with the qualified persons involved in preparing the technical report summary to ensure that content throughout the report is revised as necessary. Please similarly revise all corresponding information in your annual report. You may provide us with draft disclosures for review in advance of filing the amendments. The content of any updated or new technical report summary that you obtain to support future disclosures should provide clear explanations for any changes in assumptions that materially correlate with project economics, as this may include the cut-off grade, prices, costs and quantification of resources, relative to those requirements. In your response, and not in your filing, please explain to us the difference in the processing and underground mining cut-off grade cost profile with respect to the Horseshoe-Raven project and the Roughrider Uranium project. In this regard we note the cost assumptions used in the Roughrider Uranium cut-off calculation are significantly greater that the Horseshoe-Raven cut-off grade cost assumptions.

UEC answered
In this respect the Company notes and confirms that:

●

The noted underground mining costs of $47.83/tonne were provided for in accordance with a 2022 Canadian Mining Journal article on cut and fill mining (the “Article”). The Updated TRS QPs believe this to be an accurate representation of the anticipated mining costs at the Horseshoe-Raven Project;

The noted uranium commodity price has increased since the filing by the Company of its Original TRS Report respecting the Horseshoe-Raven Project.
Rest of the answer

The commodity price in the Updated TRS is now reasonably current and represents the present five-year projected commodity pricing;

The now Updated TRS notes that the processing costs were inflated from the 2016 scoping study originally supplied by the Company, and that this escalated the processing costs to $32.75/tonne in 2024. In this respect it appears that the number of $48.89/tonne in the Original TRS Report was an improper escalation of that cost and that the correction now to $32.75/tonne is believed to be more accurate by the QPs of the newly filed and Updated TRS; and

It believes that the recently filed and Updated TRS respecting the Horseshoe-Raven Project is fully accurate and that no revisions need to be made to the same or the Original TRS Report in this instance.

“Please revise the technical report summary to include the underground mining cost and the original assumptions reported with your July 31, 2023 annual report. We would expect the revised calculations to increase the cut-off grade resulting in a reduction in mineral resources. Please coordinate with the qualified persons involved in preparing the technical report summary to ensure that content throughout the report is revised as necessary. Please similarly revise all corresponding information in your annual report. You may provide us with draft disclosures for review in advance of filing the amendments.”.

Company Response:

In this respect the Company notes and confirms that it believes that its recently filed and Updated TRS respecting the Horseshoe-Raven Project is fully accurate and that no revisions need to be made to the same or the Original TRS Report in this instance.

“The content of any updated or new technical report summary that you obtain to support future disclosures should provide clear explanations for any changes in assumptions that materially correlate with project economics, as this may include the cut-off grade, prices, costs and quantification of resources, relative to those requirements.

In your response, and not in your filing, please explain to us the difference in the processing and underground mining cut-off grade cost profile with respect to the Horseshoe-Raven project and the Roughrider Uranium project. In this regard we note the cost assumptions used in the Roughrider Uranium cut-off calculation are significantly greater that the Horseshoe-Raven cut-off grade cost assumptions.”.

Company Response:

The Canadian Mining Journal Article of 2022 (provided in the references of the 2024 report) shows the cost of cut and fill mining can be expected at $47.83/tonne. This mining method, when combined with the savings associated with heap leach processing, provides for considerable cost savings when compared to conventional long hole stoping underground;

In the Athabasca Basin it is not uncommon for underground mining costs to approach $1,000/tonne for the most expensive underground mining operations that require unique or exotic mining methods. The Horseshoe-Raven Project is uniquely suited by its geological setting in competent quartzite to be considered for mining by cut and fill, whereas this cannot be considered for most Athabasca deposits due to the lack of ground stability by being hosted at the sub-Athabasca unconformity or within faulted rocks in the basement. These factors lend the Horseshoe-Raven Project to be considered for access by decline into basement rocks without any Athabasca sandstone cover rocks and mining by the cut and fill method with heap leach recovery; and

In contrast the Roughrider Project will require the development of a vertical shaft from surface to 300 metres or more at the Far East Zone, through unconsolidated overburden water-saturated sandstone which will require ground freezing to mitigate flooding from the water contained in the Athabasca sandstone. This will contribute to expensive and ongoing operation of ground freezing and water treatment far in excess of the costs required at the Horseshoe-Raven Project. While cut and fill mining is proposed for the very top of the West Deposit at the Roughrider Project, the majority of the deposit is not amenable to recovery by this method and long hole stoping is proposed for the rest of the Roughrider Project. Another cost mitigating factor at the Horseshoe-Raven Project is the shallow depth to mineralization, that tops at ~ 50 metres below the surface, whereas the Roughrider Project is quite deep necessitating the costly shaft. Milling/processing is another advantage for the Horseshoe-Raven Project, with a relatively uniform low-grade monometallic deposit that is amenable to heap-leach processing whereas the processing required at the Roughrider Project is conventional milling with more costly reagents and vastly more power consumption.

SEC Comment:

We are now responding, on behalf of the Company, to the SEC Staff’s recent comment respecting the timing of the now Updated TRS filing that accompanied its prior Form 10-K/A filing.

Company Response:

In this respect we note, on behalf of the Company, that the Company is the view that, in light of the foregoing responses to the recent SEC Comment Letter, no further revisions or updates are required going forward respecting its recent (and April 2, 2024 dated) Form 10-K/A filing and, in addition, that the recent and updated costing and pricing information provided for in the Updated TRS (which was also filed on April 2, 2024 and is now dated as updated to and effective as at March 1, 2024) is accurate such that no further revisions or updates are also required going forward for the same.

The Company is also of the view that, in light of the SEC’s initial comment letter in this instance; whereby the Company then determined that it was necessary to update and file its subject Form 10-K/A with certain resource estimate table footnotes updated for a large number of its material projects located in Item 2 of the same; and, furthermore, in light of the fact that the Company then also determined that it was necessary to update its Original TRS Report respecting its Horseshoe-Raven Project in order to update certain mining and processing costs and the pricing of uranium associated with an updated cut-off grade then calculated with the same; such filings by the Company were truly updated to incorporate both existing TRS information and the new information now provided for in the Updated TRS for the Horseshoe-Raven Project. As with the updated Form 10-K/A, Item 2 and the Updated TRS are current and it would be confusing to update the Original TRS Report with current information on costing and pricing and indicate that the effective date of the Original Report was somehow continuing. In this respect the Company notes that it filed several revised TRSs (but with current dated QP certification pages) in connection with its Form 10-K/A filing for fiscal 2022; at which point it was never suggested that the then revised TRSs were only effective for that fiscal year end. If that were the case, what would an issuer do if it had an updated resource estimate for a material property interest but was caused to revise a prior TRS and file the same under a prior Form 10-K filing when it knows that the information is no longer accurate. The Company is of the view the within and updated Form 10-K/A, which amends the information as set forth in the explanatory note as of the date of the filing of the Form 10-K/A, and related and Updated TRS are consistent in their approach to filing as is.

In this respect the Company also notes the current explanatory note as set forth on page 1 of its recent Form 10-K/A filing which, it believes, clearly explains the updates provided for relative to the same:

“Uranium Energy Corp… is filing this Form 10-K/A… for the fiscal year ended July 31, 2023, as originally filed with the… SEC… on September 29, 2023 (the “Original Report”) to amend the disclosure contained in Items 2 and 15 of the Original Report pursuant to correspondence with… the Staff of the SEC in connection with the Staff’s review of the Original Report, including the Staff’s review of the property disclosure requirements for registrants engaged in mining operations and reflected in the Original Report.

Item 15 of the Original Report has been amended to contain:… the S-K 1300 Technical Report Summary 2024 Technical Report on the Horseshoe-Raven Project, Saskatchewan, dated March 1, 2024, attached as Exhibit 96.4 to this Form 10-K/A.

Except as expressly set forth herein, this Form 10-K/A does not reflect events occurring after the date that the Original Report was filed or modifies or updates any other of the other disclosures contained therein in any way other than as required to reflect the amendments discussed above. The remainder of the Original Report filed with the SEC on September 29, 2023, remains unchanged….”. (emphasis added)

We hope and trust that each of the foregoing responses are clear, satisfactory and fully responsive to the SEC’s recent Comment Letter; however, should the SEC have any further questions or concerns respecting any of the same please do not hesitate to contact the undersigned, at 604.691.7445, at the SEC’s convenience at any time.

We thank the SEC in advance for its prompt attention to and its continued cooperation in this matter and, in the interim, we remain,

Yours very truly,

/s/ Thomas J. Deutsch

Thomas Deutsch* for McMillan LLP

* Law Corporation ec.

Read in the reply
In its next report

First report after the company's reply of Apr 29, 2024: 10-Q filed Jun 10, 2024 ↗, against the 10-Q filed Dec 11, 2023 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Also in this review: company letter, Mar 18, 2024, closing letter, 2024-05-02

Form 10-K

2023-02-16 to 2023-05-08 · 19 questions · 3 letters from the SEC, 4 from the company
Review closed 2023-05-08
ControlsReserves and insuranceAcquisitions
Item 2. Description of Properties, page 28
SEC asked (1)
Please disclose the selected point of reference with your summary resource table as required by Item 1303 (b)(3)(v) of Regulation S-K, and clarify the commodity price used for the Yuty resource.
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 2. Description of Properties, page 28
SEC asked (2)
For each material property please include the location, accurate to within one mile, using an easily recognizable coordinate system as required by Item 1304 (b)(1)(i) of Regulation S-K.
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 2. Description of Properties, page 28
SEC asked (3)
For each mineral resource disclosed in the individual property section of your filing please disclose the point of reference used, the metallurgical recovery factor, and the cut-off grade as required by Item 1304 (d)(1) of Regulation S-K. In addition please include the mineral price for Clarkson Hill and Anderson.
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 2. Description of Properties, page 28
SEC asked (4)
We note you use a mineral resource uranium price of $65 per pound for certain properties, as compared to $40 per pound for other properties. Please expand your disclosure to explain the reasons for using $65 per pound price as required by Item 1302 (d)(2) of Regulation S-K.
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 2. Description of Properties, page 28
SEC asked (5)
We note your disclosure of historical resources beginning on page 143 of your filing. Estimated quantities of historical resources are not defined under Item 1300 of Regulation S-K and therefore should be removed from your filing.
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 2. Description of Properties, page 28
SEC asked (6)
Please revise to include a section that includes a description of internal controls with respect to exploration and mineral resource and reserve estimation efforts as required by Item 1305 of Regulation S-K.
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 9A. Controls and Procedures · Evaluation of Disclosure Controls and Procedures, page 237
SEC asked (7)
We note you do not state a conclusion regarding the effectiveness of your disclosure controls and procedures as of the end of July 31, 2022. Please revise to disclose management’s conclusion with regard to the effectiveness of your disclosure controls and procedures. Refer to Item 307 of Regulation S-K.
UEC answered
In this respect the Company notes that it has now revised Item 9A Controls and Procedures in the Form 10-K/A to disclose management’s conclusion with regard to the effectiveness of the Company’s disclosure controls and procedures in accordance with Item 307 of Regulation S-K as follows:

Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our Principal Executive Officer and Principal Financial Officer, has evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange
Rest of the answer

Act), as of the end of the period covered by this Annual Report. Based on such evaluation, our Principal Executive Officer and Principal Financial Officer have concluded that, as of the end of the period covered by this Annual Report, our disclosure controls and procedures were effective.

It should be noted that any system of controls is based in part upon certain assumptions designed to obtain reasonable (and not absolute) assurance as to its effectiveness, and there can be no assurance that any design will succeed in achieving its stated goals.

Management’s Report on Internal Control Over Financial Reporting

Management of the Company is responsible for establishing and maintaining adequate internal control over financial reporting, as required by Sarbanes-Oxley (SOX) Section 404(a). The Company’s internal control over financial reporting is a process designed under the supervision of the Company’s Principal Executive Officer and Principal Financial Officer and effected by the Company’s Board of Directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of the Company’s consolidated financial statements for external purposes in accordance with United States generally accepted accounting principles.

Due to its inherent limitations, internal control over financial reporting may not prevent or detect misstatements on a timely basis. Also, projections of any evaluation of the effectiveness of internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

As at July 31, 2022, management assessed the effectiveness of the Company’s internal control over financial reporting based on the criteria set forth in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on that evaluation, the Company’s management concluded that, as of July 31, 2022, the Company’s internal control over financial reporting was effective.

The independent registered public accounting firm that audited the consolidated financial statements included in this Annual Report has issued an attestation report on the Company’s internal control over financial reporting which appears herein.

Changes in Internal Controls

There have been no changes in our internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) that occurred during the fourth fiscal quarter for the fiscal year ended July 31, 2022, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.”.

Read in the reply
In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.6, page 276
SEC asked (8)
It appears that your Wyoming ISR Hub and Spoke project technical report summary is missing several figures. For example it appears Figure 3-1 through Figure 3-3, Figure 6-2 through Figure 6-3b, and other figures have been omitted. Please consult with the associated qualified persons to obtain and file revised technical report summaries that includes the omitted figures.
Rest of the question

To the extent similar information has been omitted from your other technical report summaries that you have filed, advise us of your assessments in this regard, and of any actions that are necessary to similarly resolve.

UEC answered
In this respect the Company notes that the updated and now filed TRS for its Wyoming Hub and Spoke Project has been updated to ensure that all figures are now included in the filing.

In this respect the Company also notes that the requisite TRS authors believe that the figures contained in all other Company Project TRS filings are fully provided for.

“9.

We note that you have included a section in your technical report summary titled exploration potential.
Rest of the answer

Please consult with your qualified person and revise this section of your technical report summary to comply with Item 1302 (c) of Regulation S-K. To the extent similar information has been included in your other technical report summaries that you have filed, advise us of your assessments in this regard, and of any actions that are necessary to similarly resolve.”

Company Response:

In this respect the Company notes the historical resources beginning on page 143 of the Company’s prior Form 10-K filing are in reference to the Texas Hub and Spoke Project TRS, and the Company now identifies the exact page references in each filed TRS whereby any reference to exploration potential is made, as required by Item 1302 (c) of Regulation S-K, and confirms where such disclosure is not necessary:

In this respect the Company notes that no TRS revision is necessary in this regard as there is no reference to exploration potential in this TRS or related to this Project.

In this respect the Company notes that no TRS revision is necessary in this regard as there is no reference to exploration potential in this TRS or related to this Project.

In this respect the Company notes that Section 9.2 Exploration Potential of this updated and now filed TRS was updated and retitled “Exploration Target” and moved into Chapter 7 of the updated TRS, specifically in Section 7.4 on pages 7-11 through 7-12 of the TRS.

In this respect the Company notes that no TRS revision is necessary in this regard as there is no reference to exploration potential in this TRS or related to this Project.

“10.

We note from Table 10-1 that no recent processing or metallurgical testing has been conducted on material from certain project areas. Please consult with your qualified person and revise to explain how the qualified person determined the assumed mineral extraction process supports mineral resource reporting for these project areas. To the extent similar information has been included in your other technical report summaries that you have filed, advise us of your assessments in this regard, and of any actions that are necessary to similarly resolve.”

Company Response:

In this respect the Company notes in respect of each TRS as to whether it includes an assumed mineral extraction process therein which supports mineral resource reporting and, where an updated TRS has been provided for, if necessary, to include determinations as to whether the requisite assumed mineral extraction process supports mineral resource reporting:

In this respect the Company notes that in this TRS metallurgical testing was completed for a prior preliminary economic assessment completed in 2014 and a recovery of 90% was utilized based on the results on page 10-42 of the TRS.

In this respect the Company notes that this comment does not appear to apply to this TRS because there is no Table 10-1 in the TRS.

In this respect the Company notes that Section 6.3 of this TRS describes all of the Project deposits as sandstone-hosted roll-fronts. Saturated roll-front deposits in sandstone are inherently recoverable by ISR. All of the geologic formations hosting mineralization for this TRS Project properties have been the subject of metallurgical testing, pilot studies or successful uranium ISR production. In this respect the Company notes that it is the QP’s opinion that the information presented in this TRS is sufficient to support an Initial Assessment with an accuracy of +/-50% and a 25% contingency, and that the ISR mineral extraction process supports mineral resource reporting for these Project areas.

In this respect the Company also notes that Section 22.2 of this TRS states that the “most significant potential risks to recovering the resources presented in this [TRS] will be associated with the success of the wellfield operation and recovery of uranium from the targeted host sands. The amount of uranium ultimately recovered from the Project is subject to in-situ wellfield recovery processes that can be impacted by variable geochemical and hydrogeological conditions”. This statement applies to all uranium ISR projects, and the Project areas included in this TRS do not present an unusual level of risk in this regard.

In addition, Table 10-1 of this TRS notes that no recent mineral processing or metallurgical testing was conducted at Allemand-Ross, Clarkson Hill, Ludeman and Red Rim. Below are explanations for how it was determined that the assumed mineral extraction process supports the mineral resource reporting for individual Project areas. It should be noted that the mineral resources reported in this TRS are in-situ at the Project areas.

Allemand Ross: The ISR process simply and effectively reverses the redox reaction that deposited uranium in sandstone hosted roll front deposits and the mineralization and geology at Allemand-Ross is well studied and understood. The uranium mineralization at the Allemand-Ross project area is located in the Fort Union Formation from which other projects such as the nearby Smith Ranch/Highland mine have successfully produced commercial quantities of uranium using ISR as discussed in Section 11.4 and Chapter 20 of the updated TRS. The Allemand-Ross project area has been explored but not permitted or licensed, and before permitting and developing the Allemand-Ross project area UEC will need to perform mineral processing and metallurgical testing.

Clarkson Hill: The ISR process simply and effectively reverses the redox reaction that deposited uranium in sandstone hosted roll front deposits and the mineralization and geology at Clarkson Hill is well studied and understood. The Clarkson Hill Project area is located in the Fort Union Formation from which other projects have successfully produced commercial quantities of uranium using ISR as discussed in Section 11.4 and Chapter 20 of the updated TRS. The Clarkson Hill Project area has been explored but not permitted or licensed, and before permitting and developing the Clarkson Hill Project the Company will need to perform mineral processing and metallurgical testing.

Ludeman: Two successful pilot plant studies were conducted by prior owners and are noted in Section 9.1 of the updated TRS and referenced in Table 10-1.

Nine Mile: A pilot ISR and leachability study was conducted at the Nine Mile Project area by Rocky Mountain Energy (RME) and the U.S. Bureau of Mines as described in Section 9.1 of the updated TRS and referenced in Table 10-1.

Red Rim: The ISR process simply and effectively reverses the redox reaction that deposited uranium in sandstone hosted roll front deposits and the mineralization and geology at Red Rim is well studied and understood. The Red Rim Project area is located in the Fort Union Formation from which other projects have successfully produced commercial quantities of uranium using ISR as discussed in Section 11.4 and Chapter 20 of the updated TRS. The Red Rim Project area has been explored but not permitted or licensed, and before permitting and developing the Red Rim Project area the Company will need to perform mineral processing and metallurgical testing.

The Company does not propose to update this TRS based on the responses herein.

In this respect the Company notes that this TRS used the CIM guideline recovery of 70%, as there has been limited recent metallurgical testing, as detailed on pages 10-35 and 10-36s of the TRS.

“11.

Please revise to include the qualified person’s estimates of cut-off grades based on assumed costs and commodity prices that provide a reasonable basis for establishing the prospects of economic extraction for mineral resources, as required by Item 601(b)(96)(iii)(B)(11)(iii) of Regulation S-K. To the extent similar information has been omitted from the other technical report summaries that you have filed, advise us of your assessments in this regard, and of any actions that are necessary to similarly resolve.”

Company Response:

In this respect the Company notes in respect of each TRS the exact page references in each filed TRS whereby the qualified person’s estimates of cut-off grades based on assumed costs and commodity prices provide a reasonable basis for establishing the prospects of economic extraction for mineral resources, as required by Item 601(b)(96)(iii)(B)(11)(iii) of Regulation S-K is provided for, and also notes where, if an updated TRS is provided for, to include this information:

In this respect the Company notes that additional language has now been added in this updated and now filed TRS to clarify both the cut-off and reasonable prospects for eventual economic extraction on pages 11-48 and 11-49 of the TRS.

In this respect the Company notes that Section 11.1.1 Reasonable Prospects of Economic Extraction (page 11-4) and Table 11-2 of this updated and now filed TRS on page 11-3 state the cut-off grades and prices used to determine the reasonable prospect of economic extraction for this Project.

In this respect the Company notes that Section 11.1.1 Reasonable Prospects of Economic Extraction (page 11-1) and Table 11-1 of this updated and now filed TRS on page 11-2 state the cut-off grades and prices used to determine the reasonable prospect of economic extraction.

In this respect the Company notes that additional language has now been added in this updated and now filed TRS to clarify both the cut-off and reasonable prospects for eventual economic extraction on pages 11-41 and 11-42 of the TRS.

“12.

We note that in section 11.4 of your technical report summary that your qualified person has provided an opinion that as your project contains multiple project areas in different geologic settings and stages of development, it is virtually impossible to fully resolve all issues relating to relevant technical and economic factors likely to influence the prospect of economic extraction. This statement seems to run contrary to the definition of a mineral resource in that, as defined under Item 1300 of Regulation S-K, a mineral resource has a reasonable prospect of economic extraction and with assumed and justifiable technical and economical conditions is likely to become economically extractable. Please explain this statement and revise this section as necessary. To the extent similar information has been included in your other technical report summaries that you have filed, advise us of your assessments in this regard, and of any actions that are necessary to similarly resolve.”

Company Response:

In this respect the Company notes that the updated and now filed TRSs for each of the Texas Hub and Spoke Project and the Wyoming Hub and Spoke Project have been updated to include an explanation for any statements made therein wherein the qualified person has provided an opinion that, as the particular Project contains multiple project areas in different geologic settings and stages of development, it is virtually impossible to fully resolve all issues relating to relevant technical and economic factors likely to influence the prospect of economic extraction – any such statement seeming to run contrary to the definition of a mineral resource in that, as defined under Item 1300 of Regulation S-K, a mineral resource has a reasonable prospect of economic extraction and with assumed and justifiable technical and economical conditions is likely to become economically extractable:

In this respect the Company notes that no such statement exists in this TRS.

In this respect the Company notes that Section 11.4 of this updated and now filed TRS (page 11-10) has been revised to clarify the intent of the statement.

Wyoming Hub and Spoke Project:

In this respect the Company notes that Section 11.4 of this updated and now filed TRS (page 11-9) has been revised to clarify the intent of the statement.

In this respect the Company also notes that the requisite TRS authors believe that no other Company Project TRS filings require corrections with respect to this information.

“Notes to the Consolidated Financial Statements

Note 9: Equity-Accounted Investment, page F-23

13. We note your equity interest in Uranium Royalty Corp. (“URC”) has decreased to 15.5% as of July 31, 2022 and further to 15.4% as of October 31, 2022, but that you continue to believe you have the ability to exercise significant influence with representation on URC’s board of directors. Please explain in further detail why you believe it remains appropriate to account for your investment in URC using the equity method of accounting. As part of your response, address how you concluded your ability to exercise significant influence over URC based on the factors in FASB ASC 323-10-15-6 overcame the presumption in FASB ASC 323-10-15-8.”

Company’s Response:

In this respect the Company initially notes that:

during the fiscal year 2019, the Company closed on a Royalty Purchase Agreement and received 12,000,000 consideration shares of URC, which increased the Company’s holdings to 14,000,000 URC shares, representing a 32.6% interest in URC at July 31, 2019. The Company then began equity accounting for URC due to the Company’s shareholdings and two of the Company’s officers being members of URC’s board of directors;

the Company owned 15.4% of URC as at October 31, 2022;

Amir Adnani is both the Chairman and Director of URC and the founder, CEO and director of the Company. Mr. Adnani owns an additional 2,333,400 shares, 1,333,400 warrants and 80,000 options of URC;

Scott Melbye is the CEO, President and a director of URC and the Executive Vice President of UEC. Mr. Melbye owns an additional 475,000 shares, 75,000 warrants and 200,000 options of URC;

Messrs. Adnani and Melbye represent 2 of 5 or 40% of URC’s directors;

As noted in URC’s public filings, UEC is the operator of the Anderson, Reno Creek and Workman Creek royalties. These three projects represent approximately 20% of the carrying value of URC’s royalties and royalty option assets based on carrying value; and

URC is widely held, and there are no shareholders of URC owning more than 5% of its issued shares.

The Company noted and considered ASC 323-10-15-8, which states, in part, “Conversely, an investment of less than 20 percent of the voting stock of an investee shall lead to a presumption that an investor does not have the ability to exercise significant influence unless such ability can be demonstrated.”

The Company also considered ASC 323-10-15-6, which states:

“Ability to exercise significant influence over operating and financial policies of an investee may be indicated in several ways, including the following:

a.

Representation on the board of directors b.

Participation in policy-making processes c.

Material intra-entity transactions d.

Interchange of managerial personnel e.

Technological dependency f.

Extent of ownership by an investor in relation to the concentration of other shareholdings (but substantial or majority ownership of the voting stock of an investee by another investor does not necessarily preclude the ability to exercise significant influence by the investor)….”.

In particular, the Company believes that the Company has the ability to exercise significant influence over operating and financing policies of URC due to the fact that:

Amir Adnani, the Company’s current President, CEO and a director, is also a director and the Chairman of URC’s board of directors;

Scott Melbye, the Company’s current Executive Vice President, is also a director and the CEO of URC;

Messrs. Adnani and Melbye represent 40% of URC’s board representation and a share of executive management with URC;

Messrs. Adnani and Melbye are voting members of URC’s board of directors; and the Company’s 15.4% interest in URC is the largest shareholder block. There are no other shareholders with an interest greater than 5%.

“Form 10-Q for Fiscal Quarter Ended October 31, 2022

Note 3: Acquisition of UEX Corporation, page F-11

“14.

Please provide a detailed analysis of how you concluded that the UEX Acquisition was the acquisition of assets rather than a business under FASB ASC 805.”

Company Response:

In this respect the Company notes and is of the view that UEX represented a set group of assets the entire interest of which was acquired by the Company through the purchase of all of the issued and outstanding common shares of UEX. As a result, the Company determined that it should account for the acquisition in accordance with ASC 805-50, section “Acquisition of Assets Rather Than a Business”.

In this respect the Company also notes that it completed an analysis applying ASC 805 with reference to the definition of a business under ASC 805-10-55. The Company considered the screen test and whether substantially all of the fair market value of the gross assets acquired is concentrated in a single identifiable asset or group of similar identifiable assets. The gross assets acquired did not represent a single identifiable asset or group of similar identifiable assets that represented substantially all of the assets acquired.

The Company considered the definition of a business in ASC 805-10-55-3A, “… A business is an integrated set of activities and assets that is capable of being conducted and managed for the purpose of providing a return in the form of dividends, lower costs, or other economic benefits directly to investors or other owners, members, or participants”. In order to be a business, a set needs to have an input and a substantive process that together significantly contribute to the ability to create outputs.

The Company determined that UEX does not have “output” at present, as the assets acquired include primarily certain mineral rights and properties which are in the exploration and evaluation stage, an equity accounted investee with exploration and evaluation stage mineral rights and properties and working capital items. The existence of mineral reserves has not been established for any of the properties. The Company also notes that the UEX acquisition did not include more than an insignificant amount of goodwill and that the set of acquired assets does not operate independently.

The Company also determined that UEX has neither an organized workforce nor any input that the workforce could develop or convert into outputs currently in place.

Additionally, the Company determined that they acquired no substantive processes which if applied to an acquired input, significantly contributes to it the ability to create outputs.

We hope and trust that each of the foregoing and the now updated and filed responsive materials (inclusive of the now updated and filed Form 10-K/A and TRSs) are clear, satisfactory and fully responsive to the Comment Letter; however, should the SEC have any immediate questions or concerns respecting any of the same please do not hesitate to contact the undersigned, at 604.691.7445, at the SEC’s convenience at any time.

We thank the SEC in advance for its prompt attention to and its continued cooperation in this matter and, in the interim, we remain,

Yours very truly,

Read in the reply
In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.6, page 276
SEC asked (9)
We note that you have included a section in your technical report summary titled exploration potential. Please consult with your qualified person and revise this section of your technical report summary to comply with Item 1302 (c) of Regulation S-K.
Rest of the question

To the extent similar information has been included in your other technical report summaries that you have filed, advise us of your assessments in this regard, and of any actions that are necessary to similarly resolve.

UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.6, page 276
SEC asked (10)
We note from Table 10-1 that no recent processing or metallurgical testing has been conducted on material from certain project areas. Please consult with your qualified person and revise to explain how the qualified person determined the assumed mineral extraction process supports mineral resource reporting for these project areas. To the
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.6, page 276
SEC asked (11)
Please revise to include the qualified person's estimates of cut-off grades based on assumed costs and commodity prices that provide a reasonable basis for establishing the prospects of economic extraction for mineral resources, as required by Item 601(b)(96)(iii)(B)(11)(iii) of Regulation S-K.
Rest of the question

To the extent similar information has been omitted from the your other technical report summaries that you have filed, advise us of your assessments in this regard, and of any actions that are necessary to similarly resolve.

UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.6, page 276
SEC asked (12)
We note that in section 11.4 of your technical report summary that your qualified person has provided an opinion that as your project contains multiple project areas in different geologic settings and stages of development, it is virtually impossible to fully resolve all issues relating to relevant technical and economic factors likely to influence the prospect of economic extraction.
Rest of the question

This statement seems to run contrary to the definition of a mineral resource in that, as defined under Item 1300 of Regulation S-K, a mineral resource has a reasonable prospect of economic extraction and with assumed and justifiable technical and economical conditions is likely to become economically extractable. Please explain this statement and revise this section as necessary. To the

UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Notes to the Consolidated Financial Statements · Note 9: Equity-Accounted Investment, page F-23
SEC asked (13)
We note your equity interest in Uranium Royalty Corp. (“URC”) has decreased to 15.5% as of July 31, 2022 and further to 15.4% as of October 31, 2022, but that you continue to believe you have the ability to exercise significant influence with representation on URC’s board of directors.
Rest of the question

Please explain in further detail why you believe it remains appropriate to account for your investment in URC using the equity method of accounting. As part of your response, address how you concluded your ability to exercise significant influence over URC based on the factors in FASB ASC 323-10-15-6 overcame the presumption in FASB ASC 323-10-15-8.

UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Note 3: Acquisition of UEX Corporation, page F-11
SEC asked (14)
Please provide a detailed analysis of how you concluded that the UEX Acquisition was the acquisition of assets rather than a business under FASB ASC 805. We remind you that the company and its management are responsible for the accuracy and adequacy of their disclosures, notwithstanding any review, comments, action or absence of action by the staff.
UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of Apr 3, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 2. Description of Properties, page 28
SEC asked (1)
We note your response to comment 3. Please disclose the point of reference used with respect to the calculation of your mineral resources for the Yuty Project and the Anderson Project, as required by Item 1304 (d)(1) of Regulation S-K.
UEC answered
Amendment No. 1 to Form 10-K for Fiscal Year Ended July 31, 2022 We are writing as counsel to and on behalf of Uranium Energy Corp. (the “Company” or “UEC”) and in response to the recent comment letter (the “Comment Letter”), dated April 17, 2023, from the United States Securities and Exchange Commission (the “SEC”). We are pleased to hereby provide the SEC with the Company’s responses to the Comment Letter, and please note that we have repeated below each of the comments/requests contained in the Comment Letter and responded in each instance in bold and immediately thereafter for, we hope and trust, the SEC’s ease of reference in review.
Rest of the letter

In this respect we note that we refer below to the Company’s updated and amended and most recently filed Form 10-K/A (the “Form 10-K/A”), together with each of the noted and updated Technical Report Summaries (each, a described “TRS”), which have been filed on EDGAR and have already been reviewed by the SEC prior to the delivery of this recent Comment Letter. McMillan LLP | Royal Centre, 1055 W. Georgia St., Suite 1500, PO Box 11117, Vancouver, BC, Canada V6E 4N7 | t 604.689.9111 | f 604.685.7084 Lawyers | Patent & Trade-mark Agents | Avocats | Agents de brevets et de marques de commerce Vancouver | Calgary | Toronto | Ottawa | Montréal | Hong Kong | mcmillan.ca “Amendment No. 1 to Form 10-K for Fiscal Year Ended July 31, 2022” Item 2. Description of Properties, page 28 We note your response to comment 3. Please disclose the point of reference used with respect to the calculation of your mineral resources for the Yuty Project and the Anderson Project, as required by Item 1304 (d)(1) of Regulation S-K.” In this respect the Company notes that the summary Table of Properties provided for on page 29 of the current Form 10-K/A indicates in footnote 5 therein that “The point of reference for Mineral Resources is in-situ for the projects”. The Company also notes that this footnote is not currently included for each of the Yuty Project Area Resource Summary tables, located on page 194 of the Form 10-K/A, and for the Anderson Project Area Resource Summary table, located on page 205 of the Form 10-K/A. With that said, the Company is of the view that, given footnote 5 already provided for in the summary Table of Properties, it need not further amend the Form 10-K/A to include the aforementioned footnote in the tables for the Yuty and Anderson Projects located on pages 194 and 205 of the current Form 10-K/A. In this respect the Company confirms that it will ensure that a similar point of reference for any of its mineral resource estimates is fully provided for in all future Form 10-K and related TRS filings for the Company when so required. “Item 15. Exhibits, Financial Statement Schedules” We note your response to comment 9. Additionally we note that your amended Wyoming ISR Hub and Spoke technical report summary now includes a section titled Exploration Target. Pursuant to the definition of an exploration target, as found in Item 1300 of Regulation S-K, an exploration target is a statement or estimate, quoted as a range of tonnage and a range of grade. Therefore an exploration target should not include the contained metal quantity. Please revise your exploration target to remove the contained metal quantities.” In this respect the Company notes that the previous Exploration Target estimates for the Company’s Jab and West Jab project, as located in Table 7-3 on page 7-12 of the updated Wyoming Hub & Spoke Project TRS, contains a singular approximated grade, tonnage and metal quantity estimate. The Company would ordinarily propose to revise this table to provide a better range of approximate quantities for the same as follows: Charlie Project Area Exploration Target Total Estimate Jab/West Jab Project Area Exploration Target Note: The Exploration Target included herein does not represent, and should not be construed to be, an estimate of a mineral resource or mineral reserve. Note: The Exploration Target included herein does not represent, and should not be construed to be, an estimate of a mineral resource or mineral reserve. In this respect the Company’s QP for this TRS (WWC) notes that presenting an approximate range of metal quantities is important for understanding ISR projects as grade and tonnage are less important in ISR than in conventional mining and without the inclusion of metal quantity may not tell the full story. A GT cutoff was presented in Table 7-3 for the same reason, to ensure investors have the data to make informed decisions. In this respect the Company and its QP for this TRS note that Item 1302(c) of Regulation S-K discusses expressing the exploration target grade and tonnage as a range but does not appear to preclude the inclusion of a metal quantity in addition to the grade and tonnage. It does state that an exploration target does not represent, and should not be construed to represent, an estimate of a mineral resource or mineral reserve. In this TRS the exploration target section is not in the Mineral Resource chapter, wherein it states that “the exploration target is conceptual in nature and does not meet the SEC standards identified in S-K 1300 to be considered mineral resources or mineral reserves”. Furthermore, it states that there is no certainty that it will be realized, and a footnote has been added to the proposed Table 7-3 above. If this does not make it clear that the exploration target does not represent an estimate of a mineral resource, the Company and this QP would seek to know if there are additional statements that the Company can include to clarify this intention going forward? If the Staff do not concur with the Company’s justification for the inclusion of an approximated range of metal quantity in Table 7-3, a table without the range of metal quantity is provided below. Note: The Exploration Target included herein does not represent, and should not be construed to be, an estimate of a mineral resource or mineral reserve. In this respect the Company confirms that it proposes not to submit an updated TRS for the Wyoming Hub & Spoke Project in this instance, as the Company believes that this is a minor revision which does not materially affect the disclosure contained in the rest of the TRS or in the current Form 10-KA filing. With that said, the Company confirms that it will ensure future filings will be consistent with the exploration target format that is determined to be appropriate based on the final determination of this comment. We note your response to comment 11 and we reissue the comment. With the exception of the Yuty Uranium Project technical report summary, we are unable to calculate the cut-off grade for your projects based on the information that you have provided. Please disclose the price and unit costs associated with your cut-off grade. Additionally provide the equation for the cut-off grade calculation for each of your projects or demonstrate how the cut-off grade was calculated for each of your projects.” In this respect the Company now provides for the following additional explanations in connection with the price and unit costs associated with each noted and remaining Project TRS cut-off grade for the SEC’s consideration: In this respect each of the Company and this TRS QP note and state both a grade and GT cutoff in the Anderson Project TRS on pages 11-48 and 11-49 of the same. The GT cutoff and the conceptual mine limits are the governing cutoff factors, not the minimum grade. The minimum cutoff grade of 0.02% U3O8 is the minimum grade of material which can be processed at a breakeven cost. The mineral processing cost estimated for the Anderson Project in 2014 was $10.63 per ton which escalated in 2023 to approximately $14.00 per ton. Material with a 0.02% U3O8 grade contains 0.4 pounds per ton. The gross value per ton of this material equals 0.44 times recovery (90%) times commodity price ($65) or $23.0 per ton which exceeds the mineral processing cost. In this respect each of the Company and this TRS QP note and state that as there are no material handling costs associated with uranium ore at ISR projects, GT, rather than grade, is the most practical and useful term to depict mineral content and quality. Grade cut-offs in ISR are not based on an algorithm or formula, instead they are typically selected based on industry convention or the personal experience of the resource geologist (VanHolland & Beahm (2017) - Resource estimation for roll-front uranium deposits issues and challenges - presented at U2017 Global Uranium Conference, Casper, WY, August 25, 2017). Based on this TRS QP’s experience, typical ISR production costs for sandstone-hosted uranium deposits that use an industry standard cutoff grade of 0.02 %U3O8 range from approximately $20 to $35 per pound. At a commodity price of $40 per pound, production costs of $20 to $35 per pound will justify a cutoff grade of 0.02 %U3O8 for projected uranium market conditions. In this respect each of the Company and this TRS QP again note and state that as there are no material handling costs associated with uranium ore at ISR projects, GT, rather than grade, is the most practical and useful term do depict mineral content and quality. Grade cut-offs in ISR are not based on an algorithm or formula, instead they are typically selected based on industry convention or the personal experience of the resource geologist (again VanHolland & Beahm (2017)). Based on this TRS QP’s experience, typical ISR production costs for sandstone-hosted uranium deposits that use an industry standard cutoff grade of 0.01% U3O8 to 0.2% U3O8 range from approximately $20 to $35 per pound. At a commodity price of $40 per pound production costs of $20 to $35 per pound justify the cut-off grades for projected uranium market conditions. In this respect the Company again proposes not to submit updated TRSs for each of these Projects, nor amendments to the current Form 10-K/A to specifically disclose the same in this instance, as the Company believes that the addition of this information will not assist the reader in better understanding the particular Resource Estimates nor materially affect the disclosure contained in the current Form 10-K/A filing. With that said, the Company will include these explanations in future filings under each such Project disclosure. We hope and trust that each of the foregoing responses are clear, satisfactory and fully responsive to the Comment Letter; however, should the SEC have any further questions or concerns respecting any of the same please do not hesitate to contact the undersigned, at 604.691.7445, at the SEC’s convenience at any time. We thank the SEC in advance for its prompt attention to and its continued cooperation in this matter and, in the interim, we remain,

One letter for all the questions, without numbered answers. Read the reply
In its next report

First report after the company's reply of Apr 25, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.6, page 276
SEC asked (2)
We note your response to comment 9. Additionally we note that your amended Wyoming ISR Hub and Spoke technical report summary now includes a section titled Exploration Target. Pursuant to the definition of an exploration target, as found in Item 1300 of Regulation S-K, an exploration target is a statement or estimate, quoted as a range of tonnage and a range of grade.
Rest of the question

Therefore an exploration target should not include the contained metal quantity. Please revise your exploration target to remove the contained metal quantities.

UEC answered

See the reply above.

In its next report

First report after the company's reply of Apr 25, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.6, page 276
SEC asked (3)
We note your response to comment 11 and we reissue the comment. With the exception of the Yuty Uranium Project technical report summary, we are unable to calculate the cutoff grade for your projects based on the information that you have provided. Please disclose the price and unit costs associated with your cut-off grade.
Rest of the question

Additionally provide the equation for the cut-off grade calculation for each of your projects or demonstrate how the cut-off grade was calculated for each of your projects.

UEC answered

See the reply above.

In its next report

First report after the company's reply of Apr 25, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.6, page 276
SEC asked (1)
We note your response to comment 2. In subsequent filings please revise to include the exploration target table(s) that do not include the contained pounds of uranium, consistent with the definition of an exploration target.
UEC answered
In this respect the Company notes and confirms that in any subsequent TRS and related filings it will ensure that they include any exploration target table(s) that do not include the contained pounds of uranium consistent with the definition of an exploration target.

“2.We note your response to comment 3. We note from your response that you have assumed a $65 per pound uranium price for the Anderson Project with respect to the cut-off grade, along with processing costs estimated in 2014 of $10.63 per ton which have been escalated in 2023 to approximately $14.00 per ton.
Rest of the answer

Additionally, we note from page 200 of your amended Form 10-K filing for the fiscal year ended July 31, 2022 that the Anderson project will be mined through a combination of surface and underground mining methods.

Considering it is assumed that the Anderson project will be mined through conventional means, the cut-off grade determination should also include mining costs and possibly other costs associated with extraction and processing. Please include all unit costs in the description of your cut-off grade, and clearly describe how you determined the 0.02% cut-off was calculated in order to establish prospects of economic extraction of your mineral resources.”

Company Response:

In this respect the Company and its Anderson Project QP now provide the following additional information and language that would represent revisions to section 11.7, on pages 11-48 and 11-49, of the current Anderson Project TRS should it be determined that a further amendment to the Anderson TRS need be filed by the Company going forward in order to provide for the same:

“11.7Reasonable Prospects of Economic Extraction and Cutoff Determination

Based on the depths of mineralization, average grade, thickness and GT, it is the QP’s opinion that the mineral resources at the Project can be reasonably and economically recoverable through a combination of surface and underground mining methods using a long-term price of $65/lb. An additional portion of resource, outside of the pit shell, can be reasonably extracted through highwall mining and underground mining methods where justified.

A Preliminary Economic Assessment (PEA) for the Project was completed under NI 43-101 and CIM guidance and regulations in 2014 (Beahm, et al, 2014). The cutoff applied was a minimum grade of 0.02% U3O8 and a GT of 0.1%Ft for mineral resources within the envelope of the conceptual open pit (Refer to Figures 11.1 through 11.7). This equates to a minimum economic extraction criterion of 0.02% recoverable grade over 5 ft of minimum mining thickness or a higher grade over a lessor thickness. For the portions of the resource falling within the 2014 Pit Bottom, highwall mining and underground mining envelope and extracted via underground and highwall mining methods, the 0.02% minimumaverage grade cutoff criteria was applied to composited mining thicknesses of a minimum of 3 ft and a sum GT cutoff of 0.1%Ft. Mineralized material below the 0.02 %eU3O8 minimum grade was excluded from the mineral resource calculations. Mineralized intercepts meeting both the minimum grade and GT cutoff would have a grade of 0.033 %eU3O8, 0.1%ft divided by 3 ft.

Within the conceptual mine limits and at the cutoff criteria applied, the operating costs (Beahm, et al 2014) were estimated at $34/lb16.92/ton for open pit stripping and mining, and 10.63/ton for mineral processing via on site heap leaching or a total direct cost of 27.55/ton., or about half of the Project commodity price. Based on the US CPI production costs may have escalated approximately 30% since 2014 which equates to an approximate total cost of $36 per ton, $22/ton mining and $14/ton mineral processing. , however, they would still be well below the projected commodity price of $65/lb (Section 11.6). Given the projected commodity price of $65/lb (Section 11.6), the following calculation applies to the minimum cutoff grade of 0.02 %eU3O8 and at the effective minimum grade, 0.033 %eU3O8 based on the minimum mining thickness and minimum GT.

·At 0.02 %eU3O8 contained pounds equal 0.4 lbs per ton

·At 90% recovery this equals 0.36 lbs recovered per ton

·At $65/lb the gross value of one ton of material at 0.02 %eU3O8 has a gross value of $23.4 per ton which exceeds the mineral processing cost per ton.

·At 0.033 %eU3O8 contained pounds equal 0.66 lbs per ton

·At 90% recovery this equals 0.6 lbs recovered per ton

·At $65/lb the gross value of one ton of material at 0.033 %eU3O8 has a gross value of $38.6 per ton This compares to a cost of mining and milling of approximately $36/ton.

The author concludes that application of both the minimum grade and minimum GT cutoffs represent a breakeven point with respect to mineral value and cost of production.

For this IA, the mine limits and cutoff criteria, including the conceptual mine limits, of the 2014 PEA were applied to the mineral resource estimate solely to segregate mineral resources having reasonable prospects for eventual economic extraction from within the overall envelope of mineralization. This resulted in a reduction of the estimated mineral resource and an average grade approximately five times the minimum cutoff grade as shown on Figures 11.1 through 11.7. It is recommended that mining methods and costs be updated in a future preliminary economic assessment or pre-feasibility study.

In this respect the Company again proposes not to submit updated an updated TRS for its Anderson Project at this time, nor any amendments to the current Form 10-K/A to specifically disclose the same in this instance, as the Company believes that the addition of this information will not assist the reader in better understanding the particular Resource Estimate nor materially affect the disclosure contained in the current Form 10-K/A filing. With that said, the Company would be prepared to file an amended TRS for the its Anderson Project by way of either separate Form 8-K filing or in conjunction with its Form 10-K for the year ended July 31, 2023 should that be required now in order to fully satisfy this comment.

We hope and trust that each of the foregoing responses are clear, satisfactory and fully responsive to the Comment Letter; however, should the SEC have any further questions or concerns respecting any of the same please do not hesitate to contact the undersigned, at 604.691.7445, at the SEC’s convenience at any time.

We thank the SEC in advance for its prompt attention to and its continued cooperation in this matter and, in the interim, we remain,

Yours very truly,

Read in the reply
In its next report

First report after the company's reply of May 4, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Item 15. Exhibits, Financial Statement Schedules · 96.6, page 276
SEC asked (2)
We note your response to comment 3. We note from your response that you have assumed a $65 per pound uranium price for the Anderson Project with respect to the cutoff grade, along with processing costs estimated in 2014 of $10.63 per ton which have been escalated in 2023 to approximately $14.00 per ton.
Rest of the question

Additionally we note from page 200 of your amended Form 10-K filing for the fiscal year ended July 31, 2022 that the Anderson project will be mined through a combination of surface and underground mining methods. Considering it is assumed that the Anderson project will be mined through conventional means, the cut-off grade determination should also include mining costs and possibly other costs associated with extraction and processing. Please include all unit costs in the description of your cut-off grade, and clearly describe how you determined the 0.02% cutoff was calculated in order to establish prospects of economic extraction of your mineral resources.

UEC answered

No numbered answer found in the reply. Read the reply ↗

In its next report

First report after the company's reply of May 4, 2023: 10-Q filed Jun 9, 2023 ↗, against the 10-Q filed Dec 19, 2022 ↗.

Tickdelta does not hold the text of both reports, so they are not compared here.

Also in this review: company letter, Mar 7, 2023, closing letter, 2023-05-08

Letters without questions

Other letters

UPLOAD and CORRESP
24 other letters: notices that a filing will not be reviewed, requests to declare a registration effective, and the like

From the SEC's correspondence on EDGAR: staff letters (form UPLOAD) and company letters (form CORRESP), 38 letters filed since 2015-11-30. Questions and answers are matched by their numbers; topics come from words in each question. The reports are compared word for word (same form, before the first SEC letter against the first report after the company's reply). No AI.

Sources

The SEC's correspondence on EDGAR: staff letters (form UPLOAD) and company letters (form CORRESP), matched question by question. No AI.

Also

Filings: the letters in the filing list.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/UEC/export.csv") into a cell.

Next in Owners and insiders:Insider trades
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.