Read in the 10-K filed Mar 2, 2026projects within budgets and on expected schedules may be adversely affected by various factors including, but not limited to: errors in our estimated costs and projected schedule; design and engineering errors; cost increases because of demand for labor and materials; cost increases due to instituted or proposed changes in trade policies; contractors’ difficulty in predicting costs over a lengthy construction period; changes to the scope of the projects; material and/or labor shortages; adverse weather conditions; contractor defaults and bankruptcy; labor disputes; unanticipated levels of inflation; litigation; certification, licensing, or permitting denials or delays; other regulatory impediments; and environmental issues. We expect to complete the redevelopment of up to 200,000 square feet of hangar space and to build a planned advanced air mobility center of excellence. Eventually, we aim to develop Hawthorne Airport into an AI-powered operations platform with such features as AI-powered air traffic coordination, AI-coordinated ground operations for managing aircraft, crews and turns, VR-based flight simulation with adaptive AI feedback, operational forecasting driven by AI models, machine learning to detect maintenance needs and biometric and AI-enabled screening for more seamless and secure boarding. These efforts to build the airport of the future, including our plans to use Hawthorne Airport as a innovation hub for the next generation of AI-based aviation technologies, will require significant additional capital and other resources for implementation and may require additional authorization from federal, state, or local regulators. If we are unable to access such capital, obtain the necessary regulatory approval, or develop the proper AI models to support this AI-powered operations platform, we may not be able to realize our long term plan for Hawthorne Airport.
Read in the 10-K filed Mar 2, 2026The price of our Class A common stock and warrants may fluctuate due to various factors, including changes in macroeconomic, geopolitical, market, and industry conditions; volatility in interest rates, inflation, and currency exchange rates; supply chain disruptions; political events, regulatory developments, and acts of war or terrorism; our financial performance and guidance relative to expectations; actions by us or our competitors; strategic transactions and capital commitments; changes in management; declines in equity markets generally; future issuances or sales of our securities; investor sentiment; litigation or regulatory investigations; accounting changes; actions by significant stockholders; and other events beyond our control.