Read in the 10-K filed Mar 2, 2026We and our partners may not be able to obtain necessary production certificates, ramp up manufacturing, or develop supply chains capable of meeting quality, price, engineering, design, target aircraft specifications, and production standards, as well as required production volumes. We face significant challenges in the following areas, any of which could harm our business:
Read in the 10-K filed Mar 2, 2026We depend on a limited number of suppliers and service providers, including single-source and custom manufacturers, for the parts, components and materials used in our aircraft. If any supplier or service partner is unable to meet demand due to supply chain disruptions, changes in their tax and government incentives, quality issues, natural or man-made disasters, climate
Read in the 10-K filed Mar 2, 2026projects within budgets and on expected schedules may be adversely affected by various factors including, but not limited to: errors in our estimated costs and projected schedule; design and engineering errors; cost increases because of demand for labor and materials; cost increases due to instituted or proposed changes in trade policies; contractors’ difficulty in predicting costs over a lengthy construction period; changes to the scope of the projects; material and/or labor shortages; adverse weather conditions; contractor defaults and bankruptcy; labor disputes; unanticipated levels of inflation; litigation; certification, licensing, or permitting denials or delays; other regulatory impediments; and environmental issues. We expect to complete the redevelopment of up to 200,000 square feet of hangar space and to build a planned advanced air mobility center of excellence. Eventually, we aim to develop Hawthorne Airport into an AI-powered operations platform with such features as AI-powered air traffic coordination, AI-coordinated ground operations for managing aircraft, crews and turns, VR-based flight simulation with adaptive AI feedback, operational forecasting driven by AI models, machine learning to detect maintenance needs and biometric and AI-enabled screening for more seamless and secure boarding. These efforts to build the airport of the future, including our plans to use Hawthorne Airport as a innovation hub for the next generation of AI-based aviation technologies, will require significant additional capital and other resources for implementation and may require additional authorization from federal, state, or local regulators. If we are unable to access such capital, obtain the necessary regulatory approval, or develop the proper AI models to support this AI-powered operations platform, we may not be able to realize our long term plan for Hawthorne Airport.