Screener / SEC EDGAR /CIK 0001296445 /10-K filed Feb 26, 2026, compared with Feb 27, 2025 /Numbers from the XBRL of the 10-Ks
NYSE Utilities · Electric Utilities

Ormat Technologies, Inc. ORA

Compare with peers Embed
The 10-K against last year's

224 changes: 43 added, 59 removed, 121 reworded, 1 quiet changes

10-K Feb 26, 2026 vs Feb 27, 2025

10-K 0001296445-26-000006 (Feb 26, 2026) vs 10-K 0001628280-25-008531 (Feb 27, 2025)

Every paragraph, and how much of it changed

One bar per paragraph, in the order of the 10-K. Height and colour show the share of its words not in the closest paragraph a year earlier; the tallest bars are new paragraphs.

Risk Factors

196 paragraphs · 16 new · 59 reworded · 27 gone · 10-K Feb 26, 2026 against Feb 27, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 194 · 50% changed Every version of it
From time to time, certain financial institutions (with which •under the capped call transactions we entered into in connection with the Capped Call Transactions) Notes, modifications by the option counterparties or their respective affiliates may modify of their hedge positions by entering which cause them to enter into or unwinding various unwind derivatives with respect to in our common stock and/or purchasing or selling purchase or sell our common stock or other securities of ours in secondary market transactions prior to the maturity of the Notes. This activity could also cause or avoid an increase or a decrease in the market price of our common stock. securities;
Paragraph 170 · 50% changed Every version of it
Our manufacturing operations are dependent on the supply of various raw materials, including primarily steel and aluminum, commodities, vessels and industrial equipment components that we use. We currently obtain all such raw materials, commodities and equipment at prevailing market prices. We are not dependent on any one supplier and do not have any long-term agreements with any of our suppliers. Global events, such as U.S. tariffs on Canada, Mexico and China that were recently imposed or are set to take effect, and the uncertainty surrounding the possibility of expanded trade restrictions among the governments of the U.S. and countries where our suppliers operate, could result in delays in supply and increased costs. Our development activity is also impacted by the supply delay and cost increase of storage batteries and solar PV panels. Further cost increases of such raw materials, commodities and equipment could adversely affect our profit margins.
Paragraph 177 · 48% changed Every version of it
We may not be able to obtain sufficient insurance coverage to cover damages resulting from any damages to our assets and profitability including but not limited to natural disasters such as volcanic eruptions, lava flows, wind and earthquake, which could materially and adversely affect our business, operating results, and financial condition. profitability.
Paragraph 104 · 47% changed Every version of it
In the U.S., where we have a significant portion of our operations, the U.S. Environmental Protection Agency (the “EPA”) has adopted rules that, among other things, establish construction and operating permit reviews for GHG emissions from certain large stationary sources, require the monitoring and reporting of GHG emissions from certain sources and implement standards directing the reduction of methane from certain facilities in the oil and gas sector. Similarly, various states have adopted or are considering adopting legislation and regulation focused on GHG cap-and-trade programs, carbon taxes, reporting and tracking programs and emissions limits. The recent At the same time, no comprehensive climate change in the U.S. presidential administration increases the prospect of further regulatory ambiguity and change. Shortly after taking office in January 2025, President Donald Trump signed several Executive Orders specific to the energy industry, including “Declaring a National Energy Emergency” and “Unleashing American Energy.” Both signal a shift in the U.S. government's approach to energy-related initiatives, policies, and regulations, and contain directives that, among other things, i) encourage further domestic energy exploration and production, including on federal lands and waters, ii) instruct federal agency and department officials to expedite the completion and authorization of various energy-related projects, iii) promote the streamlining of various permitting processes at the federal level, and iv) rescind and revise regulations that burden future energy development, identification, and production. Notably, the Trump administration specifically highlighted “geothermal heat” as one source of energy for increased domestic attention and production. The orders neither establish new, nor rescind existing, administrative rules or statutes, which would require action by the relevant agencies and/or the U.S. Congress, and the impact on existing and future regulation, or the implementation of that regulation, remains to be seen. While the first order suggests a positive posture of the Trump administration toward geothermal energy in contrast to other renewable sources, we cannot currently make any assurance regarding the influence of the policies or political stances of the Trump administration or current U.S. Congress on our business. Relatedly, legislation has been implemented federally. Additionally, in recent years, specifically in the U.S., “anti-ESG” sentiment has gained momentum, with several U.S. states and Congress the federal government having proposed or enacted “anti-ESG” policies, legislation, or initiatives or issued related legal opinions. opinions, such as the EPA’s recent determination that it lacks the authority to regulate certain GHG emissions and would no longer stand behind its prior findings that GHG emissions are harmful. The policies of the current U.S. presidential administration also increase the prospect of regulatory ambiguity and change. For more information, see “Risks Related instance, while executive orders of the Trump administration from early 2025 suggest a positive posture of the administration toward geothermal energy relative to Governmental Regulations, Laws other renewable sources, the impact of these orders, in the absence of any substantive change in regulation since such orders were issued, remains unclear, and Taxation—The reduction, elimination we cannot currently make any assurance about the influence of the policies or inability political stances of the Trump administration on our business. The BLM has also not issued new permits or renewed certain permits for certain solar technologies supporting geothermal auxiliary loads on U.S. federal lands where we have applied for permits to monetize government incentives could adversely affect our business, financial condition, future results and cash flows.” develop or for renewed permits to continue operating, as further described in
Paragraph 133 · 46% changed Every version of it
The PURPA and QF described risks identified above are not likely to affect our Nevada based facilities that entered into PPAs with NV Energy as the off-taker after Nevada initially adopted its RPS in 2001. Those PPAs and the related rates agreed to for such facilities by the off-taker were not based upon PURPA or a QF mandated rate but were instead adopted as a result of a competitive bidding process and approved as part of the off-taker’s integrated resource planning process and in order for the off-taker to comply with Nevada’s RPS. While those PPAS were initially required to file for QF or EWG status with the FERC, the PPAs and their related prices for the term of the PPA were not approved by the FERC pursuant to PURPA. The PURPA and QF risks described above also are not likely to affect our Nevada and California based projects that have their PPAs with the SCPPA because SCPPA is not a regulated public utility under PURPA.
Paragraph 46 · 42% changed Every version of it
Our global operations in countries including Kenya, Turkey, Guadeloupe, Guatemala, Honduras, Indonesia and others require us to comply with the laws and regulations of various governments and regulatory authorities outside the U.S. in addition to legal and regulatory requirements in the U.S. Such foreign laws or regulations may not provide the same type of legal certainty, rights, or judicial processes with respect to our contractual relationships in such countries, as are afforded to our operations in the U.S. A failure to receive adequate judicial or enforcement protection of our contractual rights abroad may adversely affect our ability to fulfill our contracts successfully and generate revenues therefrom. In particular, the legal and regulatory systems in the foreign jurisdictions where we operate can be characterized by one or more of the following:
Paragraph 68 · 40% changed Every version of it
Future regional Military conflicts involving Israel, such as a re-escalation of the wars in the Middle East that lasted between 2023 and 2025, could additionally have adverse impacts on our business. Wars could result in parties with whom we have agreements involving performance military reserve duty call-ups and to our ability to ship our products from Israel, which could disrupt the operations of our Product segment and potentially delay some of our growth plans in Israel claiming that they are not obligated to perform their commitments under those agreements pursuant to force majeure provisions in such agreements. In addition, new customers the Electricity segment. New business partners may be reluctant to do business with us, and existing customers partners may be reluctant hesitate to renew their agreements with us, due to their uncertainty regarding our ability to perform under our commitments. Limitations on travel commitments in Israel, and/or claim they are not obligated to Israel from abroad could make it harder for us perform their commitments under those agreements pursuant to secure contracts in the Product segment with new business partners. We have shelter-in-place and work-from-home measures, government-imposed force majeure. Government-imposed restrictions on movement and travel and other precautions in wartime taken to address the ongoing conflict and which have temporarily in the past disrupted and may continue to in any future conflicts disrupt our management and employees’ ability to effectively perform their daily tasks. All jobs. Moreover, the perception that we are an Israeli company could harm our business, due to the application of the foregoing factors could negatively affect operations within restrictive laws, policies, boycotts or sanctions that other countries or companies may place on Israel and companies operating there or that may otherwise limit our Product segment and/or delay growth in our Electricity segment. ability to do trade with, or secure new or existing contracts in, other countries with anti-Israel sentiment (such as Turkey or Indonesia).
Paragraph 107 · 40% changed Every version of it
In addition, the SEC proposed rules in 2022 that would require public companies to include extensive climate-related disclosures in their SEC filings. While these rules are currently stayed and may eventually not go into effect, we would expect to incur substantial additional compliance costs to the extent these or similar rules are adopted. Such compliance costs could in turn adversely effect Lastly, our business or results of operations. We publish an annual Sustainability Report, which describes, among other things, the measurement of our greenhouse gas emissions and our efforts to reduce emissions. Our disclosures on these matters, sustainability disclosures, a failure to meet evolving stakeholder expectations for ESG sustainability practices and reporting, or expenses required to carry on sustainability reporting and/or meet customer requirements or sustainability targets, may potentially harm our customer relationships and/or subject us to significant costs and liabilities and reputational risks, any of which could adversely affect our business, financial condition and results of operations.

MD&A

173 paragraphs · 27 new · 80 reworded · 32 gone · 10-K Feb 26, 2026 against Feb 27, 2025
New paragraph Reworded (5% of its words or more) Same or nearly
Paragraph 94 · 50% changed
Impairment associated with the Brawley power plant write-off as a result of long-lived assets for continuous losses primarily attributable to wellfield issues which have resulted in higher-than-expected operating costs and lower-than-expected electricity revenues; and (ii) $4.9 million associated with the year ended December 31, 2024 was $1.3 million compared to none for expected termination of a waste heat agreement between the year ended December 31, 2023. Company's wholly-owned subsidiary, OREG2, and its customer. The impairment of long-lived assets in 2024 is related to the termination of the waste heat agreement between the Company's wholly-owned subsidiary, OREG4, and Highline Electric Association, Inc., effective May 2024 its customer.
Paragraph 38 · 49% changed
Revenues attributable to our Product segment are based on the sale of equipment, engineering, procurement and construction contracts and the provision of various services to our customers. Product segment revenues fluctuate between periods, primarily based on our ability to receive customer orders, the status and timing of such orders, delivery of raw materials and the completion of manufacturing. Larger customer orders for our products are typically the result of our sales efforts, our participation in, and winning tenders or requests for proposals issued by potential customers in connection with projects they are developing and orders by returning customers. Such projects often take a significant amount of time to design and develop and are subject to various contingencies, such as the customer’s ability to raise the necessary financing for a project. Consequently, we are generally unable to predict the timing of such orders for our products and may not be able to replace existing orders that we have completed with new ones. As a result, revenues from our Product segment fluctuate (sometimes extensively) from period to period.
Paragraph 25 · 44% changed
•Increased Demand for Baseload and Data Centers: There has been increased demand Demand for energy electricity generated from geothermal and other renewable resources in the U.S. driven by both United States has increased due to the need for reliable baseload requirements power and the growing energy needs requirements of data centers.. centers. This demand is largely due to supported by legislative and regulatory requirements and incentives, such as initiatives, including state RPS and federal tax credits such as PTCs clean energy mandates, which encourage or ITCs (which are discussed in more detail in require the section entitled “Government Grants and Tax Benefits” below). We believe that future demand is expected to procurement of renewable energy.
Paragraph 97 · 43% changed
Notes Interest expense, net, for the year ended December 31, 2025 was $141.9 million, compared to $134.0 million for the year ended December 31, 2024, representing a 5.8% increase. This increase of $7.8 million is primarily attributable to the new long-term loans entered into during 2025 and 2024 of $548.5 million and $514.6 million, respectively (net of deferred financing costs), and the issuance of the additional 2.50% senior convertible notes in July 2024; (x) the Discount 2024 II Loan entered into in September 2024; and (xi) the Bottleneck Loan entered into in November 2024. This increase was partially offset by an increase in the amount of interest capitalized due to an increase in the construction-in-process balance and lower interest expenses on other long-term loans as a result of regular principal payments.
Paragraph 72 · 43% changed
Year Ended December 31, 2024 2023 2022 Revenues: Electricity 79.8 % 80.4 % 86.0% Product 15.9 16.1 9.7 Energy storage 4.3 3.5 4.2 Total revenues 100.0 100.0 100.0 Cost of revenues: Electricity 65.4 63.4 60.2 495,989 459,526 422,549 Product 81.6 86.6 84.7 170,671 113,911 115,802 Energy storage 89.1 93.6 79.0 50,198 33,598 27,055 Total cost of revenues 69.0 68.2 63.4 716,858 607,035 565,406 Gross profit (loss): Electricity 34.6 36.6 39.8 197,911 242,738 244,218 Product 18.4 13.4 15.3 46,015 25,750 17,961 Energy storage 10.9 6.4 21.0 28,759 4,131 1,839 Total gross profit 31.0 31.8 36.6 272,685 272,619 264,018 Operating expenses: Research and development expenses 0.7 0.9 0.7 6,304 6,501 7,215 Selling and marketing expenses 2.0 2.2 2.2 18,898 17,694 18,306 General and administrative expenses 9.1 8.2 8.3 79,592 80,119 68,179 Other operating income (1.1) 0.0 0.0 (14,844) (9,375) — Impairment of long-lived assets 0.1 0.0 4.4 12,064 1,280 — Write-off of unsuccessful exploration and storage activities 0.4 0.5 0.1 1,446 3,930 3,733 Operating income 19.6 20.1 20.8 169,225 172,470 166,585 Other income (expense): Interest income 6,015 7,883 11,983 Interest expense, net (141,851) (134,031) (98,881) Derivatives and foreign currency transaction gains (losses) 5,248 (4,187) (3,278) Income attributable to sale of tax benefits 66,726 73,054 61,157 Other non-operating income (expense), net 385 188 1,519 Income from operations before income tax and equity in earnings (losses) of investees 105,748 115,377 139,085 Income tax (provision) benefit 20,282 16,289 (5,983) Equity in earnings (losses) of investees 960 (425) 35 Net Income 126,990 131,241 133,137 Net income attributable to noncontrolling interest (3,092) (7,508) (8,738) Net income attributable to the Company's stockholders $ 123,898 $ 123,733 $ 124,399 Earnings per share attributable to the Company's stockholders: Basic: $ 2.04 $ 2.05 $ 2.09 Diluted: $ 2.02 $ 2.04 $ 2.08 Weighted average number of shares used in computation of earnings per share attributable to the Company's stockholders: Basic 60,705 60,455 59,424 Diluted 61,362 60,790 59,762
Paragraph 148 · 42% changed
Adjusted EBITDA for the fiscal year 2024 2025 increased by 14.3% 5.7% compared to fiscal year 2023, 2024, primarily due to an increase in operating income EBITDA of $5.9 $27.2 million, or 4%, together with an increase in income attributable to sale of tax benefits of $11.9 million, or 19%. 5.3%, as illustrated above. EBITDA and Adjusted EBITDA include our proportionate share (12.75%) (12.75% and 49%) of Sarulla's and Ijen EBITDA and Adjusted EBITDA, respectively. On May 2014, the Sarulla consortium (“SOL”) closed $1,170 million in financing. As of December 31, 2024, 2025, the credit facility has an outstanding balance carrying value of $717.6 million. Our long-term debt owed by Sarulla and Ijen, our unconsolidated investments, was $645.3 million, and $105.0 million, respectively, in which our proportionate share in the SOL credit facility is $91.5 million. See Note 5, investment in unconsolidated companies to the consolidated financial statements for further information relating to our investment in the Sarulla consortium. was $82.3 million, and $51.5 million, respectively.
Paragraph 78 · 41% changed
Revenues attributable to our Electricity segment for the year ended December 31, 2024 2025 were $702.3 $693.9 million, compared to $666.8 $702.3 million for the year ended December 31, 2023, 2024, representing a 5.3% increase. 1.2% decrease. This increase decrease of $35.5 $8.4 million was mainly attributable to (i) $33.3 a decrease of $18.6 million related to curtailments in the U.S., mainly from McGinness Hills, Mammoth, Tungsten and Dixie Valley; (ii) a decrease of $13.9 million as a result of a temporary reduction in generation in our Puna power plant, primarily related to wellfield issues and lower energy rates in 2025 compared to 2024; (iii) a decrease of $3.2 million related to the geothermal and solar Stillwater power plants included in the Enel purchase transaction which were consolidated by the Company starting the first quarter of 2024; (ii) $17.4 million related to the Puna power plant plant, primarily due to its higher planned repowering of the power generation plant; and energy prices in 2024; and (iii) $11.0 million related to the Heber 1 power plant which resumed operations in May 2023 after a temporary shutdown due to a fire incident that occurred in February 2022. This increase was partially offset by a decrease (iv) an additional reduction in revenues in 2024 compared to 2023 as follows: (i) $12.8 million in the Dixie Valley power plant due to an unplanned outage in 2024; (ii) $10.3 million in McGinness Hills complex primarily due to curtailments which were mostly related to third-party grid maintenance; (iii) $4.2 million in the Guadeloupe power plant due to lower availability; and (iv) decreases in power generation in lesser amounts at a number of other power plants. This decrease in revenues was partially offset by the following increases in revenues: (i) an increase of $6.6 million related to the Blue Mountain power plant which was purchased in June 2025; (ii) an increase of $5.4 million related to the Beowawe repower project which commenced commercial operation in the second quarter of 2024; (iii) an increase of $8.9 million in the Dixie Valley power plant, net of curtailment, due to the unscheduled maintenance work in 2024; and (iv) additional increases in revenues in lower amounts at a number of other power plants, primarily in Kenya and Cove Fort in the amount of $5.7 million.
Paragraph 93 · 38% changed
Impairment of long-lived assets for the year ended December 31, 2024 2025 was $1.3 $12.1 million compared to none $1.3 million for the year ended December 31, 2023. 2024. The impairment of long-lived assets in 2025 is primarily related to the termination of the waste heat agreement between the Company's wholly-owned subsidiary, OREG4, and Highline Electric Association, Inc., effective May 2024 to: (i) $7.2 million

A paragraph is matched with the one last year that shares the most of its words; under half in common makes it new. The paragraphs shown are the 8 reworded the most in each section.

The paragraph that changed most in each section

The redline

Marked against last year's 10-K: cut words struck through, new words highlighted.

MD&A280 words changed in this paragraph; it is 30% similar to last year's version.
Net cash provided by financing used in investing activities for the year ended December 31, 2024 2025 was $287.9 $726.4 million, compared to $380.0 $780.3 million for the year ended December 31, 2023. 2024. The principal factors that affected the decrease of $53.8 million in our net cash provided by financing used in investing activities during the year ended December 31, 2024 were: (i) net proceeds 2025 were cash consideration of $514.6 $88.7 million from long-term loans entered into during paid for the period such as the Hapoalim 2024 Loan, the HSBC 2024 Loan, the Mammoth Senior Secured Notes, the DEG 4 Loan, the Discount 2024 Loan, the Discount 2024 II Loan, and the Bottleneck Loan; (ii) net proceeds of $44.0 million related to proceeds from issuance acquisition of the Additional Notes; and (iii) Blue Mountain power plant in 2025, compared to cash received from noncontrolling interest consideration of $274.6 million paid for the purchase transaction with Enel EGPNA in the amount of $12.3 million. These cash inflows were 2024, partially offset by: (i) scheduled repayments by capital expenditures of long-term debt $619.8 million in the amount of $209.3 million; (ii) cash dividend payments of $29.1 million; (iii) cash paid persuant 2025 compared to a transaction with noncontrolling interest of $9.8 million; $487.7 million in 2024, primarily for our geothermal power plants and (iv) net repayments of revolving credit lines with banks of $20.0 million. The principal factors storage facilities under construction that affected support our net cash provided by financing activities during the year ended December 31, 2023 were: (i) net proceeds from issuance of common stock of $341.7 million; (ii) net proceeds from issuance of long-term loans of $149.8 million; (iii) net proceeds of $100.0 million from issuance of commercial paper; and (iii) net proceeds from revolving credit lines with banks of $20.0 million. These cash inflows were partially offset by: (i) scheduled repayments of long-term debt in the amount of $207.0 million; (ii) cash outflow related to a transaction with noncontrolling interest of $30.0 million; and (iii) cash dividend payments of $28.4 million. growth plan.

Source: Item 7, 10-K 0001296445-26-000006 vs Item 7, 10-K 0001628280-25-008531

Risk Factors251 words changed in this paragraph; it is 34% similar to last year's version.
Future regional Military conflicts involving Israel, such as a re-escalation of the wars in the Middle East that lasted between 2023 and 2025, could additionally have adverse impacts on our business. Wars could result in parties with whom we have agreements involving performance military reserve duty call-ups and to our ability to ship our products from Israel, which could disrupt the operations of our Product segment and potentially delay some of our growth plans in Israel claiming that they are not obligated to perform their commitments under those agreements pursuant to force majeure provisions in such agreements. In addition, new customers the Electricity segment. New business partners may be reluctant to do business with us, and existing customers partners may be reluctant hesitate to renew their agreements with us, due to their uncertainty regarding our ability to perform under our commitments. Limitations on travel commitments in Israel, and/or claim they are not obligated to Israel from abroad could make it harder for us perform their commitments under those agreements pursuant to secure contracts in the Product segment with new business partners. We have shelter-in-place and work-from-home measures, government-imposed force majeure. Government-imposed restrictions on movement and travel and other precautions in wartime taken to address the ongoing conflict and which have temporarily in the past disrupted and may continue to in any future conflicts disrupt our management and employees’ ability to effectively perform their daily tasks. All jobs. Moreover, the perception that we are an Israeli company could harm our business, due to the application of the foregoing factors could negatively affect operations within restrictive laws, policies, boycotts or sanctions that other countries or companies may place on Israel and companies operating there or that may otherwise limit our Product segment and/or delay growth in our Electricity segment. ability to do trade with, or secure new or existing contracts in, other countries with anti-Israel sentiment (such as Turkey or Indonesia).

Source: Item 1A, 10-K 0001296445-26-000006 vs Item 1A, 10-K 0001628280-25-008531

Accounting Policies123 words changed in this paragraph; it is 41% similar to last year's version.
The Company tests its operating plants that are operated together as a complex for impairment at the complex level because the cash flows of such plants result from significant shared operating activities. For example, the operating power plants in a complex are managed under a combined operation management generally with one central control room that controls all of the power plants in a complex and one maintenance group that services all of the power plants in a complex. As a result, the cash flows from individual plants within a complex are not largely independent of the cash flows of other plants within the complex. The Company tests for impairment of its operating plants which are not operated as a complex as well as its projects under exploration, development or construction that are not part of an existing complex at the plant or project level. To the extent an operating plant becomes part of a complex, the Company will test for impairment at the complex level.

Source: Item 8, Note 1 – BUSINESS AND SIGNIFICANT ACCOUNTING POLICIES, 10-K 0001296445-26-000006 vs Item 8, Note 1 – BUSINESS AND SIGNIFICANT ACCOUNTING POLICIES, 10-K 0001628280-25-008531

Legal Proceedings109 words changed in this paragraph; it is 72% similar to last year's version.
On In February 7, 2025, Engie Resources, LLC and certain of its affiliates filed an action against the Company’s wholly-owned subsidiary in the United States District Court for the Northern District of Texas. Texas, which was later re-filed in the Texas Business Court. The complaint alleges that the Company breached its contractual obligations, including certain indemnity obligations, under certain service agreements with or involving the plaintiffs, by failing to properly schedule responsive reserve service on behalf of the plaintiffs during the power crisis in Texas in February 2021. The complaint seeks recovery from the Company of plaintiffs originally sought $47.5 million in damages, as well as equitable relief. damages. In December 2025, the plaintiffs amended their complaint to add claims related to the same facts, seeking an additional $7.0 million in damages. The Company considers it has strong legal defenses and intends to vigorously defend itself against the claims and take all necessary legal action to have them dismissed. The Company has filed a motion for summary judgment with a hearing date set for March 20, 2026. Trial is scheduled to begin subject to the outcome of the motion for summary judgment on May 18, 2026. No amounts have been accrued for potential losses under this matter, as the Company believes the probability of the claimant receiving a material award is low. Due to the early stage of the matter, the Company low and it cannot currently reasonably predict the outcome of the proceedings, which is inherently uncertain.

Source: Item 3, via Note 20 – COMMITMENTS AND CONTINGENCIES, 10-K 0001296445-26-000006 vs Item 3, via Note 20 – COMMITMENTS AND CONTINGENCIES, 10-K 0001628280-25-008531

Sentences and paragraphs added, removed or reworded

Every change, by type

Sentences and paragraphs of ORA's Risk Factors and MD&A, 10-K Feb 26, 2026 against 10-K Feb 27, 2025. Each links to the text at sec.gov.

Quiet changes are sentences kept from last year with one to four words changed, at least one of them a hedge, a modal or a qualifier (may, could, will, not, significant, material…). A year or date rolling forward is not counted.

The full word list

adverse, adversely, all, although, anticipate, anticipates, any, approximately, believe, believes, can, cannot, certain, could, expect, expects, generally, however, if, intend, intends, largely, likely, many, material, materially, may, might, most, must, never, no, not, possible, primarily, probable, should, significant, significantly, some, substantial, substantially, unlikely, will, would

AddedRisk Factors
•low run times of compressors at recovered energy-based plants (such as low run times of the compressor stations heating our OREG power plants, which led to power generation and the likely loss of a customer agreement at one of these plants);
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
The energy storage market is impacted by battery prices that are linked to lithium prices and tariffs affecting China. 2025 was a volatile year for BESS pricing as tariffs were enacted and changed as well as the increase in demand due to the enactment of the OBBBA. These tariffs, the adoption and expansion of trade restrictions, the occurrence of a trade war or other governmental action related to tariffs, trade agreements or related policies have the potential to adversely impact our supply chain and access to equipment, our costs and ability to economically serve certain markets. If additional measures are imposed or other negotiated outcomes occur, our ability or the ability of our suppliers to purchase these products on competitive terms or to access specialized technologies from other countries could be further limited, which could adversely affect our business, financial condition and results of operations.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
The OBBBA also introduced FEOC requirements for projects starting construction in 2026 and beyond, which led to developers safe harboring equipment prior to the end of 2025 so that ITC can be maintained. For more information, see Part I, Item 1 “Business—Business Opportunities—United States—Federal.” The FEOC rules may have the result of leading to pressure for increased supply chain costs, reduced supply chain options, and may lead to increased priced pressure for energy products and projects. Various battery suppliers are preparing to manufacture batteries in the U.S., which is expected to result in additional tax benefits for projects that will use domestically produced batteries. The reduction, elimination or inability to monetize government incentives and/or continued volatility in the tariff, could adversely affect our business, financial condition, future results and cash flows.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
We have made, and may continue to make, investments in EGS, which is an emerging geothermal technology that differs materially from conventional geothermal development. EGS projects seek to create or enhance geothermal reservoirs through advanced drilling, stimulation, and reservoir management techniques. While EGS has the potential to
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
EGS projects involve substantial technical, operational, and geological uncertainties, including risks related to reservoir creation and sustainability, drilling success rates, well productivity, thermal recovery, induced seismicity, permitting, and long-term system performance. There can be no assurance that EGS projects in which we invest will achieve expected technical milestones, operate reliably, or produce energy at commercially viable levels.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
In addition, EGS projects generally require significant upfront capital investment, extended development timelines, and may be dependent on continued technological advances, third-party expertise, government incentives, or regulatory support. Cost overruns, delays, or changes in regulatory frameworks could adversely affect project economics. Further, because EGS is a relatively nascent technology, there is limited operating history to validate assumptions regarding long-term performance, maintenance requirements, and decommissioning obligations.
Read it in 10-K Feb 26, 2026 at sec.gov
Show the other 65
AddedRisk Factors
If our EGS investments fail to progress as anticipated, experience technical or regulatory setbacks, or do not achieve commercial viability, we may be required to impair some or all of our investments, incur additional costs, or forego expected returns. Any such outcomes could have a material adverse effect on our results of operations, financial condition, and cash flows.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
Existing congestion of transmission capacity, as well as expansion of transmission systems and competition from other developers seeking access to expanded systems, could also affect our performance.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedRisk Factors
“Risks Related to Governmental Regulations, Laws and Taxation—The absence of new or renewed BLM permits for solar PV projects on U.S. federal lands could impair our development activities, project pipeline and growth prospects.”
Read it in 10-K Feb 26, 2026 at sec.gov
RemovedRisk Factors
•exploring opportunities in new areas by looking for synergistic growth opportunities utilizing our core competence, market reputation as a successful company and new market opportunities focused upon environmental solutions.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedRisk Factors
The trading price of our common stock could decline if securities, industry analysts or our investors disagree with our strategic plan or the way we implement it. Accordingly, there is no assurance that the plan will enhance shareholder value through long-term growth of the Company to the extent currently anticipated by our management or at all.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedRisk Factors
Our investments in BESS facilities may also be negatively affected by the prospect of expanded trade restrictions between the governments of the U.S. and where our global supply chain partners operate. As of early 2025, the Trump administration has imposed a 10% tariff on goods imported from China. We source the components of our batteries used in our battery energy storage services primarily from China, including into the U.S. At this time, it is unclear how further expanded trade restrictions may impact our investments or our global supply chain partners’ businesses, although they pose the risk of making it more expensive to source and profitably run our battery storage services.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedRisk Factors
Our BESS projects are also subject to current permitting and regulatory compliance requirements and an evolving regulatory landscape at both the federal and state level. Our projects under development have experienced delays and may in the future experience delays as a result of these requirements. In addition, we may be required by local governmental agencies to restrict our battery charging services. For example, in February 2021, as a result of the power crisis in Texas,
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedRisk Factors
Starting October 7, 2023, Israel has been engaged in a complex multifront war, fighting against large-scale, repeated attacks on civilians from Iran, Hamas in the Gaza Strip, Hezbollah in Lebanon, the Houthis in Yemen, militant
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedRisk Factors
terrorist groups in the West Bank and others. Although Israel has since agreed to ceasefires with each of Hamas and Hezbollah with respect to the conflicts in the Gaza Strip and Lebanon, these conflicts could re-escalate if the ceasefires are violated. Iran, which has launched missiles directly at civilian targets in Israel twice during the current conflict, and other proxy forces and terrorist organizations have threatened to escalate the fighting throughout Israel, including targeting major infrastructure facilities. Additionally, the Houthis launched repeated attacks on marine vessels in the Red Sea, an important maritime route for international trade.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedRisk Factors
Since the beginning of the current war, several hundred thousand Israeli reservists have been drafted at various points in time to perform military service, including, an average of six percent of our workforce in Israel (average of two percent of our total global workforce), the vast majority of whom work in our Product segment. Some rockets have also landed during the war near our facilities. While these disruptions have caused an increase in insurance premium costs for shipments into and out of the seaport, as of the date of this Annual Report, none of our facilities or infrastructure have been damaged nor have our supply chains been significantly impacted since the war broke out. However, a prolonged war could result in further military reserve duty call-ups as well as irregularities to our supply chain and to our ability to ship our products from Israel, which could disrupt the operations of our Product segment and potentially delay some of its growth plans in the Electricity segment, materially impacting our financial position and results of operations.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedRisk Factors
Responses in various countries where we have business operations to Israel’s ongoing military conflicts on some of its borders or future similar conflicts may adversely affect our operations and may limit our ability to produce and sell our products.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedRisk Factors
Although we are a multinational company and we do not derive a majority of our revenues from Israel, we have known ties to Israel through the presence of our senior management and a significant portion of our Product segment there. The perception that we are an Israeli company could impair our business and results of operations due to the international response to Israel’s ongoing military conflicts on its borders or future similar conflicts. Our business could be substantially harmed by the interruption or curtailment of trade between Israel and its trading partners or the use of restrictive laws, policies or practices directed toward Israel or companies having operations in Israel. These restrictions may limit materially our ability to obtain raw materials from these countries or to sell our products to companies and customers in these countries. Deterioration in political relations between Israel and other countries, and/or violence from popular movements or terrorist activities in countries where we do business motivated by anti-Israel sentiment, such as Turkey or Indonesia, could impact our ability to secure new contracts, renew existing contracts and/or carry on business in those countries. Moreover, there have been increased efforts by activists to cause companies and consumers to boycott Israeli companies. Such efforts, particularly if they become more widespread, may materially and adversely impact our ability to sell our products outside of Israel.
Read it in 10-K Feb 27, 2025 at sec.gov
RewordedRisk Factors
Our indebtedness may limit our ability to borrow additional funds for working capital, capital expenditures, acquisitions or other general business purposes, limit our ability to use our cash flow or obtain additional financing for future working capital, capital expenditures, acquisitions or other general business purposes, require us to use a substantial portion of our cash flow from operations to make debt service payments, limit our flexibility to plan for, or react to, changes in our business and industry, place us at a competitive disadvantage compared to our less leveraged competitors and increase our vulnerability to the impact of adverse economic and industry conditions. conditions.Additionally, under the Notes, if we undergo a “fundamental change,” subject to certain conditions, holders may require us to repurchase for cash all or part of their Notes at a fundamental change repurchase price equal to 100% of the principal amount of the Notes to be repurchased, plus accrued and unpaid interest, and if we undergo a “make-whole fundamental change”, the conversion rate for the Notes may be increased.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Some of our leases will terminate if we do not extract geothermal resources in “commercial quantities”, if we quantities” or fail to comply with the terms or stipulations of such leases or any of the provisions of the Geothermal Steam Act applicable law or if the lessor under any such lease defaults on any debt secured by the relevant property, thus requiring us to enter into new leases or secure rights to alternate geothermal resources, none of which may be available on terms as favorable to us as any such terminated lease, if at all. property.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
While For instance, while executive orders of the first order suggests Trump administration from early 2025 suggest a positive posture of the Trump administration toward geothermal energy in contrast relative to other renewable sources, the impact of these orders, in the absence of any substantive change in regulation since such orders were issued, remains unclear, and we cannot currently make any assurance regarding about the influence of the policies or political stances of the Trump administration or current U.S. on our business.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Relatedly, Additionally, in recent years, specifically in the U.S., “anti-ESG” sentiment has gained momentum, with several U.S. states and Congress the federal government having proposed or enacted “anti-ESG” policies, legislation, or initiatives or issued related legal opinions. opinions, such as the EPA’s recent determination that it lacks the authority to regulate certain GHG emissions and would no longer stand behind its prior findings that GHG emissions are harmful.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
In the event that a lease is terminated and we determine that we will need that lease once the applicable power plant is operating, we would need to enter into one or more new leases with the owner(s) of the premises that are the subject of the terminated lease(s) in order to develop geothermal resources from, or inject geothermal resources into, such premises or secure rights to alternate geothermal resources or lands suitable for injection.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
We may not be able to obtain sufficient insurance coverage to cover damages resulting from any damages to our assets and profitability including but not limited to natural disasters such as volcanic eruptions, lava flows, wind and earthquake, which could materially and adversely affect our business, operating results, and financial condition. profitability.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
In addition, new customers New business partners may be reluctant to do business with us, and existing customers partners may be reluctant hesitate to renew their agreements with us, due to their uncertainty regarding our ability to perform under our commitments. commitments in Israel, and/or claim they are not obligated to perform their commitments under those agreements pursuant to force majeure.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
We have shelter-in-place and work-from-home measures, government-imposed Government-imposed restrictions on movement and travel and other precautions in wartime taken to address the ongoing conflict and which have temporarily in the past disrupted and may continue to in any future conflicts disrupt our management and employees’ ability to effectively perform their daily tasks. jobs.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Our exploration, development, and operation of geothermal energy resources are subject to geological risks and uncertainties, which may result in insufficient prospects to support our growth, decreased performance or increased costs for our power plants. uncertainties.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Expanding our customer and/or geographic base may expose us to customers with different credit profiles than our current customers. customers or foreign countries in which we will have to learn the business and political environment.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
Our global international operations expose us to risks related to the application of international laws and regulations, any of which may adversely affect our business, financial condition, future results and cash flows. regulations.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedRisk Factors
We Our operations are a holding company primarily conducted through our subsidiaries, which are separate legal entities, and our cash depends substantially on the performance of our subsidiaries and the power plants they operate, most of which are subject to restrictions and taxation on dividends and distributions.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In February 2026, we entered into a long-term geothermal portfolio PPA to supply up to 150MW of new geothermal capacity to support Google’s data center’s energy needs, through NV Energy’s Clean Transition Tariff program. The portfolio structure is expected to enable the development of multiple new geothermal projects across Nevada, with energy deliveries anticipated to commence between 2028 and 2030 as projects reach commercial operations. Per the PPA structure, the contract term begins with the first geothermal project achieving commercial operations and extends 15 years beyond the final project’s commercial operations date. The agreement and related energy supply arrangements are subject to approval by the Nevada PUC, which is expected in the second half of 2026.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In January 2026, we acquired Hoku, a recently built operational solar-plus-storage facility on the Big Island of Hawaii, from Innergex Renewable Energy Inc. for total cash consideration of $80.5 million. The acquired assets include a 30MW solar PV facility paired with a 30MW/120MWh battery energy storage system, which achieved commercial operation in March 2025 and is fully operational. All output from the facility is sold under a 25-year fixed-price power purchase agreement with HECO.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In January 2026, we made a $25 million investment in Sage Geosystems Inc. (“Sage”) as part of Sage’s Series B financing round. This investment represents an important milestone in our strategy to expand our EGS portfolio and capabilities and supports the continued development and commercialization of next-generation geothermal technology. In August 2025, we also announced the signing of a strategic commercial agreement with Sage. Under the terms of the agreement, Sage will pilot its advanced pressure geothermal technology to extract geothermal heat energy from hot dry rock at an existing Ormat power plant. This collaboration aims to significantly reduce the time needed to bring geothermal energy to market and is expected to enhance the Company’s operational efficiency while accelerating the implementation of next-generation geothermal solutions. The strategic commercial agreement was closed.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In January 2026, we were awarded the Telaga Ranu geothermal working area concession in Indonesia following a competitive tender process. The concession is located in Halmahera, North Maluku, within one of Indonesia’s highest approved feed-in tariff zones and has the potential to support up to approximately 40MW of baseload geothermal generation capacity. This award strengthens our long-term development pipeline and supports our continued growth strategy in Indonesia.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In January 2026, we entered into a new 20-year PPA with Switch, Inc., a leading provider of data center infrastructure, pursuant to which Switch will purchase approximately 13MW of carbon-free geothermal capacity from our Salt Wells geothermal power plant located near Fallon, Nevada. Under the agreement, energy deliveries are scheduled to commence in the first quarter of 2030, following the completion of a planned major upgrade to the Salt Wells facility. As part of the agreement, we also have the option to further expand the facility’s output through the addition of an approximately 17MW solar PV facility to support the plant’s auxiliary power needs.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In December 2025, we reached the COD for Arrowleaf, our first hybrid solar-plus-storage project, consisting of approximately 42MW of solar generation capacity and 35MW/140MWh of energy storage. The project operates
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
under a long-term tolling agreement with San Diego Community Power. In connection with the project’s COD, the related hybrid tax equity partnership transaction with Morgan Stanley Renewables, Inc. closed in December 2025 and resulted in approximately $38 million of upfront proceeds to the Company.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In October 2025, the Company and SLB announced an agreement to fast-track the development and commercialization of integrated geothermal assets, including EGS. Together, Ormat and SLB intend to streamline project deployment, from concept to power generation. As part of this effort, SLB will develop, pilot and scale EGS solutions to enable wide-scale EGS adoption. This collaboration will include the design and construction of an EGS pilot at an Ormat site.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In August 2025, we signed two Geothermal Exploration and Energy Conversion Agreements (“GEECA”), a novel form of power purchase agreement, with Perusahaan Listrik Negara (“PLN”), each covering up to 20 MW of geothermal capacity each in Songa Wayaua and Atadei located in Indonesia. Under the terms of these agreements, the Company, through its project companies, will undertake the exploration drilling, financing, designing, constructing, installing, and operating the Geothermal Power Plant on a BOT (“Build, Operate and Transfer”) basis , with a 23 year operating term. PLN will reimburse the cost of successful drilling and retains the option to acquire up to a 30% equity interest in the project companies.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In August 2025, we announced the signing of a 25-year extension to our existing power purchase agreement with SCPPA, for the 52MW from Heber 1 geothermal facility. This long-term agreement, which is effective February 2026, will ensure the continued delivery of clean, baseload geothermal energy to the Los Angeles Department of Water and Power and the Imperial Irrigation District. The Company will supply the SCPPA with electricity from the Ormat Heber 1 geothermal facility, located in the Imperial Valley of Southern California.
Read it in 10-K Feb 26, 2026 at sec.gov
AddedMD&A
•In July 2025, we entered into loan agreements with a consortium of French banks pursuant to which we will borrow up to approximately €99.8 million aggregate principal amount in connection with our new Bouillante geothermal power plant in Guadeloupe.
Read it in 10-K Feb 26, 2026 at sec.gov
RemovedMD&A
•In December 2024, we announced the successful commencement of commercial operations for our Montague energy storage facility. This 20MW/20MWh Battery Energy Storage System (BESS), located in New Jersey, will provide ancillary services on the merchant market to PJM.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•In December 2024, we announced that we successfully secured 1,678 acres in Utah’s Bureau of Land Management (BLM) Auction. We expect that these lease acquisitions will significantly support our ongoing operations and development projects in the state, further strengthening Ormat’s commitment to advancing renewable energy solutions and meeting Utah’s increasing demand for sustainable energy.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•In December 2024, we announced the pricing of an underwritten secondary offering pursuant to which ORIX Corporation agreed to sell 3,700,000 shares of our common stock. The offering closed on December 13, 2024. Ormat did not offer any new shares of its common stock in the offering and did not receive any proceeds from the sale of the shares being offered by ORIX. The shares of common stock were sold to the public at an initial price of $76.20 per share.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•In November 2024, we signed an EPC contract with Contact Energy for the development of the Te Mihi Stage 2 101MW geothermal power plant in New Zealand. The EPC contract, is valued at approximately $210 million. Te Mihi Stage 2 geothermal power plant is expected to be completed by mid-2027.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•In November 2024, we announced a successful deal to transfer ITCs from the 80MW/320MWh Bottleneck Project to a third-party. The gross proceeds from this transaction were priced at $0.93 per dollar. After deducting the buyer’s broker and legal fees, the net proceeds from the transaction amounted to approximately $46.7 million.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•In October 2024, we announced the successful commencement of commercial operations for our largest energy storage facility, the Bottleneck project. This 80MW/320MWh BESS, located in the Central Valley of California, will provide ancillary services to San Diego Gas & Electric (“SDG&E”) under a 15-year Tolling Agreement we signed in 2022.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•In October 2024, we announced that we successfully secured multiple land parcels in Nevada’s Annual BLM Auction. We believe that these lease acquisitions will significantly support Ormat's ongoing exploration and expansion efforts in the state, further strengthening the Company's commitment to advancing renewable energy solutions and meeting Nevada's increasing demand for sustainable energy.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•In August 2024, we signed two seven-year tolling agreements with Equilibrium Energy for the Lower Rio 60MW/120MWh and Bird Dog 60MW/120MWh Energy Storage facilities in Texas. The Lower Rio project is expected to come online in the second quarter of 2025, while the Bird Dog facility is anticipated to be operational in the fourth quarter of 2025. Both projects are eligible to receive a 40% investment tax credit under the Inflation Reduction Act, as of the date of this report. The tolling agreements secure fixed revenues for the energy and ancillary services provided by these facilities.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•In July 2024, we issued an additional $45.2 million aggregate principal amount of our 2.50% Convertible Senior Notes due 2027. The additional notes were issued as additional notes pursuant to the indenture, dated June 27, 2022, as supplemented by the first supplemental indenture, dated July 15, 2024. The proceeds were used for refinancing current debt.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•In July 2024, we announced the signing of a 15-year Resource Adequacy Purchase and Sale Agreement (“RA Agreement”) with the City of Riverside, for the 80MW/320MWh Shirk Battery Energy Storage System (BESS) located in Visalia, California. The RA Agreement includes a guaranteed commercial operation date (“COD”) for March 1, 2026, that we believe can be achieved by the end of 2025.
Read it in 10-K Feb 27, 2025 at sec.gov
RemovedMD&A
•On March 4, 2024, we announced the signing of a 30-year PPA with Electricité de France (“EDF”) for the development of a new 10MW geothermal power plant on the island of Guadeloupe, in which we own a 63.75% equity interest. The new plant development will be added to Ormat’s existing 15MW Bouillante geothermal power plant. The project’s field development is complete and resources are secured and it is expected to be operational by the end of 2025.
Read it in 10-K Feb 27, 2025 at sec.gov
RewordedMD&A
Balance as of Annual Loan Amount Issued December 31, 2024 2025 Interest rate Maturity Date Related Project Location (Dollars in millions) Mammoth Senior Secured Notes 2025 $ 23.4 $ 23.4 6.95 % July, 2034 Mammoth Complex United States Geothermie Bouillante tranche 1 39.2 35.7 (3) December, 2030 Geothermie Bouillante Guadeloupe Geothermie Bouillante tranche 2 55.7 56.3 (4) June, 2046 Geothermie Bouillante Guadeloupe Dominica Loan 37.6 37.6 2.40 September, 2042 Dominica Dominica Bottleneck Loan 72.6 68.9 6.31 November, 2039 Bottleneck United States Mammoth Senior Secured Notes 135.1 $ 129.2 120.4 6.73 % July, 2047 Mammoth Complex United States Bottleneck Loan 72.6 72.6 6.31 November, 2039 Bottleneck United States OFC 2 Senior Secured Notes – Series A 151.7 56.2 48.6 4.69 December, 2032 McGinness Hills phase 1, Tuscarora United States OFC 2 Senior Secured Notes – Series B C 140.0 70.7 62.6 4.61 December, 2032 McGinness Hills phase 2 United States Olkaria III Financing Agreement with DFC – Tranche 1 85.0 28.3 23.6 6.34 December, 2030 Olkaria III Complex Kenya Olkaria III Financing Agreement with DFC – Tranche 2 180.0 58.2 47.6 6.29 June, 2030 Olkaria III Complex Kenya Olkaria III Financing Agreement with DFC – Tranche 3 45.0 16.1 13.4 6.12 December, 2030 Olkaria III Complex Kenya Don A.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Interest expense, net (including amortization of deferred financing costs) 135,836 126,148 86,898 84,326 Income tax provision (benefit) (20,282) (16,289) 5,983 14,742 Adjustment to investment in unconsolidated companies: our proportionate share in interest expense, tax and depreciation and amortization in Sarulla and Ijen 15,086 17,637 16,069 13,199 Depreciation, amortization and accretion 287,505 259,151 221,415 198,603 EBITDA $ 545,135 $ 517,888 463,502 388,665 Mark-to-market on of derivative instruments 550 856 (2,206) 1,613 Stock-based compensation 19,390 20,197 15,478 11,646 Make-whole premium related to long-term debt prepayment — 1,102 Reversal of a contingent liability related to a business combination transaction — (1,829) Allowance for bad debts 228 355 115 Impairment of long-lived assets 12,064 1,280 32,648 Write-off of unsuccessful exploration and storage activities 1,446 3,930 3,733 828 Merger and acquisition transaction costs 2,272 1,949 1,234 675 Legal fees related to a settlement agreement with a third-party battery systems supplier Settlement agreements 900 4,000 — Adjusted EBITDA $ 581,985 $ 550,455 481,741 $ 435,463
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Assuming a 10% Assuming a 10% Decrease in Rates Increase in Rates As of December 31, As of December 31, Risk 2025 2024 2023 2025 2024 2023 Change in the Fair Value of (In thousands) Foreign Currency $ — (700) $ (3,191) $ — 2,078 $ 3,901 Foreign Currency Forward Contracts Interest Rate (2,986) — 3,180 — Bottleneck Loan Interest Rate (5,096) — 5,469 — (582) 605 Mammoth Senior Secured Notes 2025 Interest Rate (574) (754) 584 769 Mizrahi (1,397) 1,477 Dominica Loan Interest Rate (886) (1,090) 914 1,127 (2,453) 2,562 Geothermie Bouillante Loan Interest Rate (895) 921 Mizrahi 2025 Loan 2023 Interest Rate (869) 893 Discount 2025 Loan
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Year Ended December 31, 2025 Year Ended December 31, 2024 Year Ended December 31, 2023 Increase (Decrease) (Dollars in millions) Electricity segment cost of revenues $ 702.3 496.0 $ 666.8 459.5 $ 35.5 5.3% 36.5 7.9% Product segment cost of revenues 139.7 133.8 5.9 4.4 170.7 113.9 56.8 49.8 Energy Storage segment cost of revenues 37.7 28.9 8.8 30.6 50.2 33.6 16.6 49.4 Total Cost of Revenues $ 879.7 716.9 $ 829.4 607.0 $ 50.2 6.1% 109.9 18.1%
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
(iii) $4.2 an increase of $8.9 million in the Guadeloupe Dixie Valley power plant plant, net of curtailment, due to lower availability; the unscheduled maintenance work in 2024; and (iv) decreases additional increases in power generation revenues in lesser lower amounts at a number of other power plants. plants, primarily in Kenya and Cove Fort in the amount of $5.7 million.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Research and development expenses 0.7 0.9 0.7 6,304 6,501 7,215 Selling and marketing expenses 2.0 2.2 2.2 18,898 17,694 18,306 General and administrative expenses 9.1 8.2 8.3 79,592 80,119 68,179 Other operating income (1.1) 0.0 0.0 (14,844) (9,375) — Impairment of long-lived assets 0.1 0.0 4.4 12,064 1,280 — Write-off of unsuccessful exploration and storage activities 0.4 0.5 0.1 1,446 3,930 3,733 Operating income 19.6 20.1 20.8 169,225 172,470 166,585 Other income (expense):
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
The increase decrease was primarily attributable to legal fees related to a settlement agreement with a third-party battery systems supplier of $4.0 million, amortization of stock-based awards of $2.3 million, insurance costs of $2.1 million, which was recorded in 2024, partially offset by other legal and consulting fees in 2025 compared to 2024, as well timing of when we incur services from our vendors, primarily for legal and information technology services. vendors.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Department of Energy loan (2) 96.8 27.5 2.61 24.8 2.60 February, 2035 Neal Hot Springs United States Prudential Capital Group Nevada Loan 30.7 23.0 21.7 6.75 December, 2037 San Emidio United States Platanares Loan with DFC 114.7 63.5 55.3 7.02 September, 2032 Platanares Honduras Geothermie Bouillante (3) 8.9 1.9 1.52 March, 2026 Geothermie Bouillante Guadeloupe Geothermie Bouillante (3) 8.9 2.1 1.93 April, 2026 Geothermie Bouillante Guadeloupe Total $ 1,223.5 1,361.6 $ 657.4 739.2
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
Adjusted EBITDA for the fiscal year 2024 2025 increased by 14.3% 5.7% compared to fiscal year 2023, 2024, primarily due to an increase in operating income EBITDA of $5.9 $27.2 million, or 4%, together with an increase in income attributable to sale of tax benefits of $11.9 million, or 19%. 5.3%, as illustrated above.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
(iii) $4.2 a decrease of $3.2 million in related to the Guadeloupe Stillwater power plant plant, primarily due to lower availability; planned repowering of the power plant; and (iv) decreases an additional reduction in power generation revenues in lesser lower amounts at a number of other power plants.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
As of December 31, 2024, 2025, we did not meet the dividend distribution criteria related to the financing liability (which was assumed by the Company as part of the purchase transaction with TG Geothermal Portfolio, LLC in July 2021), DAC 1 Senior Secured Notes, which resulted in certain equity distribution restrictions from this related subsidiary.
Read it in 10-K Feb 26, 2026 at sec.gov
RewordedMD&A
There has been increased demand Demand for energy electricity generated from geothermal and other renewable resources in the U.S. driven by both United States has increased due to the need for reliable baseload requirements power and the growing energy needs requirements of data centers.. centers.
Read it in 10-K Feb 26, 2026 at sec.gov
Quiet changesMD&A
Other operating income primarily represents the non-refundable portion of the recovery of damages received from a third-party battery systems supplier as part of a settlement agreement entered into in August 2024 for which all contingency conditions have been met, as further described under Note 1 to the consolidated financial statements.
Read it in 10-K Feb 26, 2026 at sec.gov

Sources

The two latest 10-Ks on EDGAR, section by section. Each change links to the text at sec.gov.

Also

New risk factors: paragraphs with nothing like them last year, quoted in full.

Work with it

Excel workbook · CSV. Google Sheet that stays up to date: paste =IMPORTDATA("https://tickdelta.com/company/ORA/export.csv") into a cell.

Next:Related parties
Esc

Type a ticker such as AAPL, a name, an investor such as Buffett, or a topic such as tariffs. ↑ ↓ to move, Enter to open.