Tariffs and trade barriers
190 of 521 companies added a paragraph in Risk Factors that uses one of these words:
tariff, tariffs, trade war, import duties, customs duties, export controls.
The paragraph is in the latest 10-K and nothing like it was in the one before.
It counts text; it does not say how serious a risk is. Words in capitals only (such as AI) must be in capitals.
By sector
Sector is the SEC's industry description of the company. Each count opens that sector's quotes below.
| Sector | Companies | Compared |
|---|---|---|
| Arrangement of Transportation of Freight & Cargo | 2 | 2 |
| Cutlery, Handtools & General Hardware | 2 | 2 |
| Instruments For Meas & Testing of Electricity & Elec Signals | 2 | 2 |
| Optical Instruments & Lenses | 2 | 2 |
| Aircraft | 1 | 1 |
| Aircraft & Parts | 1 | 1 |
| Apparel & Other Finishd Prods of Fabrics & Similar Matl | 1 | 1 |
| Canned, Fruits, Veg, Preserves, Jams & Jellies | 1 | 1 |
| Communications Equipment, NEC | 1 | 1 |
| Communications Services, NEC | 1 | 1 |
| Electromedical & Electrotherapeutic Apparatus | 1 | 1 |
| Engines & Turbines | 1 | 1 |
| Farm Machinery & Equipment | 1 | 1 |
| Gas & Other Services Combined | 1 | 1 |
| General Industrial Machinery & Equipment, NEC | 1 | 1 |
| Grain Mill Products | 1 | 1 |
| Guided Missiles & Space Vehicles & Parts | 1 | 1 |
| Heavy Construction Other Than Bldg Const - Contractors | 1 | 1 |
| Leather & Leather Products | 1 | 1 |
| Meat Packing Plants | 1 | 1 |
| Metal Mining | 1 | 1 |
| Misc Industrial & Commercial Machinery & Equipment | 1 | 1 |
| Miscellaneous Food Preparations & Kindred Products | 1 | 1 |
| Oil & Gas Field Machinery & Equipment | 1 | 1 |
| Ophthalmic Goods | 1 | 1 |
| Ordnance & Accessories, (No Vehicles/Guided Missiles) | 1 | 1 |
| Paper Mills | 1 | 1 |
| Poultry Slaughtering and Processing | 1 | 1 |
| Radiotelephone Communications | 1 | 1 |
| Retail-Eating & Drinking Places | 1 | 1 |
| Retail-Home Furniture, Furnishings & Equipment Stores | 1 | 1 |
| Retail-Radio, Tv & Consumer Electronics Stores | 1 | 1 |
| Services-Detective, Guard & Armored Car Services | 1 | 1 |
| Services-Engineering, Accounting, Research, Management | 1 | 1 |
| Services-Misc Health & Allied Services, NEC | 1 | 1 |
| Special Industry Machinery, NEC | 1 | 1 |
| Telephone & Telegraph Apparatus | 1 | 1 |
| Television Broadcasting Stations | 1 | 1 |
| Wholesale-Motor Vehicle Supplies & New Parts | 1 | 1 |
| Biological Products, (No Diagnostic Substances) | 4 | 5 |
| Laboratory Analytical Instruments | 4 | 5 |
| Semiconductors & Related Devices | 10 | 15 |
| Computer & office Equipment | 2 | 3 |
| Computer Communications Equipment | 2 | 3 |
| Electronic Computers | 2 | 3 |
| Measuring & Controlling Devices, NEC | 2 | 3 |
| Natural Gas Transmission | 2 | 3 |
| Plastic Materials, Synth Resins & Nonvulcan Elastomers | 2 | 3 |
| Services-Consumer Credit Reporting, Collection Agencies | 2 | 3 |
| Wholesale-Drugs, Proprietaries & Druggists' Sundries | 2 | 3 |
| Pharmaceutical Preparations | 7 | 11 |
| Industrial Instruments For Measurement, Display, and Control | 3 | 5 |
| Orthopedic, Prosthetic & Surgical Appliances & Supplies | 3 | 5 |
| Finance Services | 16 | 28 |
| Services-Business Services, NEC | 8 | 16 |
| Motor Vehicles & Passenger Car Bodies | 2 | 4 |
| Retail-Eating Places | 2 | 4 |
| Search, Detection, Navigation, Guidance, Aeronautical Sys | 2 | 4 |
| Security & Commodity Brokers, Dealers, Exchanges & Services | 2 | 4 |
| Agricultural Chemicals | 1 | 2 |
| Aircraft Engines & Engine Parts | 1 | 2 |
| Fats & Oils | 1 | 2 |
| Industrial Organic Chemicals | 1 | 2 |
| Men's & Boys' Furnishgs, Work Clothg, & Allied Garments | 1 | 2 |
| Paperboard Containers & Boxes | 1 | 2 |
| Printed Circuit Boards | 1 | 2 |
| Rubber & Plastics Footwear | 1 | 2 |
| Services-General Medical & Surgical Hospitals, NEC | 1 | 2 |
| Services-Medical Laboratories | 1 | 2 |
| Services-To Dwellings & Other Buildings | 1 | 2 |
| Telephone Communications (No Radiotelephone) | 1 | 2 |
| Trucking (No Local) | 1 | 2 |
| Beverages | 2 | 5 |
| Computer Storage Devices | 2 | 5 |
| Retail-Variety Stores | 2 | 5 |
| Services-Computer Programming, Data Processing, Etc. | 2 | 5 |
| Investment Advice | 3 | 8 |
| National Commercial Banks | 4 | 11 |
| Electric Services | 5 | 15 |
| Electric & Other Services Combined | 4 | 12 |
| Air-Cond & Warm Air Heatg Equip & Comm & Indl Refrig Equip | 1 | 3 |
| Electrical Work | 1 | 3 |
| General Industrial Machinery & Equipment | 1 | 3 |
| Life Insurance | 1 | 3 |
| Perfumes, Cosmetics & Other Toilet Preparations | 1 | 3 |
| Services-Commercial Physical & Biological Research | 1 | 3 |
| Services-Computer Integrated Systems Design | 1 | 3 |
| Surgical & Medical Instruments & Apparatus | 3 | 10 |
| Real Estate Investment Trusts | 8 | 27 |
| Crude Petroleum & Natural Gas | 2 | 7 |
| Fire, Marine & Casualty Insurance | 3 | 12 |
| Electronic & Other Electrical Equipment (No Computer Equip) | 1 | 4 |
| Services-Prepackaged Software | 4 | 19 |
| Petroleum Refining | 1 | 6 |
| State Commercial Banks | 1 | 6 |
| Security Brokers, Dealers & Flotation Companies | 1 | 7 |
455 paragraphs · Electric & Other Services Combined show all sectors
operation of the J.H. Campbell, as well as similar prior or future executive actions, including the January 2025 and April 2025 executive orders related to energy supply and reliability. The Federal Power Act, DOE regulations, and U.S. Secretary of Energy emergency orders all provide for cost recovery associated with continued operations, but there is not currently a FERC-approved MISO Tariff for recovery of compliance costs associated with the continued operation of J.H. Campbell, and continued operation of J.H. Campbell is not contemplated in Consumers’ current MPSC rates or rate filings at the MPSC. Consumers is pursuing cost recovery at FERC but cannot predict the outcome of those efforts or the impact of other executive actions.
Read in the 10-K filed Feb 10, 2026 ↗
Alternatively, this rapid expansion of data centers and resulting increase in demand for electric power in MISO and in Consumers’ service territory may not develop as anticipated. Efforts to attract data center developers could be unsuccessful as other utilities and regions compete for these projects, which may limit future load growth. In addition, local zoning, permitting, land‑use constraints, and other external factors outside Consumers’ control could impede data center development. If these challenges arise and cannot be effectively mitigated, the anticipated benefits of data center load growth may not materialize. Further, even when data center customers enter into contracts to purchase utility service, there is a risk they may not fulfill their contractual or tariff obligations.
Read in the 10-K filed Feb 10, 2026 ↗
Risks Related to Supply Chain Disruptions, Inflation, Tariffs and Foreign Export Restrictions
Read in the 10-K filed Feb 26, 2026 ↗
Duke Energy’s operations and capital projects are exposed to supply chain disruptions, inflation, tariffs and export restrictions. These factors may increase costs, extend lead times for critical equipment and/or delay construction and maintenance activities. Rising demand for electric infrastructure and international trade developments, including potential export controls on certain rare earth materials and technologies used in electric utility infrastructure, may further constrain supply availability. These risks may result in higher costs than estimated or than allowed under approved regulatory mechanisms and could impact our financial results, capital plan execution or our ability to deliver on system modernization goals.
Read in the 10-K filed Feb 26, 2026 ↗
Duke Energy’s long-term strategy requires extensive capital investment in generation and transmission facilities. The construction of such projects involve a number of risks, including construction delays, delays in or failure to receive required regulatory approvals and/or siting or environmental permits, nonperformance by equipment and other third-party suppliers, and increases in equipment and labor costs beyond expectations. Uncertainty in long-term customer usage patterns or lower than anticipated load growth could impact the nature, timing or magnitude of the Company’s investments, and consequently, the achievement of the Company’s growth objectives. Additionally, to support expected demand growth, Duke Energy Registrants will have compounding risks due to the simultaneous development and construction of multiple facilities. Completion of these types of large projects is subject to substantial delay or cost overrun risks that have, or may occur again, in the future, including those related to labor costs, availability of materials, productivity of workforce/equipment; as well as supply chain issues including, quality, availability, disruptions and potential tariff impacts; weather related delays; start up issues; public and regulatory support; transmission grid interconnection issues; and potential for increased financing costs as a result of interest rates and impact of delays including loss of otherwise available tax credits and incentives. Project cancellations may result in significant cancellation penalties under the equipment purchase orders and construction contracts or impairment charges. If a construction project is completed, the total costs may be higher than estimated or deemed imprudent and may be disallowed or otherwise not recoverable through regulated rates.
Read in the 10-K filed Feb 26, 2026 ↗
Our ability to construct the currently contemplated generation and transmission assets, and any future generation, transmission or distribution assets in a timely manner and within budget is contingent upon many variables and subject to substantial risks. These variables include, but are not limited to, the ability of key suppliers, general contractors and subcontractors to timely satisfy their obligations under existing or future contracts and in compliance with the terms of such contracts, including the EPC Contracts and equipment supply contracts we have already entered into; the impact of new tariffs, if any, inflation and other trade or economic factors that may impact the cost of supplies and services; any other changes in the availability or costs of materials, equipment or commodities; changes in law or regulation, including environmental compliance requirements; the availability of and ability of our contractors to hire and retain qualified labor and the cost of such labor; delays caused by construction incidents or injuries, work stoppages, poor initial cost estimates and unforeseen engineering issues; the impact of public health emergencies or natural disasters or other severe weather events; capital market conditions, including the availability of credit and our ability to obtain financing on acceptable terms; charges allocated to us by MISO with respect to these assets; the impact of public involvement, intervention or litigation; and our ability to obtain any necessary land rights, easements and/or zoning approvals in a timely manner, or at all.
Read in the 10-K filed Feb 11, 2026 ↗
We face risks related to providing service to our large-scale customers, including potential customers under our proposed VLC and Bespoke Resources Tariffs, which could impact our business, results of operations, and financial condition.
Read in the 10-K filed Feb 20, 2026 ↗
The ability to complete large capital projects is dependent upon a number of factors, including the ability to obtain financing of such projects on satisfactory terms and conditions. Along with the significant capital spend, a portion of the expected earnings growth from these projects will result in an increase in AFUDC as part of CWIP, with recovery of these costs delayed until the capital project is placed in service. As a result of this delay in receiving cash proceeds, we may be required to issue additional debt and/or equity to support these projects, which could negatively impact our earnings, balance sheet, and/or credit metrics. Other dependent factors include the ability to secure regulatory permits, secure sufficient land for the siting of power generation facilities, obtain necessary interconnection or transmission service in MISO, garner public support for these projects, and the ability of suppliers and contractors to fulfill their obligations under contracts. Successful completion of these projects may be further influenced by changes in law or regulation, such as new legislation or regulation impacting large data center cost allocation or environmental compliance requirements, trade and tariff issues, including those associated with imported solar panels, as well as supply chain delays or disruptions, workforce challenges, and other events beyond our control. If these projects are significantly delayed or become subject to cost overruns or cancellation due to these or other factors, we could incur additional costs and termination payments or face increased risk of potential write-offs of our investments in these projects. The occurrence of any of these events may materially affect the schedule, cost, and performance of these projects.
Read in the 10-K filed Feb 20, 2026 ↗